Soluble ball pressure-bearing tool
By designing a soluble ball pressure-bearing tool, the fluid circulation and one-way pressure-bearing sealing in the oil pipe are achieved by combining the circulation holes of the ball seat and the inner liner, which solves the long sealing time and missed seating of the packer in the prior art. The problem of sealing risk has achieved fast and safe sealing and water injection operations for packer seating and water injection.
Patent Information
- Application Number
- CN202420693172.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-07
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2034-04-07
AI Technical Summary
There is a lack of a tool in the prior art that can realize the sealing of the sealer in the oil pipe string without steel wire operation, resulting in the risk of sealing of the sealer incorrectly and the problem of the extended working time.
A soluble ball pressure-bearing tool is designed, including a ball seat sliding sleeve, inner liner and body. The fluid circulation is realized through the cooperation of the ball seat primary circulation hole, inner liner circulation hole and body circulation hole, and the soluble ball is used for the One-way pressure-bearing securing, and a closed channel is achieved by sealing O-rings and bypass cavity to simplify operation.
The sealer is completed without wire operation, which reduces the time taken to drilling rig, simplifies the operation process, avoids the risk of sealing the sealer by mistake, and improves the completion time.
Smart Images

Figure CN221957556U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of petroleum well completion, in particular to a soluble ball pressure-bearing tool used for realizing functions such as switching circulation channels and setting seals in a well completion pipe string. Background Art
[0002] Conventional oil and gas well completion processes generally include circulation, hydraulic setting, pressure testing and other procedures. Taking the water injection string with production packer as an example, the traditional completion procedure is to circulate the oil casing annulus packer before the tubing hanger is put into place, and after the hanger is put into place and the Christmas tree is installed, the production packer is set and plugged by wireline operation. Circulating the packer fluid requires the use of the drilling rig, which normally takes about 5 hours, and there is a certain risk of packer missetting during the circulation process. Wireline operation normally takes about 10 hours, which may be greatly delayed due to site restrictions and other reasons. At the same time, affected by factors such as well inclination, the wireline operation does not have the ability to plug at a well inclination greater than 60°.
[0003] Therefore, the prior art lacks a tool that has a circulation capability and can set a production packer without wire operation. Utility Model Content
[0004] In order to solve the above technical problems, the utility model provides a soluble ball pressure-bearing tool. The tool has a circulating flow channel before the annular packer is set, and can set various packers after the ball is dropped, without being restricted by the site and wire equipment. After the setting is completed, the circulation channel is closed, which does not affect the fluid path inside the oil pipe, reduces the rig occupation time, and simplifies the setting process.
[0005] The utility model is realized by adopting the following technical solutions.
[0006] A soluble ball pressure-bearing tool comprises a ball seat sleeve, an inner sleeve and a body are sequentially sleeved outside the ball seat sleeve, and the ball seat sleeve is fixed to the inner sleeve by pins; a ball seat secondary circulation hole and a ball seat primary circulation hole are sequentially opened on the side wall of the ball seat sleeve from top to bottom, and a ball seat is formed in the ball seat sleeve between the ball seat primary circulation hole and the ball seat secondary circulation hole; an inner sleeve circulation hole, an inner sleeve bypass circulation hole 1 and an inner sleeve bypass circulation hole 2 are sequentially opened on the side wall of the inner sleeve from top to bottom; a body circulation hole is opened on the upper side wall of the body, and the body circulation hole is aligned and connected with the ball seat primary circulation hole and the inner sleeve circulation hole; the lower part of the body is expanded to form a bypass cavity.
[0007] Furthermore, a body limiting shoulder is formed at the lower part of the body, the lower end of the inner sleeve is seated on the body limiting shoulder, and the body and the inner sleeve are fixed by pins.
[0008] Furthermore, an inner sleeve limiting shoulder is formed at the lower portion of the inner sleeve.
[0009] Furthermore, multiple sealing O-rings are provided between the ball seat sliding sleeve and the inner bushing, and between the inner bushing and the body.
[0010] Furthermore, a sealing ball is arranged in the ball seat, and the sealing ball is a soluble sealing ball.
[0011] Furthermore, a female buckle is arranged at the upper end of the body, and a male buckle is arranged at the lower end.
[0012] The utility model achieves the following beneficial effects.
