Multifunctional transportation device of bridge girder erection machine
By integrating multi-functional transport devices on the bridge erecting machine, using the combination of electric hoists and ropes, the rapid and convenient transportation of injured people and materials is achieved, and the problem of the time spent on transporting injured people during bridge erecting construction is solved, and the construction efficiency and Security.
Patent Information
- Application Number
- CN202420141882.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-19
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-01-19
AI Technical Summary
During the bridge construction process, the transport of injured people to the ground takes a long time, which affects treatment and is inconvenient for many people to carry stretchers.
Design a multi-functional transport device for bridge mounts, including a carrier frame and a lifting assembly. The carrier frame is arranged on the lifting assembly. The lifting assembly consists of electric hoists and ropes to lift the carrier frame on the side of the bridge, simplifying the injured person and Transfer of materials.
It significantly reduces the time for injured people to be transferred to the ground, improves the convenience and safety of construction workers, and facilitates and quickly transports materials.
Smart Images

Figure CN221955635U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of bridge construction rescue equipment, and in particular to a multifunctional transport device for a bridge erection machine. Background Art
[0002] The bridge erection machine is a device that places the prefabricated beams on the prefabricated bridge piers. It belongs to the category of cranes because its main function is to lift the beams, transport them to the location and then put them down. During the bridge erection construction, since the construction site is located on the bridge piers and at a high distance from the ground, when people are injured during the construction process, they need to be transferred to the ground in time and then sent to the hospital for treatment.
[0003] At present, the injured person is usually placed on a stretcher, and then multiple construction workers lift the stretcher to the built bridge section, and then lift the injured person to the ground from the staircase on the side of the built bridge. However, the distance between the construction section and the built bridge section is long, and it is very inconvenient for multiple construction workers to carry the stretcher on the staircase, resulting in a lot of time spent on transferring the injured person to the ground, which affects the treatment of the injured person. Utility Model Content
[0004] In order to reduce the time spent in transporting injured persons to the ground during bridge construction, the present application provides a multifunctional transport device for a bridge erection machine.
[0005] The present application provides a multifunctional transport device for a bridge erecting machine, which adopts the following technical solution:
[0006] A multifunctional transport device for a bridge erecting machine comprises a load-bearing frame and a hoisting assembly, wherein the load-bearing frame is arranged on the hoisting assembly and is used to receive a stretcher, and the hoisting assembly is arranged on the bridge erecting machine and is used to drive the load-bearing frame to be lifted and lowered on the side of a bridge.
[0007] By adopting the above technical scheme, when people are injured during the construction process, the construction workers place the injured person on a stretcher, then lift the stretcher to the load-bearing frame, and place the stretcher on the load-bearing frame, and then drive the load-bearing frame to be lowered from the side of the bridge through the lifting assembly, and then the load-bearing frame can be lowered to the ground on the side of the bridge, and then the injured person is transferred to the ground, thereby improving the convenience of the construction workers in transferring the injured person to the ground, and effectively reducing the time spent in transferring the injured person to the ground during bridge construction, and the construction workers can also place emergency items, medicines, water and other materials on the load-bearing frame, and then drive the load-bearing frame to rise to the bridge deck through the lifting assembly, so as to conveniently and quickly transport the materials.
[0008] Optionally, the lifting assembly includes an electric hoist and a lifting rope, the electric hoist is arranged on the bridge erecting machine, the lifting rope is arranged on a hook of the electric hoist, and the lifting rope is wound around a bearing frame.
[0009] By adopting the above technical solution, the construction workers will wrap the lifting rope around the bearing frame and put the lifting rope onto the hook of the electric hoist. Then the construction workers can drive the bearing frame to descend or ascend on the side of the bridge by controlling the descent or ascent of the hook of the electric hoist, thereby effectively improving the convenience of the construction workers in controlling the lifting and lowering of the bearing frame.
[0010] Optionally, a railing is provided on the support frame, and the railing is circumferentially arranged around the outer circumference of the support frame.
[0011] By adopting the above technical solution, the railings surround the outer periphery of the load-bearing frame, thereby improving the safety of construction workers after placing the stretcher on the load-bearing frame.
