Reactor pool flushing system
An automated flushing system with spray pipe sections installed in the reactor pool solves the problems of low efficiency and safety risks associated with manual flushing of reactor pools in existing technologies, achieving efficient and safe pool cleaning.
Patent Information
- Application Number
- CN202323633481.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-28
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2033-12-28
AI Technical Summary
Existing manual flushing methods for nuclear power plant reactor pools are inefficient and pose risks of personnel contamination and industrial safety, especially when there is a significant elevation difference between the reactor refueling pool and the in-core components pool, where manual flushing carries substantial safety risks.
Design a reactor pool flushing system, including a first water source pipeline and a flushing pipeline group, which are respectively connected to the reactor pool and the spent fuel pool cooling and treatment system. Spray pipe sections are set on the inner wall of the pool to realize automated flushing, and the existing water source of the nuclear power plant is used for flushing.
The automated flushing of the reactor pool was achieved, avoiding the risks of personnel contamination and industrial safety risks associated with manual flushing, improving flushing efficiency, and solving the water source problem by utilizing existing water sources.
Smart Images

Figure CN221966190U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of nuclear power, in particular to a reactor pool flushing system. Background Art
[0002] The reactor in a nuclear power plant is a device that generates, maintains and controls a chain nuclear fission reaction. It releases energy at a certain power and is conducted out by the coolant. The heat generated by the core is then transferred to the secondary feed water of the steam generator through the steam generator to generate steam, which drives the steam turbine generator to generate electricity. The core is the core component of the reactor and is located in the reactor pool. The nuclear fuel realizes nuclear fission reaction in the core, releasing nuclear energy and converting nuclear energy into heat energy. Therefore, it is a high-temperature heat source and a strong radiation source.
[0003] In existing nuclear power plants, a PTR (reactor pool and spent fuel pool cooling and treatment system) system is installed, whose main function is to cool, purify, fill and drain the reactor pool and spent fuel pool. The PTR system is mainly composed of the reactor pool, spent fuel pool, refueling water tank and the cooling, purification, filling and drainage circuits connected to them. Among them, the reactor pool is located in the reactor building, including the refueling cavity (or called the reactor cavity) and the internal component storage pool. The bottom elevation of the two parts differs by more than 3 meters, and they are separated by an airtight baffle, which can be filled and drained separately.
[0004] When the unit is operating normally, the reactor pool is not filled with water. Only when the reactor pressure vessel head needs to be opened during refueling, the reactor pool is filled with water to achieve water shielding and reduce the level of radioactivity to the workers. During the overhaul of the unit, after the loading and unloading is completed and the reactor refueling pool or the in-core component pool is emptied, highly radioactive water will adhere to the inner wall. In order to reduce the level of radioactivity, service personnel are required to use a special atomizing water gun to flush and decontaminate the inner wall of the reactor refueling pool or the in-core component pool. In addition to low efficiency and poor benefits, the existing manual flushing and decontamination method will also cause the corresponding staff to receive a large dose and may even cause personnel contamination incidents. In addition, due to the high height difference between the reactor refueling pool and the in-core component pool, there is a greater industrial safety risk when flushing manually. Utility Model Content
[0005] The technical problem to be solved by the utility model is to provide a reactor pool flushing system.
[0006] The utility model adopts the following technical solutions:
[0007] Construct a reactor pool flushing system, including:
[0008] A first water source pipeline, one end of which is connected to the reactor water pool and the spent fuel pool cooling and treatment system; and
[0009] A flushing pipeline group, comprising a first flushing pipeline and a second flushing pipeline, one end of the first flushing pipeline and one end of the second flushing pipeline are both connected to the other end of the first water source pipeline;
[0010] Among them, the first flushing pipeline includes a first spray pipe section for flushing the inner wall surface of the reactor refueling water pool, and the second flushing pipeline includes a second spray pipe section for flushing the inner wall surface of the core component water pool. The first spray pipe section is arranged on at least a part of the inner wall surface of the reactor refueling water pool, and the second spray pipe section is arranged on at least a part of the inner wall surface of the core component water pool.
[0011] In some embodiments, the first spray pipe section is arranged around the upper part of the inner wall of the reactor refueling pool, and a plurality of water spray ports are arranged at intervals on the first spray pipe section, and the plurality of water spray ports are respectively arranged toward the inner wall of the reactor refueling pool;
[0012] And / or, the second spray pipe section is arranged around the upper part of the inner wall of the in-core component water pool, and a plurality of water spray outlets are arranged at intervals on the second spray pipe section, and the plurality of water spray outlets are respectively arranged toward the inner wall of the in-core component water pool.