[0013] After the Christmas tree is installed, the utility model realizes the connection between the oil pipe and the annulus of the casing due to the cooperation of the tool body circulation hole, the inner sleeve circulation hole, and the ball seat primary circulation hole, so as to establish fluid circulation; due to the cooperation of the ball seat (inner diameter 2.4″) and the soluble ball (diameter 2.5″) inside the tool, the downward unidirectional pressure in the oil pipe is realized, that is, the positive pressure sealing packer is realized; after the ball seat is sheared, the ball seat secondary circulation hole, the inner sleeve bypass circulation hole 1, the inner sleeve and bypass cavity annulus gap, the inner sleeve bypass circulation hole 2, and the sealing O-ring cooperate to close the connection between the oil pipe and the annulus of the casing, and the fluid can be directly injected downward. The utility model has the ability to switch the circulation channel, the sealing ball is a soluble ball, and water injection can be started immediately after sealing, which is not limited by well inclination and site factors. The utility model has a simple structure, is easy to maintain, can simplify the operation process, improve the completion time, and is highly practical. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a structural schematic diagram of the ball seat sliding sleeve of the utility model;
[0015] Figure 2 It is a structural schematic diagram of the inner liner of the utility model;
[0016] Figure 3 It is a structural schematic diagram of the utility model body;
[0017] Figure 4 This is a schematic diagram of the cycle state of the utility model;
[0018] Figure 5 This is a schematic diagram of the utility model in the state of ball throwing and sealing;
[0019] Figure 6 This is a schematic diagram of the state of the shear ball seat of the utility model.
[0020] Among them: 1. Ball seat; 2. Soluble seating ball; 3. Primary circulation hole of ball seat; 4. Secondary circulation hole of ball seat; 5. Sealing O-ring; 6. Pin; 7. Inner sleeve circulation hole; 8. Inner sleeve bypass circulation hole one; 9. Inner sleeve bypass circulation hole two; 10. Inner sleeve limit shoulder; 11. Female buckle; 12. Male buckle; 13. Body circulation hole; 14. Bypass cavity; 15. Body limit shoulder. DETAILED DESCRIPTION
[0021] The technical solution of the utility model will be clearly and completely described below through specific implementation methods.
[0022] In conventional water injection strings, a production packer is usually designed to be lowered to isolate the annulus pressure. Since the annulus liquid is static for a long time, it is necessary to replace the packer fluid during the completion stage to protect the casing. The traditional operation method takes up drilling time to replace the packer fluid. After the installation of the Christmas tree, the production packer needs to be sealed by wire operation. The utility model is arranged below the production packer, which can meet the demand for replacing the packer fluid after the installation of the Christmas tree. At the same time, the sealing of the production packer is not affected by factors such as well inclination and site area.
[0023] Specifically, Figure 1-3 As shown, a soluble ball pressure-bearing tool includes a body, an inner liner sleeve, a ball seat sleeve and a soluble sealing ball 2.
[0024] The upper end of the body is provided with a female buckle 11, and the lower end is a male buckle 12, the buckle type is an API oil pipe buckle or a special buckle, which can be processed according to the operation requirements and connected to the oil pipe. The upper side wall of the body is provided with a body circulation hole 13, and the lower part is expanded to form a bypass cavity 14.
[0025] An inner sleeve is arranged in the body, and a body limiting shoulder 15 is formed in the lower part of the body, and the lower end of the inner sleeve is seated on the body limiting shoulder 15, and the body and the inner sleeve are fixed by a pin 6. The side wall of the inner sleeve is provided with an inner sleeve circulation hole 7, an inner sleeve bypass circulation hole 1 8 and an inner sleeve bypass circulation hole 2 9 in sequence from top to bottom. An inner sleeve limiting shoulder 10 is also formed in the lower part of the inner sleeve, and the inner sleeve limiting shoulder 10 is used to limit the ball seat sliding sleeve.
[0026] A ball seat sleeve is arranged in the inner sleeve, and the ball seat sleeve is fixed to the middle and upper part of the inner sleeve by a pin 6, and the shear force of the pin is 5000psi. The side wall of the ball seat sleeve is provided with a ball seat secondary circulation hole 4 and a ball seat primary circulation hole 3 from top to bottom. A ball seat 1 is also formed on the inner wall of the ball seat sleeve between the ball seat primary circulation hole 3 and the ball seat secondary circulation hole 4, and a soluble setting ball 2 can be put into the ball seat 1.
[0027] After the ball seat sleeve, inner sleeve and body are fixed by the pin 6, the ball seat primary circulation hole 3, the inner sleeve circulation hole 7 and the body circulation hole 13 are aligned and connected, and the inner sleeve bypass circulation hole 1 8 and the inner sleeve bypass circulation hole 2 9 are located in the bypass cavity 14.
