Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

77results about How to "Reduce construction waste" patented technology

Complex pipeline collision optimization method of subway electromechanical engineering

ActiveCN103093061AOvercome the shortcomings of error-prone, omission and bump-to-missSolving technical issues with cross collisionsSpecial data processing applicationsNODALCollision analysis
The invention belongs to the technical field of electromechanical device installation and discloses a complex pipeline collision optimization method of subway electromechanical engineering. According to the method, three-dimensional bus interface module (BIM) software is used for establishing different professional virtual BIM models which are consistent with completed engineering and then output to three-dimensional collision software for establishment of a combined three-dimensional collision model for collision analysis, collision nodes are then processed and optimized, and then decorative texture mapping and animation roaming are carried out on the combined, analysed and processed three-dimensional collision model without the collision node problem through 3D - MAX software, and therefore collision optimization of complex pipelines of the subway electromechanical engineering is achieved. According to the complex pipeline collision optimization method of the subway electromechanical engineering, the BIM technology is utilized to solve the problem that collision of various complex pipelines causes construction ceasing during electromechanical installation, reasonable planning and utilization of electromechanical pipeline equipment and the like are achieved by means of the optimized design, construction waste is reduced, construction time is shortened, working efficiency at site is improved greatly, and initial investment of a proprietor is reduced.
Owner:ELECTRIFICATION ENG CO LTD OF CHINA RAILWAY 22TH BUREAU GRP +1

Integrated assembly type steel structure building

The invention provides an integrated assembly type steel structure building. The integrated assembly type steel structure building comprises a main body framework, floor bearing plates, internal wall bearing plates, external wall bearing plates and a roof; the floor bearing plates, the internal wall bearing plates, the external wall bearing plates and the roof are connected with the main body framework through connecting parts, the internal wall bearing plates are arranged to be adjacent to the external wall bearing plates, the roof is arranged at the upper end of the main body framework, and the outer surfaces of the internal wall bearing plates, the outer surfaces of the external wall bearing plates and the outer surface of the roof are each provided with decoration and fitment plates in an integrated mode, and the interiors of the decoration and fitment plates are correspondingly provided with cable conduits and water pipes in an integrated mode. In this way, the integrated assembly type steel structure building has the advantages of being stronger in integrity, convenient to construct, high in repeating utilization rate, capable of reducing production cost and wide in application range, and integral installation and disassembly of prefabricated part and the connecting parts in a factory can be achieved; meanwhile, large-scale production at a construction site is easy to achieve, and construction waste is greatly reduced.
Owner:CHINA CONSTR STEEL STRUCTURE CORP LTD

Split mounting type prefabricated reinforced concrete construction temporary road

InactiveCN102619152AAvoid being vulnerable to damageReduce construction wasteTemporary pavingsRebarReinforced concrete
The invention discloses a split mounting type prefabricated reinforced concrete construction temporary road, which comprises a box type member, wherein a reinforced concrete box type member is arranged in the box type member; reinforcement of the reinforced concrete box type member is welded and fixed to the box type member; four angular points of the reinforced concrete box type member are provided with omega-shaped lifting rings respectively; and water discharge holes are also formed at the omega-shaped lifting rings. The split mounting type prefabricated reinforced concrete construction temporary road has the beneficial effects that: through development of the split mounting type prefabricated reinforced concrete construction temporary road, a reinforcement welding net, angle steel and concrete are formed into a whole, so that the performances of the steel and the concrete are fully utilized, particularly, the periphery of the construction temporary road is protected by using the angle steel, and the unavailability due to corner stripping caused by collision or other reasons during use of the construction temporary road is avoided; and a temporary road module is manufactured by using a shaped steel mould, and meanwhile, a special formwork and a strengthening system are matched, so that the construction quality of the corner part and the entire temporary road is effectively guaranteed.
Owner:ZHONGTIAN CONSTR GROUP

