Spherical heat storage product production equipment with replaceable mold
By designing replaceable molds and automated raw material conveying systems, the problem that existing equipment cannot efficiently produce heat accumulators of different shapes is solved, and automatic loading, laying and pushing movement is realized, improving production efficiency and light worker labor is achieved.
Patent Information
- Application Number
- CN202323599171.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-28
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2033-12-28
AI Technical Summary
The existing heat storage production equipment cannot efficiently produce heat storage devices of different shapes, and loading and unloading rely on manual operations, resulting in high labor intensity and low efficiency for workers.
A spherical heat storage product production equipment with replaceable molds is designed, using a replaceable lower mold rack and upper mold rack, combining automatic raw material conveying mechanism and push rod to realize the production of heat storage devices in different shapes, and through motors and hydraulics. Rods are automatically loaded, laid and pushed to move.
The production of heat storage devices of different shapes is realized, which reduces the labor intensity of workers, improves processing efficiency, and improves production efficiency through automated operations.
Smart Images

Figure CN221953535U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of heat storage device production, in particular to a spherical heat storage product production device with replaceable molds. Background Art
[0002] The heat accumulator production equipment can dry-press alumina powder through a mold to form a spherical heat accumulator, and place it in the exchange furnace of an aluminum plant or steel plant to store heat, achieve heat storage and avoid energy waste. However, most of the existing production equipment can only produce one shape structure, which is not conducive to production efficiency. It is also very troublesome to produce heat accumulators of other shapes. At the same time, the current loading and unloading methods are mostly manual operations, and the labor intensity of workers is high. At the same time, the manual processing efficiency is relatively lower than the automated processing efficiency. Therefore, how to overcome the above-mentioned technical problems and defects has become a key issue that needs to be solved. Utility Model Content
[0003] The purpose of the invention of the utility model is to overcome the defects described in the background technology, thereby realizing a spherical heat storage product production equipment with replaceable molds. The equipment can replace the molds for use, so as to produce heat accumulators of different shapes, and can also automatically load and flatten. At the same time, it can automatically push and move the processed heat accumulators for storage, replacing manual operations, increasing processing efficiency, and reducing the labor intensity of workers.
[0004] In order to achieve the above-mentioned invention object, the technical solution of the utility model is: a spherical heat storage product production equipment with replaceable molds, including an equipment frame. A mold plate is horizontally fixedly arranged in the middle and upper part of the equipment frame, and a raw material cabin is fixedly arranged at the bottom end of the mold plate. A raw material conveying mechanism is slidably arranged inside the raw material cabin. A plurality of mold holes that penetrate up and down and are respectively coaxially arranged are provided on the mold plate and the raw material cabin. A lower mold frame inserted into the mold hole is horizontally slidably arranged at the bottom end of the mold plate on the lower side of the raw material cabin. A pressure plate that can move up and down is arranged at the top of the equipment frame, and an upper mold frame that can be inserted into the mold hole is horizontally slidably arranged at the bottom end of the pressure plate.
[0005] In the above-mentioned spherical heat storage product production equipment with replaceable molds, the cross-sections of the mold plate and the raw material cabin are both U-shaped. A screw is rotatably arranged on the top side of the mold plate along its length direction. A motor is fixedly arranged on the mold plate at the end of the screw, and the output end of the motor is fixedly arranged with the end of the screw. A push rod designed to imitate the top of the mold plate is threaded on the screw. The processed heat accumulator can be pushed and moved automatically to increase the processing efficiency.
[0006] In the above-mentioned spherical heat storage product production equipment with replaceable molds, the raw material conveying mechanism includes an upper powder rack arranged on the raw material compartment and sliding along its length direction. An electric push rod penetrating its side wall is arranged at the top of the middle part of the upper powder rack, and an L-shaped rod fixedly arranged with the free end of the electric push rod is fixedly arranged on the side of the raw material compartment. A feed port is provided at the end of the mold plate above the electric push rod. A first position sensor is fixedly arranged inside the raw material compartment on the opposite side of the electric push rod. It can automatically load and level materials, replace manual operations, and reduce the labor intensity of workers.
[0007] In the above-mentioned spherical heat storage product production equipment with replaceable molds, a back plate is vertically fixedly arranged in the middle of the equipment frame. A plurality of top plates are fixedly arranged on the equipment frame at the front end of the back plate, and a plurality of first hydraulic rods are vertically fixedly arranged at the bottom end of the equipment frame and are respectively fixedly arranged with the bottom ends of the corresponding top plates. A second hydraulic rod is fixedly arranged at the top end of the equipment frame, and the free end of the second hydraulic rod penetrates the equipment frame and is fixedly arranged with the top end of the pressure plate. The mold can be moved up and down, thereby squeezing the powder and pressurizing it into the shape in production.
