Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

37results about How to "Promote green construction" patented technology

Split mounting type prefabricated reinforced concrete construction temporary road

InactiveCN102619152AAvoid being vulnerable to damageReduce construction wasteTemporary pavingsRebarReinforced concrete
The invention discloses a split mounting type prefabricated reinforced concrete construction temporary road, which comprises a box type member, wherein a reinforced concrete box type member is arranged in the box type member; reinforcement of the reinforced concrete box type member is welded and fixed to the box type member; four angular points of the reinforced concrete box type member are provided with omega-shaped lifting rings respectively; and water discharge holes are also formed at the omega-shaped lifting rings. The split mounting type prefabricated reinforced concrete construction temporary road has the beneficial effects that: through development of the split mounting type prefabricated reinforced concrete construction temporary road, a reinforcement welding net, angle steel and concrete are formed into a whole, so that the performances of the steel and the concrete are fully utilized, particularly, the periphery of the construction temporary road is protected by using the angle steel, and the unavailability due to corner stripping caused by collision or other reasons during use of the construction temporary road is avoided; and a temporary road module is manufactured by using a shaped steel mould, and meanwhile, a special formwork and a strengthening system are matched, so that the construction quality of the corner part and the entire temporary road is effectively guaranteed.
Owner:ZHONGTIAN CONSTR GROUP

Inner oblique beam supporting structure for oversized-area deep foundation pit and construction method

The invention discloses an inner obliquely beam supporting structure for an oversized-area deep foundation pit. The inner oblique beam supporting structure comprises a pouring pile and an inner oblique beam, wherein the pouring pile is arranged at the edge of the foundation pit, the upper end of the inner oblique beam is fixedly connected with a top beam or a waist beam arranged on the pouring pile, and the lower end of the inner oblique beam is fixedly connected with a basement base board. The invention further discloses a construction method for the supporting structure. The construction method comprises the following steps of constructing a fender post, constructing the pouring pile in the fender post, excavating earth in a graded mode to the elevation of a cushion layer of the top beam, constructing the reinforced concrete top beam and maintaining the reinforced concrete top beam to the design strength, excavating earth in a graded mode to the design elevation of the pit bottom except earth outside a reversed stereobate, constructing basement base boards except basement base boards outside the reversed stereobate, constructing a branch oblique beam supporting seat, constructing the inner oblique beam, and excavating and removing the reversed stereobate. A deep foundation pit inner support constructed according to the supporting structure and the construction method is reliable in technique, convenient to operate, obvious in benefit and capable of meeting requirements for energy conservation and environment protection.
Owner:FUJIAN JIULONG CONSTR GRP CO LTD

Precast concrete road system and construction method

The invention discloses a precast concrete road system and a construction method and relates to the technical field of road construction. The road system comprises a basic layer, a curb layer, a filling layer and a pavement layer; the basic layer is paved with concrete precast basic blocks with reversed-T-shaped longitudinal sections; the curb layer is paved with rectangular solid concrete precastcurb blocks; the filling layer is paved with precast filling blocks of a box-shaped structure; and the pavement layer is laid at the top of a structure composed of a vertical layer of the basic layer, the curb layer and the filling layer, and the pavement layer is paved with concrete precast pavement board blocks. By the adoption of the system, the basic layer is paved with the multiple basic blocks in an attached and crossed mode, the curb layer is paved with the multiple curb blocks in an attached and crossed mode, the filling layer is paved with the multiple filling blocks in an attached and crossed mode, the pavement layer is paved with the multiple pavement board blocks in an attached and crossed mode, the system is convenient to transport, easy to lay, short in site construction time, high in construction efficiency, capable of being reused, easy to replace after being damaged and small in construction waste.
Owner:马晓鹤