[0012] Optionally, a plurality of positioning cards are provided on the railing, and the positioning cards are used to position the stretcher.
[0013] By adopting the above technical solution, the positioning card positions the stretcher to prevent the stretcher from sliding during transportation, thereby effectively improving the stability of the stretcher during transportation.
[0014] Optionally, a rope clamp is provided at one end of the lifting rope close to the electric hoist, and the rope clamp tightens the end of the lifting rope close to the electric hoist.
[0015] By adopting the above technical solution, the rope clamp tightens one end of the lifting rope close to the electric hoist, so that the multiple strands of the lifting rope close to the electric hoist are tightened and then put on the hook of the electric hoist, preventing the lifting rope from being tilted and put on the hook of the electric hoist and detaching from the hook of the electric hoist, effectively improving the stability of the lifting rope put on the hook of the electric hoist.
[0016] Optionally, a plurality of lifting rings are provided on the support frame, and the lifting rope is passed through the lifting rings.
[0017] By adopting the above technical solution, the lifting ring positions the lifting rope wound on the supporting frame, prevents the lifting rope from sliding on the supporting frame, and improves the stability of the lifting rope wound on the supporting frame.
[0018] Optionally, a shackle is provided on the railing, and the lifting rope is passed through the shackle.
[0019] By adopting the above technical solution, the shackle positions the lifting rope again, further improving the stability of the lifting rope wound on the supporting frame.
[0020] Optionally, a plurality of supporting feet are provided at the bottom of the supporting frame.
[0021] By adopting the above technical solution, when the supporting frame is lowered to the ground, a plurality of supporting legs support the supporting frame, thereby improving the stability of the supporting frame when it is lowered to the ground.
[0022] In summary, the present application includes at least one of the following beneficial technical effects:
[0023] 1. Improve the convenience for construction workers to transfer injured persons to the ground, effectively reduce the time spent on transferring injured persons to the ground during bridge construction, and construction workers can also place emergency items, medicines, water and other materials on the load-bearing frame, and then drive the load-bearing frame to rise to the bridge deck through the hoisting assembly, so as to transport materials conveniently and quickly;
[0024] 2. The rope clamp tightens the end of the lifting rope close to the electric hoist to prevent the lifting rope from tilting and being detached from the hook of the electric hoist, thereby effectively improving the stability of the lifting rope on the hook of the electric hoist. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a structural schematic diagram of the multifunctional transport device of the bridge erecting machine according to an embodiment of the present application.
[0026] Figure 2 It is a structural schematic diagram of another perspective of the embodiment of the present application.
[0027] Figure 3 yes Figure 1 A partial enlarged schematic diagram of part A.
[0028] Figure numerals: 1. load-bearing frame; 11. frame; 12. steel plate; 13. rib plate; 2. lifting assembly; 21. electric hoist; 22. lifting rope; 3. railing; 4. positioning card; 5. rope card; 6. lifting ring; 7. shackle; 8. supporting foot. DETAILED DESCRIPTION
[0029] The following is combined with Figure 1-3 This application is described in further detail.
[0030] The embodiment of the present application discloses a multifunctional transport device for a bridge erecting machine.
[0031] Reference Figure 1 The multifunctional transport device of the bridge erecting machine includes a load-bearing frame 1 and a hoisting assembly 2.
[0032] Reference Figure 1 , Figure 2The load-bearing frame 1 is installed on the lifting assembly 2. In this embodiment, the load-bearing frame 1 includes a frame 11, a steel plate 12 and a rib plate 13. The frame 11 is formed by welding four angle steels end to end. The steel plate 12 is placed in the frame 11 to close the internal opening of the rectangular frame 11. The rib plate 13 is installed at the bottom of the frame 11 to provide auxiliary support for the frame 11 and the steel plate 12. The entire load-bearing frame 1 is easy to obtain materials and is easy to manufacture.