[0013] In some embodiments, the reactor water pool flushing system also includes a second water source pipeline, one end of the second water source pipeline is connected to the nuclear island desalted water distribution system, and the other end of the second water source pipeline is respectively connected to one end of the first flushing pipeline and one end of the second flushing pipeline.
[0014] In some embodiments, at least one switch valve and / or flow meter is further provided on the second water source pipeline.
[0015] In some embodiments, a connecting hose is further provided on the second water source pipeline, and the connecting hose is detachably provided on the second water source pipeline.
[0016] In some embodiments, a second switch valve and a third switch valve are also provided on the second water source pipeline, and the second switch valve and the third switch valve are respectively provided on both sides of the connecting hose, and the third switch valve is provided between the connecting hose and the nuclear island desalted water distribution system.
[0017] In some embodiments, the flushing pipeline group also includes at least one spare pipeline, one end of which is connected to the other end of the first water source pipeline, and the other end of which is arranged outside the reactor water pool.
[0018] In some embodiments, the backup pipeline includes a first backup pipeline and a second backup pipeline, one end of the first backup pipeline and one end of the second backup pipeline are respectively connected to the other end of the first water source pipeline, and the other end of the first backup pipeline and the other end of the second backup pipeline are respectively arranged on both sides of the reactor water pool.
[0019] In some embodiments, the other end of the first backup pipeline and the other end of the second backup pipeline are respectively provided with a quick connector.
[0020] In some embodiments, a switch valve is provided on the first water source pipeline and / or the first flushing pipeline and / or the second flushing pipeline and / or the at least one spare pipeline.
[0021] The utility model has the following advantages:
[0022] The utility model provides spray pipe sections on the reactor refueling pool and the internal component pool respectively, so that the reactor pool can be automatically flushed, avoiding the risk of contamination and industrial safety risks during manual flushing. In addition, the system uses the water source in the cooling and treatment system of the reactor pool and the spent fuel pool in the nuclear power plant to flush the pool, solving the water source problem without the need for another water source. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the technical solution of the utility model, the utility model will be further described below in conjunction with the accompanying drawings and embodiments. It should be understood that the following drawings only show certain embodiments of the utility model, and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:
[0024] Figure 1 It is a structural schematic diagram of a reactor pool flushing system in one embodiment of the utility model. DETAILED DESCRIPTION
[0025] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, the specific implementation methods of the present invention are now described in detail with reference to the accompanying drawings. In the following description, it should be understood that the directions or positional relationships indicated by "front", "rear", "up", "down", "left", "right", "vertical", "horizontal", "bottom", "inside", "inside", "outside", etc. are based on the directions or positional relationships shown in some of the drawings, and are constructed and operated in a specific direction. They are only for the convenience of describing the present technical solution, and do not indicate that the device or element referred to must have a specific direction, and therefore cannot be understood as a limitation to the present invention.
[0026] It should also be noted that, unless otherwise clearly specified and limited, the terms such as "installed", "connected", "connected", "fixed", "set" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. When an element is referred to as being "on" or "under" another element, the element can be "directly" or "indirectly" located on the other element, or there may be one or more intermediate elements. The terms "first", "second", etc. are only for the convenience of describing the present technical solution, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. For those of ordinary skill in the art, the specific meanings of the above terms in the present utility model can be understood according to the specific circumstances.
[0027] In the following description, specific details such as specific system structures and technologies are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention can also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to avoid unnecessary details that hinder the description of the present invention.
[0028] Figure 1 A reactor pool flushing system 1 in one embodiment of the utility model is shown, and the reactor pool flushing system 1 is used to flush the inner wall of the reactor pool after loading and unloading during the overhaul of the unit, so as to clean the highly radioactive water attached to the inner wall of the reactor pool.
[0029] The reactor water pool includes a reactor refueling water pool 2 and a reactor internals water pool 3. The reactor refueling water pool 2 and the reactor internals water pool 3 are arranged adjacent to each other and separated by a gas-tight baffle. The reactor water pool is connected to a PTR (reactor water pool and spent fuel water pool cooling and treatment system) for cooling, purifying, filling and draining the reactor refueling water pool 2 and the reactor internals water pool 3.
