Shutter for constructional engineering detection
By designing a detachable hundred-grid structure and a spring connection mechanism, the existing problem of time-consuming and labor-intensive cleaning of the hundred-grid grid is solved, and a more efficient detection and cleaning process is achieved.
Patent Information
- Application Number
- CN202323555419.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-12-26
AI Technical Summary
Existing grids used in construction projects need to be cleaned after each inspection. The cleaning process is time-consuming and laborious, and the four corners inside the grid are difficult to clean, making it inconvenient to use.
A hundred-grid grid including a connecting frame, movable plates and vertical partitions is designed. A detection grid is formed by combining slots and limit holes. After detection, the horizontal partitions and vertical partitions can be separated for easy cleaning. Spring and connection are used The pull-bar mechanism realizes the flipping and fixing of the movable plate, simplifying the cleaning process.
It improves detection efficiency and cleaning efficiency, simplifies the cleaning process, reduces cleaning dead corners, and facilitates device maintenance and preparation for the next detection.
Smart Images

Figure CN221926357U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a detection grid, in particular to a grid for building engineering detection, and belongs to the technical field of building engineering detection. Background Art
[0002] A construction project refers to an engineering entity formed by the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. The 100-grid grid uses the size of a standard brick as the outer size, and divides the rectangle into 100 grids for special testing of the mortar fullness of the masonry.
[0003] Chinese patent announcement number CN213813612U discloses a hundred-grid net for construction engineering, including a crossbar, a first grid fixedly connected to the top of the crossbar, and a second grid arranged below the crossbar. The utility model relates to the technical field of construction engineering. The hundred-grid net for construction engineering can not only be folded, but also can be connected by the magnetism of a first handle and a second handle to achieve the fixation of the first grid and the second grid, avoid unfolding during transportation or storage, prevent the occupied area from being too large, and bend by external objects, and ensure normal use. Through the cooperation between the steel cone, the threaded rod and the round rod, the hundred-grid net for construction engineering can be used to carve marks or puncture hard objects, so it is more practical, multifunctional, and suitable for popularization and use.
[0004] However, the inventor of the above device believes that there are certain defects. In order to ensure the detection accuracy during use, the above device needs to be cleaned after each test before the next detection process. The cleaning process is time-consuming and labor-intensive, and the four corners inside the grid are not easy to clean, which brings certain inconveniences to use. For this reason, the utility model provides a hundred-grid net for construction engineering detection. Utility Model Content
[0005] 1. Technical issues to be resolved
[0006] The purpose of the present utility model is to provide a kind of hundred-grid net for construction engineering inspection in order to solve the above-mentioned problem, so as to solve the problem that the device needs to be cleaned after each test in the above-mentioned comparative document before the next inspection process, the cleaning process is time-consuming and labor-intensive, and the four corners inside the grid are not easy to clean, which brings certain inconvenience to the use.
[0007] (II) Technical solution
[0008] The utility model is implemented through the following technical scheme: a hundred grid for construction engineering inspection, including a connecting frame, a connecting frame is installed at one end of the connecting frame, a plurality of transverse partitions are fixedly connected to one side of the connecting frame, the plurality of transverse partitions are all arranged inside the connecting frame, a movable plate is hinged on the top of the connecting frame through a pin hinge, a plurality of vertical partitions are fixedly connected to the movable plate, each of the vertical partitions is provided with a combination slot corresponding to the transverse partition, the plurality of vertical partitions and the plurality of transverse partitions divide the interior of the connecting frame into a plurality of inspection grids, and a fixing mechanism for limiting the opening of the movable plate is installed at one end of the movable plate.
[0009] Preferably, the fixing mechanism includes a connecting block installed at one end of the movable plate, side holes are opened at both ends of the connecting block, a connecting seat is fixedly connected to the connecting frame, a movable plug rod is slidably connected to one side of the connecting seat, and one end of the movable plug rod is inserted into the inside of the side hole.
[0010] Preferably, one end of the movable plug rod disposed inside the connecting seat is fixedly connected to a sliding plate, and a spring is installed on the top of the sliding plate.
[0011] Preferably, a connecting rod is fixedly connected to the sliding plate, and the spring is sleeved on the connecting rod.
[0012] Preferably, a limiting rod is fixedly connected to one side of the connecting frame, a limiting hole is defined at one end of the connecting frame where the connecting frame is provided, and the limiting rod is inserted into the limiting hole.
[0013] Preferably, a connection slot is formed on the inner side wall of the connection frame, and one end of the transverse partition is inserted into the connection slot.
[0014] Preferably, the movable plate is a transparent acrylic plate, and a handle is installed on a side of the movable plate away from the vertical partition.