[0008] In the above-mentioned spherical heat storage product production equipment with replaceable molds, the lower mold frame includes a first lifting plate, a second lifting plate and a third lifting plate which are sleeved from bottom to top, and the first lifting plate, the second lifting plate and the third lifting plate are all slidably arranged with the corresponding top plate. A plurality of first straight rods which are coaxially arranged with the mold holes are vertically fixedly arranged at the top of the first lifting plate. A plurality of first mold sleeves which are respectively sleeved on the corresponding first straight rods are vertically fixedly arranged at the top of the second lifting plate, and the inner diameter of the first mold sleeve is the same as the outer diameter of the first straight rod. A plurality of first mold cylinders which are respectively sleeved on the corresponding first mold sleeves are vertically fixedly arranged at the top of the third lifting plate, and the outer diameter of the first mold cylinder is the same as the diameter of the mold hole on the raw material cabin, the inner diameter of the first mold cylinder is the same as the outer diameter of the first mold sleeve, and the inner diameter of the first mold cylinder is the same as the inner diameter of the mold hole on the mold plate.
[0009] In the above-mentioned spherical heat storage product production equipment with replaceable molds, the top of the first mold sleeve is set as a plane. The sides of the first lifting plate, the second lifting plate, and the third lifting plate are vertically fixed with a second position sensor that can abut against the bottom end of the mold plate. The side of the third lifting plate is vertically fixed with a third position sensor that can detect the position of the second lifting plate.
[0010] In the above-mentioned spherical heat storage product production equipment with replaceable molds, a plurality of first upper mold sleeves coaxially arranged with the mold holes are vertically fixed at the bottom end of the upper mold frame. A first vent hole is provided on the lower side of the first upper mold sleeve. The bottom end of the first upper mold sleeve is flat. The outer diameter and inner diameter of the first upper mold sleeve are respectively the same as the outer diameter and inner diameter of the first mold sleeve and are coaxially arranged. The powder is processed into a heat storage device of a specific shape by moving the first lifting plate, the second lifting plate, the third lifting plate and the first upper mold sleeve up and down.
[0011] In the above-mentioned spherical heat storage product production equipment with replaceable molds, a temporary storage box is fixedly provided on the side of the equipment frame, and a filter plate is fixedly provided at an angle in the middle of the temporary storage box. A connecting plate abutting against the top of the temporary storage box is fixedly provided at one end of the mold plate. The processed heat storage device can be temporarily stored, and the powder can be separated from the heat storage device.
[0012] In the above-mentioned spherical heat storage product production equipment with replaceable molds, the lower mold frame includes a fourth lifting plate, a fifth lifting plate and a sixth lifting plate which are sleeved from bottom to top, and the fourth lifting plate, the fifth lifting plate and the sixth lifting plate are all slidably arranged with the corresponding top plate. The top of the fifth lifting plate is vertically fixed with a plurality of second straight rods which are respectively coaxially arranged with the mold holes, and the top of the fifth lifting plate is vertically fixed with a plurality of second mold sleeves which are respectively sleeved on the corresponding second straight rods, and the inner diameter of the second mold sleeve is the same as the outer diameter of the second straight rod. The top of the sixth lifting plate is vertically fixed with a plurality of second mold cylinders which are respectively sleeved on the corresponding second mold cylinders, and the outer diameter of the second mold cylinder is the same as the diameter of the mold hole on the raw material cabin. The inner diameter of the second mold cylinder is the same as the outer diameter of the second mold cylinder, and the inner diameter of the second mold cylinder is the same as the inner diameter of the mold hole on the mold plate.
[0013] The top of the second mold sleeve is a concave arc surface. The sides of the fourth lifting plate, the fifth lifting plate, and the sixth lifting plate are vertically fixed with a fourth position sensor that can abut against the bottom end of the mold plate. The side of the sixth lifting plate is vertically fixed with a fifth position sensor that can detect the position of the fifth lifting plate.
[0014] A plurality of second upper mold sleeves are vertically fixedly arranged at the bottom end of the upper mold frame and are respectively coaxially arranged with the mold holes. A second vent hole is opened at the lower side of the second upper mold sleeve, and the bottom end of the second upper mold sleeve is arranged in a concave arc surface. The outer diameter and inner diameter of the second upper mold sleeve are respectively the same as the outer diameter and inner diameter of the second mold sleeve and are coaxially arranged.