Green formwork system construction method

The invention discloses a green formwork system construction method, and belongs to the technical field of building construction. The method comprises the following steps of preparation before construction, formwork system erection, steel bar binding, concrete pouring and two-time formwork removal. The erection size of a formwork system is standardized, formworks are standardized, the erection efficiency and stability of the formwork system are improved, the standard formworks are utilized, circulation is fast, investment is small, only one layer of formwork needs to be prepared, the formwork can be rapidly erected from the periphery to the upper layer, circulation materials are prevented from being idle, the use of the materials is reduced, and green construction and environment protection are facilitated. According to the formwork system, a top plate early-dismantling column head is additionally arranged at the top of a vertical rod, the formworks can be conveniently dismantled in advance, and the use amount of the formworks and the circulation materials is reduced. The method is suitable for common multi-layer and high-rise cast-in-place concrete structure buildings, is particularly suitable for underground garages, plants and other projects with large single-layer area and few layers, and can also be applied to formwork erection of post-cast strips.
Owner:CHINA CONSTR SEVENTH ENG DIVISION CORP LTD

Top protection structure applied to wind power tower drums after hoisting two vertical sections and paving method thereof

The invention discloses a top protection structure applied to wind power tower drums after hoisting two vertical sections and a paving method thereof. The top protection structure comprises a rainproof tarpaulin hood, a stainless steel awning ring rainproof tarpaulin and a tensile rubber rainproof tarpaulin, wherein the rainproof tarpaulin hood is a circular hood with shape and size which are matched with that of the top of a second tower drum section; the stainless steel awning ring rainproof tarpaulin is sewed on the inner layer of the rainproof tarpaulin hood; a plurality of stainless steelawning rings are embedded at the edge of the stainless steel awning ring rainproof tarpaulin; one end of a hemp rope is fixedly fastened in one hole of each of the plurality of stainless steel awningrings; the tensile rubber rainproof tarpaulin is vertically sewed on the circumference edge of the rainproof tarpaulin hood to form a straight drum shape; tensile rubber bands are sewed on the innerlayer of the tensile rubber rainproof tarpaulin; through the sewed tensile rubber bands, the tensile rubber rainproof tarpaulin is clung to the surface of the circular outer wall of the top of the second tower drum section during paving. The top protection structure has operability and practical significance to the protection problems such as rainwater resistance, sand and dust resistance and corrosion resistance and the like of wind power plants after hoisting two vertical tower drum sections.
Owner:GUANGDONG MINGYANG WIND POWER IND GRP CO LTD

Prefabricated installation construction method for fabricated box culvert

The invention discloses an assembly type box culvert prefabrication installation construction method, an assembly type box culvert comprises a plurality of mutually connected box culvert sections and holes at two ends, each box culvert section comprises a top plate, a bottom plate and side walls, two ends of each top plate are respectively spliced with the side walls, the bottoms of the two side walls are in cast-in-place connection, a cast-in-place part is the bottom plate, and a cast-in-place part is connected with the bottom plate; the top plates, the bottom plate and the two side walls form a box-shaped channel, supporting feet protruding outwards are arranged at the bottoms of the side walls, two connectors of the top plates and the side walls are in an elbow shape and are freely hinged, and when different box-shaped culvert sections are connected, the top plates are connected through bent bolts. Prefabrication can be performed in the field in advance, the construction time is greatly shortened, the construction period is shortened, and civilized and green construction is promoted; during excavation construction, the working face is small, and damage and pollution to ground surface underground water and soil are greatly reduced; the quality of the culvert can be effectively improved, the appearance and the percent of pass of a protective layer are greatly improved, and good economic and social benefits are achieved.
Owner:CHINA FIRST HIGHWAY ENG

Construction method for assembling integral ring beam, lintel, waist beam and constructional column

