Large hollow hot core structure for replacing large solid cold core
By adopting a large hollow hot core structure and using reinforcement ribs to support the sand core cavity, the problems of high production costs, high labor intensity and low yield in the prior art are solved, and the effects of reducing costs and improving production efficiency are achieved.
Patent Information
- Application Number
- CN202323503925.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-21
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2033-12-21
AI Technical Summary
The existing large-scale solid cold core mold manufacturing technology has problems such as high production costs, high labor intensity for personnel, long production time and low yield.
Adopt a large hollow hot core structure, including the hollow sand core cavity and the inner plate-shaped reinforcement ribs and U-shaped reinforcement ribs. By dividing the sand core into contact and non-contact molten iron parts, and designing reinforcement reinforcement supports the overall strength of the core , reduce the weight and process of the sand core and optimize the casting process.
The weight of the sand core is reduced by 68%, the process time is shortened by 91%, the cost is reduced by 60%, the production efficiency is improved, and the waste rate is reduced by 30%.
Smart Images

Figure CN221952254U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of V-method molding, and in particular relates to a large hollow hot core structure replacing a large solid cold core. Background Art
[0002] At present, large and complex metal parts are manufactured using large solid cold core mold manufacturing technology, such as Figure 1 As shown, during the manufacturing process, the solid cold core is placed in the mold, and then the mold is filled by injecting liquid metal. The liquid metal solidifies during the cooling process to form the desired part shape. Since the solid cold core is placed inside the mold, a large amount of sand core material is required, which increases the production cost and the heavy weight increases the labor intensity of the personnel. Secondly, the sand core material of the solid cold core is changed from self-mixed resin sand to coated sand, which is heated by a heating tube to realize sand core molding. The sand core process is 360 minutes of 6 steps of sand mixing, core punching, baking, box opening, coating, and baking. Thirdly, the solid cold core has a large amount of gas generation during the manufacturing process, resulting in a low product yield.
[0003] Therefore, the prior art has the disadvantages of high production cost, high labor intensity, long production time and low yield. Utility Model Content
[0004] In order to solve the technical problems existing in the prior art, the utility model provides a large hollow hot core structure replacing a large solid cold core.
[0005] The technical solution of the utility model is to provide a large hollow hot core structure to replace the large solid cold core, including a hollow sand core cavity and a plate-shaped first reinforcing rib, a second reinforcing rib and a third reinforcing rib with a U-shaped cross-section arranged therein, the sand core cavity being enclosed by an upper wall, a lower wall, a front wall, a rear wall and a left wall, the first reinforcing rib and the second reinforcing rib are respectively perpendicular to the front wall and the upper wall and are arranged in the sand core cavity in an intersecting manner, and the third reinforcing rib is arranged perpendicular to the left wall on the inner side of the upper wall.
[0006] Furthermore, a plurality of the second reinforcing ribs are arranged at intervals of 5 cm, and the number of the first reinforcing ribs arranged is one.
[0007] Furthermore, the thickness of the first reinforcing rib and the second reinforcing rib is 2 cm to 3 cm.
[0008] Furthermore, the thickness of the upper wall, the lower wall, the front wall, the rear wall and the left wall is 3 cm to 4.5 cm.
[0009] Furthermore, the structure also includes an exhaust hole, and the exhaust hole is arranged on the outer side of the upper wall.
[0010] Compared with the prior art, the large hollow hot core structure provided by the utility model to replace the large solid cold core has the following beneficial effects:
[0011] The sand core is divided into a part contacting molten iron and a part not contacting molten iron, the part not contacting molten iron is made hollow, and reinforcing ribs are designed to support the overall strength of the core, wherein the sand core cavity is surrounded by an upper wall, a lower wall, a front wall, a rear wall and a left wall, the first reinforcing rib and the second reinforcing rib are respectively arranged perpendicular to the front wall and the upper wall and cross-arranged inside the sand core cavity, the first reinforcing rib is laterally arranged to be connected to the front wall and the rear wall, the second reinforcing rib is longitudinally arranged to be connected to the upper wall and the lower wall, the third reinforcing rib is perpendicular to the left wall and arranged on the inner side of the upper wall, and directly above it is a sprue for pouring. Molten iron first enters the pouring system from the sprue, so the upper wall position connected to the sprue will bear a large impact force, so the U-shaped third reinforcing rib is arranged to alleviate the impact force of the molten iron from top to bottom, thereby the large hollow hot core reduces the weight of the sand core by 68% compared with the prior art, shortens three processes, reduces the process time from 360 minutes to 30 minutes, reduces 91%, reduces the cost by 60%, improves production efficiency, reduces gas emission, and reduces the scrap rate by 30%. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of a solid cold core sand core in the prior art.
[0013] Figure 2 It is a three-dimensional schematic diagram of an embodiment of the utility model.
[0014] Figure 3 It is a schematic diagram of mold opening of an embodiment of the utility model. DETAILED DESCRIPTION
[0015] The specific implementation of the present utility model is described in detail below in conjunction with specific embodiments.