Soft coal step-by-step zooming hydraulic fracturing anatonosis device and method

The invention relates to a soft coal step-by-step zooming hydraulic fracturing anatonosis device and method, relating to the field of coal mine gas extraction. A hydraulic fracturing anatonosis deviceincludes a hole sealing device and a hydraulic fracturing device. The method contains the following steps: S1, classifying coal strength from the near to the distant according to field coal-rock massactual measurement regional tectonic distribution, coal mass joints and pore and fracture development situations, determining coal bed joints and pore and fracture development situations as well as coal strength, and forming gas extraction fracturing drill holes; S2, efficiently sealing the gas extraction fracturing drill holes by adopting a hole sealing device; and S3, carrying out step-by-stepzooming hydraulic fracturing on the gas extraction fracturing drill holes by adopting the hydraulic fracturing device. According to the device and the method which are provided by the invention, fractures in coal-rock masses can be extended to the utmost extent when being sufficiently developed, strong support is provided by follow-up efficient gas extraction, and a technical guarantee is providedfor precise gas extraction of a working surface and safe production.
Owner:CHINA COAL TECH & ENG GRP CHONGQING RES INST CO LTD

Assembly type splicing building mass

The invention provides a building mass, and relates to the technical field of buildings. The building mass comprises a wall body assembly and multiple door and window frame assemblies assembled mutually, wherein the wall body assembly comprises multiple brick bodies; first inserted-connected structures are arranged between the top ends and the bottom ends of the brick bodies and comprise first rabbets located at the top ends of the brick bodies and first mortises located at the bottom ends of the brick bodies; second inserted-connected structures are arranged at two opposite side ends of the brick bodies and comprise second mortises located at one side ends of the brick bodies and second rabbets located at the other side ends of the brick bodies; the cross sections of the second mortises and the cross sections of the second rabbets are in matched isosceles trapezoid shapes; the door and window frame assemblies comprise frame bodies, end wall guard plates and lintel boards; the inner side surfaces of the end wall guard plates and side frames of the frame bodies are assembled in an inserted-connected way; the inner side surfaces of the lintel boards and top frames of the frame bodies are assembled in an inserted-connected way; the outer side surfaces of the end wall guard plates and the second inserted-connected structures of the brick bodies are assembled in an inserted-connected way; and the outer side surfaces of the lintel boards and the first inserted-connected structures of the brick bodies are assembled in an inserted-connected way.
Owner:金点石(北京)建筑设计咨询服务有限责任公司

Method for manufacturing navigation mark concrete bearing platform

The invention discloses a method for manufacturing a navigation mark concrete bearing platform and belongs to the field of constructional engineering. The method for manufacturing the navigation mark concrete bearing platform comprises the steps that a navigation mark concrete bearing platform pile foundation composed of bearing piles is erected in a predetermined water area, and a first concrete bearing platform layer is prefabricated on land beside the preset water area at the same time; the prefabricated first concrete bearing platform layer is conveyed to and installed on the berating platform pile foundation; follow-up construction is conducted with the fixed first concrete bearing platform layer as a construction platform. By the adoption of the method for manufacturing the navigation mark concrete bearing platform, the workload for setting up the construction platform and conveying raw materials is greatly lightened, construction efficiency is improved, the overall construction cost of a navigation mark is reduced, the quantity of manual work on water is reduced, all kinds of building waste generated in the construction process is reduced, the safety coefficient of construction operation is improved, and the ecological environment of the construction water area is protected.
Owner:JIANGSU LONGGUAN NEW MATERIAL TECH

Underground coal mine coal seam hydraulic fracturing-cutting coupling permeability-improving method

