Lightweight concrete brick

By designing the side connection mechanism and guide groove structure on lightweight concrete bricks, the problems of offset and cement waste during masonry are solved, and stable connection and efficient construction are achieved.

CN221972742UActive Publication Date: 2024-11-08路三
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420581388.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-25
Publication Date
2024-11-08
Estimated Expiration
2034-03-25

AI Technical Summary

Technical Problem

Existing lightweight concrete bricks are prone to offset during masonry, and cement slurry is prone to extrusion and waste.

Method used

A lightweight concrete brick is designed, including a side connection mechanism, a first groove, a second groove, a snap-in, a material barrier and a material guide groove in the direction of its long side, and adjacent brick blocks are realized through these structures. The stable connection and cement pouring trough ensure the fixation and conservation of cement slurry.

Benefits of technology

The stable connection of lightweight concrete bricks is achieved, avoiding offsets, reducing cement waste, improving construction efficiency and quality, and reducing material use and production costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221972742U_ABST
    Figure CN221972742U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of constructional engineering, in particular to a lightweight concrete brick which comprises a concrete brick body, the concrete brick body is of a square structure, and side connecting mechanisms are arranged on the end faces of the two sides of the concrete brick body in the long edge direction of the concrete brick body. Compared with the prior art, the concrete brick has the advantages that the overall mass of the concrete brick bodies is reduced and the manufacturing cost is reduced by arranging the second grooves, the two adjacent concrete brick bodies can be mutually connected and the quality of a built wall is ensured by arranging the side connecting mechanisms, and the clamping parts matched with the first grooves are arranged and are matched with the side connecting mechanisms, so that the construction efficiency is improved. The problem of deviation during building is avoided, the working efficiency is improved, the construction quality can be guaranteed, the first concrete storage cavity, the material guide hole, the material guide groove and the second concrete storage cavity which communicate with one another are arranged, poured cement paste can be bonded and fixed into a whole, and bonding reliability is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering, in particular to a light concrete brick. Background Art

[0002] Concrete bricks are made of cement, aggregates, and admixtures and additives added as needed, which are mixed with water, formed, and supported by curing. They are mainly used for wall construction. In recent years, they have been used more and more widely. However, in order to reduce their weight, most of the existing concrete bricks are hollow concrete bricks, that is, lightweight concrete bricks. These lightweight concrete bricks are directly stacked upward in a single layer during masonry. During actual masonry, it is necessary to first apply cement slurry on the concrete bricks, and then put the next concrete brick on it, so that the two concrete bricks can be fixed. However, during the operation, the concrete bricks are prone to offset during masonry, and the cement slurry is easy to squeeze out, resulting in waste. Utility Model Content

[0003] The utility model aims to solve at least one of the technical problems existing in the prior art. To this end, one purpose of the utility model is to provide a lightweight concrete brick, which is easy and reliable to connect, can reduce cement overflow, and save materials.

[0004] In order to solve the above technical problems, the technical solution provided by the utility model is: a lightweight concrete brick, the lightweight concrete brick includes a concrete brick body, side connecting mechanisms are provided on the two side end faces of the concrete brick body in the long side direction, a first groove is opened on the bottom surface of the concrete brick body, a second groove is opened on the top surface of the concrete brick body from the first groove, a clamping part is arranged on the top surface of the concrete brick body to fit the inner wall of the first groove and a first material stopper whose inner wall is flush with the side wall of the second groove, a plurality of material guide grooves connected with the first groove are evenly spaced between the clamping part and the material stopper on the top surface of the concrete brick body, material guide holes connected with the material guide grooves are opened on the two side walls of the concrete brick body where the side connecting mechanisms are arranged, and a second material stopper is arranged on one of the side walls.

[0005] Preferably, the side connection mechanism includes a connection block with a trapezoidal cross-section and a connection seat clamped with the connection block, the connection seat is provided with a connection groove that cooperates with the connection block, and the connection block is clamped downward into the connection seat through the top of the connection groove to achieve connection.

[0006] Preferably, the first groove cooperates with the clamping portion and the first material blocking portion to enclose a first concrete storage cavity that is connected to the material guiding trough.