[0033] Reference Figure 1 , Figure 2 The hoisting assembly 2 is installed on the bridge erecting machine. The hoisting assembly 2 is used to drive the load-bearing frame 1 to rise and fall on the side of the bridge. The hoisting assembly 2 includes an electric hoist 21 and a hoisting rope 22. The electric hoist 21 is installed on the bridge erecting machine. The electric hoist 21 can be a CD1 single-speed type, an MD1 double-speed type, etc. In the present embodiment, the electric hoist 21 is a CD1 single-speed electric hoist 21; the hoisting rope 22 is sleeved on the hook of the electric hoist 21. The hoisting rope 22 can be a steel rope, a nylon rope, etc. In the present embodiment, the hoisting rope 22 is a steel rope, and the hoisting rope 22 is sleeved on the hook of the electric hoist 21 with multiple strands, and the ends of the multiple strands of the hoisting rope 22 away from the electric hoist 21 are respectively wound around the two ends of the load-bearing frame 1.
[0034] During the construction of the bridge, when people are injured on the bridge deck, the construction workers place the injured person on a stretcher, then lift the stretcher to the load-bearing frame 1 on the side of the bridge, and retract the steel rope of the electric hoist 21 to lift the load-bearing frame 1 to the side bridge deck of the bridge. The construction workers then place the stretcher on the load-bearing frame 1, and then control the steel rope of the electric hoist 21 to release, so that the load-bearing frame 1 can be smoothly lowered to the ground, and the injured person can be quickly transferred to the ground, which improves the convenience of the construction workers in transferring the injured person to the ground, and effectively reduces the time spent in transferring the injured person to the ground during bridge construction. In daily construction, the construction workers can also place emergency items, medicines, water and other materials on the load-bearing frame 1, and then use the electric hoist 21 to drive the load-bearing frame 1 to rise to the bridge deck, and then transport the materials to the bridge deck, so as to conveniently and quickly transport the materials from the ground to the bridge deck.
[0035] Reference Figure 1 , Figure 2 A rope clamp 5 is installed at one end of the lifting rope 22 close to the electric hoist 21. In this embodiment, the rope clamp 5 includes a U-shaped rod, a locking sleeve and a nut. The locking sleeve is slidably installed on the open end of the U-shaped rod, and the nut is threadedly installed on each of the two support rods at the open end of the U-shaped rod.
[0036] The construction workers put the multi-strand lifting rope 22 into the U-shaped rod, and then rotate the two nuts so that the two nuts drive the locking sleeve to press the multi-strand lifting rope 22 against the U-shaped rod, so that the multiple lifting ropes 22 are tightened, so that the end of the multi-strand lifting rope 22 close to the hook of the maneuvering hoist is in a retracted state, and then the multi-strand lifting rope 22 can be in a vertical state after one end of the lifting rope 22 is sleeved on the hook of the electric hoist 21, thereby preventing the lifting rope 22 from being tilted on the hook of the electric hoist 21 and easily falling off the hook of the electric hoist 21, thereby effectively improving the stability of the lifting rope 22 on the hook of the electric hoist 21.
[0037] Reference Figure 1 , Figure 2 A railing 3 is installed on the carrier frame 1. In this embodiment, the railing 3 is welded by multiple connecting steel plates 12 and multiple steel pipes to form a frame body arranged around the carrier frame 1; a plurality of positioning cards 4 are installed on the railing 3. In this embodiment, the positioning card 4 is welded by two steel bars on the railing 3. The spacing between the two steel bars is the same as the diameter of the support rods on both sides of the stretcher, and one positioning card 4 is welded on the railing 3 at the four corners of the carrier frame 1, and a rubber pad is installed on the railing 3 at the bottom of the positioning card 4 to enhance the friction between the stretcher and the railing 3 and prevent the stretcher from sliding on the railing 3.
[0038] The construction workers place the stretcher on the carrier frame 1 so that the two support rods on both sides of the stretcher are respectively inserted into different positioning cards 4, and the positioning cards 4 can position the stretcher. At this time, the injured person on the stretcher will exert gravity on the supporting cloth of the stretcher, and the injured person can be recessed into the space formed by the railing 3 and the carrier frame 1, effectively improving the stability of the stretcher on the carrier frame 1, thereby improving the safety when transporting the injured person.
