Civil engineering air duct purification device mounting frame
By using multiple installation frames and polyurethane foam material layers in the installation frame of the civil air duct purification device, combined with the support mechanism and cross-shaped support rods, the problems of rigid structure vibration and inconvenient maintenance are solved, achieving a more stable, safe and convenient Maintained design.
Patent Information
- Application Number
- CN202420500736.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-15
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2034-03-15
AI Technical Summary
The existing civil air duct purification device installation frame has safety hazards due to its rigid structure in a vibration environment, and it is inconvenient to repair at high places, so an additional inspection platform needs to be built.
An installation frame including multiple installation frames and layers of polyurethane foam material was designed. A support mechanism was used to enhance structural stability and shock absorption performance, and cross-shaped support rods and connectors were used to achieve rapid assembly.
It improves the stability and bearing strength of the installation frame, reduces the height of a single device, facilitates maintenance and repair, and achieves excellent shock absorption through the polyurethane foam material layer, improving the safety, reliability and practicality of the overall design.
Smart Images

Figure CN221923807U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of installation frames for civil engineering air duct purification devices, in particular to an installation frame for civil engineering air duct purification devices. Background Art
[0002] The installation frame of the civil engineering air duct purification device is an installation frame built in the fresh air duct of the underground subway station. Since the fresh air duct itself is prone to secondary dust, a centralized fresh air purification device is installed on the installation frame in the civil engineering fresh air duct. The fresh air can be centrally processed to avoid the production of secondary dust. It is also easy to manage in a unified manner, which is beneficial to later operations. Since the installation frame in the fresh air duct is provided with a fresh air purification device, there are certain requirements on the strength of the installation frame, which is generally supported by setting columns on the air outlet side.
[0003] In the current prior art, since a fresh air purification device is provided on the installation frame in the fresh air duct, certain requirements are placed on the strength of the installation frame. Generally, the installation frame is supported by providing columns on the air outlet side. However, both the installation frame and the columns are rigid structures without shock-absorbing measures. They are prone to vibration in the environment of civil air ducts, posing a potential safety hazard. At the same time, it is inconvenient to inspect and maintain the purification device at a high place, and an additional inspection and maintenance platform needs to be built. Therefore, an installation frame for a civil air duct purification device is proposed to solve the above problems. Utility Model Content
[0004] In view of the shortcomings of the prior art, the utility model provides a mounting frame for a civil air duct purification device, which has the advantages of safe use and easy maintenance, and solves the problem that the mounting frame and columns are both rigid structures without shock-absorbing measures, are prone to vibration in the environment of the civil air duct, and pose a safety hazard. At the same time, the purification device at a high place is inconvenient to maintain and an additional maintenance platform needs to be built.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a civil engineering air duct purification device installation frame, comprising a first installation frame and a polyurethane foam material layer, wherein a support mechanism is arranged inside the first installation frame;
[0006] The support mechanism includes a cross-shaped support rod for supporting the mounting frame, the cross-shaped support rod is clamped in the interior of the first mounting frame, a concave block is provided at one left end of the cross-shaped support rod, the concave block is fixedly connected to the left side wall of the inner cavity of the first mounting frame, a through groove is provided at the bottom of the concave block, a connecting piece is fixedly installed between the left and right side walls of the inner cavity of the through groove, a fixing groove is provided at the top of the concave block, a threaded column with one end penetrating the fixing groove and extending to the outside of the concave block is fixedly installed on the top of the connecting piece, and the outer surface of the threaded column is threadedly connected to a fixing piece located inside the fixing groove.
[0007] Furthermore, a second installation frame is fixedly connected to the right side of the first installation frame, a third installation frame is fixedly connected to the bottom of the second installation frame, and a fourth installation frame is fixedly connected between the left side of the third installation frame and the bottom of the first installation frame.