[0030] The reactor pool flushing system 1 includes a first water source pipeline 10, a second water source pipeline 20 and a flushing pipeline group 30. One end of the first water source pipeline 10 is connected to the PTR, and the other end is connected to the flushing pipeline group 30, so that the water from the PTR can be used to flush the inner wall of the reactor pool through the flushing pipeline group 30, thereby solving the problem of water source introduction and simplifying the pipeline division of the system. One end of the second water source pipeline 20 is connected to the SED (nuclear island desalted water distribution system), and the other end is connected to the flushing pipeline group 30, so that the inner wall of the reactor pool can be flushed through the water of the SED, providing a second drinking water source. The two water sources are used as backup for each other to improve the usability of the reactor pool flushing system 1.
[0031] In this embodiment, a first switch valve 11 is provided on the first water source pipeline 10 to control the opening and closing of the first water source pipeline 10 .
[0032] The second water source pipeline 20 is provided with a second switch valve 21, a third switch valve 22, a connecting hose 23 and a flow meter 24. The connecting hose 23 is detachably provided on the second water source pipeline 20, so that when the reactor water pool flushing system 1 is not used, administrative isolation can be achieved by removing the connecting hose 23, thereby preventing the water in the SED from accidentally flushing the inner wall of the reactor water pool through the second water source pipeline 20 and the flushing pipeline group 30, thereby causing the risk of accidental dilution.
[0033] The second switch valve 21 and the third switch valve 22 are respectively arranged on both sides of the connecting hose 23, and the third switch valve 22 is arranged between the connecting hose 23 and the SED. It should be understood that the third switch valve 22 can be used as a functional valve of the administrative isolation switch valve, and a chain is set on the third switch valve 22 to ensure that it is not opened by mistake. When in use, it is necessary to open the chain and turn the hand wheel to unlock. The administrative isolation measure of the third switch valve 22 closes the second water source pipeline 20, which can prevent the water in the SED from leaking out after the connecting hose 23 is disassembled, causing water waste, and can also prevent staff from accidentally operating, thereby improving the level of isolation.
[0034] The flow meter 24 is disposed between the third switch valve 22 and the connecting hose 23 , and is used to detect the amount of water flowing in the second water source pipeline 20 .
[0035] In some other optional embodiments, the third switch valve 22 may not be provided, and the second switch valve 21 may be provided at the position where the third switch valve 22 is located. Alternatively, the second switch valve 21 may not be provided, and only the third switch valve 22 may be provided. The flow meter 24 may also be provided at other positions of the second water source pipeline 20.
[0036] In this embodiment, the flushing pipeline group 30 includes a first flushing pipeline 31 and a second flushing pipeline 32. One end of the first flushing pipeline 31 is respectively connected to the other end of the first water source pipeline 10 and the other end of the second water source pipeline 20, and the other end of the first flushing pipeline 31 is connected to the reactor refueling water pool 2. One end of the second flushing pipeline 32 is respectively connected to the other end of the first water source pipeline 10 and the other end of the second water source pipeline 20, and the other end of the second flushing pipeline 32 is connected to the reactor internal component water pool 3. The first water source pipeline 10 and the second water source pipeline 20 are arranged in parallel, and the PTR and SED can simultaneously deliver water to the first flushing pipeline 31 and the second flushing pipeline 32 to flush the reactor refueling water pool 2 and the reactor internal component water pool 3, ensuring that the PTR or SED will not affect the flushing of the reactor water pool when a fault occurs. And both the PTR and the SED can achieve simultaneous flushing of the two pools to improve the flushing efficiency.
[0037] Specifically, the first flushing pipeline 31 includes a first spray pipe section 311 and a first delivery pipe section 312, one end of the first delivery pipe section 312 is respectively connected to the other end of the first water source pipeline 10 and the other end of the second water source pipeline 20, and the other end of the first delivery pipe section 312 is connected to the first spray pipe section 311. The first spray pipe section 311 is arranged on at least part of the inner wall surface of the reactor refueling pool 2, and is used to flush the inner wall surface of the reactor refueling pool 2.
[0038] The second flushing pipeline 32 includes a second spraying pipe section 321 and a second delivery pipe section 322. One end of the second delivery pipe section 322 is respectively connected to the other end of the first water source pipeline 10 and the other end of the second water source pipeline 20, and the other end of the second delivery pipe section 322 is connected to the second spraying pipe section 321. The second spraying pipe section 322 is arranged on at least part of the inner wall surface of the reactor internals water pool 3, and is used to flush the inner wall surface of the reactor internals water pool 3.
[0039] In this embodiment, the first spray pipe section 311 is arranged around the inner wall of the reactor refueling pool 2, and a plurality of water spray ports are arranged thereon. The plurality of water spray ports are arranged evenly spaced, and the openings are all facing the inner wall of the reactor refueling pool 2 to ensure full coverage of the spray. The first spray pipe section 311 is arranged at the upper end of the inner wall of the reactor refueling pool 2 to ensure that the inner wall of the reactor refueling pool 2 is flushed from top to bottom through a pipeline.
