Truss and column top positioning node and large-span truss positioning structure

By using sliding track components and embedded parts in the truss and column top placement nodes, the welding connection between the truss and the support base plate is directly completed, solving the problem of complex and time-consuming construction steps in the existing technology, and improving construction Efficiency and stability of truss structure.

CN221956955UActive Publication Date: 2024-11-05CHINA CONSTR STEEL STRUCTURE ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420471744.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-11
Publication Date
2024-11-05
Estimated Expiration
2034-03-11

AI Technical Summary

Technical Problem

During the construction of existing truss and column top positioning nodes, the truss structure needs to be lifted by a jack, and steel sliders and tracks need to be removed, resulting in complex construction steps, long time and low efficiency.

Method used

A truss and column top positioning node was designed, including the installation groove and slider at the bottom end of the truss structure, the embedded parts and support base plate of the concrete column were connected through sliding track components, simplifying the construction process, and the truss structure was directly hoisted and The cutting track forms short tracks and long tracks to realize the direct welding connection between the truss and the base plate of the support.

Benefits of technology

The construction steps are reduced, the construction process is simplified, the working hours are reduced, the construction efficiency is improved, and the stability and firmness of the truss structure are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221956955U_ABST
    Figure CN221956955U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of truss positioning construction, and aims to provide a truss and column top positioning node and a large-span truss positioning structure. The falling joint construction steps are few, the process is simple, time consumption is low, and construction efficiency is high. The landing node comprises a truss structure, a concrete column, a connecting assembly and a track assembly, a mounting groove is formed in the bottom end of the truss structure, and a sliding block is arranged in the mounting groove; the top of the concrete column is provided with an embedded part and a support base plate which are connected with each other; the two connecting assemblies are arranged on the two sides of the concrete column. The sliding block is in sliding connection with the rail assembly, and the rail assembly comprises a short rail connected with an embedded part arranged on the column top and a long rail arranged on the connecting assembly. The problems that in the prior art, a jacking device is needed to lift a truss structure and a steel sliding block and a track need to be dismantled during construction of a truss and a column top landing node, the number of construction steps is large, the process is complex, time consumption is large, and construction efficiency is low are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of truss placement construction, in particular to a truss and column top placement node and a large-span truss placement structure. Background Art

[0002] Truss placement construction technology is a commonly used construction technology in large bridges, stadiums, high-rise buildings and other structural projects that require large spans and high load capacity. It is an efficient placement construction technology that uses cranes and other lifting equipment to lift the prefabricated truss structure to the corresponding column top installation position, and then connects the truss structure to the column by welding.

[0003] The existing truss placement construction technology includes the following steps: connecting adjacent concrete columns through structures such as steel beams, and then laying tracks on the top of the concrete columns and the steel beams. A steel slider is set on the bottom surface of the truss structure, and then the truss structure is hoisted onto the track, and the truss structure is pulled to slide on the track by a jack. When the truss structure reaches the designated installation position, multiple jacks are set at the track intervals to lift the truss structure as a whole to a height of about 5 cm, and then the steel slider and track at the bottom of the truss are removed, and the support bottom plate is installed. Finally, the truss structure is placed on the support bottom plate, and the bottom of the truss structure is welded to the support bottom plate. Since the steel slider contacts the track at the node where the truss and the top of the column are placed, the bottom of the truss structure is not in direct contact with the top of the concrete column, and thus the welding connection between the truss structure and the top of the column cannot be directly completed. Therefore, it is necessary to set a jack to lift the truss structure during the construction process, and it is also necessary to remove the steel slider and track, which has many construction steps, a complicated process, is time-consuming, and has low construction efficiency. Utility Model Content

[0004] Therefore, the technical problem to be solved by the utility model is to overcome the defects of the prior art that the truss and column top landing nodes need to use a jack to lift the truss structure during construction, and also need to remove the steel slider and the track, which has many construction steps, complicated process, long time consumption and low construction efficiency, so as to provide a truss and column top landing node and a large-span truss landing structure with fewer construction steps, simple process, less time consumption and higher construction efficiency.