[0028] In order to improve the sealing performance of the tool of the utility model, multiple sealing O-rings 5 are provided between the ball seat sliding sleeve and the inner bushing, and between the inner bushing and the body.
[0029] The utility model has the functions of circulation state, ball-dropping sealing state, shear ball seat state, and has the functions of oil pipe and annulus circulation, oil pipe pressure sealing packer, closing the oil pipe and annulus channel and injecting water into the oil pipe. Figure 4 As shown, during the well entry stage, the utility model can connect the oil pipe with the annulus through the ball seat primary circulation hole 3, the inner sleeve circulation hole 7, and the body circulation hole 13. After the water injection string is in place and the Christmas tree is installed, it has the ability to circulate and replace the sealing fluid. Figure 5 As shown in FIG. 1 , after the soluble sealing ball 2 is inserted into the ball seat 1, the passage from top to bottom of the oil pipe is blocked and cannot be connected to the annulus. The production packer can be set by positive pressure. Figure 6 As shown, after the production packer is set, the pressure is continued to be pressed to the shear value of the pin 6 between the ball seat sliding sleeve and the inner sleeve, and the ball seat sliding sleeve moves down to the inner sleeve limit shoulder 10. At this time, the ball seat secondary circulation hole 4 is aligned and connected with the inner sleeve bypass circulation hole 18. The water injection in the oil pipe can start to inject water into the formation through the ball seat secondary circulation hole 4, the inner sleeve bypass circulation hole 18, the annular gap between the inner sleeve and the bypass cavity 14, and the inner sleeve bypass circulation hole 29. After the well fluid is soaked for 120 hours, the soluble setting ball 2 is completely dissolved, further increasing the water injection flow area of the utility model. After the utility model completes the setting of the packer, the closed annular circulation channel is directly transferred to the water injection operation, which can avoid the circulation risk when the production packer is not in place, save the use time of the drilling rig, and the setting position of the packer is not restricted, which simplifies the setting process.
[0030] The utility model is applied in the water injection pipe string, and it is estimated that a single well can save about 12 hours of drilling rig use time, and can effectively improve the time efficiency of well completion operations.
[0031] The embodiments described above are merely descriptions of preferred implementation modes of the present invention, and are not intended to limit the concept and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary engineering and technical personnel in the field should fall within the protection scope of the present invention. The technical contents for which protection is sought in the present invention have been fully recorded in the technical requirements.
Claims
1. A soluble ball pressure-bearing tool, Features: The invention comprises a ball seat sleeve, an inner sleeve and a body are sequentially sleeved outside the ball seat sleeve, and the ball seat sleeve is fixed to the inner sleeve by a pin (6); a ball seat secondary circulation hole (4) and a ball seat primary circulation hole (3) are sequentially provided on the side wall of the ball seat sleeve from top to bottom, and a ball seat (1) is formed in the ball seat sleeve between the ball seat primary circulation hole (3) and the ball seat secondary circulation hole (4); an inner sleeve circulation hole (7), an inner sleeve bypass circulation hole 1 (8) and an inner sleeve bypass circulation hole 2 (9) are sequentially provided on the side wall of the inner sleeve from top to bottom; a body circulation hole (13) is provided on the upper side wall of the body, and the body circulation hole (13) is aligned and connected with the ball seat primary circulation hole (3) and the inner sleeve circulation hole (7); the lower part of the body is enlarged to form a bypass cavity (14).
2. A soluble ball pressure-bearing tool according to claim 1, Features: A body limiting shoulder (15) is formed at the lower part of the body, the lower end of the inner sleeve is seated on the body limiting shoulder (15), and the body and the inner sleeve are fixed by a pin (6).
3. A soluble ball pressure-bearing tool according to claim 1, Features: An inner sleeve limiting shoulder (10) is formed at the lower portion of the inner sleeve.
4. A soluble ball pressure-bearing tool according to claim 1, Features: Multiple sealing O-rings (5) are provided between the ball seat sliding sleeve and the inner bushing, and between the inner bushing and the body.
5. A soluble ball pressure-bearing tool according to claim 1, Features: A sealing ball is arranged in the ball seat (1), and the sealing ball is a soluble sealing ball (2).
6. A soluble ball pressure-bearing tool according to claim 1, Features: A female buckle (11) is arranged at the upper end of the body, and a male buckle (12) is arranged at the lower end.