InactiveCN112982735AImprove molding qualityAppearance quality is easy to controlStrutsWallsArchitectural engineeringUltimate tensile strength
The invention discloses a construction method for assembling an integral ring beam, a lintel, a waist beam and a constructional column. The construction method comprises the following steps that S1, shaped constructional building blocks matched with building blocks used for wall engineering at the ring beam, the lintel, the waist beam and the constructional column are selected; and S2, the shaped constructional building blocks matched with the ring beam are in a C-shaped section shape, and the multiple shaped constructional building blocks are spliced and matched with a wall. After the shaped constructional building blocks are built, a constructional column shell with good appearance quality is formed and can also be used as a constructional column formwork, in the abovementioned way, the process of a branch constructional column formwork in a traditional construction method is omitted, use of woodworking labor force and turnover materials is avoided, and meanwhile the construction quality is guaranteed; and due to the fact that the constructional building blocks are high in self weight and self strength and the lateral supporting force of the built wall is large, the strength and stability of the formwork are reliable along with increase of the strength of masonry mortar, and the requirement for pouring fine aggregate concrete into the formwork from top to bottom is met.
Owner:THE FOURTH OF CHINA EIGHTH ENG BUREAU

A barrier-free cleaning device for abandoned piles

The invention discloses a barrier-free cleaning device for an abandoned pile. The barrier-free cleaning device comprises a shell with a cylindrical cavity formed in the inner part, an upper sleeve tube is arranged on the upper surface of the shell, an upper through hole communicating with the sleeve tube is formed in the upper wall of the shell, a lower through hole corresponding to the upper through hole is formed in the lower wall of the shell, a round support plate is fixed to the middle of the hollow cavity of the shell, a penetrating hole for the abandoned pile to penetrate is formed in the middle of the support plate, a plurality of slag discharging holes are formed in the upper surface of the support plate in the radial direction of the support plate, an upper ring seat coaxially arranged with the upper through hole is arranged on the upper wall of the hollow cavity, a plurality of upper scraping blades are arranged on the bottom surface of the upper ring seat in the radial direction of the ring seat, a plurality of discharging holes are evenly formed in the side surface of the shell between the support plate and the lower wall of the cavity, and a lower sleeve tube is further arranged on the lower part of the shell. Soil stuck to the outer wall of the abandoned pile is cleaned by using the barrier-free cleaning device, the jacking-up weight is effectively decreased, meanwhile the labor intensity of works is relieved, and the jacking-up efficiency is improved.
Owner:甘肃九州岩土工程有限公司

Rapid precipitation construction method for anti-floating anchor rod

PendingCN113529765ASave the cost of drainage holesReduce dustBulkheads/pilesSlurryRock bolt
The invention discloses a rapid precipitation construction method of an anti-floating anchor rod. The rapid precipitation construction method is applied to sandy mudstone with abundant underground fissure water, and comprises the following steps that firstly, earth excavation and manual bottom picking are carried out; then concrete cushion layer pouring is carried out; hole forming operation is preferentially carried out on anchor holes around a serious water gushing part after the pouring is completed; after the hole is formed, a self-sucking pump is put down, water in the formed hole is discharged outwards through the self-sucking pump, and precipitation treatment is carried out on an area with serious water seepage and water gushing; hole forming operation is carried out on the position with serious water gushing after treatment is completed, and an anti-floating anchor rod which is made in advance is put down after hole forming is completed; and then grouting is carried out on the anchor hole, and after grout is solidified, waterproof treatment is carried out on the anti-floating anchor rod. According to the rapid precipitation construction method of the anti-floating anchor rod, existing anchor holes are used for precipitation, the well point precipitation and drainage mode adopted at present is replaced, the well point precipitation and drainage hole forming cost is saved, and the safety of the bearing capacity of a base is guaranteed.
Owner:CHINA CONSTR SECOND ENG BUREAU LTD