[0005] In order to solve the above problems, the utility model provides a truss and column top landing node, including:

[0006] A truss structure, wherein a mounting groove is provided at the bottom end of the truss structure, and a sliding block is provided in the mounting groove;

[0007] A concrete column, wherein the top of the concrete column is provided with connected embedded parts and a support base plate;

[0008] Connecting components, two groups of connecting components are arranged on both sides of the concrete column;

[0009] A track assembly, the slider is slidably connected to the track assembly, and the track assembly includes a short track connected to the embedded part arranged on the top of the column and a long track arranged on the connecting assembly.

[0010] Optionally, the truss structure includes: a truss column and a first pusher connector, and the first pusher connector is arranged on at least one side of the bottom of the truss column.

[0011] Optionally, the first pusher connector includes: two push ear plates spaced apart in a direction perpendicular to the extension direction of the track assembly, and a connection hole is formed on a side of the push ear plate away from the truss column.

[0012] Optionally, the length of the short rail is smaller than the length of the support base plate, and the width of the short rail is smaller than the width of the support base plate.

[0013] Optionally, the bottom end of the truss structure is welded to the support base plate around four sides.

[0014] Optionally, the connecting component is a sliding steel beam.

[0015] Optionally, the connection assembly includes: a concrete beam and a plurality of embedded parts spaced apart on the concrete beam, and the long rail is connected to the embedded parts disposed on the concrete beam.

[0016] A large-span truss placement structure comprises a plurality of truss and column top placement nodes, wherein the plurality of truss and column top placement nodes are arranged along the extension direction of a track assembly and / or perpendicular to the extension direction of the track assembly, and the truss columns of two adjacent truss and column top placement nodes are connected by a connecting truss, and the concrete columns are connected by a connecting assembly.

[0017] Optionally, the large-span truss landing structure also includes a booster node, which includes: a booster profile and a second booster connector, the booster profile is arranged at the bottom of the connecting truss, and the second booster connector is arranged on at least one side of the booster profile.

[0018] Optionally, the large-span truss landing structure also includes a sliding node, which includes: a secondary truss, a pushing support and a third pushing device connecting piece, the secondary truss is arranged in parallel between two of the truss columns, the pushing support is arranged at the bottom of the secondary truss, the bottom end of the pushing support is slidably connected to the track assembly, and the third pushing device connecting piece is arranged on at least one side of the pushing support.

[0019] The utility model has the following advantages:

[0020] 1. The truss and column top landing node provided by the utility model comprises: a truss structure, a concrete column, a connecting assembly and a track assembly. The bottom end of the truss structure is provided with an installation groove, and a slider is arranged in the installation groove. The top of the concrete column is provided with embedded parts and a support base plate connected to each other. Two sets of connecting assemblies are arranged on both sides of the concrete column. The slider is slidably connected to the track assembly, and the track assembly comprises a short track connected to the embedded parts arranged on the top of the column and a long track arranged on the connecting assembly. The short track and the long tracks on both sides are originally integrated, and are cut and separated into short tracks and long tracks during the subsequent construction process. The specific construction process is as follows: an integral track is arranged on the concrete column and the connecting assemblies on both sides, the track part located on the concrete column is connected to the embedded parts, and the remaining track parts are connected to the connecting assemblies. Then the truss structure is hoisted onto the track assembly, and the slider is slidably connected to the track assembly. The truss structure is driven by the pusher to slide on the track assembly until it reaches the installation position of the top of the concrete column, and then the track parts on both sides of the bottom end of the truss structure to the edge of the concrete column are cut off, thereby forming a short track and a long track. Since the slider is embedded in the bottom of the truss structure, the bottom of the truss structure can be directly connected to the support bottom plate to complete the positioning and fixing of the truss structure. It can be seen that during the construction of this positioning node, there is no need for a jack to lift the truss structure and remove the steel slider and the entire track, which greatly reduces the construction steps, simplifies the construction process, reduces the time consumption, and improves the construction efficiency.

