Flood prevention box for water conservancy project
By introducing lifting mechanisms and connectors into the flood control box, the shortcomings of existing flood control boxes in stacking and moving are solved, convenient movement and quick connection are achieved, and the stability and strength of the flood control box are improved, especially in soft soil quality. fixed effect.
Patent Information
- Application Number
- CN202420585791.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-05
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing flood control boxes lack a fixed connection structure when stacked and arranged, which affects the firm strength and is inconvenient to move. Especially in soft soil, it is difficult to fix and firmly, and it is easy to be washed away by the sliding table.
A flood control box including a top open-shaped box, two-side connections, anchor rods, walking wheels and stabilization plates are designed. The running wheels and stabilization plates are raised or lowered simultaneously through the lifting mechanism, and the anchor rods and connectors are quickly connected. and fix to ensure the stability and firmness of the box.
It realizes convenient movement and quick connection of flood control boxes, improves the stability and strength of the overall structure, avoids injury to the anchor tip, and provides a reliable fixing effect on soft soil.
Smart Images

Figure CN221956634U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water conservancy projects, in particular to a flood prevention box for water conservancy projects. Background Art
[0002] When flood disasters occur, flood control boxes are stacked and arranged into a wall to consolidate embankments and dams, thereby improving flood control efficiency and the strength of embankment and dam construction. However, when existing flood control boxes are stacked and arranged together, there is a lack of fixed connection structures between adjacent flood control boxes, which affects the strength of the flood control box walls. In addition, existing flood control boxes are inconvenient to move, making manual transportation difficult. The conventional method of installing rollers at the bottom for movement causes the placement of the flood control boxes to be unstable due to the small contact area between the rollers and the ground. In addition, the flood control boxes are usually fixed at the edges by anchor rods, which are difficult to fix firmly on soft soil and are easily washed away and moved.
[0003] Therefore how to solve the above-mentioned technical problems just becomes the problem that the utility model faces. Utility Model Content
[0004] In order to solve the deficiencies of the prior art, the utility model provides a flood prevention box for a water conservancy project which is easy to move, firmly and conveniently connected, and stably placed.
[0005] The utility model solves the technical problem by adopting the following technical solution: the utility model provides a flood prevention box for a water conservancy project, comprising a box body with an opening at the top, connecting pieces are arranged on both sides of the box body, and anchor rods are arranged on the connecting pieces;
[0006] The bottom of the box is provided with running wheels and a stabilizing plate, and the running wheels and the stabilizing plate are both connected with a lifting mechanism;
[0007] A cover plate is hinged on the top of the box body.
[0008] The box
[0009] It is a rectangular structure, and the connecting member includes two pairs of upper connecting blocks symmetrically arranged on both sides of the top of the box body, wherein an upper connecting plate is fixedly connected between the two upper connecting blocks on one side, and an upper connecting groove is fixedly connected between the two upper connecting blocks on the other side;
[0010] Two lower connection blocks are symmetrically arranged on both sides of the bottom of the box body, a lower connection groove is fixedly connected between the two lower connection blocks located directly below the upper connection plate, and a lower connection plate is fixedly connected between the two lower connection blocks located directly below the upper connection groove;
[0011] The upper connecting plate is plugged into and matched with the upper connecting groove on the adjacent box body and is fixedly connected by an upper fixing bolt nut, and the lower connecting plate is plugged into and matched with the lower connecting groove on the adjacent box body and is fixedly connected by a lower fixing bolt nut.
[0012] There are four anchor rods and the roots of the anchor rods are fixedly connected to bases, the bases are matched with the top of the lower connecting plate, and the center of the lower connecting plate is provided with a socket matched with the anchor rod body;
[0013] A vertical sliding groove is provided between each of the upper connecting blocks and the corresponding lower connecting block, each of the sliding grooves is slidably connected to a sliding block, and a fixing hole matching with the anchor rod body is provided at the center of each sliding block;
[0014] A magnet block is arranged on the top of each sliding block, and the magnet block cooperates with the bottom of the upper connecting block made of metal.
[0015] The lifting mechanism comprises mounting blocks respectively arranged at the four corners of the bottom of the inner side of the box body, the inner center of the mounting block is rotatably connected with a threaded sleeve with an opening facing downward, the inner side of each threaded sleeve is threadedly connected with a threaded rod, and the bottom of each threaded rod is fixedly connected with the walking wheel;
[0016] A first worm gear is coaxially sleeved on the outer side of the top of each threaded sleeve, and the two first worm gears located on the same side are respectively meshed with both sides of the first worm, and the first worm is horizontally rotatably connected to the lower inner side of the box body. A second worm gear is coaxially sleeved on the outer side of the central part of the two first worms, and the two second worm gears are meshed with both sides of the second worm connected horizontally and rotatably to the lower inner side of the box body, and the front end of the second worm extends to the outside of the box body and is fixedly connected to a rocker.
