Prestressed concrete pipe pile hoisting device
By designing a prestressed concrete pipe pile lifting device and using components such as cranes and curved covers, the problems of unstable and inconvenient lifting in the existing technology are solved, and the safe and firm lifting and rapid separation of pipe piles are achieved, which meets daily efficiency Use requirements.
Patent Information
- Application Number
- CN202323644488.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-29
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2033-12-29
AI Technical Summary
The existing prestressed concrete pipe pile lifting fixtures have insufficient adaptability and inconvenience in use, and cannot achieve reliable limit and stable lifting of pipe piles. They are prone to insecurity due to equipment shaking during lifting, and cannot quickly and stably position and separation, which cannot meet daily use. need.
A prestressed concrete pipe pile hoisting device is designed, including a crane, a crane, a lifting frame, a lifting head, a rope fixing seat, a curved cover frame, an adjustment base, a limit rubber strip and a drive motor, and the rope and arc are lifted. The combination of a shaped cover frame enables the firm lifting and rapid separation of pipe piles, and uses limit rubber strips and adjustment bases to ensure the stability of the lifting.
It realizes safe, stable lifting and rapid separation of prestressed concrete pipe piles, improves the effectiveness and practicality of the equipment, and meets daily efficient lifting needs.
Smart Images

Figure CN221988017U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of concrete pipe pile hoisting, in particular to a prestressed concrete pipe pile hoisting device. Background Art
[0002] Reinforced concrete prestressed pipe piles, also known as concrete precast piles, are prefabricated in a prefabricated component processing plant. After being cured and reaching the designed strength, they are transported to the construction site and driven into the soil with a pile driver. Then the pedestal beam foundation is poured on the top of the pile. In order to resist hammering and penetrating the soil layer, the stirrups should be denser at the top and tip of the pile, and the main reinforcement at the tip of the pile should be bent and welded to a core rod. Reinforced concrete precast piles have the advantages of simple production, high strength, high rigidity and can be made into various cross-sectional shapes. It is a widely used pile type.
[0003] For example, the patent document with the announcement number CN 216549228 U discloses a crane for prestressed concrete pipe piles, including a support shaft, a first sliding cylinder, a second sliding cylinder, a first limiting ring, a second limiting ring, a first positioning screw, a second positioning screw, a steel cable and a hoist, wherein the first sliding cylinder and the second sliding cylinder can be axially displaced at both ends of the support shaft, a first L-shaped clip is provided at the bottom of the first sliding cylinder, and a second L-shaped clip is provided at the bottom of the second sliding cylinder, the first L-shaped clip and the second L-shaped clip are symmetrically arranged, the first limiting ring is located on the side of the first sliding cylinder away from the second sliding cylinder, and the first limiting ring is threadedly matched with the support shaft, the second limiting ring is located on the side of the second sliding cylinder away from the first sliding cylinder, and the second limiting ring is threadedly matched with the support shaft. This technical solution is used to solve the problems of insufficient adaptability and inconvenience in use of existing prestressed concrete pipe pile lifting fixtures.
[0004] However, when the structure is actually lifting the prestressed concrete pipe piles, it is unable to perform a more reliable limited and stable lifting and lifting operation for the pipe piles as a whole. Once the lifting is carried out, the equipment is easily shaken as a whole due to the bumps in the equipment, resulting in the pipe piles being unable to always maintain a safe and stable protective lifting operation. At the same time, the equipment is unable to quickly and stably position the lifting equipment, and is unable to quickly separate from the pipe piles, and is unable to meet daily use needs. Therefore, it is urgent to design a prestressed concrete pipe pile lifting device to solve the above problems. Utility Model Content
[0005] The purpose of the utility model is to provide a prestressed concrete pipe pile lifting device to solve the problem that the existing structure proposed in the above background technology is unable to perform a more reliable limited and stable lifting and lifting operation for the pipe pile as a whole during the actual prestressed concrete pipe pile lifting. Once the mobile lifting is carried out, it is very easy for the equipment to shake as a whole due to the bumps, resulting in the pipe pile being unable to always maintain a safe and stable protective lifting operation. At the same time, the equipment is unable to perform fast and stable lifting equipment positioning, and the actual fast separation operation from the pipe pile cannot meet the daily use needs.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a prestressed concrete pipe pile hoisting device, comprising a crane, a lifting frame is arranged at one end of the crane, a lifting frame is arranged at one end of the lifting frame, a hoisting head is arranged at the bottom of the lifting frame, a rope fixing seat is fixedly connected to the bottom of the hoisting head, and a hoisting rope is arranged at the bottom of the hoisting head;
[0007] It includes a first arc-shaped cover frame and a second arc-shaped cover frame, the top of the first arc-shaped cover frame is connected to one side of the bottom of the rope-fixing seat through a lifting rope, the top of the second arc-shaped cover frame is connected to the other side of the bottom of the rope-fixing seat through a lifting rope, and the bottoms of the first arc-shaped cover frame and the second arc-shaped cover frame are provided with adjustment bases.