[0008] Furthermore, the connecting member includes a mounting rod and a connecting ring, the connecting ring is rotatably mounted on the outer surface of the mounting rod, the mounting rod is fixedly mounted between the left and right side walls of the inner cavity of the through groove, and one end of the threaded column is fixedly connected to the outer surface of the connecting ring.
[0009] Furthermore, the concave block includes a connecting block and a groove, wherein the groove is opened on the front side of the connecting block, and the left end of the cross-shaped support rod passes through and extends to the inside of the groove.
[0010] Furthermore, the fixing groove includes a rectangular groove and a circular groove, the rectangular groove is opened at the top of the connecting block and penetrates into the interior of the groove, and the circular groove is opened at the top of the connecting block and communicates with the rectangular groove.
[0011] Furthermore, the fixing member includes a threaded sleeve and an annular handle, the threaded sleeve is threadedly installed on the outer surface of the threaded column, one end of the threaded sleeve penetrates into the inside of the circular groove, and the annular handle is fixedly installed on the outer surface of the threaded sleeve.
[0012] Furthermore, the polyurethane foam material layer is filled on the inner walls of the first installation frame and the second installation frame, and the polyurethane foam material layer is filled on the inner walls of the third installation frame and the fourth installation frame.
[0013] Furthermore, the number of the supporting mechanisms is four, the first installation frame and the second installation frame are both provided with supporting mechanisms inside, and the third installation frame and the fourth installation frame are both provided with supporting mechanisms inside.
[0014] Compared with the prior art, the technical solution of this application has the following beneficial effects:
[0015] The installation frame of the civil engineering air duct purification device is composed of a plurality of installation frames, thereby increasing the contact area with the civil engineering air duct and reducing the height of a single device, thereby facilitating later maintenance and repair. Moreover, by laying a polyurethane foam material layer, it can play an excellent shock-absorbing role, and the support mechanism is used to enhance the stability and bearing strength of the installation frame, so that the overall design is safe and reliable, and at the same time, it is easy to assemble, so that the practicality of the installation frame of the civil engineering air duct purification device is enhanced. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the structure of the utility model;
[0017] Figure 2 This is a schematic diagram of the structure of the utility model Figure 1 A in the enlarged view;
[0018] Figure 3 It is a top view of the concave block of the utility model structure.
[0019] In the figure: 1. first installation frame; 2. polyurethane foam material layer; 3. support mechanism; 301. cross support rod; 302. concave block; 303. through groove; 304. connecting piece; 305. fixing groove; 306. threaded column; 307. fixing piece; 4. second installation frame; 5. third installation frame; 6. fourth installation frame. DETAILED DESCRIPTION
[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0021] Example 1: Please refer to Figure 1-3 In this embodiment, a civil engineering air duct purification device installation frame includes a first installation frame 1 and a polyurethane foam material layer 2. The right side of the first installation frame 1 is fixedly connected to a second installation frame 4, the bottom of the second installation frame 4 is fixedly connected to a third installation frame 5, and the left side of the third installation frame 5 and the bottom of the first installation frame 1 are fixedly connected to a fourth installation frame 6. A support mechanism 3 is arranged inside the first installation frame 1.
[0022] Among them, the first installation frame 1, the second installation frame 4, the third installation frame 5 and the fourth installation frame 6 are all composed of two layers of galvanized aluminum, and the polyurethane foam material layer 2 is filled between the two layers of galvanized aluminum to improve the shock absorption performance of the installation frame. Moreover, the number of installation frames can be selected according to the actual civil engineering air duct specifications to weld multiple installation frames.
[0023] In addition, the number of the supporting mechanisms 3 is the same as the number of the mounting frames, thereby enhancing the stability and bearing strength of the mounting frames.
[0024] By adopting the above technical scheme, it is realized that the first mounting frame 1, the second mounting frame 4, the third mounting frame 5 and the fourth mounting frame 6 are used to form an installation frame, thereby increasing the contact area with the civil engineering air duct and reducing the height of a single device, so as to facilitate subsequent maintenance and repair. In addition, by laying the polyurethane foam material layer 2, it can play an excellent shock-absorbing role, and the support mechanism 3 is used to enhance the stability and bearing strength of the installation frame, so that the overall design is safe and reliable, and it is easy to assemble.