[0015] The utility model provides a hundred-grid net for construction engineering detection, which has the following beneficial effects:
[0016] 1. The device covers the top of the connection frame with a movable plate, and inserts multiple vertical partitions into multiple horizontal partitions under the action of the combined slots. The multiple horizontal partitions and multiple vertical partitions divide the interior of the connection frame into one hundred detection grids to detect the fullness of the mortar. After the detection, the movable plate is opened and the connection frame is removed from one end of the connection frame, so that the horizontal partitions and the vertical partitions are separated, which is convenient for cleaning the mortar adhered to the inside of the device and improves the detection efficiency.
[0017] 2. The device pulls the connecting rod to pull one end of the movable rod out from the inside of the side hole, thereby separating the movable rod from the connecting block, so that the movable plate can be flipped open from the top of the connecting frame. Through the set connecting slot, the other end of the diaphragm is inserted into the inside of the connecting slot to increase the stability of the diaphragm during installation. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is an overall stereogram of the utility model;
[0019] Figure 2 It is a three-dimensional diagram of the connection frame structure of the utility model;
[0020] Figure 3 This is a schematic diagram of the combined structure of the transverse partition and the vertical partition of the utility model;
[0021] Figure 4 For the utility model Figure 3 Enlarged schematic diagram at point A in the middle.
[0022]
Main component symbol description
[0023] 1. Connecting frame; 11. Connecting slot; 12. Limiting hole; 2. Connecting frame; 21. Horizontal partition; 22. Limiting rod; 3. Movable plate; 31. Vertical partition; 32. Combination slot; 4. Connecting block; 41. Side hole; 5. Connecting seat; 51. Movable plug rod; 52. Sliding plate; 53. Connecting pull rod. DETAILED DESCRIPTION
[0024] The embodiment of the utility model provides a hundred-grid network for construction engineering detection.
[0025] See also Figure 1 , Figure 2 , Figure 3 and Figure 4 A grid for detecting construction projects comprises a connecting frame 1, a connecting frame 2 is installed at one end of the connecting frame 1, a plurality of transverse partitions 21 are fixedly connected to one side of the connecting frame 2, and the plurality of transverse partitions 21 are all arranged inside the connecting frame 1, and a limiting rod 22 is fixedly connected to one side of the connecting frame 2, and a limiting hole 12 is provided at one end of the connecting frame 1 provided with the connecting frame 2, and the limiting rod 22 is inserted into the inside of the limiting hole 12, and a connecting slot 11 is provided on the inner side wall of the connecting frame 1, and one end of the transverse partition 21 is inserted into the inside of the connecting slot 11, and the inside of the connecting frame 1 is divided by the plurality of transverse partitions 21, and the connecting frame 2 is stably installed at one end of the connecting frame 1 by the provided limiting holes 12 and limiting rods 22, and the connecting frame 2 can be removed from one end of the connecting frame 1 by pulling the connecting frame 2, so that the transverse partition 21 is taken out from the inside of the connecting frame 1.
[0026] Please refer to Figure 1 , Figure 2 and Figure 3 The top of the connecting frame 1 is hinged with a movable plate 3 through a pin hinge, and a plurality of vertical partitions 31 are fixedly connected to the movable plate 3, and each vertical partition 31 is provided with a combination slot 32 corresponding to the transverse partition 21. The plurality of vertical partitions 31 and the plurality of transverse partitions 21 divide the interior of the connecting frame 1 into a plurality of detection grids. The movable plate 3 is a transparent acrylic plate, and a handle is installed on the side of the movable plate 3 away from the vertical partition 31. The movable plate 3 is flipped over and covered on the top of the connecting frame 1, and the vertical partition 31 is inserted into the transverse partition 21 under the action of the combination slot 32. The plurality of vertical partitions 31 and the plurality of vertical partitions 31 divide the interior of the connecting frame 1 into a plurality of detection grids, and then the device is covered on the brick to detect the fullness of the mortar. The movable plate 3 of the transparent acrylic plate is convenient for observing the fullness of the mortar.
[0027] Please refer to Figure 1 , Figure 3 and Figure 4 A fixing mechanism for limiting the opening of the movable panel 3 is installed at one end of the movable panel 3, and the fixing mechanism includes a connecting block 4 installed at one end of the movable panel 3, and side holes 41 are opened at both ends of the connecting block 4. A connecting seat 5 is fixedly connected to the connecting frame 2, and a movable plug rod 51 is slidably connected to one side of the connecting seat 5. One end of the movable plug rod 51 is inserted into the inside of the side hole 41. The movable panel 3 is flipped over and covered on the top of the connecting frame 1, and then one end of the movable plug rod 51 is inserted into the inside of the side hole 41 to limit the flipping and opening of the movable panel 3.