[0008] Preferably, adjustment shafts are provided on both sides of the adjustment base, and anti-slip pads are provided on the surface of the adjustment base.
[0009] Preferably, the bottom of the adjustment base is fixedly connected to a docking base, and the four corners of the side of the docking base are fixedly connected to docking ball grooves.
[0010] Preferably, the inner walls of the first arc-shaped cover frame and the second arc-shaped cover frame are provided with limiting rubber strips, and the top ends of the first arc-shaped cover frame and the second arc-shaped cover frame are fixedly connected with lifting rings.
[0011] Preferably, a driving motor is provided at the top of the lifting head, a winding roller seat is provided at the bottom end of the driving motor, winding roller seats are provided on both sides of the interior of the lifting head through a transmission unit, rope tying seats are fixedly connected to both sides of the bottom of the rope fixing seat, and a partition plate is fixedly connected to the inner wall of the rope fixing seat.
[0012] Preferably, one end of the crane is fixedly connected to a connecting seat, one end of the connecting seat is fixedly connected to a supporting base, the inner bottom wall of the supporting base is provided with a docking groove, and the four corners of the inner side wall of the supporting base are provided with docking balls.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] The prestressed concrete pipe pile lifting device can make the equipment perform safer and more stable prestressed concrete pipe pile lifting operations by means of the crane, the lifting frame, the lifting frame, the lifting head, the rope fixing seat, the lifting rope, the first arc-shaped cover frame, the second arc-shaped cover frame, the adjusting base, the adjusting shaft, the anti-skid pad, the limiting rubber strip and the lifting ring. In actual use, the staff first docks the concrete pipe pile to be lifted on the adjusting base. At this time, the lifting frame and the lifting frame can be directly started to drive the lifting head and the rope fixing seat to pull the lifting rope, so that the first arc-shaped cover frame and the second arc-shaped cover frame can be lifted. The installation ropes are pulled from their respective lifting rings and rotated and docked along the adjustment shafts on both sides of their respective adjusting bases, so that the concrete pipe piles that fall on the adjusting base can be quickly closed and covered. After the lifting head and the rope fixing seat lift the first arc cover frame and the second arc cover frame together with the concrete pipe piles as a whole through the lifting ropes, the concrete pipe piles can be firmly tightened and locked. In the subsequent lifting process, the concrete pipe piles as a whole can be more safely limited by the limiting rubber strips inside the first arc cover frame and the second arc cover frame, and a stable lifting operation can be performed, which reflects the practicality of the equipment design.
