Tunnel construction data surveying and mapping device

By designing support components and using screws and ground cones to fix the total station, the shaking problem caused by unstable tunnel ground is solved and the stability and flexibility of the surveying and mapping device are achieved.

CN221925122UActive Publication Date: 2024-10-29JIANGSU YUXIANGTONG INTELLIGENT TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323173808.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-11-23
Publication Date
2024-10-29
Estimated Expiration
2033-11-23

AI Technical Summary

Technical Problem

The existing surveying and mapping equipment is not stable enough on the tunnel ground and is prone to shaking, affecting the surveying and mapping results.

Method used

A tunnel construction data surveying device including a total station and a support component is designed. The support component includes a base, fixing parts, lifting parts and a mounting plate. Through the cooperation of screws and ground cones, the total station can be fixed on the tunnel ground. , to avoid shaking.

Benefits of technology

It effectively avoids the shaking of the total station during the surveying and mapping process, ensures the stability of the surveying and mapping results, and provides height and orientation adjustment functions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221925122U_ABST
    Figure CN221925122U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of measuring devices, in particular to a tunnel construction data surveying and mapping device which comprises a total station and a supporting assembly, and the supporting assembly comprises a base, a plurality of fixing pieces, a lifting piece and a mounting plate. The fixing piece comprises a supporting rod, a screw rod and a ground cone; the supporting rod is fixedly connected with the base, the screw is in threaded connection with the supporting rod, the ground cone is fixedly connected with the screw, the lifting part is arranged at the top of the base, the mounting plate is arranged at the top of the lifting part, and the total station is fixedly connected with the mounting plate; during use, a worker places the base on the tunnel ground, the base, the lifting part and the mounting plate support the total station, the screw rod is rotated to move on the supporting rod, the screw rod drives the ground cones to rotate and move downwards, the ground cones are inserted into ground soil, the position of the base is fixed by utilizing the multiple ground cones, and the total station is fixed. Therefore, the total station can be stably fixed on the tunnel ground, and the situation that the total station shakes in the surveying and mapping process to affect the result is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of measuring devices, in particular to a tunnel construction data surveying and mapping device. Background Art

[0002] Tunnel construction is a series of work carried out in the construction of underground, underwater and mountain buildings, which is mainly divided into tunnel planning, surveying, design, through-control measurement and construction. Tunnels can be divided into three categories according to their location: mountain tunnels, underwater tunnels and urban tunnels. Among them, the most built are mountain tunnels. Workers need to use surveying and mapping equipment when surveying and mapping tunnels.

[0003] The existing surveying and mapping device includes a total station and a tripod. The total station is fixed on the tripod. When in use, the tripod is placed on the ground, and the total station is used to perform data surveying and mapping of the tunnel.

[0004] However, using the above method, since the ground of the tunnel is mostly soil, the total station placed on the tunnel ground using a tripod is not stable enough and is prone to shaking during the surveying process, affecting the results. Utility Model Content

[0005] The utility model aims to provide a tunnel construction data surveying and mapping device, which can stably fix a total station on the tunnel ground to prevent the total station from shaking during the surveying and mapping process and affecting the results.

[0006] To achieve the above-mentioned purpose, the utility model provides a tunnel construction data surveying and mapping device, including a total station and a support assembly, wherein the support assembly includes a base, a plurality of fixing members, a lifting member and a mounting plate;

[0007] The multiple fixing parts are respectively located on the sides of the base, and the fixing parts include a support rod, a screw rod and a ground cone; the support rod is fixedly connected to the base and is located on the side of the base; the screw rod is threadedly connected to the support rod and passes through the support rod; the ground cone is fixedly connected to the screw rod and is located at the bottom of the screw rod; the lifting part is arranged on the top of the base, and the mounting plate is arranged on the top of the lifting part; the total station is fixedly connected to the mounting plate and is located on the top of the mounting plate.

[0008] Among them, the lifting member includes a threaded column, a sleeve and a rotating shaft; the threaded column is fixedly connected to the base and is located on the top of the base; the sleeve is threadedly connected to the threaded column and is located on the side of the threaded column; the rotating shaft is rotatably connected to the sleeve and is fixedly connected to the mounting plate and is located between the sleeve and the mounting plate.

[0009] Wherein, the lifting member further comprises a second locking bolt; the second locking bolt is threadedly connected to the sleeve and is located at a side of the sleeve.

