Engineering construction supporting device

By designing the base soil layer, concrete layer and positioning steel bar mechanism in the soil nail wall, the problem of insufficient bearing capacity and stability of the soil nail wall is solved, and higher stability and cost-effectiveness are achieved, ensuring the leveling of the soil nail wall degree and durability.

CN221972441UInactive Publication Date: 2024-11-08HENAN VOCATIONAL & TECHN COLLEGE OF COMM +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420477850.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-12
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing soil nail wall affects the load-bearing capacity and stability through the length, diameter and spacing of the soil nail. The weighing and stability of a single soil nail is insufficient, resulting in the need to add soil nails to maintain stability when a large load is required. But increasing soil nails will increase construction costs.

Method used

An engineering construction support device was designed, including a base soil layer, a concrete layer, a steel wire mesh and a positioning steel bar mechanism. By measuring and laying the positioning on the base soil layer and placing the soil nails into holes, the steel bar casing and expansion sheet set are improved. Contact area, after grouting, steel wire mesh is prepared and concrete layer is sprayed to ensure the overall stability of the soil nail wall and prevent water influence through drainage and waterproofing measures.

Benefits of technology

The overall stability and bearing capacity of the soil nail wall are improved, the construction cost is reduced due to the increase in the number of soil nails, the flatness and durability of the soil nail wall are ensured, and water immersion is prevented from affecting stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972441U_ABST
    Figure CN221972441U_ABST
Patent Text Reader

Abstract

The utility model discloses an engineering construction supporting device, relates to the technical field of engineering protection devices, and aims to solve the problems that according to an existing soil nailing wall, the bearing capacity and stability of soil nails can be directly affected by the lengths, the diameters and the intervals of the soil nails, and the weighing performance and stability of an existing single soil nail are insufficient. In order to solve the problems that the stability of a soil nailing wall needs to be kept by adding soil nails when the weight needs to be large, but the construction cost is also increased when the soil nails are added, a concrete layer is arranged on one side of a foundation soil layer, a drainage ditch is formed in one side of the lower end of the concrete layer, and an intercepting ditch is formed in the other side of the upper end of the concrete layer; a steel wire mesh is arranged in the concrete layer, positioning steel bar mechanisms are arranged in the foundation soil layer and the concrete layer, the positioning steel bar mechanisms are perpendicular to the steel wire mesh, and each positioning steel bar mechanism comprises a steel bar sleeve and a positioning steel bar.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering protection devices, in particular to an engineering construction support device. Background Art

[0002] Engineering construction support devices are a series of temporary or permanent support and protection facilities used to ensure construction safety and engineering stability during various types of engineering construction. These support devices can resist external loads, prevent the movement of soil or rock, protect the safety of construction personnel and equipment, and ensure the stability and integrity of engineering structures. Common engineering construction support devices include: steel sheet piles, underground continuous walls, soil nail walls and support structures. The soil nail wall is a support structure composed of reinforced soil, soil nails placed in the soil and a sprayed concrete surface layer. It is mainly used for excavation of foundation pits with small depth and width, or used in conjunction with other support structures; prestressed anchor rod: one end of the tension rod is anchored on a stable stratum or structure, and the other end is connected to various forms of force transmission structures. The prestress of the stratum or structure is transmitted to the deep stable stratum through the stretching of the tension rod, thereby achieving the purpose of reinforcement or support.

[0003] The Chinese patent publication number is CN216551988U, which discloses a support assembly for a soil nail wall and a soil nail wall thereof. The support assembly includes a surface layer body, the surface layer body is suitable for being laid on the slope of the soil nail wall; a positioning assembly, the positioning assembly includes a plurality of positioning steel bars arranged at intervals, each of the positioning steel bars passes through the surface layer body and extends into the soil nail wall; a connecting assembly, the connecting assembly includes a plurality of connecting steel bars, each of the connecting steel bars is pressed on the surface layer body, and each of the connecting steel bars is welded and connected to at least two adjacent positioning steel bars. By welding at least two adjacent positioning steel bars together through the connecting steel bars, and by pressing each connecting steel bar tightly against the surface layer body, the number of components of the support assembly is reduced, the on-site construction process is simplified, and the on-site construction is made simpler and more convenient, so as to improve work efficiency.

