By designing the bottom support positioning components and grouting hole structure in the prefabricated building wall, the concrete mortar can be fully contacted and solidified on the positioning barrel and column, the unfixed bond between the mortar and the bottom support part in the prior art is solved. The problem of improving connection stability.
Patent Information
- Application Number
- CN202422437377.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2034-10-10
AI Technical Summary
In existing prefabricated building walls, the concrete mortar injected into the grouting hole can only come into contact with the top end surface of the positioning pin, resulting in the problem of insolid bonding with the bottom support part.
An environmentally friendly prefabricated building wall including a bottom support positioning assembly, a wall panel body, I-steel and a connector are designed. By setting the positioning bobbins and columns in the bottom support positioning assembly, and setting the wall panel body on the main body. Grouting holes ensure that concrete mortar can flow into the inner part of the positioning bobbin and wrap the column, enhancing the stability of connection with the bottom support positioning assembly.
The stable connection between the concrete mortar and the bottom support part is achieved, and the bonding ability and support stability of the wall panel main body and the bottom support positioning component are improved.
Smart Images

Figure CN221972741U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of prefabricated building walls, in particular to an environmentally friendly assembled building wall. Background Art
[0002] Prefabricated concrete walls have the advantages of quick assembly and shortened construction period in construction. For example, the public document with announcement number CN220550718U discloses an assembled building wall, which includes a wall and a connector. Both side end faces of the wall are integrally provided with convex edge portions, and both side end faces of the connector are integrally provided with groove portions that can be connected with the convex edge portions. The front and rear side surfaces of the connector are provided with multiple groups of connection holes that penetrate the groove portions.
[0003] The design of the positioning holes and positioning pins of the above-mentioned prefabricated building wall can improve the stability of the base support, but the concrete mortar injected from the grouting hole can only contact the top end surface of the positioning pin, and there is a problem that the concrete mortar is not firmly bonded to the bottom support part. Summary of the invention
[0004] In order to remedy the above deficiencies, the utility model provides an environmentally friendly prefabricated building wall, aiming to improve the problem in the related technology that the concrete mortar injected from the grouting hole can only contact the top end surface of the positioning pin, and there is a problem that the concrete mortar is not firmly bonded to the bottom supporting part.
[0005] The utility model is achieved in this way:
[0006] The utility model provides an environment-friendly assembled building wall, comprising a bottom support positioning component, a wall panel body, an I-beam and a connecting piece.
[0007] The bottom support positioning assembly includes a base plate, a positioning tube and a column. The positioning tube is fixed above the base plate, and the bottom end of the column is inserted into the positioning tube and fixedly connected to the base plate. Grouting holes are provided on the wall panel body, and the positioning tube is inserted into the lower section of the grouting hole. The two wall panel bodies are connected by I-beams, and the two bottom support positioning assemblies are connected by connectors.
[0008] In an embodiment of the present invention, the connecting member includes a connecting plate, and the connecting plate connects the two base plates through fixing bolts.
[0009] In an embodiment of the present invention, a mounting groove matching with the connecting plate is provided on the outer side of the end portion of the base plate.
[0010] In an embodiment of the utility model, a positioning hole is provided on a side of the installation groove, and a positioning column plug-fitted with the positioning hole is provided on one side of the connecting plate.
[0011] In one embodiment of the utility model, the positioning tube, the column and the grouting holes are all arranged in multiple groups of corresponding numbers, and the tops of the multiple groups of grouting holes are provided with interconnected transverse grooves.
[0012] In an embodiment of the utility model, matching mounting holes are provided on the side of the I-beam and the outer side of the end of the wall panel body.
[0013] In an embodiment of the present utility model, a card slot which is plugged and matched with the bottom of the wall panel body is provided on the upper surface of the base plate.
[0014] The beneficial effect of the utility model is that the utility model obtains an environmentally friendly assembled building wall through the above design, and concrete mortar is injected into the grouting holes in the wall panel body from the top until the grouting holes inside the wall panel body are filled. The concrete mortar injected into the grouting holes will flow into the positioning tube and partially wrap around the outside of the column. After the concrete mortar is dry, the wall panel body and the bottom support positioning assembly can be more stably connected, so that the bottom support positioning assembly has better connection and support stability to the wall panel body. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the drawings required for use in the implementation mode will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 This is a schematic diagram of an environmentally friendly assembled building wall structure provided by an embodiment of the utility model;
[0017] Figure 2 A schematic diagram of the structure of the bottom support positioning assembly provided in the embodiment of the utility model;
[0018] Figure 3 A schematic diagram of the main structure of the wall panel provided in the embodiment of the utility model;
[0019] Figure 4 A schematic diagram of the connector structure provided in an embodiment of the utility model.
[0020] In the figure: 10-bottom support positioning assembly; 110-base plate; 120-positioning tube; 130-column; 140-installation groove; 150-positioning hole; 20-wall panel body; 210-grouting hole; 220-cross groove; 30-I-beam; 40-connector; 410-connecting plate; 420-fixing bolt; 430-positioning column. DETAILED DESCRIPTION
[0021] In order to make the purpose, technical solution and advantages of the implementation of the utility model clearer, the technical solution in the implementation of the utility model will be clearly and completely described below in conjunction with the drawings in the implementation of the utility model. Obviously, the described implementation is a part of the implementation of the utility model, not all of the implementations. Based on the implementation of the utility model, all other implementations obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Example
[0022] See also Figure 1-Figure 4 The utility model provides an environmentally friendly assembled building wall, including a bottom support positioning assembly 10, a wall panel body 20, an I-beam 30 and a connecting piece 40.