[0010] Wherein, the fixing member also includes a handle; the handle is fixedly connected to the screw rod and is located at the top of the screw rod.

[0011] The utility model provides a tunnel construction data surveying and mapping device. When in use, a worker places the base on the tunnel ground. The base, the lifting member and the mounting plate provide support for the total station. The screw is rotated to move on the support rod, and the screw drives the ground cone to rotate and move downward, so that the ground cone is inserted into the ground soil. The position of the base is fixed by using a plurality of ground cones, so that the total station can be stably fixed on the tunnel ground, thereby preventing the total station from shaking during the surveying and mapping process and affecting the results. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.

[0013] Figure 1 It is a schematic diagram of the overall structure of the first embodiment of the utility model.

[0014] Figure 2 It is an overall cross-sectional view of the first embodiment of the utility model.

[0015] Figure 3 It is a schematic diagram of the overall structure of the second embodiment of the utility model.

[0016] 101-total station, 102-support assembly, 103-base, 104-fixing part, 105-lifting part, 106-mounting plate, 107-support rod, 108-screw rod, 109-ground cone, 110-threaded column, 111-sleeve, 112-rotating shaft, 114-second locking bolt, 201-handle. DETAILED DESCRIPTION

[0017] The first embodiment of the present application is:

[0018] See also Figure 1-Figure 2 ,in, Figure 1 It is a schematic diagram of the overall structure of the first embodiment of the utility model. Figure 2 It is an overall cross-sectional view of the first embodiment of the utility model.

[0019] The utility model provides a tunnel construction data surveying and mapping device, including a total station 101 and a support assembly 102, wherein the support assembly 102 includes a base 103, a plurality of fixing members 104, a lifting member 105 and a mounting plate 106; the fixing member 104 includes a support rod 107, a screw rod 108 and a ground cone 109; the lifting member 105 includes a threaded column 110, a sleeve 111, a rotating shaft 112 and a second locking bolt 114; through the above-mentioned scheme, the total station 101 can be stably fixed on the tunnel ground, so as to avoid the shaking of the total station 101 during the surveying and mapping process and affect the results.

[0020] According to this specific embodiment, the plurality of fixing members 104 are respectively located on the sides of the base 103, and the fixing members 104 include a support rod 107, a screw rod 108 and a ground cone 109; the support rod 107 is fixedly connected to the base 103 and is located on the sides of the base 103; the screw rod 108 is threadedly connected to the support rod 107 and passes through the support rod 107; the ground cone 109 is fixedly connected to the screw rod 108 and is located at the bottom of the screw rod 108; the lifting member 105 is arranged at the top of the base 103, and the mounting plate 106 is arranged at the top of the lifting member 105; the total station 101 is fixedly connected to the mounting plate 106 and is located at the top of the mounting plate 106. During use, the staff places the base 103 on the tunnel ground. The base 103, the lifting member 105 and the mounting plate 106 provide support for the total station 101. The screw 108 is rotated to move the screw 108 on the support rod 107. The screw 108 drives the ground cone 109 to rotate and move downward, so that the ground cone 109 is inserted into the ground soil. The position of the base 103 is fixed by using multiple ground cones 109, so that the total station 101 can be stably fixed on the tunnel ground to prevent the total station 101 from shaking during the surveying process and affecting the results.

[0021] The threaded column 110 is fixedly connected to the base 103 and is located at the top of the base 103; the sleeve 111 is threadedly connected to the threaded column 110 and is located at the side of the threaded column 110; the rotating shaft 112 is rotatably connected to the sleeve 111 and is fixedly connected to the mounting plate 106 and is located between the sleeve 111 and the mounting plate 106. After the base 103 is fixed, the sleeve 111 is rotated to move the sleeve 111 longitudinally along the threaded column 110, and the sleeve 111 drives the rotating shaft 112 and the mounting plate 106 to move, so that the height position of the total station 101 can be adjusted, and the rotating shaft 112 can be rotated by rotating the mounting plate 106, so that the direction of the total station 101 can be adjusted for surveying and mapping.

[0022] Meanwhile, the second locking bolt 114 is threadedly connected to the sleeve 111 and is located at the side of the sleeve 111. By rotating the second locking bolt 114, the second locking bolt 114 is pressed against the rotating shaft 112, so that the position of the rotating shaft 112 can be fixed to prevent the total station 101 from moving.