[0040] The second spray pipe section 321 is arranged around the inner wall of the reactor internals water pool 3, and is provided with a plurality of water spray ports, which are evenly spaced and open toward the inner wall of the reactor internals water pool 3 to ensure full coverage of the spray. The second spray pipe section 321 is arranged at the upper end of the inner wall of the reactor internals water pool 3 to ensure that the inner wall of the reactor internals water pool 3 is flushed from top to bottom through one pipeline.
[0041] In some other optional embodiments, the first spray pipe section 311 and / or the second spray pipe section 321 can also be configured as a mesh pipeline, which is entirely covered on the inner wall surface of the reactor refueling water pool 2 / core internal component water pool 3.
[0042] In some other optional embodiments, the water spraying ports on the first spraying pipe section 311 and / or the second spraying pipe section 321 may be arranged unevenly, and may be arranged more concentratedly at the part of the inner wall of the pool where radioactive water is easily accumulated, and slightly dispersedly at other parts. However, it should be understood that the density of the water spraying ports on the first spraying pipe section 311 and / or the second spraying pipe section 321 must at least ensure that the clean water sprayed from the water spraying ports can cover the circumference of the pool to ensure comprehensive cleaning coverage.
[0043] It should be understood that, since the reactor refueling water pool 2 is connected to the internal component water pool 3 and the two are separated by an airtight baffle, the side walls of the reactor refueling water pool 2 and the internal component water pool 3 are not cylindrical, and the above-mentioned "surrounded by the circumference of the inner wall of the reactor refueling water pool 2" and "surrounded by the circumference of the inner wall of the internal component water pool 3" are not closed-loop enclosures, but indicate horizontal extensions in the circumference of the reactor refueling water pool 2 / internal component water pool 3 but not arranged on the airtight baffle.
[0044] It should be understood that in some other optional embodiments, the first conveying pipe section 312 and the second conveying pipe section 322 may share at least a portion of the pipe section.
[0045] In this embodiment, a fourth switch valve 313 is provided on the first flushing pipeline 31, and a fifth switch valve 323 is provided on the second flushing pipeline 32, which are respectively used to control the conduction and closing of the first flushing pipeline 31 and the second flushing pipeline 32, so as to control the separate flushing of the reactor refueling pool 2 or the in-core component pool 3.
[0046] Specifically, the fourth switch valve 313 is disposed on the first delivery pipe section 312 , and the fifth switch valve 323 is disposed on the second delivery pipe section 322 .
[0047] In some other optional embodiments, the flushing pipeline group 30 also includes at least one spare pipeline, one end of which is connected to the other end of the first water source pipeline 10 and the other end of the second water source pipeline 20, and the other end of the spare pipeline is arranged outside the reactor water pool so as to serve as a free end to be connected to an external water pipe at any time to specifically flush the corners in the reactor water pool that have not been flushed clean.
[0048] In this embodiment, there are two backup pipelines, namely, a first backup pipeline 33 and a second backup pipeline 34. One end of the first backup pipeline 33 is connected to the other end of the first water source pipeline 10 and the other end of the second water source pipeline 20, respectively, and the other end is arranged on one side of the reactor water pool, and is arranged at the connection between the side wall of the reactor internals water pool 3 and the side wall of the reactor refueling water pool 2.
[0049] One end of the second backup pipeline 34 is respectively connected to the other end of the first water source pipeline 10 and the other end of the second water source pipeline 20, and the other end is arranged at the other side of the reactor water pool, and is arranged at the other connection between the side wall of the reactor internals water pool 3 and the side wall of the reactor refueling water pool 2. This ensures that when a connecting pipe of a certain length is used to connect the free end of the first backup pipeline 33 or the free end of the second backup pipeline 34, each position of the side wall of the reactor refueling water pool 2 and the reactor internals water pool 3 can be covered as much as possible.
[0050] In some other optional embodiments, the number of the spare pipelines can also be one, three, four, or more, and their locations can be flexibly set according to the specific needs of the plant where the reactor pool is located.
[0051] In this embodiment, a first quick connector 331 is provided at the free end of the first backup pipeline 33, and a second quick connector 341 is provided at the free end of the second backup pipeline 34, so as to conveniently and quickly connect other pipeline equipment.
[0052] The first standby pipeline 33 is also provided with a sixth switch valve 332 for controlling the conduction and closing of the first standby pipeline 33. The second standby pipeline 34 is also provided with a seventh switch valve 342 for controlling the conduction and closing of the second standby pipeline 34.