[0004] The above-mentioned existing technical solutions have the following defects: although they can simplify the on-site construction process and make the construction simpler and more convenient, the length, diameter and spacing of the soil nails will directly affect the bearing capacity and stability of the soil nails. The existing single soil nails have insufficient weighing and stability. When a large weight is required, it is necessary to maintain the stability of the soil nail wall by adding soil nails, but adding soil nails also increases the construction cost. Therefore, we propose an engineering construction support device to solve the above-mentioned problems. Utility Model Content

[0005] The utility model aims to provide an engineering construction support device to solve the problem in the above-mentioned background technology that the length, diameter and spacing of the soil nails in the existing soil nail wall will directly affect the bearing capacity and stability of the soil nails, the existing single soil nails have insufficient weighing and stability, and when a large weight is required, it is necessary to maintain the stability of the soil nail wall by adding soil nails, but the addition of soil nails also increases the construction cost.

[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an engineering construction support device, comprising a base soil layer, a concrete layer is arranged on one side of the base soil layer, a drainage ditch is arranged on one side of the lower end of the concrete layer, and a drainage ditch is arranged on the other side of the upper end of the concrete layer, a wire mesh is arranged inside the concrete layer, a positioning steel bar mechanism is arranged inside the base soil layer and the concrete layer, and the positioning steel bar mechanism is arranged vertically to the wire mesh, and the positioning steel bar mechanism includes a steel bar casing and positioning steel bars.

[0007] Preferably, the steel bar casing includes a first steel bar casing, a second steel bar casing, a positioning connection block and an expansion plate group. The first steel bar casing is located on one side of the second steel bar casing. Seventeen expansion plate groups are arranged in a ring between the first steel bar casing and the second steel bar casing. A positioning connection block is arranged on one side of the second steel bar casing.

[0008] Preferably, the middle position of one end surface of the positioning connection block is welded to the positioning steel bar, and the outer side of one end surface of the positioning connection block is welded to the second steel bar sleeve.

[0009] Preferably, the second steel bar sleeve is located on the outer side of the lower end of the positioning steel bar, the first steel bar sleeve is located on the outer side of the upper end of the positioning steel bar, and the positioning steel bar is slidably connected to the first steel bar sleeve.

[0010] Preferably, the expansion plate group consists of two symmetrically arranged expansion plates, one end of the expansion plate on one side is rotatably connected to the lower end of the first steel bar casing, and the other end of the expansion plate on the other side is rotatably connected to the upper end of the second steel bar casing, the connection between the two expansion plates is rotatably connected, and the gap between adjacent expansion plate groups is one to two millimeters.

[0011] Preferably, one end of the positioning steel bar mechanism located in the base soil layer is tilted downward by fifteen degrees, a positioning plate is mounted and welded on the outer side of the upper end of the positioning steel bar, and the lower end surface of the positioning plate is welded to the wire mesh, and the upper end of the first steel bar sleeve is welded to the wire mesh.

[0012] Preferably, a waterproof layer is bonded and adhered to the upper surface of the concrete layer, one side of the upper end of the waterproof layer is bonded to the upper surface of the intercepting ditch, and the lower end of the waterproof layer is bonded to the upper surface of the drainage ditch. Drain pipes are provided inside the base soil layer and the concrete layer, and the drain pipes penetrate to the outside of the concrete layer and tilt downward.