Lining mounting construction device and method for movable steel roof face

The invention relates to a lining mounting construction device for a movable steel roof face. The lining mounting construction device comprises factory building steel columns, crane beams, electric driving guiding wheels and vertical pipe mounting sleeves, wherein the crane beams are mounted on the factory building steel columns, and a space truss system of the electric driving guiding wheels is mounted on the crane beams, so that the flatness of a whole moving construction platform is ensured; the space truss system is of cuboid frame structure formed by truss upper chords, truss lower chords, vertical truss web members and truss upper-lower-chord transversely-horizontal supports, truss inclined web members and truss upper-lower-chord transversely-horizontal inclined supports are correspondingly arranged on the diagonal lines of all the planes of the cuboid frame, and truss vertical and transverse inclined supporting rods are arranged on the plane in the middle of the cuboid frame; and climbing ladders are arranged on the left side and the right side of the space truss system, and the vertical pipe mounting sleeves are evenly arranged on the front side and the rear side of the upper end of the space truss system at intervals and are used for mounting of platform vertical pipes. The lining mounting construction device for the movable steel roof face is convenient to mount and disassemble, and quickening of the mounting progress of steel roof face lining plates is facilitated.
Owner:SHANGHAI ERSHIYE CONSTR CO LTD +1

Adjustable steel supporting system for building construction, and installation and use methods thereof

The invention discloses an adjustable steel supporting system for building construction, and installation and use methods thereof. The adjustable steel supporting system comprises four supporting rodsand eight cross rods; the two ends of the cross rods are respectively connected with the supporting rods; two buckles are respectively arranged on each of the four supporting rods; the two ends of the cross rods are respectively fixed on the buckles; a bottom supporting plate is arranged at the bottom end of each of the supporting rods, a lead screw is arranged at the top end, and a top support is arranged at the top end of the lead screw; plugs are respectively arranged at the two ends of each of the cross rods, and an oblique installation port is formed in each of the plugs. The adjustablesteel supporting system disclosed by the invention has the benefits that the adjustable steel supporting system is less in steel consumption compared with a bowl-buckle type scaffold and a steel pipescaffold, the number of the supporting rods on a mould supporting field is less, the operation space is large, personnel passage and material handling are facilitated, the field is easy to manage, theconstruction speed is accelerated, the resource consumption rate is also reduced while the construction efficiency is improved, and the green construction on a site construction site is favorably promoted.
Owner:徐晓胜

Construction Method of Combined Cofferdam Suitable for Deep Foundation Pit in Weak Geology

ActiveCN104988930BAvoid pollutionMeet the structural stress requirementsExcavationsBulkheads/pilesCofferdamRebar
The invention discloses a construction method of a combined cofferdam suitable for a weak geology deep foundation pit and relates to the field of bridge construction. The construction method includes the following steps that the construction position of the concrete cofferdam is set out and positioned; base replacement is conducted on the construction position; supporting sole timber and steel blade feet are laid, rebars are tied, the concrete cofferdam is poured, and anchor rebars are installed on the top face of the concrete cofferdam; a first inner support is installed in the concrete cofferdam; the concrete cofferdam is made to sink; steel plate piles are installed on the top face of the concrete cofferdam, a second inner support is installed in the steel plate piles, the second inner support is fixed to the anchor rebars, and a third inner support is installed above the second inner support; the concrete cofferdam is made to sink continuously to design elevation. The combined cofferdam can meet the structural stress requirement; environmental pollution of construction waste, dust, noise and the like generated when the concrete cofferdam is detached is avoided; green construction is facilitated; construction progress is effectively accelerated; the construction cost is saved.
Owner:CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD

A support and hanger green construction integrated system

The invention relates to a green construction integrated system for support and hangers, which includes an enclosure wall and an accessory storage station, a processing workstation, an assembly workstation, a finished product storage station and an office mobile workstation arranged in the enclosure wall. The enclosure wall is assembled from multiple sets of prefabricated enclosures. There is an entrance and exit on one side of the fence, and an office mobile workstation is set at the entrance and exit of the fence. A finished product storage station is set on one side of the office mobile workstation, and an assembly workstation is set on the opposite side of the finished product storage station. The assembly workstation is used for assembling steel parts. A processing workstation is set on the side, and the processing workstation is used for punching, cutting and welding operations on the steel parts, and an accessory storage station is set at one end of the processing workstation and the assembly workstation, and the accessory storage station is used for storing the steel accessories. The production and assembly of the support and hanger is centralized to avoid the problem of placing various equipment and accessories everywhere. The assembly line is used to process and assemble the support and hanger, which effectively improves the assembly efficiency.
Owner:江苏安赫智能装备科技有限公司