[0017] The stabilizing plate is rectangular in shape, and a plurality of stabilizing cones with their tips facing downward are evenly arranged at the bottom of the stabilizing plate. A rack is vertically arranged upward at each of the four corners of the top of the stabilizing plate. The rack passes through the through slot at the bottom of the box from bottom to top and is slidably connected to the through slot.
[0018] Two gears are coaxially sleeved on both sides of the two first worms corresponding to the racks, and the four gears are respectively meshed with the four racks.
[0019] A partition is arranged above the lifting mechanism.
[0020] The upper side of each anchor rod is movably matched with a protective tube with an opening facing downward, and the top of each sliding block is provided with a circular slot matched with the bottom of the protective tube.
[0021] When the utility model is actually used: in the placed state, the base of the anchor rod is placed on the lower connecting block, the sliding block is slid downward so that it is located at the bottom of the sliding groove and is sleeved on the outside of the anchor rod, and the protective tube cover is buckled on the outside of the tip of the anchor rod. At this time, the walking wheel is in contact with the ground. When the flood prevention box needs to be used for flood prevention, the flood prevention box filled with sandbags is pushed to the use site by the walking wheel. First, the rocker drive upgrading mechanism is selected to make the walking wheel rise, the stabilizing plate synchronously descends, and the stabilizing cone is inserted into the ground. The protective tube is removed, the sliding block is slid upward and fixed by adsorption with the upper connecting block through the magnet block, the anchor rod is removed and nailed into the ground through the jack, and the adjacent flood prevention boxes are quickly and firmly connected through the connecting piece, the connecting plate is inserted into the corresponding connecting groove, and connected by the fixing bolt.
[0022] The beneficial effects of the utility model are:
[0023] 1. The utility model adopts a structural setting that the running wheel and the stabilizing plate are driven by the lifting mechanism at the same time, so that the flood control box can be easily moved as a whole and can be quickly switched to a stable working state. When the running wheel is lifted, the stabilizing cone is lowered and penetrated into the ground;
[0024] 2. The utility model can quickly and firmly connect two adjacent flood control boxes through the connecting piece, thereby improving the strength of the overall structure and ensuring the flood control effect;
[0025] 3. The utility model can place the anchor rod stably and safely on the structure itself when it is placed, without having to place it separately, and can also effectively prevent the tip of the anchor rod from hurting people. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is the front view of the utility model;
[0027] Figure 2 This is a schematic diagram of the three-dimensional structure of the utility model from a first angle;
[0028] Figure 3 It is a top view of the utility model with the cover plate opened and the partition plate separated from the box body;
[0029] Figure 4 It is a schematic diagram of the three-dimensional structure of the utility model when the cover is opened and the partition is separated from the box body;
[0030] Figure 5 for Figure 4 A magnified schematic diagram of area A;
[0031] Figure 6 This is a schematic diagram of the three-dimensional structure of the utility model from a second angle;
[0032] Figure 7 This is a schematic diagram of the structure of the utility model when the box is in an open state;
[0033] Figure 8 This is a schematic diagram of the three-dimensional structure of the utility model in the connected state;
[0034] Fig. 9 It is a schematic diagram of the three-dimensional structure of the sliding block of the utility model.
[0035] Wherein, the accompanying drawings are marked as follows:
[0036] 1. Box body; 101. Through slot; 102. Partition; 2. Connectors; 201. Upper connecting block; 202. Upper connecting plate; 203. Upper connecting slot; 204. Lower connecting block; 205. Lower connecting slot; 206. Lower connecting plate; 207. Upper fixing bolt nut; 208. Lower fixing bolt nut; 209. Socket; 210. Sliding slot; 211. Sliding block; 212. Fixing hole; 213. Magnet block ; 214, slot; 3, anchor rod; 301, base; 4, walking wheel; 5, stabilizing plate; 501, stabilizing cone; 6, lifting mechanism; 601, mounting block; 602, threaded sleeve; 603, threaded rod; 604, first worm gear; 605, first worm; 606, second worm gear; 607, second worm; 608, rocker; 609, rack; 610, gear; 7, cover plate; 8, protective tube. DETAILED DESCRIPTION
[0037] In order to clearly illustrate the technical features of this solution, this solution is described below through a specific implementation method.
[0038] See also Figures 1 to 9 As shown, the utility model is a flood prevention box for water conservancy projects, including a box body 1 with an open top, connecting pieces 2 are arranged on both sides of the box body 1, anchor rods 3 are arranged on the connecting pieces, running wheels 4 and a stabilizing plate 5 are arranged at the bottom of the box body 1, the running wheels 4 and the stabilizing plate 5 are both connected to a lifting mechanism 6, and a cover plate 7 is hinged on the top of the box body 1.