[0015] The prestressed concrete pipe pile lifting device further improves the overall use effect of the equipment through the setting of the lifting head, rope fixing seat, first arc cover frame, second arc cover frame, adjusting base, docking base, docking ball groove, driving motor, transmission unit, winding roller seat, rope binding seat, partition plate, connecting seat, supporting base, docking groove and docking ball. In daily use, the staff can dock the adjusting base at the bottom ends of the first arc cover frame and the second arc cover frame to the supporting base at one end of the connecting seat. At this time, the bottom of the adjusting base is adapted to the docking groove and docking ball inside the supporting base for stable locking and fastening docking operation, and then the driving motor on the top of the lifting head is started, and the two groups of winding roller seats are synchronously rotated in coordination with the transmission unit, so that the lifting rope is unwound, and then the first arc cover frame and the second arc cover frame are slowly unfolded along the adjusting shafts of each group of adjusting bases, so that the concrete pipe piles on the adjusting base can be conveniently and quickly removed, and the lifting operation of the concrete pipe piles can be continuously and efficiently performed, which reflects the comprehensiveness of the equipment design. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a three-dimensional schematic diagram of the structure of the utility model;
[0017] Figure 2 It is an overall schematic diagram of the first arc-shaped cover frame and the second arc-shaped cover frame structure of the utility model;
[0018] Figure 3 It is an overall schematic diagram of the adjustable base structure of the utility model;
[0019] Figure 4 It is an overall schematic diagram of the structure of the lifting head of the utility model;
[0020] Figure 5 It is an overall schematic diagram of the rope fixing seat structure of the utility model;
[0021] Figure 6 It is an overall schematic diagram of the support base structure of the utility model.
[0022] In the figure: 1. crane; 2. lifting frame; 3. lifting frame; 4. lifting head; 5. rope fixing seat; 6. lifting rope; 7. first arc cover frame; 8. second arc cover frame; 9. adjustment base; 10. adjustment shaft; 11. anti-skid pad; 12. docking base; 13. docking ball groove; 14. limiting rubber strip; 15. lifting ring; 16. driving motor; 17. transmission unit; 18. winding roller seat; 19. rope tying seat; 20. partition plate; 21. connecting seat; 22. supporting base; 23. docking groove; 24. docking ball. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] See also Figure 1-6 , an embodiment provided by the utility model:
[0025] A prestressed concrete pipe pile hoisting device comprises a crane 1, a crane frame 2 is arranged at one end of the crane 1, a lifting frame 3 is arranged at one end of the crane frame 2, a lifting head 4 is arranged at the bottom of the lifting frame 3, a rope fixing seat 5 is fixedly connected to the bottom of the lifting head 4, a lifting rope 6 is arranged at the bottom of the lifting head 4, a driving motor 16 is arranged at the top of the lifting head 4, a winding roller seat 18 is arranged at the bottom end of the driving motor 16, winding roller seats 18 are arranged on both sides of the interior of the lifting head 4 through a transmission unit 17, rope tying seats 19 are fixedly connected to both sides of the bottom of the rope fixing seat 5, a partition plate 20 is fixedly connected to the inner wall of the rope fixing seat 5, and the crane 1 is provided with a lifting device. One end is fixedly connected to a connecting seat 21, and one end of the connecting seat 21 is fixedly connected to a supporting base 22. The inner bottom wall of the supporting base 22 is provided with a docking groove 23, and the four corners of the inner side wall of the supporting base 22 are provided with docking balls 24. The lifting frame 2 and the lifting frame 3 are directly started to drive the lifting head 4 and the rope fixing seat 5 to pull the lifting rope 6, so that the lifting rope 6 in the first arc cover frame 7 and the second arc cover frame 8 is pulled from the respective lifting rings 15, and rotates and docks along the adjustment shafts 10 on both sides of the respective adjustment bases 9, so as to quickly perform a closed cover connection operation on the concrete pipe piles that fall on the adjusting base 9.
[0026] The first arc cover frame 7 and the second arc cover frame 8 are included. The top of the first arc cover frame 7 is connected to one side of the bottom of the fixed rope seat 5 through a lifting rope 6. The top of the second arc cover frame 8 is connected to the other side of the bottom of the fixed rope seat 5 through a lifting rope 6. The bottom of the first arc cover frame 7 and the second arc cover frame 8 are provided with an adjustment base 9. Adjustment shafts 10 are provided on both sides of the adjustment base 9. The surface of the adjustment base 9 is provided with an anti-slip pad 11. The bottom of the adjustment base 9 is fixedly connected to a docking base 12. The four corners of the side of the docking base 12 are fixed. It is connected with a docking ball groove 13, and the inner walls of the first arc cover frame 7 and the second arc cover frame 8 are provided with a limiting rubber strip 14. The top ends of the first arc cover frame 7 and the second arc cover frame 8 are fixedly connected with a lifting ring 15, and the adjustment base 9 at the bottom ends of the first arc cover frame 7 and the second arc cover frame 8 are docked to the support base 22 at one end of the connecting seat 21. At this time, the bottom of the adjustment base 9 is adapted to the docking groove 23 and the docking ball 24 inside the support base 22 through the docking base 12 and the docking ball groove 13 for stable locking and fastening docking operation.