Supporting hanger green construction integration system

The invention relates to a supporting hanger green construction integration system. The supporting hanger green construction integration system comprises an enclosure wall, an accessory storage station, a processing workstation, an assembly workstation, a finished product storage station and an office moving workstation, wherein the accessory storage station, the processing workstation, the assembly workstation, the finished product storage station and the office moving workstation are arranged in the enclosure wall. The enclosure wall is formed by assembling a plurality of groups of prefabricated enclosure blocking pieces. One side of the enclosure wall is provided with an access opening provided with the office moving workstation. One side of the office moving workstation is provided with the finished product storage station. The assembly workstation is arranged opposite the finished product storage station and is used for assembling a profile steel fitting. One side of the assemblyworkstation is provided with the processing workstation used for punching, cutting and welding the profile steel fitting. One end of the processing workstation and one end of the assembly workstationare respectively provided with a fitting storage station used for storing profile steel fittings. The production and assembly of supporting hangers are centralized, so that the problem that a plurality of sets of equipment and accessories are placed at any place is avoided. The supporting hangers are processed and assembled in a streamline mode, so that the assembly efficiency is effectively improved.
Owner:江苏安赫智能装备科技有限公司

Earthen kiln folk house wall prestressed reinforcement structure

The invention discloses an earthen kiln folk house wall prestressed reinforcement structure. The earthen kiln folk house wall prestressed reinforcement structure is provided with outer walls, inner walls, an upper layer reinforcement ring installed on the upper portion of the outer walls and the inner walls, a lower layer reinforcement ring installed on the lower portion of the outer walls and theinner walls, a plurality of vertically arranged prestressed anchor cables connecting the upper layer reinforcement ring and the lower layer reinforcement ring, a plurality of first anchor heads installed at the upper layer reinforcement ring for anchoring the upper ends of the prestressed anchor cables, a plurality of second anchor heads installed at the lower layer reinforcement ring for anchoring the lower ends of the prestressed anchor cables and a plurality of grooves corresponding to the multiple prestressed anchor cables. According to the earthen kiln folk house wall prestressed reinforcement structure, steel plates are used for drawing wall bodies of an earthen kiln folk house by using the prestressed anchor cables, so that horizontal and vertical reinforcement of the inner walls and the outer walls of the earthen kiln folk house is realized, the wall bodies have higher strength and integrity, the stability of the wall bodies of the earthen kiln folk house is increased, and thesafety of the earthen kiln folk house is improved; and the earthen kiln folk house wall prestressed reinforcement structure is convenient, practical and easy to operate, all materials used are conventional and economical, energy saving and environmental protection are achieved, and the earthen kiln folk house wall prestressed reinforcement structure is suitable for large-scale overall reinforcement of the earthen kiln folk house.
Owner:王维玉

A reinforcement system for the overall structure of traditional earthen kiln dwellings and its construction technology

The invention discloses a traditional earthen kiln folk house overall structure reinforcement system and construction technology. The reinforcement system is provided with wall bodies, a kiln roof, upper, middle and lower layer reinforcement rings, nylon ropes, limiting glue-stopping plugs and a kiln roof support frame. The upper, middle and lower layer reinforcement rings are all provided with external L-shaped steel plates, steel strands, anchorage devices, internal L-shaped steel plates and in-wall supporting steel plate bars. According to the traditional earthen kiln folk house overall structure reinforcement system and construction technology, the external L-shaped steel plates are used for performing pre-stressed drawing on the outer wall bodies by using the steel strands, and the internal L-shaped steel plates are adopted in walls and the in-wall supporting steel plate bars are welded to form the upper, middle and lower layer reinforcement rings; and through holes in the wall bodies are tied by the nylon ropes, and finally the overall reinforcement of the wall bodies of an earthen kiln is achieved, so that the wall bodies have higher strength and integrity. The reinforcementof the kiln roof is achieved through the kiln roof support frame. The traditional earthen kiln folk house overall structure reinforcement system and construction technology effectively improve the safety of earthen kiln folk houses, and is convenient, practical and easy to operate, all materials used are conventional and economical, energy saving and environmental protection are achieved, and thetraditional earthen kiln folk house overall structure reinforcement system and construction technology are suitable for large-scale overall reinforcement of the earthen kiln folk houses.
Owner:王维玉