[0013] Compared with the prior art, the beneficial effects of the utility model are as follows: during the construction of the utility model, the position of the positioning steel bar mechanism is measured and marked on the base soil layer, a hole is formed at the marked position, and then the soil nail is placed in the hole, and then the first steel bar sleeve of the steel bar sleeve is hammered downward. Due to the downward movement of the first steel bar sleeve, the expansion sheet group is pushed outward, thereby increasing its contact area with the base soil layer. At this time, grouting is performed between the steel bar sleeve and the positioning steel bar and between the positioning steel bar mechanism and the hole. After the grouting is completed, a wire mesh needs to be woven on the slope. After the weaving is completed, the lower end face of the positioning plate is welded to the wire mesh, and the upper end of the first steel bar sleeve is welded to the wire mesh to ensure the overall stability of the soil nail wall, and the construction of the sprayed concrete layer is carried out. The strength and The thickness should meet the design requirements to ensure the surface flatness and durability of the soil nail wall. Finally, a waterproof layer is laid on the surface of the shotcrete layer, a drainage ditch is laid on the side above the concrete layer, and a waterproof layer is laid on the side below the concrete layer. The setting of the waterproof layer can prevent water from penetrating into the concrete layer and affecting the overall stability of the soil nail wall. The setting of the drain pipe can drain the accumulated water in the base soil layer, and the drainage ditch and the drainage ditch can drain the accumulated water on the surface of the waterproof layer. The problem that the length, diameter and spacing of the soil nails in the existing soil nail wall will directly affect the bearing capacity and stability of the soil nails, and the existing single soil nails have insufficient weighing and stability. When a large weight is required, it is necessary to maintain the stability of the soil nail wall by adding soil nails, but adding soil nails also increases the construction cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a structural schematic diagram of the utility model;

[0015] Figure 2 This is a working state diagram of the steel bar positioning mechanism in the utility model;

[0016] Figure 3 This is another working state diagram of the steel bar positioning mechanism in the utility model;

[0017] Figure 4 For the utility model Figure 3 AA direction cross-sectional view.

[0018] In the figure: 1. base soil layer; 2. positioning steel bar mechanism; 3. intercepting ditch; 4. concrete layer; 5. wire mesh; 6. drainage ditch; 7. waterproof layer; 8. positioning plate; 9. drain pipe; 10. steel bar casing; 11. positioning steel bar; 12. first steel bar casing; 13. second steel bar casing; 14. positioning connection block; 15. expansion plate group. DETAILED DESCRIPTION

[0019] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0020] See also Figure 1-4 The utility model provides an embodiment: an engineering construction support device, including a base soil layer 1, a concrete layer 4 is arranged on one side of the base soil layer 1, a drainage ditch 6 is arranged on one side of the lower end of the concrete layer 4, and a drainage ditch 3 is arranged on the other side of the upper end of the concrete layer 4, a wire mesh 5 is arranged inside the concrete layer 4, a positioning steel bar mechanism 2 is arranged inside the base soil layer 1 and the concrete layer 4, and the positioning steel bar mechanism 2 is arranged vertically to the wire mesh 5, and the positioning steel bar mechanism 2 includes a steel bar sleeve 10 and a positioning steel bar 11.

[0021] During construction, the position of the positioning steel bar mechanism 2 is measured and marked on the base soil layer 1, holes are drilled at the marked positions, and then soil nails are placed in the holes. The first steel bar sleeve 12 of the steel bar sleeve 10 is hammered downward. The downward movement of the first steel bar sleeve 12 causes the expansion sheet group 15 to open outward, thereby increasing its contact area with the base soil layer 1. At this time, grouting is performed between the steel bar sleeve 10 and the positioning steel bars 11 and between the positioning steel bar mechanism 2 and the hole. After the grouting is completed, it is necessary to weave a wire mesh 5 on the slope. After the weaving is completed, the lower end face of the positioning plate 8 is welded to the wire mesh 5, and the upper end face of the first steel bar sleeve 12 is welded to the lower end face of the positioning plate 8. The ends are welded and connected with the wire mesh 5 to ensure the overall stability of the soil nail wall, and the sprayed concrete layer 4 is constructed. The strength and thickness of the sprayed concrete should meet the design requirements to ensure the surface flatness and durability of the soil nail wall. Finally, a waterproof layer 7 is laid on the surface of the sprayed concrete layer 4, a drainage ditch 3 is laid on the side above the concrete layer 4, and a waterproof layer 7 is laid on the side below the concrete layer 4. The setting of the waterproof layer 7 can prevent water from infiltrating into the concrete layer 4 and affecting the overall stability of the soil nail wall. The setting of the drain pipe 9 can drain the accumulated water in the base soil layer 1, and the drainage ditch 3 and the drainage ditch 6 can drain the accumulated water on the surface of the waterproof layer 7.

