Anchoring device of bridge support
By using prefabricated columns and anchor components on the bridge support, the anchoring of the bridge support is achieved, solving the problem of time-consuming and labor-intensive removal of anchor bolt holes and the damage to steel bars, and improving construction efficiency and quality.
Patent Information
- Application Number
- CN202420244758.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-31
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-01-31
AI Technical Summary
In bridge construction, manually removing anchor bolt holes is time-consuming and labor-intensive, and it is easy to destroy the preset steel bars in the pier, affecting the construction quality.
An anchoring device for bridge bearings is designed, including prefabricated columns and multiple sets of anchoring components prefabricated on the pier. Through the cooperation of threaded sleeves and installation components, the anchoring of bridge bearings is achieved, avoiding manual removal of anchor bolt holes. , protects the original design of the steel bars.
Effective anchoring and installation of bridge support is achieved, manual operation is reduced, damage to steel bars is avoided, and construction efficiency and quality is improved.
Smart Images

Figure CN221972077U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bridge construction, in particular to an anchoring device for a bridge support. Background Art
[0002] Bridge bearings are a common auxiliary tool for bridge construction. When bridge bearings are in use, anchor holes are reserved when pouring concrete on the supporting cushion stone of the pier top cap. After the concrete reaches the designed strength and before the bridge is erected, the anchor holes are manually removed so that the position, depth, and geometric dimensions of the anchor holes meet the design and specification requirements. When the bridge is erected, the bridge bearing lower pad (the anchor bolts have been welded to the lower pad) is placed, and then the bridge is erected. In the process of assisting the anchoring of the bridge bearings by reserving anchor holes, firstly, manually removing the anchor holes is time-consuming and laborious. Secondly, in the process of manually removing the anchor holes, the preset steel bars in the supporting cushion stone are easily cut off, which destroys the tensile stress of the steel bars in the original design and affects the quality of the overall bridge construction.
[0003] In view of this, the present utility model is proposed. Utility Model Content
[0004] In order to solve the above technical problems, the basic concept of the technical solution adopted by the utility model is:
[0005] The anchoring device of the bridge bearing comprises a bridge bearing arranged on the top of the pier, the bridge bearing comprising a bearing body, a lower pad and an upper pad are respectively fixed at the upper and lower ends of the bearing body, and also comprises an anchoring assembly arranged between the lower pad and the pier for anchoring the bridge bearing, the anchoring assembly comprises a prefabricated column prefabricated at the end of the pier, the lower pad is provided with a plurality of mounting holes for the ends of the prefabricated column to pass through, a threaded sleeve is fixedly installed on the prefabricated column by means of the mounting assembly, and the outer side of the threaded sleeve is threadedly engaged with the anchoring sleeve.
[0006] The anchoring components are arranged in multiple groups, and the multiple groups of anchoring components are evenly distributed around the support body.
[0007] The mounting assembly includes an opening formed on a prefabricated column, a mounting rod being slidably connected to the opening, nuts being threadedly engaged at both ends of the mounting rod, and both ends of the nut being arranged to abut against the outer side of the threaded sleeve, and a support assembly for connecting to the internal support of the opening is provided on the mounting rod.
[0008] The support components are arranged in a plurality of groups in a circular array on the mounting rod. The support components include mounting grooves provided on the outside of the mounting rod. The mounting grooves are connected to limited support plates via connecting components.
[0009] Inclined surfaces are provided on both sides of the position limiting support plate.
[0010] The connecting assembly includes a plurality of sleeves fixed inside the mounting groove, each sleeve is slidably connected with a slide rod, one end of the slide rod is fixed to one side of the limit support plate, and a spring is sleeved on the outer side of each sleeve.
[0011] Compared with the prior art, the utility model has the following beneficial effects:
[0012] The anchoring device of the bridge bearing of the utility model completes the anchoring operation of the bridge bearing on the pier through the anchoring assembly. During the whole anchoring process, it can not only ensure the effective anchoring installation of the bridge bearing, but also can prefabricate the outwardly convex prefabricated column. During the anchoring installation process, it is no longer necessary to manually remove the anchor bolt holes, and it can avoid damaging the tensile stress of the steel bars originally designed.
