Safety protection structure for hydraulic engineering construction

Through the combination of upright piles and connection sealing structures, steel cables are used to fix upright piles and fenders to form a stable safety protection structure for water conservancy engineering construction, solving the problem of widening the water dam in the existing technology, and achieving rapid Economic construction effect.

CN221956622UInactive Publication Date: 2024-11-05HENAN XINGSHUI ENG MANAGEMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420186290.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-25
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing water conservancy project construction safety protection structure mainly relies on gravel and mud bags to build water blocking dams, resulting in the need to widen the water blocking dams to stabilize the interception of rivers and waste a lot of manpower and material resources.

Method used

Adopt a pile, fixed connection structure and connection sealing structure, including connecting seats, threaded seats, extruded bolts, rope holes and steel cables. The piles are fixed by the cable tension, combining the limit grooves, fenders, connecting seats and Fix the bolts to form a stable water blocking structure to reduce the amount of silt and sand filling.

Benefits of technology

The rapid construction safety protection barrier dam with good stability has been achieved, reducing construction costs and manpower and material investment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221956622U_ABST
    Figure CN221956622U_ABST
Patent Text Reader

Abstract

The utility model discloses a hydraulic engineering construction safety protection structure which comprises a vertical pile, a fixed connection structure and a connection plugging structure, the fixed connection structure is arranged on the vertical pile, the connection plugging structure is arranged on the vertical pile, and the fixed connection structure comprises a first connection seat, a threaded seat, an extrusion bolt, a rope hole and a steel rope. The first connecting base is fixedly arranged on the vertical pile, the threaded base is fixedly arranged on the first connecting base, the extrusion bolt penetrates through the threaded base to be arranged in a threaded mode, the rope holes penetrate through the first connecting base, and the two ends of the steel rope penetrate through the rope holes to be fixedly arranged in the first connecting base. The utility model belongs to the technical field of water conservancy project equipment, particularly relates to a water conservancy project construction safety protection structure, and effectively solves the problems that most water conservancy project construction safety protection structures in the current market utilize broken stones and mud bags to build retaining dams for blocking, and in order to stably intercept rivers, the retaining dams need to be widened to be higher, and the construction cost is low. And lots of manpower and material resources are wasted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of water conservancy engineering equipment, in particular to a safety protection structure for water conservancy engineering construction. Background Art

[0002] Water conservancy projects require the construction of different types of hydraulic structures such as dams, dikes, spillways, sluices, water inlets, channels, ferries, rafts, fishways, etc. to achieve their goals. During the construction of water conservancy facilities, in order to facilitate construction, the river channel is generally intercepted and the project location is drained to facilitate construction. However, most of the existing safety protection structures for water conservancy project construction are built with gravel and mud bags to fill and block water. In order to be able to stably intercept the river, the water dam needs to be widened and raised, wasting a lot of manpower and material resources. Utility Model Content

[0003] In view of the above situation, in order to overcome the defects of the prior art, the utility model proposes a water conservancy project construction safety protection structure, which effectively solves the problem that most of the water conservancy project construction safety protection structures on the market are currently built with gravel and mud bags to build water dams for filling and blocking. In order to be able to stably intercept the river, the water dam needs to be widened and raised, wasting a lot of manpower and material resources.

[0004] The technical solution adopted by the utility model is as follows: A water conservancy project construction safety protection structure proposed by the utility model includes a pile, a fixed connection structure and a connection blocking structure, the fixed connection structure is arranged on the pile, the connection blocking structure is arranged on the pile, the fixed connection structure includes a connecting seat one, a threaded seat, an extrusion bolt, a rope hole and a steel cable, the connecting seat one is fixedly arranged on the pile, the threaded seat is fixedly arranged on the connecting seat one, the extrusion bolt passes through the threaded arrangement of the threaded seat, the rope hole is penetrated in the connecting seat one, the two ends of the steel cable respectively pass through the rope holes and are fixed in the connecting seat one, and the steel cable plays a role of tension fixing.

[0005] Preferably, the connection sealing structure includes a limit groove, a mudguard, a second connection seat, a connection plate and a fixing bolt. The limit groove is arranged through the piles. The mudguards are slidably arranged on both sides in the upper limit grooves of the two groups of piles. The mudguards play a role in blocking mud and water. The second connection seat is fixed on the piles. The connection plate is buckled in the second connection seat on the two groups of piles. The connection plate plays a role in connection and fixing. The fixing bolts pass through the connection plate and are threadedly arranged on the second connection seat.

[0006] In order to achieve a better fixing effect, the two groups of piles are fixed by the tension of steel cables. The steel cables exert relative tension on the piles on both sides, thereby stabilizing the piles and avoiding uneven unidirectional force.

[0007] In order to achieve the purpose of connection more quickly, the stakes and the connecting plate are arranged vertically, and the connecting plate and the fender are arranged parallelly.

[0008] Furthermore, the mud guards on the piles are arranged in parallel to form a baffle, which vertically blocks the river channel, thereby using less silt for filling.

[0009] The beneficial effects achieved by the utility model using the above structure are as follows: This scheme proposes a water conservancy project construction safety protection structure, in which piles are used to support mud guards to quickly build a prototype of a dam, and steel cables are used to connect the two sides to avoid collapse after filling with soil, thereby forming a construction safety protection dam with good stability and low cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 This is a schematic diagram of the overall structure of a water conservancy project construction safety protection structure proposed by the utility model;

[0011] Figure 2 This is a structural schematic diagram from another perspective of a water conservancy project construction safety protection structure proposed by the utility model;

[0012] Figure 3 The utility model is a schematic diagram of the cross-sectional structure of a safety protection structure for water conservancy project construction proposed by the utility model.