[0021] 2. The utility model provides a truss and a column top landing node, the truss structure includes: a truss column and a first pusher connector, the first pusher connector is arranged on at least one side of the bottom of the truss column. The pusher connector includes two pusher lugs arranged at intervals perpendicular to the extension direction of the track assembly, and a connection hole is opened on the side of the pusher lug away from the truss column. After the first pusher connector is set, it can be directly connected to the pusher through the connection hole, which is convenient and quick.

[0022] 3. The length of the short track of the node between the truss and the column top provided by the utility model is less than the length of the support bottom plate, and the width of the short track is less than the width of the support bottom plate. In this way, when the truss structure reaches the designated installation position, the four sides of its bottom end can be welded to the support bottom plate, and the stability and firmness of the truss structure are better.

[0023] 4. The truss provided by the utility model and the column top landing node, the connection component is a sliding steel beam, which is convenient for dismantling and recycling the sliding steel beam after the construction is completed.

[0024] 5. The large-span truss placement structure provided by the utility model includes a plurality of truss and column top placement nodes, which are arranged along the extension direction of the track assembly and / or perpendicular to the extension direction of the track assembly, and the truss columns of two adjacent truss and column top placement nodes are connected by a connecting truss, and the concrete columns are connected by a connecting assembly. After the plurality of placement nodes are connected, they can slide as a whole along the extension direction of the track assembly, thereby improving the overall construction efficiency.

[0025] 6. The large-span truss landing structure provided by the utility model also includes a boosting node and a sliding node. The boosting node includes: a pushing profile and a second pushing device connector. The pushing profile is arranged at the bottom of the connecting truss, and the second pushing device connector is arranged on at least one side of the pushing profile. The sliding node includes: a secondary truss, a pushing support and a third pushing device connector. The secondary truss is arranged in parallel between two truss columns, the pushing support is arranged at the bottom of the secondary truss, the bottom end of the pushing support is slidably connected to the track assembly, and the third pushing device connector is arranged on at least one side of the pushing support. The boosting node and the sliding node can be connected to the pushing device, so as to facilitate the sliding of the truss as a whole. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0027] Figure 1 It is a schematic diagram of the utility model of the truss and the column top landing node when the connecting component is a sliding steel beam;

[0028] Figure 2 It is a side view of the node between the truss and the top of the column of the utility model when the connecting component is a sliding steel beam;

[0029] Figure 3 It is a schematic diagram of the utility model truss and column top landing node when the connection components are concrete beams and embedded parts;

[0030] Figure 4 It is a side view of the node between the truss and the top of the column of the utility model when the connection components are concrete beams and embedded parts;

[0031] Figure 5 This is a schematic diagram of the large-span truss landing structure of the utility model when the connecting component is a sliding steel beam;

[0032] Figure 6 It is a schematic diagram of a boosting node in the large-span truss landing structure of the utility model;

[0033] Figure 7 It is a schematic diagram of a sliding node in the large-span truss landing structure of the utility model;

[0034] Figure 8 This is a schematic diagram of the large-span truss landing structure of the utility model when the connecting components are concrete beams and embedded parts.

[0035] Description of reference numerals:

[0036] 101, slider, 102, truss column, 103, first thruster connecting piece;

[0037] 2. Concrete columns;

[0038] 301, sliding steel beam, 302, concrete beam, 303, embedded parts;

[0039] 4. Track components,

[0040] 5. Connect the trusses;

[0041] 601, a pusher profile, 602, a second pusher connecting piece;

[0042] 701, secondary truss, 702, jacking support, 703, third jacking device connecting piece;