[0015] In the above-mentioned spherical heat storage product production equipment with replaceable molds, the lower mold frame includes a seventh lifting plate, an eighth lifting plate and a ninth lifting plate which are sleeved from bottom to top, and the seventh lifting plate, the eighth lifting plate and the ninth lifting plate are all slidably arranged with the corresponding top plate. The top of the seventh lifting plate is vertically fixed with a plurality of straight rod groups which are respectively coaxially arranged with the mold holes, and the straight rod group includes five vertically arranged third straight rods. The top of the eighth lifting plate is vertically fixed with a plurality of third mold sleeves which are respectively sleeved on the corresponding third straight rods, and the third mold sleeve is provided with a first through hole which is the same as the outer diameter of the third straight rod and is coaxially arranged with the third straight rod. The top of the ninth lifting plate is vertically fixed with a plurality of third mold barrels which are respectively sleeved on the corresponding third mold sleeves, and the outer diameter of the third mold barrel is the same as the diameter of the mold hole on the raw material cabin. The inner diameter of the third mold barrel is the same as the outer diameter of the third mold sleeve, and the inner diameter of the third mold barrel is the same as the inner diameter of the mold hole on the mold plate.
[0016] The top of the third mold sleeve is a concave arc surface, and the sides of the seventh lifting plate, the eighth lifting plate, and the ninth lifting plate are vertically fixed with a sixth position sensor that can abut against the bottom end of the mold plate. The side of the ninth lifting plate is vertically fixed with a seventh position sensor that can detect the position of the eighth lifting plate.
[0017] A plurality of third upper mold sleeves are vertically fixedly arranged at the bottom end of the upper mold frame and are respectively coaxially arranged with the mold holes, and a third vent hole is provided at the lower side of the third upper mold sleeve. The bottom end of the third upper mold sleeve is a concave arc surface, and the outer diameter of the third upper mold sleeve is the same as the outer diameter of the third mold sleeve. The third upper mold sleeve is provided with a first through hole that is the same as the outer diameter of the third straight rod and is coaxially arranged with the third straight rod.
[0018] Compared with the prior art, the spherical heat storage product production equipment with replaceable molds of the utility model has at least the following beneficial effects:
[0019] 1. The spherical heat storage product production equipment with replaceable molds of the utility model is provided with a replaceable lower mold frame and an upper mold frame, and the molds can be replaced to produce heat storage devices of different shapes to meet different production needs.
[0020] 2. The spherical heat storage product production equipment with replaceable molds of the utility model is provided with a raw material conveying mechanism located inside the raw material cabin, which can automatically load and flatten the mold, replacing manual operation and reducing the labor intensity of workers.
[0021] 3. The spherical heat storage product production equipment with replaceable molds of the utility model is provided with a mold plate that can move along the length direction of the mold plate and is designed to imitate the mold plate, which can automatically push and move the processed heat storage device to increase the processing efficiency.
[0022] 4. The spherical heat storage product production equipment with replaceable molds of the utility model is provided with a temporary storage box and a filter plate located on the side of the mold plate, which can temporarily store the processed heat accumulator and separate the powder from the heat accumulator. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a schematic diagram of the overall structure of the spherical heat storage product production equipment with replaceable molds of the utility model;
[0024] Figure 2 It is an exploded schematic diagram of the spherical heat storage product production equipment with replaceable molds of the utility model after the equipment frame is removed;
[0025] Figure 3 It is an exploded schematic diagram of the lower mold frame of the spherical heat storage product production equipment with replaceable molds of the utility model;
[0026] Figure 4 It is a schematic diagram of the upper mold frame structure of the spherical heat storage product production equipment with replaceable molds of the utility model;
[0027] Figure 5 It is a schematic diagram of the second upper mold sleeve and the third upper mold sleeve of the spherical heat storage product production equipment with replaceable molds of the utility model;
[0028] Figure 6 It is a schematic diagram of the positions of the second straight rod and the straight rod group of the spherical heat storage product production equipment with replaceable molds of the utility model.
[0029] In the figure: 1. Equipment frame; 2. Mold plate; 3. Raw material cabin;
[0030] 4. Raw material conveying mechanism; 41. Powder loading rack; 42. Electric push rod; 43. L-shaped rod; 44. Feeding port; 45. First position sensor;
[0031] 5. Die hole;
[0032] 6. Lower mold frame; 61. First lifting plate; 62. Second lifting plate; 63. Third lifting plate; 64. First straight rod; 65. First mold sleeve; 66. First mold cylinder; 67. Second position sensor; 68. Third position sensor;
[0033] 7. Pressure plate;
[0034] 8. upper mold frame; 81. first upper mold sleeve; 82. first vent hole;
[0035] 9. Screw rod; 10. Motor; 11. Push rod; 12. Back plate; 13. Top plate; 14. First hydraulic rod; 15. Second hydraulic rod; 16. Temporary storage box; 17. Filter plate; 18. Connecting plate;
[0036] 1901, fourth lifting plate; 1902, fifth lifting plate; 1903, sixth lifting plate; 1904, second straight rod; 1905, second mold sleeve; 1906, second mold cylinder; 1907, fourth position sensor; 1908, fifth position sensor;
[0037] 2001, second upper mold sleeve; 2002, second vent hole;
[0038] 2101. The seventh lifting plate; 2102. The eighth lifting plate; 2103. The ninth lifting plate;
[0039] 2109, straight rod group; 2104, third straight rod;
[0040] 2105, third mold sleeve; 2106, third mold cylinder; 2107, sixth position sensor; 2108, seventh position sensor;
[0041] 2201. a third upper mold sleeve; 2202. a third vent hole. DETAILED DESCRIPTION
[0042] The spherical heat storage product production equipment with replaceable molds of the utility model is described in more detail below with reference to the accompanying drawings and through specific implementation methods.