[0022] See also Figure 2-4The steel casing 10 includes a first steel casing 12, a second steel casing 13, a positioning connection block 14 and an expansion plate group 15. The first steel casing 12 is located on one side of the second steel casing 13. Seventeen expansion plate groups 15 are arranged in a ring between the first steel casing 12 and the second steel casing 13. A positioning connection block 14 is arranged on one side of the second steel casing 13.

[0023] See also Figure 2-3 The middle position of one end surface of the positioning connection block 14 is welded to the positioning steel bar 11 , and the outer side of one end surface of the positioning connection block 14 is welded to the second steel bar sleeve 13 .

[0024] See also Figure 2-3 The second steel bar sleeve 13 is located on the outer side of the lower end of the positioning steel bar 11, the first steel bar sleeve 12 is located on the outer side of the upper end of the positioning steel bar 11, and the positioning steel bar 11 is slidably connected to the first steel bar sleeve 12.

[0025] See also Figure 3-4 The expansion plate group 15 consists of two symmetrically arranged expansion plates, one end of the expansion plate on one side is rotatably connected to the lower end of the first steel sleeve 12, and the other end of the expansion plate on the other side is rotatably connected to the upper end of the second steel sleeve 13. The connection between the two expansion plates is rotatably connected, and the gap between adjacent expansion plate groups 15 is one to two millimeters.

[0026] See also Figure 1-3 The end of the positioning steel bar mechanism 2 located in the base soil layer 1 is tilted downward by fifteen degrees. A positioning plate 8 is mounted and welded on the outer side of the upper end of the positioning steel bar 11, and the lower end surface of the positioning plate 8 is welded to the wire mesh 5. The upper end of the first steel bar sleeve 12 is welded to the wire mesh 5.

[0027] See also Figure 1 A waterproof layer 7 is bonded and adhered to the upper surface of the concrete layer 4, one side of the upper end of the waterproof layer 7 is bonded to the upper surface of the intercepting ditch 3, and the lower end of the waterproof layer 7 is bonded to the upper surface of the drainage ditch 6. A drainage pipe 9 is provided inside the base soil layer 1 and the concrete layer 4, and the drainage pipe 9 penetrates to the outside of the concrete layer 4 and tilts downward.

[0028] Working principle: During construction, the position of the positioning steel bar mechanism 2 is measured and marked on the base soil layer 1, and a hole is made at the marked position. Then, the soil nail is placed in the hole, and the first steel bar sleeve 12 of the steel bar sleeve 10 is hammered downward. The downward movement of the first steel bar sleeve 12 causes the expansion sheet group 15 to open outward, thereby increasing its contact area with the base soil layer 1. At this time, grouting is performed between the steel bar sleeve 10 and the positioning steel bar 11 and between the positioning steel bar mechanism 2 and the hole. After the grouting is completed, it is necessary to weave a wire mesh 5 on the slope. After the weaving is completed, the lower end surface of the positioning plate 8 is welded to the wire mesh 5. The first steel bar sleeve 1 2 is welded to the steel wire mesh 5 to ensure the overall stability of the soil nail wall, and the sprayed concrete layer 4 is constructed. The strength and thickness of the sprayed concrete should meet the design requirements to ensure the surface flatness and durability of the soil nail wall. Finally, a waterproof layer 7 is laid on the surface of the sprayed concrete layer 4, a cut-off ditch 3 is laid on one side above the concrete layer 4, and a waterproof layer 7 is laid on one side below the concrete layer 4. The setting of the waterproof layer 7 can prevent water from infiltrating into the concrete layer 4 and affecting the overall stability of the soil nail wall. The water accumulation in the base soil layer 1 can be discharged by the setting of the drain pipe 9, and the cut-off ditch 3 and the drain ditch 6 can discharge the water accumulated on the surface of the waterproof layer 7.