ActiveCN108180002AIncrease analytical migration speedImprove extraction efficiencyFluid removalGeomorphologyPeak value
The invention relates to an underground coal mine coal seam hydraulic fracturing-cutting coupling permeability-improving method. The underground coal mine coal seam hydraulic fracturing-cutting coupling permeability-improving method comprises the following steps that 1, coal and rock parameters are actually measured on site, and all numerical simulation parameters are determined; 2, numerical simulation is conducted on coal seam hydraulic fracturing, and on-way resistance change and the peak value area distance of high-pressure water spreading in coal and rock holes and fractures are analyzed;3, hydraulic fracturing drilling positions and hydraulic cutting drilling positions are arranged according to the peak value area distance; 4, drilling, hole sealing and hydraulic fracturing permeability-improving construction are conducted at the hydraulic fracturing drilling positions; 5, after hydraulic fracturing permeability-improving construction is completed, a high-pressure pump station device of hydraulic fracturing permeability-improving equipment is moved to the hydraulic cutting drilling positions to conduct drilling, after pressure relief of a drill hole, hole sealing is conducted, and hydraulic cutting permeability-improving construction is conducted; and 6, the high-pressure pump station device of the hydraulic fracturing permeability-improving equipment is moved to the hydraulic fracturing drilling positions, and the step 4 is repeated till permeability-improving construction of a whole mine is completed. According to the underground coal mine coal seam hydraulic fracturing-cutting coupling permeability-improving method, the coal seam permeability-improving effect is greatly improved.
Owner:CHINA COAL TECH & ENG GRP CHONGQING RES INST CO LTD

Mobile assembly type natural stone composite floor board and production technique thereof

The invention relates to building decoration material and the manufacture technology, in particular to a movable splicing composite floor tiles made of natural stone material, comprising an aluminum honeycomb reinforcing sheet and a stone surface slab, wherein, the aluminum honeycomb reinforcing sheet comprises two pieces of glass fiber cloth and an aluminum honeycomb core; the glass fiber cloth is bound with the aluminum honeycomb core; the aluminum honeycomb reinforcing sheet is bound with the stone slab. The invention is characterized in that one side of the stone slab is bound with the aluminum honeycomb reinforcing sheet, then high strength epoxy adhesive with proper concentration is applied on the four sides of the integrated floor tiles to fabricate a plurality of chase mortises; the tenons on the two adjacent lateral faces are made using a plurality of fixing strips with grooves as tenon mold; a plurality of grooves are arranged on the other two adjacent lateral faces; the finished product is produced through precise processing after the adhesive of the tenon slot is fully solidified. The invention has the advantages of light weight and high strength due to the adoption of the stone honeycomb slab, good water and moisture-proof performance due to the adoption of tenon slots made of special epoxy adhesive through forming on the periphery of the floor tiles, convenient, simple and rapid construction, saved cost for installation material and repeated removal for reutilization.
Owner:仇洪祥

Skirting line system integrated with weak electric wires, and wall plate with system

The invention belongs to the technical field of buildings, and provides a skirting line system integrated with weak electric wires, and a wall plate. The skirting line system comprises a skirting lineand the weak electric wires, and the skirting line comprises a skirting line body and a skirting line cover; the skirting line body is provided with two or more types of wire grooves of different sizes, the wire grooves of the different sizes are electrically isolated, and the different types of weak electric wires are embedded in the wire grooves matched with the weak electric wires in size correspondingly; and the skirting line cover is in buckle connection with the skirting line body, and covers the wire grooves. The wires are further separated from a main body structure while the functions of the skirting line are achieved; the disadvantage that during traditional pre-buried wire maintenance, a floor plate and a wall body need to be dug is overcome, damage to a structure main body isreduced, and the safety, reliability and durability of a house are greatly improved; and meanwhile, the wire grooves of the different sizes are electrically isolated, and thus the different types of weak electric wires in the skirting line do not interfere with each other.
Owner:东莞市碧桂园房地产开发有限公司