[0043] In the description of the present invention, it should be understood that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating directions or positional relationships, are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.
[0044] See also Figure 1-Figure 6The spherical heat storage product production equipment with replaceable molds in this embodiment can replace the molds for use, so as to produce heat storage devices of different shapes, and can also automatically load and flatten. At the same time, the processed heat storage devices can be automatically pushed and moved for storage, replacing manual operations, increasing processing efficiency, and reducing the labor intensity of workers; in this embodiment, it mainly includes an equipment frame 1. A mold plate 2 is horizontally fixedly arranged in the middle and upper part of the equipment frame 1, and a raw material cabin 3 is fixedly arranged at the bottom end of the mold plate 2. The cross-sections of the mold plate 2 and the raw material cabin 3 are both U-shaped structures. A screw 9 is rotatably arranged on the top side of the mold plate 2 along its length direction. A motor 10 is fixedly arranged on the mold plate 2 at the end of the screw 9, and the output end of the motor 10 is fixedly arranged with the end of the screw 9. A push rod 11 designed to imitate the top of the mold plate 2 is threaded on the screw 9. A control module is also provided, and the control module is a mature existing technology and is not described here. The motor 10 is centrally controlled by the control module. A temporary storage box 16 is fixedly provided on the side of the equipment frame 1 , and a filter plate 17 is fixedly provided obliquely in the middle of the temporary storage box 16 . A connecting plate 18 abutting against the top of the temporary storage box 16 is fixedly provided at one end of the mold plate 2 .
[0045] When the heat accumulator is pressurized and produced, the control module controls the motor 10 to work, and the motor 10 drives the screw 9 to rotate. At this time, the screw 9 drives the push rod 11 to transport the heat accumulator from the mold plate 2 to the temporary storage box 16 through the connecting plate 18. The heat accumulator entering the temporary storage box 16 passes through the filter plate 17 to separate the remaining powder and the heat accumulator.
[0046] In order to realize the automatic production of spherical heat storage tanks. In this embodiment, see Figure 1-Figure 4 , a plurality of mold holes 5 are provided on the mold plate 2 and the raw material cabin 3, which penetrate the mold plate 2 and are coaxially arranged. A back plate 12 is vertically fixedly arranged in the middle of the equipment frame 1. A plurality of top plates 13 are fixedly arranged on the equipment frame 1 at the front end of the back plate 12, and a plurality of first hydraulic rods 14 are vertically fixedly arranged at the bottom end of the equipment frame 1, which are respectively fixedly arranged with the bottom ends of the corresponding top plates 13. A second hydraulic rod 15 is fixedly arranged at the top end of the equipment frame 1, and the free end of the second hydraulic rod 15 penetrates the equipment frame 1 and is fixedly arranged with the top end of the pressure plate 7. The first hydraulic rod 14 and the second hydraulic rod 15 are centrally controlled by the control module.
[0047] The lower mold frame 6 includes a first lifting plate 61, a second lifting plate 62 and a third lifting plate 63 which are sleeved from bottom to top. The first lifting plate 61, the second lifting plate 62 and the third lifting plate 63 are all slidably arranged with the corresponding top plate 13. The first lifting plate 61, the second lifting plate 62 and the third lifting plate 63 can be fixed by bolts or the like. A plurality of first straight rods 64 which are coaxially arranged with the mold holes 5 are vertically fixedly arranged at the top of the first lifting plate 61. A plurality of first mold sleeves 65 which are respectively sleeved on the corresponding first straight rods 64 are vertically fixedly arranged at the top of the second lifting plate 62. The inner diameter of the first mold sleeve 65 is the same as the outer diameter of the first straight rod 64. A plurality of first mold cylinders 66 which are respectively sleeved on the corresponding first mold sleeves 65 are vertically fixedly arranged at the top of the third lifting plate 63. The outer diameter of the first mold cylinder 66 is the same as the diameter of the mold hole 5 on the raw material cabin 3. The inner diameter of the first mold cylinder 66 is the same as the outer diameter of the first mold sleeve 65 , and the inner diameter of the first mold cylinder 66 is the same as the inner diameter of the mold hole 5 on the mold plate 2 .