[0029] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. A construction support device, comprising a base soil layer (1), characterized in that: A concrete layer (4) is provided on one side of the base soil layer (1), a drainage ditch (6) is provided on one side of the lower end of the concrete layer (4), a drainage ditch (3) is provided on the other side of the upper end of the concrete layer (4), a steel wire mesh (5) is provided inside the concrete layer (4), a positioning steel bar mechanism (2) is provided inside the base soil layer (1) and the concrete layer (4), and the positioning steel bar mechanism (2) is arranged vertically to the steel wire mesh (5), and the positioning steel bar mechanism (2) comprises a steel bar sleeve (10) and positioning steel bars (11).

2. The engineering construction support device according to claim 1, characterized in that: The steel bar sleeve (10) comprises a first steel bar sleeve (12), a second steel bar sleeve (13), a positioning connection block (14) and an expansion plate group (15); the first steel bar sleeve (12) is located on one side of the second steel bar sleeve (13); seventeen expansion plate groups (15) are arranged in a ring between the first steel bar sleeve (12) and the second steel bar sleeve (13); and a positioning connection block (14) is arranged on one side of the second steel bar sleeve (13).

3. The engineering construction support device according to claim 2, characterized in that: The middle position of one end surface of the positioning connection block (14) is welded to the positioning steel bar (11), and the outer side of one end surface of the positioning connection block (14) is welded to the second steel bar sleeve (13).

4. The engineering construction support device according to claim 2, characterized in that: The second steel bar sleeve (13) is located outside the lower end of the positioning steel bar (11), the first steel bar sleeve (12) is located outside the upper end of the positioning steel bar (11), and the positioning steel bar (11) is slidably connected to the first steel bar sleeve (12).

5. The engineering construction support device according to claim 2, characterized in that: The expansion sheet group (15) is composed of two symmetrically arranged expansion sheets, one end of the expansion sheet on one side is rotatably connected to the lower end of the first steel bar sleeve (12), and the other end of the expansion sheet on the other side is rotatably connected to the upper end of the second steel bar sleeve (13). The connection between the two expansion sheets is rotatably connected, and the gap between adjacent expansion sheet groups (15) is one to two millimeters.

6. The engineering construction support device according to claim 2, characterized in that: One end of the positioning steel bar mechanism (2) located in the base soil layer (1) is tilted downward by fifteen degrees, a positioning plate (8) is sleeved and welded to the outer side of the upper end of the positioning steel bar (11), and the lower end surface of the positioning plate (8) is welded to the steel wire mesh (5), and the upper end of the first steel bar sleeve (12) is welded to the steel wire mesh (5).

7. The engineering construction support device according to claim 1, characterized in that: A waterproof layer (7) is bonded and provided on the upper surface of the concrete layer (4); one side of the upper end of the waterproof layer (7) is bonded to the upper surface of the intercepting ditch (3); the lower end of the waterproof layer (7) is bonded to the upper surface of the drainage ditch (6); a drainage pipe (9) is provided inside the base soil layer (1) and the concrete layer (4); and the drainage pipe (9) penetrates to the outside of the concrete layer (4) and is inclined downward.