[0025] Example 2: Please refer to Figure 1-3 On the basis of the first embodiment, the support mechanism 3 includes a cross-shaped support rod 301 for supporting the installation frame. The cross-shaped support rod 301 is clamped in the interior of the first installation frame 1. A concave block 302 is provided at the left end of the cross-shaped support rod 301. The concave block 302 is fixedly connected to the left side wall of the inner cavity of the first installation frame 1. The concave block 302 includes a connecting block and a groove. The groove is opened on the front of the connecting block. The left end of the cross-shaped support rod 301 passes through and extends to the interior of the groove, so that the cross-shaped support rod 301 is inserted into the interior of the concave block 302. A through groove 303 is opened at the bottom of the concave block 302. The inner cavity of the through groove 303 A connecting piece 304 is fixedly installed between the left and right side walls, a fixing groove 305 is opened on the top of the concave block 302, and a threaded column 306 with one end penetrating the fixing groove 305 and extending to the outside of the concave block 302 is fixedly installed on the top of the connecting piece 304. The connecting piece 304 includes a mounting rod and a connecting ring. The connecting ring is rotatably installed on the outer surface of the mounting rod. The mounting rod is fixedly installed between the left and right side walls of the inner cavity of the through groove 303. One end of the threaded column 306 is fixedly connected to the outer surface of the connecting ring, which facilitates the threaded column 306 to rotate around the mounting rod. The outer surface of the threaded column 306 is threadedly connected to a fixing piece 307 located inside the fixing groove 305.
[0026] The fixing groove 305 includes a rectangular groove and a circular groove. The rectangular groove is opened at the top of the connecting block and penetrates into the inside of the groove. The circular groove is opened at the top of the connecting block and communicates with the rectangular groove.
[0027] In addition, the fixing member 307 includes a threaded sleeve and an annular handle. The threaded sleeve is threadedly installed on the outer surface of the threaded column 306. One end of the threaded sleeve passes through the inside of the circular groove. The annular handle is fixedly installed on the outer surface of the threaded sleeve, which makes it easy to use the threaded sleeve to be inserted into the inside of the circular groove to fix the position of the threaded column 306.
[0028] By adopting the above technical solution, the cross-shaped support rod 301 is inserted into the interior of the first installation frame 1, so that the four ends of the cross-shaped support rod 301 are respectively inserted into the interior of the concave block 302, and the threaded column 306 is rotated around the installation rod in the connecting piece 304 until the threaded column 306 is inserted into the interior of the fixing groove 305, and then the annular handle in the fixing piece 307 is rotated so that the threaded sleeve threadedly connected to the outer surface of the threaded column 306 is inserted into the circular groove in the fixing groove 305, thereby fixing the cross-shaped support rod 301, facilitating the rapid assembly of the installation frame, and then the cross-shaped support rod 301 is installed in the second installation frame 4, the third installation frame 5 and the fourth installation frame 6 in turn.
[0029] The working principle of the above embodiment is:
[0030] When assembling the installation frame of the civil engineering air duct purification device, the first installation frame 1, the second installation frame 4, the third installation frame 5 and the fourth installation frame 6 are welded into a field shape to reduce the height of a single device, and then the cross-shaped support rod 301 is inserted into the interior of the first installation frame 1, so that the four ends of the cross-shaped support rod 301 are respectively inserted into the interior of the concave block 302, and the threaded column 306 is rotated around the installation rod in the connecting member 304 until the threaded column 306 is inserted into the interior of the fixing groove 305, and then the annular handle in the rotating fixing member 307 is , so that the threaded sleeve threadedly connected to the outer surface of the threaded column 306 is inserted into the circular groove in the fixing groove 305, thereby fixing the cross-shaped support rod 301, which is convenient for the rapid assembly of the installation frame, and then the cross-shaped support rod 301 is installed in the second installation frame 4, the third installation frame 5 and the fourth installation frame 6 in turn, so as to improve the supporting strength of the installation frame, and a polyurethane foam material layer 2 is laid on the inner walls of the first installation frame 1, the second installation frame 4, the third installation frame 5 and the fourth installation frame 6, which can play an excellent shock-absorbing role.