[0039] The box body 1 is a rectangular structure, and the connecting member 2 includes two pairs of upper connecting blocks 201 symmetrically arranged on both sides of the top of the box body 1, wherein an upper connecting plate 202 is fixedly connected between the two upper connecting blocks 201 on one side, and an upper connecting groove 203 is fixedly connected between the two upper connecting blocks 201 on the other side, and two lower connecting blocks 204 are symmetrically arranged on both sides of the bottom of the box body 1, a lower connecting groove 205 is fixedly connected between the two lower connecting blocks 204 directly below the upper connecting plate 202, and a lower connecting plate 206 is fixedly connected between the two lower connecting blocks 204 directly below the upper connecting groove 203, the upper connecting plate 202 is plug-fitted with the upper connecting groove 203 on the adjacent box body 1 and fixedly connected by an upper fixing bolt nut 207, and the lower connecting plate 206 is plug-fitted with the lower connecting groove 205 on the adjacent box body 1 and fixedly connected by a lower fixing bolt nut 208.
[0040] There are four anchor rods 3 and their roots are fixedly connected with bases 301, which match with the top of the lower connecting plate 206. The center of the lower connecting plate 206 is provided with a socket 209 that matches with the rod body of the anchor rod 3. A vertical sliding groove 210 is provided between each upper connecting block 201 and its corresponding lower connecting block 204. Each sliding groove 210 is slidably connected with a sliding block 211. The center of each sliding block 211 is provided with a fixing hole 212 that matches with the rod body of the anchor rod 3. A magnet block 213 is provided at the top of each sliding block 211, and the magnet block 213 matches with the bottom of the upper connecting block 201 made of metal. The upper side of each anchor rod 3 is movably matched with a protective tube 8 with an opening facing downward, and the top of each sliding block 211 is provided with a circular slot 214 that matches with the bottom of the protective tube 8.
[0041] The lifting mechanism 6 includes mounting blocks 601 respectively arranged at the four corners of the bottom inner side of the box body 1, and a threaded sleeve 602 with an opening facing downward is rotatably connected to the inner center of the mounting block 601, and a threaded rod 603 is threadedly connected to the inner side of each threaded sleeve 602, and the bottom of each threaded rod 603 is fixedly connected to the walking wheel 4, and a first worm gear 604 is coaxially sleeved on the outer side of the top of each threaded sleeve 602, and the two first worm gears 604 located on the same side are respectively meshed with the two sides of the first worm 605, and the first worm 605 is horizontally rotatably connected to the lower inner side of the box body 1, and the second worm gears 606 are coaxially sleeved on the outer sides of the center parts of the two first worm gears 605, and the two second worm gears 606 are meshed with the two sides of the second worm 607 which is horizontally rotatably connected to the lower inner side of the box body 1, and the front end of the second worm 607 extends to the outside of the box body 1 and is fixedly connected to the rocker 608. The stabilizing plate 5 is rectangular in shape, and a number of stabilizing cones 501 with their tips facing downwards are evenly arranged at the bottom of the stabilizing plate 5. A rack 609 is vertically arranged upwards at the four corners of the top of the stabilizing plate 5. The rack 609 passes through the through groove 101 at the bottom of the box body 1 from bottom to top and is slidably connected to the through groove 101. Two gears 610 are coaxially sleeved on the corresponding racks 609 on both sides of the two first worm gears 605, and the four gears 610 are respectively meshed with the four racks 609. A partition 102 is arranged above the lifting mechanism 6.
[0042] In actual use: in the placed state, the base 301 of the anchor rod 3 is placed on the lower connecting block 204, and the sliding block 211 is slid downward so that it is located at the bottom of the sliding groove 210 and is sleeved on the outside of the anchor rod 3. The protective tube 8 cover is buckled on the outside of the tip of the anchor rod 3. At this time, the walking wheel 4 is in contact with the ground. When the flood prevention box is needed for flood prevention, the flood prevention box filled with sandbags is pushed to the use site by the walking wheel 4. First, the rocker 608 is selected to drive the upgrading mechanism 6 to make the walking wheel 4 rise, and the stabilizing plate 5 is synchronously lowered, and the stabilizing cone 501 is inserted into the ground, and the protective tube 8 is removed. The sliding block 211 is slid upward and fixed to the upper connecting block 201 through the magnet block 213, and the anchor rod 3 is removed and nailed into the ground through the socket 209. The adjacent flood prevention boxes are quickly and firmly connected through the connecting piece 2, and the connecting plate is inserted into the corresponding connecting groove and connected by fixing bolts.