[0043] 8. Thruster. DETAILED DESCRIPTION

[0044] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0045] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0046] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0047] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0048] like Figure 1 , Figure 2As shown, it is a preferred embodiment of the node between the truss and the top of the column of the utility model, and the node between the truss and the top of the column comprises: a truss structure, a concrete column 2, a connection assembly and a track assembly 4. During construction, the truss structure needs to be located on the concrete column 2, and a mounting groove is provided at the bottom end of the truss structure, and a slider 101 is provided in the mounting groove, which is equivalent to embedding a slider 101 at the bottom end of the truss structure. The concrete column 2 is the column structure of the building and plays a bearing role. The top of the concrete column 2 is provided with a connected embedded part 303 and a support base plate. The embedded part 303 is provided to facilitate the fixing of the track assembly 4, and the support base plate is provided to facilitate the fixing of the truss structure. Two sets of connection assemblies are provided on both sides of the concrete column 2. Since each building will be provided with multiple concrete columns 2, adjacent concrete columns 2 can be connected together through the connection assembly, so that the entire track can be laid on the connection assembly and the embedded part 303. The slider 101 is slidably connected to the track assembly 4. The track assembly 4 includes a short track connected to the embedded part 303 set at the top of the column and a long track set on the connecting assembly. The short track and the long track are originally an integral track. In the subsequent construction process, the integral track is cut to form a separated short track and two long tracks. The specific construction process is as follows: an integral track is arranged on the concrete column 2 and the connecting assemblies on both sides. The track part located at the concrete column 2 is connected to the embedded part 303, and the remaining track part is connected to the connecting assembly. The connection method can be welding to weld the two sides of the track to the embedded part 303 or the connecting assembly. Then the truss structure is hoisted onto the track assembly 4, so that the slider 101 at the bottom end of the truss structure is slidably connected to the track assembly 4. The truss structure is driven to slide on the track assembly 4 by the pusher 8. When the truss structure reaches the installation position of the top of the concrete column 2, the track parts on both sides of the bottom end of the truss structure to the edge of the concrete column 2 can be cut off, thereby forming a short track and a long track. Since the slider 101 is embedded in the bottom of the truss structure, the bottom of the truss structure can be directly connected to the support bottom plate, so as to complete the positioning and fixing of the truss structure. It can be seen that during the construction of this positioning node, there is no need for a jack to lift the truss structure and remove the steel slider 101 and the entire track, which greatly reduces the construction steps, simplifies the construction process, reduces the time consumption, and improves the construction efficiency.

[0049] Furthermore, the embedded part 303 is embedded in the column when the concrete column 2 is poured. The track is a channel steel track. A short track can be set on the upper surface of the embedded part 303. Both sides of the channel steel track are welded to the embedded part 303 to achieve connection. The support base plate is also welded to the embedded part 303. The length of the short track is less than the length of the support base plate, and the width of the short track is less than the width of the support base plate. During the sliding process of the truss structure, due to the existence of the track, even if the truss structure slides to the specified position, the two sides of the truss structure facing the long track cannot be directly welded to the support base plate. Cutting the track is also to weld the two sides of the truss structure facing the long track to the support base plate, to ensure that the four sides of the bottom end of the truss structure can be welded to the support base plate, so that the truss structure is more stable and reliable.

[0050] The truss structure includes: a truss column 102 and a first pusher connector 103. The bottom end of the truss column 102 is provided with a slider 101. The slider 101 is preferably a steel slider 101, which can slide on the track. The first pusher connector 103 is arranged on at least one side of the bottom of the truss column 102. In this embodiment, the first pusher connector 103 is arranged on any side of the truss column 102 facing the long track. Of course, in other embodiments, the pusher 8 connector can also be arranged on both sides of the truss column 102. Specifically, the first pusher connector 103 includes: two pusher lugs arranged at intervals along a direction perpendicular to the extension of the track assembly 4, and a connection hole is opened on the side of the pusher lug away from the truss column 102. The connection hole is arranged to facilitate the direct connection of the first pusher connector 103 with the pusher 8. During construction, the truss column 102 is driven to move on the track by the pusher 8, and the pusher 8 can be removed after the construction is completed.

[0051] Furthermore, in this embodiment, the connecting components on both sides of the concrete column 2 are sliding steel beams 301. The sliding steel beams 301 are temporarily installed between the two concrete columns 2 during construction to facilitate the laying of tracks. The tracks can be directly welded and fixed to the sliding steel beams 301. The sliding steel beams 301 can be removed after the construction is completed.