[0013] The specific implementation of the utility model is further described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In the attached picture:
[0015] Figure 1 It is a schematic diagram of the overall appearance structure of the utility model;
[0016] Figure 2 This is a schematic diagram of the pier structure of the utility model;
[0017] Figure 3 This is a schematic diagram of the structure of the anchoring assembly of the utility model;
[0018] Figure 4 This is a schematic diagram of the installation assembly structure of the utility model;
[0019] Figure 5 This is a schematic diagram of the support assembly structure of the utility model;
[0020] Figure 6 It is a schematic diagram of the structure of the connection component of the utility model.
[0021] In the figure: 1-pier; 201-lower pad; 202-support body; 203-upper pad; 301-prefabricated column; 302-mounting hole; 303-threaded sleeve; 304-anchor sleeve; 401-opening; 402-mounting rod; 403-nut; 501-mounting groove; 502-limiting support plate; 503-inclined surface; 601-casing; 602-sliding rod; 603-spring. DETAILED DESCRIPTION
[0022] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. The following embodiments are used to illustrate the utility model.
[0023] like Figures 1 to 6 As shown, the anchoring device of the bridge bearing comprises a bridge bearing arranged on the top of the pier 1, the bridge bearing comprises a bearing body 202, a lower pad 201 and an upper pad 203 are respectively fixed at the upper and lower ends of the bearing body 202, and also comprises an anchoring assembly arranged between the lower pad 201 and the pier 1 for anchoring the bridge bearing, the anchoring assembly comprises a prefabricated column 301 prefabricated at the end of the pier 1, a plurality of mounting holes 302 for the ends of the prefabricated column 301 to pass through are opened on the lower pad 201, a threaded sleeve 303 is fixedly installed on the prefabricated column 301 by the mounting assembly, and the outer side of the threaded sleeve 303 is engaged with the anchoring sleeve 304; the anchoring operation of the bridge bearing on the pier 1 is completed by the anchoring assembly, and during the entire anchoring process, the effective anchoring installation of the bridge bearing can be guaranteed, and the prefabricated convex prefabricated column 301 can also be used. During the anchoring installation process, it is no longer necessary to manually remove the anchor bolt holes, and the damage to the tensile stress of the steel bars originally designed can be avoided.
[0024] There are multiple groups of anchoring components, and the multiple groups of anchoring components are evenly distributed around the support body 202; the effect of anchoring installation is guaranteed by the multiple groups of anchoring components.
[0025] The mounting assembly includes an opening 401 formed on a prefabricated column 301, a mounting rod 402 being slidably connected to the opening 401, nuts 403 being threadedly engaged at both ends of the mounting rod 402, and both ends of the nut 403 being set against the outer side of the threaded sleeve 303, and a support assembly for connecting to the inner support of the opening 401 is set on the mounting rod 402; after the mounting rod 402 is pushed into the opening 401, the two nuts 403 are respectively threadedly connected to the two ends of the mounting rod 402 and are set against the outer side of the threaded sleeve 303, so that the threaded sleeve 303 after being sleeved is installed and fixed.
[0026] There are multiple groups of support components arranged in a circular array on the mounting rod 402, and the support components include a mounting groove 501 opened on the outer side of the mounting rod 402, and a limited support plate 502 is connected to the mounting groove 501 through a connecting component; inclined surfaces 503 are opened on both sides of the limited support plate 502; in the process of pushing the mounting rod 402 toward the inside of the opening 401, the inclined surface 503 abuts against the inner wall of the opening 401, pushing the limited support plate 502 to move toward the inside of the mounting groove 501 for contraction, and after the mounting rod 402 is pushed into the inside of the opening 401, the spring 603 on the connecting component pushes the outer side of the limited support plate 502 to abut against the inner wall of the opening 401, so that the pushed-in mounting rod 402 is installed and fixed inside the opening 401.