Fabricated enclosing wall and construction method thereof

The invention provides a fabricated enclosing wall. The fabricated enclosing wall comprises ground beams, supporting uprights and an underground foundation part. The ground beams are laid above the ground, a plurality of ground beam reinforcing bars are laid into the ground beams in the horizontal direction, and every two adjacent ground beams stretch out of the ground beam reinforcing bars at the two ends and are arranged at connecting nodes in a staggered and lap-joint mode. The underground foundation part comprises a foundation short column, a bearing table, a cushion layer and a plain soil punning layer. The foundation short column is of a hollow structure, and the bearing table, the cushion layer and the plain soil punning layer are sequentially arranged below the foundation short column from top to bottom. The hollow structure of the upper portion of the foundation short column is internally provided with vertical steel bars and a plurality of stirrups. The vertical steel bars extend into the connecting nodes of every two adjacent ground beams and are in perpendicular lap-joint connection with the ground beam reinforcing bars. The invention further provides a construction method of the fabricated enclosing wall. The fabricated enclosing wall is stable in structural stress, solid and durable; the construction method is high in construction speed and facilitates installation; and the product quality is good.
Owner:汤始建华建材(天津)有限公司

Cast-in-place concrete early-dismantling formwork system and construction method thereof

PendingCN109057322AFaster turnaround usageSave one time investmentForms/shuttering/falseworksBearing capacityBuilding construction
The invention discloses a cast-in-place concrete early-dismantling formwork system and a construction method thereof. The construction method comprises the steps of installing beam and slab supportingstructures, installing a beam and slab formwork, installing floor supporting structures, assembling a floor formwork and the like. The construction method of the cast-in-place concrete early-dismantling formwork system can achieve early dismantling in the real sense, and the allocation amount of the formworks is reduced by 1/3 to 1/2. The jacking and supporting combination degree is high, installation and disassembly are easy, the stability is high, and the bearing capacity is high. The height of the floor formwork and the height of the beam and slab formwork can be adjusted to meet differentconstruction requirements. Besides, much fewer wood rods, much fewer steel pipes and much fewer wood beams are used, fewer building wastes are generated, the construction environment is clean, neat,beautiful and friendly, it is ensured that the site is cleaned up after construction is finished, and potential safety hazards to workers are reduced. The input cost is reduced, resource waste is reduced, and the construction method of the cast-in-place concrete early-dismantling formwork system has an important significance in energy saving, environmental protection, low carbon and emission reduction.
Owner:广东锐良新型建筑模板支撑材料有限公司

Compound stone decorative concrete structure and manufacture method thereof

InactiveCN102808494AProtected from atmospheric corrosionIncreased durabilityCovering/liningsSteel frameStructure system
The invention relates to a compound stone decorative concrete structure and a manufacture method of the compound stone decorative concrete structure. The compound stone decorative concrete has the characteristics of decorative effect and structural stress at the same time; concrete, steel frames and decorative stones of the compound stone decorative concrete are formed and fixed together in one step; the inner surfaces of the decorative stones are adhered on the outer surface of the concrete; the back surfaces of the decorative stones are provided with grooves; concrete is integrally grouted and filled in the grooves; and after the concrete is grouted, the compound stone decorative concrete forms an integral structure system in the civil and architectural engineering. The manufacture method comprises the following steps: firstly installing the steel frames, the decorative stones and concrete templates before grouting the concrete; pre-fixing the decorative stones so that the outer surfaces of the decorative stones are adhered on the inner lateral surfaces of the concrete templates; and filling the concrete in the spaces in the concrete templates and the grooves on the back surfaces of the decorative stones while grouting the concrete. The compound stone decorative concrete is formed by the synchronous precision design and manufacture of the concrete and the decorative stones, so that the structure is simple, the cost is low, and the durability is strong.
Owner:饶淳

Construction device for quickly processing drainage ditch and construction method thereof

The invention provides a construction device for quickly processing a drainage ditch and a construction method for quickly processing the drainage ditch. The construction device comprises a roller anda plurality of walking balance small wheels arranged on the two sides of the construction device, wherein t the outer contour of the radial section of a roller body of the roller is consistent with the shape of the drainage ditch; the construction device further comprises a supporting and positioning device of the roller, limiting platforms, a motor and a hand push rod, and the supporting and positioning device, the motor and the hand push rod are all mounted on the limiting platforms; the limiting platforms are arranged on the two sides of the construction device, and the hand push rod is connected with the limiting platforms on the two sides to form a whole. According to the construction device, the use amount of template materials is reduced, labor is reduced, and the engineering costis reduced. The device is used for overall construction of the drainage ditch structure, and the integrity of the structure is improved. Compared with a traditional drainage ditch construction scheme,the construction device has the remarkable advantages of being simple in structure, small in occupied space, easy and convenient to construct, good in durability, capable of saving energy, environmentally friendly, capable of reducing construction waste and saving manufacturing cost and the like.
Owner:POWERCHINA HUADONG ENG COPORATION LTD