Hoop, beam-column connection structure including the hoop, and construction method thereof

The invention discloses a hoop, a beam-column connection structure comprising the hoop and a construction method thereof. The inner end face of the hoop abuts against the outer end face of an existing column, and one end of a box-shaped steel beam is socketed in the pre-socketed steel beam. stay in the groove, and the other end is set on the support short column; the bottom of the underground structure roof is provided with a support frame, and the support frame is formed by connecting vertical concrete support columns and horizontal concrete support columns; the support short column is set above the underground structure roof to support The bottom of the short column is inserted at the intersection of the vertical concrete support column and the horizontal concrete support column, and is coaxial with the vertical concrete support column of the supporting frame; the existing column vertically passes through the roof of the underground structure and extends out of the roof of the underground structure for at least 20cm. The invention makes the installation of the box-shaped steel beam and the existing column more convenient, solves the technical problem of low strength of the existing beam-column connection node, provides a beam-column connection structure with a more stable structure, and provides a powerful foundation for the establishment of the tower crane conversion foundation. condition.
Owner:BEIJING NO 3 CONSTR ENG +1

Nomadic building prefabricated PC component production line and method

PendingCN112792977AConducive to parallel constructionControllable prefabrication cycleCeramic shaping plantsProduction lineConstruction engineering
The invention discloses a nomadic building prefabricated PC component production line and method. The nomadic building prefabricated PC component production line is arranged on a construction site and comprises a material distribution area and a steam curing area, a vibration table and a mold table assembly arranged on the vibration table are flatly laid in the material distribution area, and a material distribution device is arranged above the mold table assembly; a plurality of foldable oxygen steaming rooms are flatly laid in the steam curing area; and the nomadic building prefabricated PC component production line further comprises a transfer mechanism which is used for transferring and stacking the mold table assembly. According to the design, the construction site is reasonably utilized for producing prefabricated PC components on site, the prefabricating period can be reasonably arranged along with the building construction process, parallel construction is facilitated, the construction period is controllable, and the production efficiency is high; in addition, resources of the construction site are reasonably used, the site construction cost is saved, and green construction is facilitated; and in addition, the cost input caused by long-distance transportation of the prefabricated components is avoided, building assembly can be carried out after the prefabricated components are prefabricated on site, the prefabricated components are not prone to being damaged, and the safety and reliability of a building are effectively guaranteed.
Owner:贵州中昇东浩科技有限公司

A tower crane relay lifting storage rack device

The invention relates to a device for conveying accommodating frames through tower crane relaying. The device comprises bodies, wherein each body comprises movable foundations, steel pipe stand columns and square steel pipe cross beams, the movable foundations are fixed on a foundation, embedded bolts are arranged at upper ends of the movable foundations, the steel pipe stand columns are mounted at upper ends of the movable foundations, springs are arranged at lower ends inside the steel pipe stand columns, round steel plates are arranged at top ends of the springs, supports are arranged on two sides of lower ends of the square steel pipe cross beams, diameters of the supports correspond to those of the steel pipe stand columns, round steel pipes are arranged at lower ends of the supports, diameters of the round steel pipes are smaller than those of the steel pipe stand columns, the square steel pipe cross beams are mounted on the steel pipe stand columns by the aid of the round steel pipes, and the round steel pipes are pressed against the round steel plates inside the steel pipe stand columns. The device is simple to manufacture and easy to mount, the whole set of device can be recycled, green construction is facilitated, the device is provided with shock-absorbing devices, the service life can be prolonged, safe construction is facilitated, and the problem about transportation of hillside construction materials is solved.
Owner:SHANGHAI ERSHIYE CONSTR CO LTD +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products