[0053] It should be understood that the first backup pipeline 33 and the second backup pipeline 34 may share a portion of the pipeline section, and the first backup pipeline 33 and the second backup pipeline 34 and the first delivery pipeline section 312 and the second delivery pipeline section 322 may share a portion of the pipeline section.
[0054] In some other optional embodiments, the reactor water pool flushing system 1 may not be provided with the first water source pipeline 10 or the second water source pipeline 20, and the reactor water pool flushing system 1 may not be provided with a spare pipeline.
[0055] It can be understood that the above embodiments only express the preferred implementation methods of the utility model, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the patent scope of the utility model. It should be pointed out that, for ordinary technicians in this field, without departing from the concept of the utility model, the above-mentioned technical features can be freely combined, and several deformations and improvements can be made, which all belong to the protection scope of the utility model. Therefore, all equivalent changes and modifications made to the scope of the claims of the utility model should fall within the scope of the claims of the utility model.
Claims
1. A reactor pool flushing system, characterized in that: include: A first water source pipeline (10), one end of which is connected to the reactor water pool and the spent fuel water pool cooling and treatment system; as well as A flushing pipeline group (30) comprises a first flushing pipeline (31) and a second flushing pipeline (32), wherein one end of the first flushing pipeline (31) and one end of the second flushing pipeline (32) are both connected to the other end of the first water source pipeline (10); The first flushing pipeline (31) comprises a first spray pipe section (311) for flushing the inner wall surface of the reactor refueling water pool (2), and the second flushing pipeline (32) comprises a second spray pipe section (321) for flushing the inner wall surface of the reactor internal component water pool (3). The first spray pipe section (311) is arranged on at least a part of the inner wall surface of the reactor refueling water pool (2), and the second spray pipe section (321) is arranged on at least a part of the inner wall surface of the reactor internal component water pool (3).
2. The reactor pool flushing system according to claim 1, characterized in that: The first spray pipe section (311) is arranged around the upper part of the inner wall of the reactor refueling water pool (2), and a plurality of water spraying ports are arranged at intervals on the first spray pipe section (311), and the plurality of water spraying ports are respectively arranged toward the inner wall of the reactor refueling water pool (2); And / or, the second spray pipe section (321) is arranged around the upper part of the inner wall surface of the in-pile component water pool (3), and a plurality of water spray outlets are arranged at intervals on the second spray pipe section (321), and the plurality of water spray outlets are respectively arranged toward the inner wall surface of the in-pile component water pool (3).
3. The reactor pool flushing system according to claim 1, characterized in that: The reactor pool flushing system also includes a second water source pipeline (20), one end of which is connected to the nuclear island desalted water distribution system, and the other end of which is respectively connected to one end of the first flushing pipeline (31) and one end of the second flushing pipeline (32).
4. The reactor pool flushing system according to claim 3, characterized in that: The second water source pipeline (20) is also provided with at least one switch valve and / or flow meter (24).
5. The reactor pool flushing system according to claim 3, characterized in that: The second water source pipeline (20) is also provided with a connecting hose (23), and the connecting hose (23) is detachably arranged on the second water source pipeline (20).
6. The reactor pool flushing system according to claim 5, characterized in that: The second water source pipeline (20) is also provided with a second switch valve (21) and a third switch valve (22), the second switch valve (21) and the third switch valve (22) are respectively arranged on both sides of the connecting hose (23), and the third switch valve (22) is arranged between the connecting hose (23) and the nuclear island desalted water distribution system.
7. The reactor pool flushing system according to claim 1, characterized in that: The flushing pipeline group (30) also includes at least one spare pipeline, one end of which is connected to the other end of the first water source pipeline (10), and the other end of which is arranged outside the reactor water pool.
8. The reactor pool flushing system according to claim 7, characterized in that: The backup pipeline comprises a first backup pipeline (33) and a second backup pipeline (34); one end of the first backup pipeline (33) and one end of the second backup pipeline (34) are respectively connected to the other end of the first water source pipeline (10); the other end of the first backup pipeline (33) and the other end of the second backup pipeline (34) are respectively arranged on both sides of the reactor water pool.
9. The reactor pool flushing system according to claim 8, characterized in that: The other end of the first backup pipeline (33) and the other end of the second backup pipeline (34) are respectively provided with a quick connector.
10. The reactor pool flushing system according to claim 7, characterized in that: The first water source pipeline (10) and / or the first flushing pipeline (31) and / or the second flushing pipeline (32) and / or the at least one spare pipeline are provided with a switch valve.