[0052] In other embodiments, the connecting component may also be other structures, such as Figure 3 , Figure 4 As shown, the connection assembly includes: a concrete beam 302 and a plurality of embedded parts 303 arranged at intervals on the concrete beam 302, and the embedded parts 303 of the concrete beam 302 have the same structure as the embedded parts 303 arranged in the top of the concrete column 2. The long rail is connected to the embedded parts 303 arranged on the concrete beam 302, and the connection method can also be selected by welding.

[0053] This embodiment also provides a large-span truss landing structure, such as Figure 5 , Figure 8As shown, the large-span truss placement structure includes multiple truss and column top placement nodes, and the multiple truss and column top placement nodes are arranged along the extension direction of the track assembly 4 and / or perpendicular to the extension direction of the track assembly 4. Due to different building structures, there will be different layout methods and different numbers of concrete columns 2, and correspondingly, trusses of different shapes need to be arranged, and then there will be multiple truss and column top placement nodes. The truss columns 102 of two adjacent truss and column top placement nodes are connected by a connecting truss 5, regardless of whether they are along the extension direction of the track assembly 4 or along the direction perpendicular to the extension direction of the track assembly 4. The truss columns 102 of the two adjacent truss structures are connected by the connecting truss 5. The two adjacent concrete columns 2 along the extension direction of the track assembly 4 need to be connected by a connecting assembly, and there is no need to connect the two adjacent concrete columns 2 along the extension direction perpendicular to the track assembly 4. After multiple truss structures are connected together, they form an integral truss that can slide synchronously.

[0054] Further, such as Figure 6 As shown, the long-span truss landing structure also includes a boosting node, which includes: a boosting profile 601 and a second booster connector 602. The boosting profile 601 is arranged at the bottom of the connecting truss 5. In this embodiment, the boosting profile 601 is preferably a steel section. The second booster connector 602 is arranged on at least one side of the boosting profile 601. The installation method and structure of the second booster connector 602 are the same as the first booster connector 103 arranged at the bottom of the truss column 102. In this embodiment, the second booster connector 602 is only arranged on one side. Of course, in other embodiments, the second booster connector 602 can also be arranged on the other side or both sides of the booster profile 601. After the boosting node is set, the connection points between the entire truss and the booster 8 can be increased, which can better pull / push the truss to move. After the construction is completed, the boosting profile 601 and the second booster connector 602 can also be removed. One or more boosting nodes may be provided at each connecting truss 5 , or one boosting node may be provided at intervals of several connecting trusses 5 .

[0055] In addition, in order to improve the strength of the connection between the push profile 601 and the connecting truss 5, a stiffening plate is also provided on the truss 5.

[0056] Furthermore, Figure 7As shown, the long-span truss landing structure also includes a sliding node, which includes: a secondary truss 701, a push support 702 and a third pusher connector 703. The secondary truss 701 is parallel to the truss column 102, and the secondary truss 701 is arranged between two truss columns 102. The push support 702 is arranged at the bottom of the secondary truss 701, and the bottom end of the push support 702 is slidably connected to the track assembly 4. The third pusher connector 703 is arranged on at least one side of the push support 702. The installation method and structure of the third pusher connector 703 are the same as the first pusher connector 103 arranged at the bottom of the truss column 102. In this embodiment, the third pusher connector 703 is only arranged on one side. Of course, in other embodiments, the third pusher connector 703 can also be arranged on the other side or both sides of the push support 702. After the sliding node is arranged, the sliding connection points between the entire truss and the track can be increased, which can better guide the truss to slide. After the construction is completed, the secondary truss 701, the jacking support 702 and the third jacking device connector 703 can also be removed. A sliding node can be provided between every two truss columns 102, or a sliding node can be provided between every several truss columns 102.

[0057] Of course, in other embodiments, the boosting node and / or the sliding node may not be provided.