[0007] Preferably, a concrete pouring trough connected to the material guiding trough is formed between the clamping portion and the first material blocking portion.

[0008] Preferably, the second material blocking portion includes two oppositely arranged baffles, the two baffles are arranged on any side of the concrete brick body where the material guide hole is opened, and the long sides of the two baffles are arranged perpendicular to the bottom surface of the concrete brick body.

[0009] Preferably, the second material stopper cooperates with a side wall of the concrete brick body opposite to the side wall to form a second concrete storage cavity.

[0010] After adopting the above structure, the utility model has the following advantages:

[0011] The device of the present application reduces the overall weight of the concrete brick body and reduces the production cost by providing a second groove. By providing a side connection mechanism, two adjacent concrete brick bodies can be connected to each other to ensure the quality of wall construction. A clamping portion that cooperates with the first groove is provided to cooperate with the side connection mechanism to ensure that the problem of offset during masonry is avoided, which not only improves work efficiency but also ensures construction quality. By providing a first concrete storage chamber, a material guide hole, a material guide trough and a second concrete storage chamber that are connected to each other, the poured cement slurry can be bonded and fixed as a whole to ensure reliable bonding.

[0012] The above summary is for the purpose of description only and is not intended to be limiting in any way. In addition to the illustrative aspects, embodiments and features described above, further aspects, embodiments and features of the utility model will be readily apparent by reference to the accompanying drawings and the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0014] Figure 1 This is a schematic diagram of the structure of the utility model Figure 1 .

[0015] Figure 2 This is a schematic diagram of the structure of the utility model Figure 2 .

[0016] Figure 3 It is the front view of the utility model.

[0017] Figure 4 yes Figure 3Schematic diagram of the cross-sectional structure of AA.

[0018] Figure 5 yes Figure 3 Schematic diagram of the cross-sectional structure of BB.

[0019] Figure 6 yes Figure 3 Schematic diagram of the cross-sectional structure of CC.

[0020] Figure 7 It is a schematic diagram of the combined state of the utility model.

[0021] As shown in the figure: 1. Concrete brick body; 2. Second material stopper; 3. First groove; 4. First material stopper; 5. Clamping part; 6. Connecting block; 7. Connecting seat; 8. First concrete storage cavity; 9. Material guide trough; 10. Second groove; 11. Material guide hole; 12. Second concrete storage cavity; 13. Concrete pouring trough. DETAILED DESCRIPTION

[0022] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be understood as limiting the present application.

[0023] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0024] Combined with Figure 1-Figure 7 A lightweight concrete brick comprises a concrete brick body 1, the concrete brick body 1 is a square structure, and the concrete brick body 1 is provided with side connection mechanisms on both side end faces in the long side direction thereof.

[0025] A first groove 3 is provided on the bottom surface of the concrete brick body 1, and a second groove 10 is provided on the top surface of the concrete brick body 1 from the first groove 3. The first groove 3 and the second groove 10 are arranged in a stepped shape, and the horizontal cross-section shapes of the first groove 3 and the second groove 10 are both square, which reduces the overall mass of the concrete brick body 1.

[0026] The top surface of the concrete brick body 1 is provided with a clamping portion 5 which is fitted with the inner walls of the first groove 3 and a first material stopper 4 whose inner wall is flush with the side wall of the second groove 10. The clamping portion 5 is a clamping plate which is arranged along the inner wall of the first groove 3, and the first material stopper 4 is a material stopper plate which is arranged along the inner wall of the second groove 10. The first material stopper 4 is fitted with the top surface of the first groove 3, and the concrete brick body 1 is longitudinally connected through the first groove 3 and the clamping portion 5.

[0027] The top surface of the concrete brick body 1 is provided with a plurality of material guide grooves 9 connected to the first groove 3 at even intervals between the clamping portion 5 and the material stop portion. The concrete brick body 1 is provided with material guide holes 11 connected to the material guide grooves 9 on both side walls where the side connection mechanism is provided, and a second material stop portion 2 is provided on one of the side walls.