[0048] The top of the first mold sleeve 65 is set in a plane. The sides of the first lifting plate 61, the second lifting plate 62, and the third lifting plate 63 are vertically fixed with a second position sensor 67 that can abut against the bottom end of the mold plate 2. The side of the third lifting plate 63 is vertically fixed with a third position sensor 68 that can detect the position of the second lifting plate 62. The second position sensor 67 and the third position sensor 68 feedback signals to the control module. The bottom end of the upper mold frame 8 is vertically fixed with a plurality of first upper mold sleeves 81 that are coaxially arranged with the mold hole 5. A pressure sensor is arranged on the first upper mold sleeve 81, and the pressure sensor feedbacks signals to the control module. A first vent hole 82 is opened on the lower side of the first upper mold sleeve 81. The bottom end of the first upper mold sleeve 81 is set in a plane. The outer diameter and inner diameter of the first upper mold sleeve 81 are respectively the same as the outer diameter and inner diameter of the first mold sleeve 65 and are coaxially arranged.
[0049] When the heat accumulator needs to be produced, the control module first controls the first hydraulic rod 14 to place the first lifting plate 61, the second lifting plate 62, and the third lifting plate 63 in the initial position. At this time, the top ends of the first straight rod 64 and the first mold barrel 66 are both level with the bottom end of the raw material chamber 3, and the bottom end of the second lifting plate 62 abuts against the top end of the first lifting plate 61. When the powder fills the space above the first mold sleeve 65 and is flattened, the control module controls the first hydraulic rod 14 to work. At this time, the first lifting plate 61, the second lifting plate 62, and the third lifting plate 63 rise, so that the first mold barrel 66, the first mold sleeve 65, and the first straight rod 64 rise accordingly, until the second position sensor 67 on the third lifting plate 63 abuts against the bottom end of the raw material chamber 3. Then continue to control the first hydraulic rod 14 corresponding to the first lifting plate 61 and the second lifting plate 62 to work until the position sensor on the first lifting plate 61 abuts against the bottom end of the raw material chamber 3. The control module controls the first hydraulic rod 14 and the second hydraulic rod 15 corresponding to the second lifting plate 62 to work, so that the first upper mold sleeve 81 and the first mold sleeve 65 move relative to each other, thereby pressurizing the powder on the first mold sleeve 65. When the third position sensor 68 senses the position of the second lifting plate 62, the control module controls the first hydraulic rod 14 to stop rising, and at this time, the pressure sensor and the second hydraulic rod 15 pressurize the powder for molding.
[0050] During this process, the first straight rod 64 is inserted into the first upper mold sleeve 81, and exhaust is exhausted through the vent hole to prevent the pressure inside the first mold sleeve 65 from increasing and affecting the detection of the pressure sensor. After pressurized molding, the first hydraulic rod 14 and the second hydraulic rod 15 corresponding to the second lifting plate 62 are controlled by the control module to rise until the second hydraulic rod 15 returns to the original position, and the second position sensor 67 on the second lifting plate 62 abuts against the bottom end of the raw material cabin 3. At this time, the molded heat accumulator is pushed up to the mold plate 2. When the molded heat accumulator is removed, the first hydraulic rod 14 is controlled by the control module to work, so that the first lifting plate 61, the second lifting plate 62, and the third lifting plate 63 return to their original positions. This operation is repeated to achieve automatic pressurized production of the heat accumulator.
[0051] To achieve automatic loading and paving. Figure 1 and Figure 2In this embodiment, a raw material conveying mechanism 4 is slidably provided inside the raw material compartment 3. The raw material conveying mechanism 4 includes an upper powder rack 41 which is provided on the raw material compartment 3 and slides along its length direction. An electric push rod 42 which passes through its side wall is provided at the top of the middle part of the upper powder rack 41, and the electric push rod 42 is centrally controlled by the control module. An L-shaped rod 43 which is fixedly provided on the side of the raw material compartment 3 and is fixedly provided with the free end of the electric push rod 42. A feed port 44 is provided at the end of the mold plate 2 above the electric push rod 42. A first position sensor 45 is fixedly provided inside the raw material compartment 3 on the opposite side of the electric push rod 42. The first position sensor 45 feeds back a signal to the control module.
[0052] When the first lifting plate 61, the second lifting plate 62, and the third lifting plate 63 are in the initial position, the control module controls the electric push rod 42 to work, and the electric push rod 42 pushes the upper powder rack 41 to move along the raw material compartment 3 until the upper powder rack 41 abuts against the first position sensor 45. At this time, the powder in the middle of the upper powder rack 41 moves to the top of the first mold sleeve 65, so that it enters the space above the first mold sleeve 65. After a period of time, when the powder completely enters the top of the first mold sleeve 65, the electric push rod 42 is controlled to shrink back to the initial position. In this process, the upper powder rack 41 paves the top of the first mold sleeve 65. When the powder in the upper powder rack 41 is insufficient, it can be added through the feed port 44.