[0043] Among them, in the working process of the lifting mechanism 6, the rotation of the rocker 608 drives the second worm 607 to rotate, the second worm 607 drives the second worm wheel 606 to rotate, the second worm wheel 606 drives the first worm 605 to rotate, the first worm 605 drives the first worm wheel 604 to rotate, the first worm wheel 604 drives the threaded sleeve 602 to rotate, the threaded sleeve 602 drives the threaded rod 603 to rise, the walking wheel 4 rises, and at the same time, the rotation of the first worm 605 drives the gear 610 to rotate, the gear 610 drives the rack 609 to descend, thereby pushing the stabilizing plate 5 to descend.
[0044] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A flood control box for a water conservancy project, characterized in that: It comprises a box body (1) with an open top, connecting pieces (2) are arranged on both sides of the box body (1), and anchor rods (3) are arranged on the connecting pieces; The bottom of the box body (1) is provided with running wheels (4) and a stabilizing plate (5), and the running wheels (4) and the stabilizing plate (5) are both connected to a lifting mechanism (6); A cover plate (7) is hinged on the top of the box body (1).
2. The flood control box for water conservancy projects according to claim 1, characterized in that: The box body (1) is a rectangular structure, and the connecting member (2) comprises two pairs of upper connecting blocks (201) symmetrically arranged on both sides of the top of the box body (1), wherein an upper connecting plate (202) is fixedly connected between the two upper connecting blocks (201) located on one side, and an upper connecting groove (203) is fixedly connected between the two upper connecting blocks (201) located on the other side; Two lower connection blocks (204) are symmetrically arranged on both sides of the bottom of the box body (1); a lower connection groove (205) is fixedly connected between the two lower connection blocks (204) located directly below the upper connection plate (202); and a lower connection plate (206) is fixedly connected between the two lower connection blocks (204) located directly below the upper connection groove (203); The upper connecting plate (202) is plugged into and matched with the upper connecting groove (203) on the adjacent box body (1) and is fixedly connected via an upper fixing bolt nut (207); the lower connecting plate (206) is plugged into and matched with the lower connecting groove (205) on the adjacent box body (1) and is fixedly connected via a lower fixing bolt nut (208).
3. The flood control box for water conservancy projects according to claim 2, characterized in that: There are four anchor rods (3) and the roots of the four anchor rods are fixedly connected to a base (301), the base (301) cooperates with the top of the lower connecting plate (206), and the center of the lower connecting plate (206) is provided with a socket (209) that cooperates with the rod body of the anchor rod (3); A vertical sliding groove (210) is provided between each upper connecting block (201) and its corresponding lower connecting block (204), each sliding groove (210) is slidably connected to a sliding block (211), and a fixing hole (212) is provided at the center of each sliding block (211) for cooperating with the rod body of the anchor rod (3); A magnet block (213) is provided on the top of each sliding block (211), and the magnet block (213) cooperates with the bottom of the upper connecting block (201) made of metal.
4. The flood control box for water conservancy projects according to claim 3, characterized in that: The lifting mechanism (6) comprises mounting blocks (601) respectively arranged at the four corners of the bottom inner side of the box body (1); a threaded sleeve (602) with an opening facing downward is rotatably connected to the inner central part of the mounting block (601); a threaded rod (603) is threadedly connected to the inner side of each threaded sleeve (602); and the bottom of each threaded rod (603) is fixedly connected to the walking wheel (4); A first worm gear (604) is coaxially sleeved on the outer side of the top of each threaded sleeve (602); the two first worm gears (604) located on the same side are respectively meshed with the two sides of a first worm (605); the first worm (605) is horizontally rotatably connected to the lower inner side of the housing (1); a second worm gear (606) is coaxially sleeved on the outer side of the central part of the two first worm gears (605); the two second worm gears (606) are meshed with the two sides of a second worm (607) horizontally rotatably connected to the lower inner side of the housing (1); the front end of the second worm (607) extends to the outside of the housing (1) and is fixedly connected to a rocker (608).
5. The flood control box for water conservancy projects according to claim 4, characterized in that: The stabilizing plate (5) is rectangular in shape, and a plurality of stabilizing cones (501) with their tips facing downward are evenly arranged at the bottom of the stabilizing plate (5). A rack (609) is vertically arranged upward at each of the four corners of the top of the stabilizing plate (5). The rack (609) passes through the through slot (101) at the bottom of the box body (1) from bottom to top and is slidably connected to the through slot (101); Two gears (610) are coaxially sleeved on the two sides of the two first worms (605) corresponding to the racks (609), and the four gears (610) are respectively meshed with the four racks (609). A partition plate (102) is arranged above the lifting mechanism (6).
6. The flood control box for water conservancy projects according to claim 3, characterized in that: The upper side of each anchor rod (3) is movably matched with a protective tube (8) with its opening facing downward, and the top of each sliding block (211) is provided with a circular slot (214) matched with the bottom of the protective tube (8).