[0028] The side connection mechanism includes a connection block 6 with a trapezoidal cross-section and a connection seat 7 that is clamped with the connection block 6. The connection seat 7 is provided with a connection groove that cooperates with the connection block 6. The connection block 6 is clamped downward into the connection seat 7 through the top of the connection groove to achieve connection. The concrete brick body 1 is laterally connected through the side connection mechanism.

[0029] The first groove 3 cooperates with the clamping part 5 and the first material stopper 4 to enclose a first concrete storage chamber 8 connected with the material guide trough 9, and a concrete casting trough 13 connected with the material guide trough 9 is formed between the clamping part 5 and the first material stopper 4. The second material stopper 2 includes two oppositely arranged baffles, which are arranged on one side of the concrete brick body 1 where the connecting block 6 is arranged, and the long sides of the two baffles are arranged perpendicular to the bottom surface of the concrete brick body 1. The second material stopper 2 cooperates with the side wall on the opposite side of the concrete brick body 1 to form a second concrete storage chamber 12. Concrete is poured through the concrete casting trough 13 to enter the material guide trough 9, and enters the first concrete storage chamber 8 and the material guide hole 11 respectively through the material guide trough 9, and enters the second concrete storage chamber 12 through the material guide hole 11.

[0030] During construction, the concrete brick body 1 is Figure 7 As shown, the connecting blocks 6 on the two adjacent concrete brick bodies 1 are clamped with the connecting seats 7, and the first groove 3 of the vertically arranged and upper concrete brick body 1 is clamped on the top surface of the clamping portion 5 of the lower concrete brick body 1, so that the top end of the first material blocking portion 4 is fitted and combined with the top surface of the first groove 3 to form a whole, so that the second concrete storage cavity 12 and the material guide trough 9 on the upper and lower concrete brick bodies 1 are connected, and the first concrete storage cavity 8 and the concrete pouring trough 13 are connected, and integral pouring can be carried out, or after connecting the two adjacent concrete brick bodies 1, concrete pouring can be carried out first, and then the remaining concrete brick bodies 1 can be stacked in sequence. The concrete can be made by mixing and stirring cement, sand and admixtures.

[0031] The above describes the utility model and its implementation methods, which is not restrictive. What is shown in the full text is only one of the implementation methods of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it, without departing from the purpose of the invention of the utility model, they can design a structure and embodiment similar to the technical solution without creativity, which should belong to the protection scope of the utility model.

Claims

1. A lightweight concrete brick, Features: The lightweight concrete brick includes a concrete brick body, and side connecting mechanisms are provided on the end surfaces of both sides of the concrete brick body in the long side direction. A first groove is opened on the bottom surface of the concrete brick body, and a second groove is opened on the concrete brick body from the top surface of the first groove. The top surface of the concrete brick body is provided with a clamping portion that is fitted with the inner wall of the first groove and a first material stopper whose inner wall is flush with the side wall of the second groove. A plurality of material guide grooves connected with the first groove are evenly spaced between the clamping portion and the material stopper on the top surface of the concrete brick body. Material guide holes connected with the material guide grooves are opened on the side walls on both sides of the concrete brick body where the side connecting mechanisms are provided, and a second material stopper is provided on one of the side walls.

2. A lightweight concrete brick according to claim 1, Features: The side connection mechanism includes a connection block with a trapezoidal cross section and a connection seat clamped with the connection block. The connection seat is provided with a connection groove that cooperates with the connection block. The connection block is clamped downward into the connection seat through the top of the connection groove to achieve connection.

3. A lightweight concrete brick according to claim 1, Features: The first groove cooperates with the clamping portion and the first material blocking portion to enclose a first concrete storage cavity that is communicated with the material guiding trough.

4. A lightweight concrete brick according to claim 1, Features: A concrete pouring trough communicated with the material guiding trough is formed between the clamping portion and the first material blocking portion.

5. A lightweight concrete brick according to claim 1, Features: The second material blocking portion includes two oppositely arranged baffles, which are arranged on any side of the concrete brick body where the material guide hole is opened, and the long sides of the two baffles are arranged perpendicular to the bottom surface of the concrete brick body.

6. A lightweight concrete brick according to claim 1, Features: The second material blocking portion cooperates with a side wall of the concrete brick body opposite to the other side to form a second concrete storage cavity.