[0053] The method of using the spherical heat storage product production equipment with replaceable molds of the utility model is as follows: First, when the first lifting plate 61, the second lifting plate 62, and the third lifting plate 63 are in the initial position, the control module controls the electric push rod 42 to work. The electric push rod 42 pushes the upper powder rack 41 to move along the raw material compartment 3, so that the powder in the upper powder rack 41 fills the space above the first mold sleeve 65. The electric push rod 42 is retracted to return the upper powder rack 41 to the initial position, and in the process, the top of the first mold sleeve 65 is flattened. When the powder in the upper powder rack 41 is insufficient, it can be added through the feed port 44.
[0054] When the heat accumulator needs to be produced, the first hydraulic rod 14 is controlled by the control module to work, and the first lifting plate 61, the second lifting plate 62, and the third lifting plate 63 rise, so that the first mold cylinder 66, the first mold sleeve 65 and the first straight rod 64 rise accordingly, until the second position sensor 67 on the third lifting plate 63 abuts against the bottom end of the raw material compartment 3. Then continue to control the first hydraulic rod 14 corresponding to the first lifting plate 61 and the second lifting plate 62 to work until the position sensor on the first lifting plate 61 abuts against the bottom end of the raw material compartment 3. The control module controls the first hydraulic rod 14 and the second hydraulic rod 15 corresponding to the second lifting plate 62 to work, so that the first upper mold sleeve 81 and the first mold sleeve 65 move relative to each other, thereby pressurizing the powder on the first mold sleeve 65. When the third position sensor 68 senses the position of the second lifting plate 62, the control module controls the first hydraulic rod 14 to stop rising, and at this time, the pressure sensor and the second hydraulic rod 15 pressurize the powder.
[0055] During this process, the first straight rod 64 is inserted into the first upper mold sleeve 81 and exhausted through the vent hole to prevent the pressure inside the first mold sleeve 65 from increasing and affecting the detection of the pressure sensor. After the pressurized molding, the control module controls the first hydraulic rod 14 and the second hydraulic rod 15 corresponding to the second lifting plate 62 to rise until the second hydraulic rod 15 returns to the initial position and the second position sensor 67 on the second lifting plate 62 abuts against the bottom end of the raw material cabin 3. At this time, the formed heat accumulator is pushed up to the mold plate 2.
[0056] The control module controls the motor 10 to work, and at this time the screw 9 drives the push rod 11 to transport the heat accumulator from the mold plate 2 to the temporary storage box 16 through the connecting plate 18. The heat accumulator entering the temporary storage box 16 is separated from the remaining powder and the heat accumulator through the filter plate 17. Then the control module controls the first hydraulic rod 14 to work, so that the first lifting plate 61, the second lifting plate 62, and the third lifting plate 63 return to their original positions. This operation is circulated to realize the automatic pressurization production of the heat accumulator.
[0057] Embodiment 2: The same as Embodiment 1 is not described again, except that:
[0058] In order to realize the automatic production of spherical heat storage tanks. In this embodiment, see Figure 5 and Figure 6The lower mold frame 6 includes a fourth lifting plate 1901, a fifth lifting plate 1902 and a sixth lifting plate 1903 which are sleeved from bottom to top. The fourth lifting plate 1901, the fifth lifting plate 1902 and the sixth lifting plate 1903 are all slidably arranged with the corresponding top plate 13. The top of the fifth lifting plate 1902 is vertically fixed with a plurality of second straight rods 1904 which are coaxially arranged with the mold holes 5, and the top of the fifth lifting plate 1902 is vertically fixed with a plurality of second mold sleeves 1905 which are sleeved on the corresponding second straight rods 1904, and the inner diameter of the second mold sleeves 1905 is the same as the outer diameter of the second straight rods 1904. The top of the sixth lifting plate 1903 is vertically fixed with a plurality of second mold cylinders 1906 which are sleeved on the corresponding second mold sleeves 1905, and the outer diameter of the second mold cylinders 1906 is the same as the diameter of the mold holes 5 on the raw material cabin 3. The inner diameter of the second mold cylinder 1906 is the same as the outer diameter of the second mold sleeve 1905 , and the inner diameter of the second mold cylinder 1906 is the same as the inner diameter of the mold hole 5 on the mold plate 2 .
[0059] The top of the second mold sleeve 1905 is a concave arc surface. The sides of the fourth lifting plate 1901, the fifth lifting plate 1902, and the sixth lifting plate 1903 are vertically fixed with a fourth position sensor 1907 that can abut against the bottom end of the mold plate 2. The side of the sixth lifting plate 1903 is vertically fixed with a fifth position sensor 1908 that can detect the position of the fifth lifting plate 1902. The fourth position sensor 1907 and the fifth position sensor 1908 feedback signals to the control module.