[0058] The construction process of the large-span truss placement structure provided in this embodiment is described as follows:

[0059] The embedded parts 303 and the support base plate are set at the top of the concrete column 2, and then the adjacent concrete columns 2 are connected by the connecting assembly (taking the sliding steel beam 301 as an example), and then the track is laid on the top of the concrete column 2 and the connecting assembly, and a track is set on each row of concrete columns 2. Then the prefabricated entire truss is hoisted onto the track, and the entire truss has connected all the truss columns 102 together. Then, the pusher 8 is connected to the pusher 8 connectors of each landing node, boosting node and sliding node, and then the entire truss is driven to slide on the track until the truss column 102 reaches the corresponding column top installation position of the concrete column 2 and stops sliding. At this time, the track part of the bottom end of the truss column 102 at each landing node facing the two sides of the long track to the edge of the concrete column 2 is cut off, and then the bottom end of the truss column 102 is surrounded by welding with the support base plate. After the welding construction is completed, the connecting assembly, the pusher 8, the boosting node and the sliding node can be removed.

[0060] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

Claims

1. A truss and column top landing node, characterized in that: include: A truss structure, wherein a mounting groove is provided at the bottom end of the truss structure, and a sliding block (101) is provided in the mounting groove; A concrete column (2), wherein the top of the concrete column (2) is provided with a connected embedded part (303) and a support base plate; Connecting components, two groups of connecting components are arranged on both sides of the concrete column (2); A track assembly (4), the slider (101) being slidably connected to the track assembly (4), the track assembly (4) comprising a short track connected to the embedded part (303) arranged at the top of the column and a long track arranged on the connection assembly.

2. The truss and column top landing node according to claim 1 is characterized in that: The truss structure comprises: a truss column (102) and a first pusher connection member (103), wherein the first pusher connection member (103) is arranged on at least one side of the bottom of the truss column (102).

3. The truss and column top landing node according to claim 2 is characterized in that: The first pusher connector (103) comprises: two push ear plates spaced apart in a direction perpendicular to the extension direction of the track assembly (4), and a connection hole is provided on a side of the push ear plate away from the truss column (102).

4. The truss and column top landing node according to claim 1 is characterized in that: The length of the short rail is smaller than the length of the support base plate, and the width of the short rail is smaller than the width of the support base plate.

5. The truss and column top landing node according to claim 4 is characterized in that: The bottom end of the truss structure is welded to the support bottom plate around its periphery.

6. The truss and column top landing node according to any one of claims 1 to 5, characterized in that: The connection component is a sliding steel beam (301).

7. The truss and column top landing node according to any one of claims 1 to 5, characterized in that: The connection assembly comprises: a concrete beam (302) and a plurality of embedded parts (303) arranged at intervals on the concrete beam (302); the long rail is connected to the embedded parts (303) arranged on the concrete beam (302).

8. A long-span truss landing structure, comprising a plurality of truss and column top landing nodes according to any one of claims 1 to 7, characterized in that: A plurality of the truss and column top landing nodes are arranged along the extension direction of the track assembly (4) and / or perpendicular to the extension direction of the track assembly (4), and the truss columns (102) of two adjacent truss and column top landing nodes are connected by a connecting truss (5), and the concrete columns (2) are connected by a connecting assembly.

9. The large-span truss landing structure according to claim 8, characterized in that: It also includes a boosting node, which includes: a boosting profile (601) and a second booster connecting member (602), wherein the boosting profile (601) is arranged at the bottom of the connecting truss (5), and the second booster connecting member (602) is arranged on at least one side of the boosting profile (601).

10. The large-span truss landing structure according to claim 9, characterized in that: It also includes a sliding node, which includes: a secondary truss (701), a pushing support (702) and a third pushing device connecting member (703), wherein the secondary truss (701) is arranged in parallel between two truss columns (102), the pushing support (702) is arranged at the bottom of the secondary truss (701), the bottom end of the pushing support (702) is slidably connected to the track assembly (4), and the third pushing device connecting member (703) is arranged on at least one side of the pushing support (702).