[0013] Among them, 1. piles, 2. fixed connection structure, 3. connection sealing structure, 4. connection seat 1, 5. threaded seat, 6. extrusion bolts, 7. rope holes, 8. steel cables, 9. limiting grooves, 10. mudguards, 11. connection seat 2, 12. connection plates, and 13. fixing bolts.

[0014] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. They are used together with the embodiments of the present invention to explain the present invention and do not constitute a limitation to the present invention. DETAILED DESCRIPTION

[0015] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments; based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0016] like Figure 1 and Figure 3As shown, the utility model proposes a water conservancy project construction safety protection structure, including a pile 1, a fixed connection structure 2 and a connection blocking structure 3, the fixed connection structure 2 is arranged on the pile 1, the connection blocking structure 3 is arranged on the pile 1, the fixed connection structure 2 includes a connecting seat 4, a threaded seat 5, an extrusion bolt 6, a rope hole 7 and a steel cable 8, the connecting seat 4 is fixedly arranged on the pile 1, the threaded seat 5 is fixedly arranged on the connecting seat 4, the extrusion bolt 6 penetrates the threaded seat 5 and is threadedly arranged, the rope hole 7 is penetrated in the connecting seat 4, both ends of the steel cable 8 respectively penetrate the rope holes 7 and are fixed in the connecting seat 4, and the steel cable 8 plays a role of tension fixing.

[0017] like Figure 1 and Figure 2 As shown, the connection and blocking structure 3 includes a limit groove 9, a mud guard 10, a second connection seat 11, a connection plate 12 and a fixing bolt 13. The limit groove 9 is arranged through the pile 1, and the mud guard 10 is slidably arranged on both sides in the limit groove 9 on the two groups of piles 1. The mud guard 10 plays a role in blocking mud and water. The second connection seat 11 is fixed on the pile 1, and the connection plate 12 is snap-fitted into the second connection seat 11 on the two groups of piles 1. The connection plate 12 plays a role in connection and fixing. The fixing bolt 13 passes through the connection plate 12 and is threadedly arranged on the second connection seat 11.

[0018] like Figure 1 and Figure 3 As shown, two groups of piles 1 are fixed by the tension of steel cables 8. The steel cables 8 exert relative tension on the piles 1 on both sides, thereby stabilizing the piles 1 and avoiding unidirectional force unevenness.

[0019] like Figure 1 and Figure 2 As shown, the pile 1 and the connecting plate 12 are arranged vertically, and the connecting plate 12 and the fender 10 are arranged parallelly.

[0020] like Figure 1 and Figure 2 As shown, the mud guards 10 on the piles 1 are arranged in parallel, so as to be connected to form a baffle, which vertically blocks the river channel, thereby using less silt for filling.

[0021] During specific use, when the user uses this device, he first arranges the piles 1 and inserts them into the bottom of the river channel, then inserts the connecting plate 12 into the connecting seat 2 11 on the two groups of piles 1, and then uses the fixing bolts 13 to penetrate the connecting seat 2 11 and the connecting plate 12 to fix them with threads, and then inserts multiple groups of mud guards 10 into the limiting grooves 9 between the two groups of piles 1 to form a partition structure, and then penetrates multiple groups of steel cables 8 into the rope holes 7 on the connecting seat 1 4, and then turns the extrusion bolts 6 to penetrate the threaded seat 5 and screw downward to fix the steel cables 8 in the connecting seat 1 4, so that the steel cables 8 pull and fix the piles 1 on both sides to avoid excessive force on the piles 1 and the mud guards 10 after filling with mud and sand, and thus collapse, thereby forming a stable protective structure. The above is the use process of the entire water conservancy project construction safety protection structure.

[0022] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0023] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

[0024] The above description of the utility model and its implementation methods is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.

Claims

1. A safety protection structure for water conservancy project construction, characterized in that: It includes a pile, a fixed connection structure and a connection blocking structure, the fixed connection structure is arranged on the pile, the connection blocking structure is arranged on the pile, the fixed connection structure includes a connecting seat one, a threaded seat, an extrusion bolt, a rope hole and a steel cable, the connecting seat one is fixedly arranged on the pile, the threaded seat is fixedly arranged on the connecting seat one, the extrusion bolt penetrates the threaded arrangement of the threaded seat, the rope hole penetrates the connecting seat one, and both ends of the steel cable respectively penetrate the rope holes and are fixedly arranged in the connecting seat one.

2. A water conservancy project construction safety protection structure according to claim 1, characterized in that: The connection sealing structure includes a limit groove, a mudguard, a second connection seat, a connection plate and a fixing bolt. The limit groove passes through the pile, and the mudguard is slidably arranged on both sides in the upper limit grooves of the two groups of piles. The second connection seat is fixed on the pile, and the connection plate is buckled in the second connection seat on the two groups of piles. The fixing bolt passes through the connection plate and is threadedly arranged on the second connection seat.

3. A water conservancy project construction safety protection structure according to claim 2, characterized in that: The two groups of piles are fixed by the tension of steel cables, and the steel cables form relative tension on the piles at both sides.

4. A water conservancy project construction safety protection structure according to claim 3, characterized in that: The stakes and the connecting plate are arranged vertically, and the connecting plate and the fender are arranged parallelly.

5. A water conservancy project construction safety protection structure according to claim 4, characterized in that: The mudguards are arranged in parallel on the piles.