[0060] The bottom end of the upper mold frame 8 is vertically fixed with a plurality of second upper mold sleeves 2001 respectively coaxially arranged with the mold holes 5. A pressure sensor is arranged on the second upper mold sleeve 2001, and the pressure sensor feeds back a signal to the control module. A second vent hole 2002 is opened on the lower side of the second upper mold sleeve 2001, and the bottom end of the second upper mold sleeve 2001 is a concave arc surface. The outer diameter and inner diameter of the second upper mold sleeve 2001 are respectively the same as the outer diameter and inner diameter of the second mold sleeve 1905 and are coaxially arranged.
[0061] The working process and operation method of the embodiment 2 are the same as those of the embodiment 1, except that the shape, size and structure of the processed heat storage device are different, so its working process and operation method are not described in detail here.
[0062] Embodiment 3: The same as Embodiment 1 is not described again, except that:
[0063] In order to realize the automatic production of spherical heat storage tanks. In this embodiment, see Figure 5 and Figure 6The lower mold frame 6 includes a seventh lifting plate 2101, an eighth lifting plate 2102 and a ninth lifting plate 2103 which are sleeved from bottom to top, and the seventh lifting plate 2101, the eighth lifting plate 2102 and the ninth lifting plate 2103 are all slidably arranged with the corresponding top plate 13. A plurality of straight rod groups 2109 which are respectively coaxially arranged with the mold holes 5 are vertically fixedly arranged at the top of the seventh lifting plate 2101, and the straight rod group 2109 includes five vertically arranged third straight rods 2104. A plurality of third mold sleeves 2105 which are respectively sleeved on the corresponding third straight rods 2104 are vertically fixedly arranged at the top of the eighth lifting plate 2102, and a first through hole which is the same in outer diameter as the third straight rod 2104 and is coaxially arranged with the third straight rod 2104 is opened on the third mold sleeve 2105. A plurality of third mold cylinders 2106 respectively sleeved on the corresponding third mold sleeves 2105 are vertically fixedly disposed on the top of the ninth lifting plate 2103, and the outer diameter of the third mold cylinder 2106 is the same as the diameter of the mold hole 5 on the raw material cabin 3. The inner diameter of the third mold cylinder 2106 is the same as the outer diameter of the third mold sleeve 2105, and the inner diameter of the third mold cylinder 2106 is the same as the inner diameter of the mold hole 5 on the mold plate 2.
[0064] The top of the third mold sleeve 2105 is a concave arc surface, and the sides of the seventh lifting plate 2101, the eighth lifting plate 2102, and the ninth lifting plate 2103 are vertically fixed with a sixth position sensor 2107 that can abut against the bottom end of the mold plate 2. The side of the ninth lifting plate 2103 is vertically fixed with a seventh position sensor 2108 that can detect the position of the eighth lifting plate 2102. The sixth position sensor 2107 and the seventh position sensor 2108 feed back signals to the control module.
[0065] The bottom end of the upper mold frame 8 is vertically fixed with a plurality of third upper mold sleeves 2201 respectively coaxially arranged with the mold holes 5. The third upper mold sleeve 2201 is provided with a pressure sensor, and the pressure sensor feeds back a signal to the control module. A third vent hole is provided at the lower side of the third upper mold sleeve 2201. The bottom end of the third upper mold sleeve 2201 is a concave arc surface, and the outer diameter of the third upper mold sleeve 2201 is the same as the outer diameter of the third mold sleeve 2105. The third upper mold sleeve 2201 is provided with a first through hole having the same outer diameter as the third straight rod 2104 and coaxially arranged with the third straight rod 2104.
[0066] The working process and operation method of the embodiment 3 are the same as those of the embodiment 1, except that the shape, size and structure of the processed heat storage device are different, so its working process and operation method are not described in detail here.
[0067] Unless otherwise defined, the technical or scientific terms used herein shall have the usual meanings understood by persons of ordinary skill in the field to which the present invention belongs. The use of "one" or "an" and other similar words in the specification and claims of this application does not necessarily indicate a quantitative limitation. "Include" or "comprises" and other similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and other similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect.
[0068] The exemplary implementation of the present invention is described in detail above with reference to the preferred embodiments. However, it can be understood by those skilled in the art that, without departing from the concept of the present invention, various modifications and variations can be made to the above-mentioned specific embodiments, and various combinations of the various technical features and structures proposed in the present invention can be made without exceeding the protection scope of the present invention.
Claims
1. A spherical heat storage product production equipment with replaceable molds, Features: The invention comprises an equipment frame (1), wherein a mold plate (2) is fixedly arranged horizontally in the middle and upper part of the equipment frame (1), a raw material cabin (3) is fixedly arranged at the bottom end of the mold plate (2), a raw material conveying mechanism (4) is slidably arranged inside the raw material cabin (3), a plurality of mold holes (5) penetrating vertically and coaxially arranged are provided on the mold plate (2) and the raw material cabin (3), a lower mold frame (6) inserted into the mold hole (5) is horizontally slidably arranged at the bottom end of the mold plate (2) on the lower side of the raw material cabin (3), a pressure plate (7) movable vertically is arranged at the top end of the equipment frame (1), and an upper mold frame (8) inserted into the mold hole (5) is horizontally slidably arranged at the bottom end of the pressure plate (7).