[0027] Working principle: When in use, the user first docks the concrete pipe pile to be hoisted on the adjusting base 9. At this time, the lifting frame 2 and the lifting frame 3 can be directly started to drive the lifting head 4 and the rope fixing seat 5 to pull the lifting rope 6, so that the lifting ropes 6 in the first arc cover frame 7 and the second arc cover frame 8 are pulled from their respective lifting rings 15, and rotated and docked along the adjustment shafts 10 on both sides of the respective adjusting bases 9, so as to quickly carry out a closed covering operation on the concrete pipe piles that fall on the adjusting base 9. After the lifting head 4 and the rope fixing seat 5 lift the first arc cover frame 7 and the second arc cover frame 8 together with the concrete pipe pile as a whole through the lifting rope 6, the concrete pipe pile can be firmly tightened and locked, so that in the subsequent lifting process, the concrete pipe pile as a whole is safer in the first arc cover frame 7 and the second arc cover frame 8 through the limiting rubber strip 14. The lifting rope 6 can be unwound by slowly unfolding the first arc cover frame 7 and the second arc cover frame 8 along the adjusting shaft 10 of each group of adjusting bases 9, so as to facilitate and quickly remove the concrete pipe piles on the adjusting base 9, and continuously and efficiently carry out the lifting operation of the concrete pipe piles.
[0028] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
Claims
1. A prestressed concrete pipe pile hoisting device, comprising a crane (1), Features: A lifting frame (2) is provided at one end of the crane (1), a lifting frame (3) is provided at one end of the lifting frame (2), a lifting head (4) is provided at the bottom of the lifting frame (3), a rope fixing seat (5) is fixedly connected to the bottom of the lifting head (4), and a lifting rope (6) is provided at the bottom of the lifting head (4); The invention comprises a first arc-shaped cover frame (7) and a second arc-shaped cover frame (8), wherein the top end of the first arc-shaped cover frame (7) is connected to one side of the bottom of the rope-fixing seat (5) via a lifting rope (6), and the top end of the second arc-shaped cover frame (8) is connected to the other side of the bottom of the rope-fixing seat (5) via a lifting rope (6), and an adjustment base (9) is arranged at the bottom of the first arc-shaped cover frame (7) and the second arc-shaped cover frame (8).
2. A prestressed concrete pipe pile hoisting device according to claim 1, Features: Adjustment shafts (10) are arranged on both sides of the adjustment base (9), and an anti-slip pad (11) is arranged on the surface of the adjustment base (9).
3. A prestressed concrete pipe pile hoisting device according to claim 1, Features: The bottom of the adjustment base (9) is fixedly connected to a docking base (12), and the four corners of the side of the docking base (12) are fixedly connected to docking ball grooves (13).
4. A prestressed concrete pipe pile hoisting device according to claim 1, Features: The inner walls of the first arc-shaped cover frame (7) and the second arc-shaped cover frame (8) are provided with limiting rubber strips (14), and the top ends of the first arc-shaped cover frame (7) and the second arc-shaped cover frame (8) are fixedly connected with lifting rings (15).
5. A prestressed concrete pipe pile hoisting device according to claim 1, Features: A driving motor (16) is arranged at the top of the lifting head (4), a winding roller seat (18) is arranged at the bottom end of the driving motor (16), winding roller seats (18) are arranged on both sides of the interior of the lifting head (4) through a transmission unit (17), rope tying seats (19) are fixedly connected to both sides of the bottom of the rope fixing seat (5), and a partition plate (20) is fixedly connected to the inner wall of the rope fixing seat (5).
6. A prestressed concrete pipe pile hoisting device according to claim 1, Features: One end of the crane (1) is fixedly connected to a connecting seat (21), one end of the connecting seat (21) is fixedly connected to a supporting base (22), an inner bottom wall of the supporting base (22) is provided with a docking groove (23), and four corners of the inner side wall of the supporting base (22) are provided with docking balls (24).