[0016] Provide a large hollow hot core structure to replace the large solid cold core, such as Figure 2As shown, it includes a hollow sand core cavity 100 and a plate-shaped first reinforcing rib 101, a second reinforcing rib 102 and a third reinforcing rib 103 with a U-shaped cross section arranged therein. The sand core is divided into a molten iron contacting part and a non-molten iron contacting part. The non-molten iron contacting part is hollowed, and reinforcing ribs are designed to support the overall strength of the core. The sand core cavity 100 is surrounded by an upper wall 104, a lower wall 105, a front wall 106, a rear wall 107 and a left wall (not shown in the figure). The first reinforcing rib 101 and the second reinforcing rib 102 are respectively perpendicular to the front wall 106 and the upper wall 104 and intersect each other. The fork is arranged inside the sand core cavity 100, the first reinforcing rib 101 is laterally connected to the front wall 106 and the rear wall 107, the second reinforcing rib 102 is longitudinally connected to the upper wall 104 and the lower wall 105, the third reinforcing rib 103 is vertically arranged on the left wall on the inner side of the upper wall 104, and directly above it is the straight runner 108 for pouring. The molten iron first enters the pouring system from the straight runner 108, so the position of the upper wall 104 connected to the straight runner 108 will be subjected to a greater impact force. Therefore, the U-shaped third reinforcing rib 103 is arranged to alleviate the impact force of the molten iron from top to bottom.
[0017] Specifically, compared with the traditional large solid cold core made of fully artificial self-mixed resin sand, it has to go through six production processes: sand mixing, sand filling, baking, box opening, coating, and baking. In addition, its gas emission is large, resulting in sintering of the core, high pores and high scrap rate. Figure 3 As shown, the hollow hot core of this embodiment installs the four molds of the upper film 201, the lower film 202, the left film 203, and the right film 204 on the sand shooting machine, and combines them, turns on the sand shooting machine, shoots the coated sand into the sand shooting area through the reserved sand shooting holes, and then turns on the heating. After heating at 220° for 10 minutes, separates the right film 204 mold for core pulling, separates the upper mold 201, separates the left mold 203, and lifts the sand core cavity 100 through the lifting hole to the coating area to complete the production, thereby making the non-contact molten iron part hollow, and forming strengthening reinforcement to support the overall strength of the core. By setting up the large hollow hot core structure, the weight of the sand core is reduced by 68%, 3 processes are shortened, the process time is reduced from 360 minutes to 30 minutes, which is a reduction of 91%, the cost is reduced by 60%, the production efficiency is improved, and the scrap rate is reduced by 30%.
[0018] Furthermore, in this embodiment, a plurality of second reinforcing ribs 102 are arranged at intervals of 5 cm, and a first reinforcing rib 101 is arranged in number. The thickness of the first reinforcing rib 101 and the second reinforcing rib 102 is 2 cm to 3 cm, which is used to form sufficient lateral and longitudinal supporting force inside the hollow sand core cavity 100, thereby increasing the overall structural strength, reducing the use of sand core materials, and reducing costs.
[0019] Furthermore, in this embodiment, the thickness of the upper wall 104, the lower wall 105, the front wall 106, the rear wall 107 and the left wall is 3 cm to 4.5 cm, that is, the overall wall thickness of the core must be sufficient to support the initial setting of the molten iron for 2 hours.
[0020] Furthermore, if Figure 2 As shown, the structure further includes an exhaust hole 109, which is disposed on the outer side of the upper wall 104. The exhaust hole 109 needs to have the same diameter as the sand tire exhaust hole for exhausting the cavity gas.
Claims
1. A large hollow hot core structure replacing a large solid cold core, characterized in that: It includes a hollow sand core cavity and a plate-shaped first reinforcing rib, a second reinforcing rib and a third reinforcing rib with a U-shaped cross-section arranged therein. The sand core cavity is surrounded by an upper wall, a lower wall, a front wall, a rear wall and a left wall. The first reinforcing rib and the second reinforcing rib are respectively perpendicular to the front wall and the upper wall and are arranged inside the sand core cavity in an intersecting manner. The third reinforcing rib is arranged perpendicular to the left wall on the inner side of the upper wall.
2. A large hollow hot core structure replacing a large solid cold core as claimed in claim 1, characterized in that: A plurality of the second reinforcing ribs are arranged at intervals of 5 cm, and the number of the first reinforcing ribs arranged is one.
3. A large hollow hot core structure replacing a large solid cold core as claimed in claim 1, characterized in that: The thickness of the first reinforcing rib and the second reinforcing rib is 2 cm to 3 cm.
4. A large hollow hot core structure replacing a large solid cold core as claimed in claim 1, characterized in that: The thickness of the upper wall, the lower wall, the front wall, the rear wall and the left wall is 3 cm to 4.5 cm.
5. A large hollow hot core structure replacing a large solid cold core as claimed in any one of claims 1 to 4, characterized in that: The structure further comprises an exhaust hole, and the exhaust hole is arranged on the outer side of the upper wall.