Foundation pit support system and building method thereof

The invention provides a foundation pit support system. The foundation pit support system is used for providing support for a foundation pit and comprises a first row pile, a second row pile and a third row pile, and the first row pile, the second row pile and the third row pile all comprise several supporting piles; the first row pile, the second row pile and the third row pile are arranged in sequence; the second row pile is connected with the first row pile and the third row pile separately in the height direction through several cant beams, several horizontal beams and several concrete wallboards to form the foundation pit support system. According to the foundation pit support system, all the row piles are connected through the cant beams and the horizontal beams to form a truss structure, the stiffness of the truss structure is large, and the stiffness of the foundation pit support system is greatly improved. By means of the foundation pit support system, when the supporting piles need to be recycled, partial supporting piles can be taken out and recycled, and do not need to be taken out when the supporting piles do not need to be recycled, and thus a large amount of buildingrubbish is reduced; meanwhile, the foundation pit support system cannot hinder construction inside the foundation pit, and therefore, the construction efficiency is improved.
Owner:深圳市前海世茂投资管理有限公司

Solid waste building material comprehensive treatment and disposal process

The invention relates to a solid waste building material comprehensive treatment and disposal process, which comprises the following process steps: respectively processing urban sludge, river sludge and construction waste, crushing and screening the raw materials, mixing, aging, making blanks, stacking the blanks, sintering in a kiln, cooling and warehousing; according to the invention, the treatment and disposal of the urban sludge, river sludge and construction waste are recombined and designed, toxic and harmful components in the sludge are solidified and subjected to combustion treatment,the possibility of secondary pollution of pollutants is completely reduced, and three new methods of solid waste treatment and disposal with only landfill are opened up. The reduced landfill volume can greatly reduce the demand for land resources, the original useless waste is changed into valuables, and the resource utilization of waste is realized. The process has the advantages of small equipment investment, large production capacity, low operation cost and high cost performance, and can realize centralized treatment of various solid wastes, realizes the integration of multiple wastes, multi-industry chain production, and finally realizes preparation of building materials from the solid wastes.
Owner:洛阳中新能再生能源有限公司

Prestressed concrete hollow slab and construction method thereof

The invention relates to a building floor slab, in particular to a prestressed concrete hollow slab and a construction method thereof. The hollow slab comprises two SP plates, wherein two ends of each SP plate are provided with nicks for holding column reinforcements respectively; the sections of each SP plate are provided with a plurality of reinforcement casings; one end of each reinforcement is connected with the one reinforcement casing, and the other end of each reinforcement is free; a plurality of steel hinge ropes are pre-embedded inside the two SP plates along the direction of long edges; and two ends of the steel hinge ropes are threaded out from the nicks, wherein the out-treaded ends of the steel hinge ropes pre-embedded inside a first hollow SP plate are connected with a steel-hinge-rope fixing frame. The method comprises the steps of placing the reinforcements in the SP plates through the nicks at two ends of the two SP plates, installing and fixing the steel-hinge-rope fixing frame and the reinforcements on the column reinforcements, bundling and fixing intersections of the steel hinge ropes, the reinforcements and the column reinforcements by use of bundling reinforcements, inserting porous steel pipes into second holes of the SP plates, injecting concrete into the pipes and casting the concrete into the SP plates after concrete strength is up. The prestressed concrete hollow slab has the characteristics of saving energy consumption and the like, along with simple rapid installation.
Owner:谭齐阳
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products