[0039] Reference Figure 1 , Figure 3 A plurality of lifting rings 6 are installed on the load-bearing frame 1. In the present embodiment, one lifting ring 6 is installed at each of the four corners of the load-bearing frame 1. A plurality of shackles 7 are installed on the railing 3. In the present embodiment, one shackle 7 is installed at each of the four corners of the railing 3 close to the load-bearing frame 1. The lifting rope 22 is passed through the lifting ring 6, and the lifting rope 22 is passed through the shackle 7.
[0040] The lifting ring 6 and the shackle 7 jointly position the lifting rope 22 to prevent the lifting rope 22 from sliding on the supporting frame 1 , thereby improving the stability of the lifting rope 22 wound around the supporting frame 1 , and further improving the stability of the lifting rope 22 when lifting the supporting frame 1 .
[0041] Reference Figure 1 , Figure 2A plurality of supporting feet 8 are installed at the bottom of the supporting frame 1. In the present embodiment, a supporting foot 8 is installed at each of the four corners of the bottom of the supporting frame 1, and a contact plate is installed at one end of the supporting foot 8 away from the supporting frame 1 to increase the contact area between the supporting foot 8 and the ground.
[0042] When the construction workers lower the supporting frame 1 to the ground through the electric hoist 21, the four supporting legs 8 support the four corners of the supporting frame 1 to improve the stability of the supporting frame 1 when it is lowered to the ground.
[0043] The implementation principle of the multifunctional transportation device of the bridge-building machine in the embodiment of the present application is as follows: the construction workers place the injured person on the stretcher, and then lift the stretcher to the load-bearing frame 1, so that the four positioning clips 4 on the railing 3 are clamped on the support rods on both sides of the stretcher in groups of two, and then control the lower part of the steel rope of the electric hoist 21 to lower the load-bearing frame 1 to the ground, and then quickly and conveniently transfer the injured person to the ground, effectively reducing the time spent in transferring the injured person to the ground during bridge construction. At the same time, the construction workers can also place emergency items, medicines, water and other materials on the receiving frame, and then use the electric hoist 21 to raise the load-bearing frame 1 to the bridge deck, so as to conveniently and quickly transport the materials.
[0044] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A multifunctional transport device for a bridge erecting machine, characterized in that: It comprises a load-bearing frame (1) and a lifting assembly (2), wherein the load-bearing frame (1) is arranged on the lifting assembly (2), the load-bearing frame (1) is used to receive a stretcher, the lifting assembly (2) is arranged on a bridge erecting machine, and the lifting assembly (2) is used to drive the load-bearing frame (1) to be raised or lowered on the side of the bridge; The hoisting assembly (2) comprises an electric hoist (21) and a hoisting rope (22); the electric hoist (21) is arranged on a bridge erecting machine; the hoisting rope (22) is arranged on a hook of the electric hoist (21); and the hoisting rope (22) is wound around a bearing frame (1).
2. The multifunctional transport device for bridge erection machine according to claim 1, characterized in that: The support frame (1) is provided with a railing (3), and the railing (3) is circumferentially arranged around the outer circumference of the support frame (1).
3. The multifunctional transport device for bridge erection machine according to claim 2 is characterized in that: A plurality of positioning cards (4) are provided on the handrail (3), and the positioning cards (4) are used to position the stretcher.
4. The multifunctional transport device for bridge erection machine according to claim 1, characterized in that: A rope clamp (5) is provided at one end of the lifting rope (22) close to the electric hoist (21), and the rope clamp (5) tightens the end of the lifting rope (22) close to the electric hoist (21).
5. The multifunctional transport device for bridge erection machine according to claim 1, characterized in that: The support frame (1) is provided with a plurality of lifting rings (6), and the lifting rope (22) is passed through the lifting rings (6).
6. The multifunctional transport device for bridge erection machine according to claim 2, characterized in that: The railing (3) is provided with a shackle (7), and the lifting rope (22) is passed through the shackle (7).
7. The multifunctional transport device for bridge erection machine according to claim 1, characterized in that: A plurality of supporting feet (8) are provided at the bottom of the supporting frame (1).