[0023] When using the utility model, the staff places the base 103 on the tunnel ground, and rotates the screw 108 to move the screw 108 on the support rod 107. The screw 108 drives the ground cone 109 to rotate and move downward, so that the ground cone 109 is inserted into the ground soil. The position of the base 103 is fixed by using multiple ground cones 109, so that the total station 101 can be stably fixed on the tunnel ground, avoiding the shaking of the total station 101 during the surveying process and affecting the results. After the position of the base 103 is fixed, the sleeve 111 is rotated to move the sleeve 111 longitudinally along the threaded column 110, and the sleeve 111 drives the rotating shaft 112 and the mounting plate 106 to move, so that the height position of the total station 101 can be adjusted; the rotating shaft 112 is rotated by rotating the mounting plate 106, and the orientation of the total station 101 can be adjusted for surveying and mapping, and the second locking bolt 114 is rotated to tighten the second locking bolt 114 against the rotating shaft 112, so that the position of the rotating shaft 112 can be fixed to prevent the total station 101 from moving.

[0024] The second embodiment of the present application is:

[0025] Based on the first embodiment, please refer to Figure 3 ,in, Figure 3 It is a schematic diagram of the overall structure of the second embodiment of the utility model.

[0026] The utility model provides a tunnel construction data mapping device, wherein the fixing member 104 further includes a handle 201 .

[0027] According to this specific embodiment, the handle 201 is fixedly connected to the screw rod 108 and is located at the top of the screw rod 108. The user can rotate the screw rod 108 by holding the handle 201.

[0028] When using the utility model, the staff places the base 103 on the tunnel ground, and rotates the screw 108 by holding the handle 201 to move the screw 108 on the support rod 107. The screw 108 drives the ground cone 109 to rotate and move downward, so that the ground cone 109 is inserted into the ground soil. The position of the base 103 is fixed by using multiple ground cones 109, so that the total station 101 can be stably fixed on the tunnel ground, avoiding the shaking of the total station 101 during the surveying process and affecting the results. After the position of the base 103 is fixed, the sleeve 111 is rotated to move the sleeve 111 longitudinally along the threaded column 110, and the sleeve 111 drives the rotating shaft 112 and the mounting plate 106 to move, so that the height position of the total station 101 can be adjusted; the rotating shaft 112 is rotated by rotating the mounting plate 106, and the orientation of the total station 101 can be adjusted for surveying and mapping, and the second locking bolt 114 is rotated to tighten the second locking bolt 114 against the rotating shaft 112, so that the position of the rotating shaft 112 can be fixed to prevent the total station 101 from moving.

[0029] What is disclosed above is only one or more preferred embodiments of the present application, and cannot be used to limit the scope of rights of the present application. Ordinary technicians in this field can understand that all or part of the processes of implementing the above embodiments and equivalent changes made according to the claims of the present application are still within the scope covered by the present application.

Claims

1. A tunnel construction data surveying and mapping device, comprising a total station, It is characterized in that Also included is a support assembly; The support assembly includes a base, a plurality of fixing members, a lifting member and a mounting plate; The multiple fixing parts are respectively located on the sides of the base, and the fixing parts include a support rod, a screw rod and a ground cone; the support rod is fixedly connected to the base and is located on the side of the base; the screw rod is threadedly connected to the support rod and passes through the support rod; the ground cone is fixedly connected to the screw rod and is located at the bottom of the screw rod; the lifting part is arranged on the top of the base, and the mounting plate is arranged on the top of the lifting part; the total station is fixedly connected to the mounting plate and is located on the top of the mounting plate.

2. A tunnel construction data mapping device as claimed in claim 1, It is characterized in that The lifting member includes a threaded column, a sleeve and a rotating shaft; the threaded column is fixedly connected to the base and is located on the top of the base; the sleeve is threadedly connected to the threaded column and is located on the side of the threaded column; the rotating shaft is rotatably connected to the sleeve and is fixedly connected to the mounting plate and is located between the sleeve and the mounting plate.

3. A tunnel construction data mapping device as claimed in claim 2, It is characterized in that The lifting member further comprises a second locking bolt; the second locking bolt is threadedly connected to the sleeve and is located at a side edge of the sleeve.

4. A tunnel construction data mapping device as claimed in claim 3, It is characterized in that The fixing member also includes a handle; the handle is fixedly connected to the screw rod and is located at the top of the screw rod.