[0028] Please refer to Figure 1 , Figure 3 and Figure 4 The movable plug rod 51 is arranged at one end inside the connecting seat 5 and is fixedly connected to a sliding plate 52. A spring is installed on the top of the sliding plate 52. A connecting pull rod 53 is fixedly connected to the sliding plate 52. The spring is sleeved on the connecting pull rod 53. The movable plug rod 51 is pulled out from the inside of the side hole 41 by pulling one end of the connecting pull rod 53, so that the movable plate 3 can be flipped open on the connecting frame 1, and one end of the movable plug rod 51 is in an arc shape, so that when the movable plate 3 is closed, the connecting block 4 squeezes one end of the movable plug rod 51. The movable plug rod 51 is pushed to automatically retract into the inside of the connecting seat 5 by squeezing the spring, and then the movable plug rod 51 is quickly driven to automatically insert into the inside of the side hole 41 through the rebound of the spring.
[0029] Working principle: One hundred detection grids are formed by combining multiple horizontal partitions 21 and vertical partitions 31, and then the device is covered on the mortar-coated surface of the brick to detect the fullness of the mortar. After the detection is completed, one end of the movable plug rod 51 is pulled out from the inside of the side hole 41 by pulling one end of the connecting rod 53, so that the movable plate 3 can be freely flipped open to separate the vertical partitions 31 from the horizontal partitions 21, and then the connecting frame 2 is pulled out of the limiting rod 22 from the inside of the limiting hole 12 to separate the connecting frame 2 from the connecting frame 1, and the vertical partitions 31 on the movable plate 3 and the horizontal partitions 21 on the connecting frame 2 are cleaned separately, which improves the cleaning efficiency and reduces the cleaning dead corners. After cleaning, the connecting frame 2 is reinstalled on one end of the connecting frame 1, and then the movable plate 3 is flipped over and covered on the top of the connecting frame 1 to carry out the next detection process.
[0030] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.
Claims
1. A hundred-grid net for construction engineering inspection, comprising a connection frame (1), characterized in that: A connecting frame (2) is installed at one end of the connecting frame (1), and a plurality of transverse partitions (21) are fixedly connected to one side of the connecting frame (2), and the plurality of transverse partitions (21) are arranged inside the connecting frame (1). A movable plate (3) is hingedly connected to the top of the connecting frame (1) via a hinge, and a plurality of vertical partitions (31) are fixedly connected to the movable plate (3), and each of the vertical partitions (31) is provided with a combination slot (32) corresponding to the transverse partition (21). The plurality of vertical partitions (31) and the plurality of transverse partitions (21) divide the interior of the connecting frame (1) into a plurality of detection grids, and a fixing mechanism for limiting the opening of the movable plate (3) is installed at one end of the movable plate (3).
2. The one-hundred-grid net for construction engineering inspection according to claim 1, characterized in that: The fixing mechanism comprises a connecting block (4) mounted on one end of the movable plate (3), both ends of the connecting block (4) being provided with side holes (41), a connecting seat (5) being fixedly connected to the connecting frame (2), a movable plug rod (51) being slidably connected to one side of the connecting seat (5), and one end of the movable plug rod (51) being plugged into the inside of the side hole (41).
3. The one-hundred-grid net for construction engineering inspection according to claim 2, characterized in that: One end of the movable plug rod (51) disposed inside the connection seat (5) is fixedly connected to a sliding plate (52), and a spring is installed on the top of the sliding plate (52).
4. The one-hundred-grid net for construction engineering inspection according to claim 3, characterized in that: A connecting rod (53) is fixedly connected to the sliding plate (52), and the spring is sleeved on the connecting rod (53).
5. The one-hundred-grid net for construction engineering inspection according to claim 1, characterized in that: A limiting rod (22) is fixedly connected to one side of the connecting frame (2); a limiting hole (12) is provided at one end of the connecting frame (1) on which the connecting frame (2) is provided, and the limiting rod (22) is inserted into the inside of the limiting hole (12).
6. The one-hundred-grid net for construction engineering inspection according to claim 1, characterized in that: The inner side wall of the connection frame (1) is provided with a connection slot (11), and one end of the transverse partition (21) is inserted into the interior of the connection slot (11).
7. The one-hundred-grid net for construction engineering inspection according to claim 1, characterized in that: The movable plate (3) is a transparent acrylic plate, and a handle is installed on a side of the movable plate (3) away from the vertical partition plate (31).