2. The spherical heat storage product production equipment with replaceable mold according to claim 1, Features: The cross-sections of the mold plate (2) and the raw material chamber (3) are both U-shaped structures. A screw (9) is rotatably arranged on the top side of the mold plate (2) along its length direction. A motor (10) is fixedly arranged on the mold plate (2) at the end of the screw (9). The output end of the motor (10) is fixedly arranged on the end of the screw (9). A push rod (11) designed to imitate the top of the mold plate (2) is threadedly arranged on the screw (9).
3. The spherical heat storage product production equipment with replaceable mold according to claim 1, Features: The raw material conveying mechanism (4) comprises an upper powder rack (41) which is arranged on the raw material chamber (3) and slides along the length direction thereof; an electric push rod (42) penetrating through the side wall thereof is arranged at the top middle portion of the upper powder rack (41); an L-shaped rod (43) which is fixedly arranged on the side of the raw material chamber (3) and is fixedly arranged on the free end of the electric push rod (42); a feed port (44) is provided at the end of the mold plate (2) above the electric push rod (42); and a first position sensor (45) is fixedly arranged inside the raw material chamber (3) on the opposite side of the electric push rod (42).
4. The spherical heat storage product production equipment with replaceable mold according to claim 1, Features: A back plate (12) is vertically fixedly arranged in the middle of the equipment frame (1), a plurality of top plates (13) are fixedly arranged on the equipment frame (1) at the front end of the back plate (12), a plurality of first hydraulic rods (14) are vertically fixedly arranged at the bottom end of the equipment frame (1) and are respectively fixedly arranged at the bottom ends of the corresponding top plates (13), a second hydraulic rod (15) is fixedly arranged at the top end of the equipment frame (1), and the free end of the second hydraulic rod (15) passes through the equipment frame (1) and is fixedly arranged at the top end of the pressure plate (7).
5. The spherical heat storage product production equipment with replaceable mold according to claim 1, Features: The lower mold frame (6) comprises a first lifting plate (61), a second lifting plate (62) and a third lifting plate (63) which are sleeved from bottom to top. The first lifting plate (61), the second lifting plate (62) and the third lifting plate (63) are all slidably arranged with the corresponding top plate (13). A plurality of first straight rods (64) which are respectively coaxially arranged with the mold holes (5) are vertically fixedly arranged at the top of the first lifting plate (61). A plurality of first mold sleeves (64) which are respectively sleeved on the corresponding first straight rods (64) are vertically fixedly arranged at the top of the second lifting plate (62). 5), the inner diameter of the first mold sleeve (65) is the same as the outer diameter of the first straight rod (64), a plurality of first mold cylinders (66) respectively sleeved on the corresponding first mold sleeves (65) are vertically fixed on the top of the third lifting plate (63), the outer diameter of the first mold cylinder (66) is the same as the diameter of the mold hole (5) on the raw material cabin (3), the inner diameter of the first mold cylinder (66) is the same as the outer diameter of the first mold sleeve (65), and the inner diameter of the first mold cylinder (66) is the same as the inner diameter of the mold hole (5) on the mold plate (2).
6. The spherical heat storage product production equipment with replaceable mold according to claim 5, Features: The top end of the first mold sleeve (65) is arranged in a flat surface, and the sides of the first lifting plate (61), the second lifting plate (62), and the third lifting plate (63) are vertically fixed with a second position sensor (67) that can abut against the bottom end of the mold plate (2), and the side of the third lifting plate (63) is vertically fixed with a third position sensor (68) that can detect the position of the second lifting plate (62).
7. The spherical heat storage product production equipment with replaceable mold according to claim 5, Features: A plurality of first upper mold sleeves (81) are vertically fixedly arranged at the bottom end of the upper mold frame (8) and are respectively coaxially arranged with the mold holes (5); a first vent hole (82) is opened at the lower side of the first upper mold sleeve (81); the bottom end of the first upper mold sleeve (81) is arranged in a plane; the outer diameter and inner diameter of the first upper mold sleeve (81) are respectively the same as the outer diameter and inner diameter of the first mold sleeve (65) and are coaxially arranged.
8. The spherical thermal storage product production equipment with replaceable molds according to any one of claims 1 to 7, Features: A temporary storage box (16) is fixedly provided on the side of the equipment frame (1), a filter plate (17) is fixedly provided at an angle in the middle of the temporary storage box (16), and a connecting plate (18) abutting against the top end of the temporary storage box (16) is fixedly provided at one end of the mold plate (2).