[0031] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A civil engineering air duct purification device installation frame, comprising a first installation frame (1) and a polyurethane foam material layer (2), characterized in that: A supporting mechanism (3) is arranged inside the first installation frame (1); The support mechanism (3) comprises a cross-shaped support rod (301) for supporting the installation frame, the cross-shaped support rod (301) being clamped inside the first installation frame (1), a concave block (302) being arranged at one left end of the cross-shaped support rod (301), the concave block (302) being fixedly connected to the left side wall of the inner cavity of the first installation frame (1), a through groove (303) being arranged at the bottom of the concave block (302), a connecting piece (304) being fixedly installed between the left and right side walls of the inner cavity of the through groove (303), a fixing groove (305) being arranged at the top of the concave block (302), a threaded column (306) having one end penetrating the fixing groove (305) and extending to the outside of the concave block (302) being fixedly installed at the top of the connecting piece (304), the threaded column (306) having one end penetrating the fixing groove (305) and extending to the outside of the concave block (302), the outer surface of the threaded column (306) being threadedly connected to a fixing piece (307) located inside the fixing groove (305).
2. The installation frame of a civil engineering air duct purification device according to claim 1, characterized in that: A second mounting frame (4) is fixedly connected to the right side of the first mounting frame (1), a third mounting frame (5) is fixedly connected to the bottom of the second mounting frame (4), and a fourth mounting frame (6) is fixedly connected between the left side of the third mounting frame (5) and the bottom of the first mounting frame (1).
3. The installation frame of a civil engineering air duct purification device according to claim 1, characterized in that: The connecting member (304) comprises a mounting rod and a connecting ring, wherein the connecting ring is rotatably mounted on the outer surface of the mounting rod, the mounting rod is fixedly mounted between the left and right side walls of the inner cavity of the through slot (303), and one end of the threaded column (306) is fixedly connected to the outer surface of the connecting ring.
4. The installation frame of a civil engineering air duct purification device according to claim 1, characterized in that: The concave block (302) comprises a connecting block and a groove, wherein the groove is opened on the front side of the connecting block, and the left end of the cross-shaped supporting rod (301) penetrates and extends into the interior of the groove.
5. The installation frame of a civil engineering air duct purification device according to claim 4, characterized in that: The fixing groove (305) comprises a rectangular groove and a circular groove, wherein the rectangular groove is opened at the top of the connecting block and penetrates into the interior of the groove, and the circular groove is opened at the top of the connecting block and communicates with the rectangular groove.
6. The installation frame of a civil engineering air duct purification device according to claim 5, characterized in that: The fixing member (307) comprises a threaded sleeve and an annular handle, wherein the threaded sleeve is threadedly mounted on the outer surface of the threaded column (306), one end of the threaded sleeve penetrates into the interior of the circular groove, and the annular handle is fixedly mounted on the outer surface of the threaded sleeve.
7. The installation frame of a civil engineering air duct purification device according to claim 2, characterized in that: The polyurethane foam material layer (2) is filled on the inner walls of the first installation frame (1) and the second installation frame (4), and the polyurethane foam material layer (2) is filled on the inner walls of the third installation frame (5) and the fourth installation frame (6).
8. The installation frame of a civil engineering air duct purification device according to claim 2, characterized in that: The number of the supporting mechanisms (3) is four; the first installation frame (1) and the second installation frame (4) are both provided with supporting mechanisms (3); and the third installation frame (5) and the fourth installation frame (6) are both provided with supporting mechanisms (3).