[0023] The bottom support and positioning assembly 10 is used to support the wall panel body 20, and the I-beam 30 is used to connect adjacent wall panel bodies 20. When pouring concrete mortar, the design of the bottom support and positioning assembly 10 enables the wall panel body 20 to contact the bottom support and positioning assembly 10 over a larger area, thereby improving the bonding ability between the bottom support and positioning assembly 10 and the wall panel body 20.
[0024] See also Figure 1 , Figure 2 and Figure 3 The bottom support positioning assembly 10 includes a base plate 110, a positioning tube 120 and a column 130. The positioning tube 120 is fixed on the top of the base plate 110 by welding, and the bottom end of the column 130 is inserted into the positioning tube 120 and fixedly connected to the base plate 110 by welding. A grouting hole 210 is provided on the wall panel body 20, and the positioning tube 120 is inserted into the lower section of the grouting hole 210. The two wall panel bodies 20 are connected by an I-beam 30, and the two bottom support positioning assemblies 10 are connected by a connector 40.
[0025] The wall panel body 20 installed above the base plate 110 injects concrete mortar into the grouting holes 210 in the wall panel body 20 from the top until the grouting holes 210 inside the wall panel body 20 are filled. The concrete mortar injected into the grouting holes 210 will flow into the positioning barrel 120 and partially wrap around the outside of the column 130. After the concrete mortar is dry, the wall panel body 20 and the bottom support positioning assembly 10 can be more stably connected, so that the bottom support positioning assembly 10 has better connection and support stability to the wall panel body 20.
[0026] In the above specific implementation, please refer to Figure 2 and Figure 4The connecting member 40 includes a connecting plate 410, and the connecting plate 410 is connected to the two base plates 110 by means of a fixing bolt 420. The two base plates 110 are connected by means of the setting of the fixing bolt 420 and the connecting plate 410. An installation groove 140 matching with the connecting plate 410 is provided on the outer side of the end of the base plate 110, and the installation groove 140 is used to limit the installation of the installation groove 140. A positioning hole 150 is provided on the side of the installation groove 140, and a positioning column 430 plugged with the positioning hole 150 is provided on one side of the connecting plate 410. The setting of the positioning hole 150 and the positioning column 430 can make the connecting plate 410 stably installed on the side of the base plate 110.
[0027] Specifically, the positioning barrel 120, the column 130 and the grouting holes 210 are all arranged in a corresponding number of groups, and the tops of the multiple groups of grouting holes 210 are provided with interconnected transverse grooves 220. When concrete mortar is injected into one grouting hole 210, when the one grouting hole 210 is full, the excess concrete mortar can flow along the transverse groove 220 into the grouting holes 210 of the remaining groups until all the grouting holes 210 are filled with concrete mortar, that is, the operation of injecting concrete mortar into the multiple groups of grouting holes 210 is more convenient.
[0028] Furthermore, the side of the I-beam 30 and the outer side of the end of the wall panel body 20 are both provided with matching mounting holes. The upper surface of the base plate 110 is provided with a slot that is plugged and matched with the bottom of the wall panel body 20.
[0029] The working principle of the environmentally friendly assembled building wall is as follows: when in use, the wall panel body 20 installed above the base plate 110 injects concrete mortar from the top into the grouting holes 210 in the wall panel body 20 until the grouting holes 210 inside the wall panel body 20 are filled. The concrete mortar injected into the grouting holes 210 will flow into the positioning barrel 120 and partially wrap around the outside of the column 130. After the concrete mortar is dry, the wall panel body 20 and the bottom support positioning assembly 10 can be more stably connected, so that the bottom support positioning assembly 10 has better connection and support stability to the wall panel body 20.
[0030] The above description is only the preferred implementation of the utility model, and is not intended to limit the utility model. For those skilled in the art, the utility model can have various modifications and changes. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. An environmentally friendly assembled building wall, It is characterized in that include A bottom support positioning assembly (10), the bottom support positioning assembly (10) comprising a base plate (110), a positioning tube (120) and a column (130), the positioning tube (120) being fixed above the base plate (110), and the bottom end of the column (130) being inserted into the positioning tube (120) and fixedly connected to the base plate (110); A wall panel body (20), wherein a grouting hole (210) is provided on the wall panel body (20), and the positioning tube (120) is inserted into a lower section inside the grouting hole (210); I-beams (30) and connecting pieces (40), the two wall panel bodies (20) are connected via the I-beams (30), and the two bottom support positioning assemblies (10) are connected via the connecting piece (40).
2. An environmentally friendly assembled building wall according to claim 1, It is characterized in that The connecting member (40) comprises a connecting plate (410), and the connecting plate (410) is connected to the two base plates (110) via fixing bolts (420).
3. An environmentally friendly assembled building wall according to claim 2, It is characterized in that An installation groove (140) matching with the connecting plate (410) is provided on the outer side of the end of the base plate (110).
4. An environmentally friendly assembled building wall according to claim 3, It is characterized in that A positioning hole (150) is provided on the side of the installation groove (140), and a positioning column (430) pluggably engaged with the positioning hole (150) is provided on one side of the connection plate (410).
5. The environmentally friendly assembled building wall according to claim 1, It is characterized in that The positioning barrel (120), the column (130) and the grouting holes (210) are all arranged in a corresponding number of groups, and the tops of the multiple groups of grouting holes (210) are provided with interconnected transverse grooves (220).
6. The environmentally friendly assembled building wall according to claim 1, It is characterized in that Matching mounting holes are provided on the side of the I-beam (30) and on the outer side of the end of the wall panel body (20).
7. The environmentally friendly assembled building wall according to claim 1, It is characterized in that The upper surface of the base plate (110) is provided with a slot which is plugged into and matched with the bottom of the wall plate body (20).