[0027] The connecting assembly includes a plurality of sleeves 601 fixed inside the mounting groove 501, each sleeve 601 is slidably connected with a slide rod 602, one end of the slide rod 602 is fixed to one side of the limit support plate 502, and a spring 603 is sleeved on the outer side of each sleeve 601; the movement of the limit support plate 502 after being subjected to force is guided by the sleeve 601 and the slide rod 602, and the reset movement of the support limit rod 502 after movement is facilitated by each spring 603.
[0028] During the pouring process of the pier 1, multiple groups of prefabricated columns 301 are prefabricated on the upper end side of the pier 1. After the pouring of the pier 1 is completed, the bridge bearings are installed;
[0029] During the installation of the bridge bearing, the lower pad 201 is pushed toward the upper end of the pier 1. During the pushing process, the ends of each group of prefabricated columns 301 are respectively passed through each installation hole 302. After the passing is completed, the threaded sleeve 303 is installed and fixed on the outside of the prefabricated column 301 through the mutual cooperation of the installation component and the support component. During the installation process, the threaded sleeve 303 is placed above the lower pad 201. After the threaded sleeve 303 is installed, each anchor sleeve 304 is threadedly connected to the outside of the threaded sleeve 303 and abutted against the upper end of the lower pad 201. Through the abutting and squeezing effect of each anchor sleeve 304, the lower pad 201 is fixed above the pier 1 to complete the anchoring operation of the bridge bearing. During the entire anchoring process, it can not only ensure the effective anchoring installation of the bridge bearing, but also through the prefabricated convex prefabricated column 301, during the anchoring installation process, it is no longer necessary to manually remove the anchor bolt hole, and to avoid destroying the original designed steel bar tensile stress.
Claims
1. Anchoring device for bridge bearings, including: A bridge bearing arranged on the top of a pier (1), the bridge bearing comprising a bearing body (202), a lower pad (201) and an upper pad (203) being fixed to the upper and lower ends of the bearing body (202) respectively; It is characterized by further comprising: An anchoring assembly for anchoring a bridge support is arranged between a lower pad (201) and a pier (1), the anchoring assembly comprising a prefabricated column (301) prefabricated at the end of the pier (1), the lower pad (201) being provided with a plurality of mounting holes (302) for the ends of the prefabricated column (301) to pass through, a threaded sleeve (303) being fixedly mounted on the prefabricated column (301) by means of the mounting assembly, and an anchoring sleeve (304) being engaged with the outer thread of the threaded sleeve (303).
2. The anchoring device for a bridge support according to claim 1, characterized in that: The anchoring components are arranged in multiple groups, and the multiple groups of anchoring components are evenly distributed around the support body (202).
3. The anchoring device for a bridge support according to claim 1, characterized in that: The mounting assembly comprises an opening (401) formed on a prefabricated column (301), a mounting rod (402) being slidably connected to the opening (401), nuts (403) being threadedly engaged at both ends of the mounting rod (402), and both ends of the nut (403) being arranged to abut against the outer side of the threaded sleeve (303), and a support assembly for connecting to the inner support of the opening (401) is arranged on the mounting rod (402).
4. The anchoring device for a bridge support according to claim 3, characterized in that: The support components are arranged in a plurality of groups in a circular array on the mounting rod (402), and the support components include a mounting groove (501) opened on the outside of the mounting rod (402), and a limited support plate (502) is connected to the mounting groove (501) via a connecting component.
5. The anchoring device for a bridge support according to claim 4, characterized in that: Inclined surfaces (503) are provided on both sides of the position-limiting support plate (502).
6. The anchoring device for a bridge support according to claim 4, characterized in that: The connection assembly comprises a plurality of sleeves (601) fixed inside the mounting groove (501), each of the sleeves (601) being slidably connected with a slide rod (602), one end of the slide rod (602) being fixed to one side of the limiting support plate (502), and a spring (603) being sleeved on the outer side of each of the sleeves (601).