Reusable personnel platform structure for steel bridge anchoring

By designing a reusable steel plate platform structure, the problems of unsafe operation of the steel truss bridge anchoring operation platform at high altitudes and damage to the main beam are solved, and rapid construction and disassembly are achieved, construction efficiency and safety are improved, and construction costs are reduced. .

CN221989118UActive Publication Date: 2024-11-12NANJING FORESTRY UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420389915.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2024-11-12
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

The existing steel truss bridge anchoring operation platform is not safe to operate at high altitudes, and the traditional method will damage the main beam, which is complex and consumes a lot of manpower, affecting construction efficiency and cost.

Method used

Design a reusable personnel operation platform structure, including steel plate platform, steel string belly rod, bolts, steel pipes and perforated steel plates. It can be quickly connected and disassembled by bolts to ensure the rapid construction and disassembly of the platform and steel trusses, and avoid the need for The main beam causes damage.

Benefits of technology

The rapid construction and safety improvement of the steel truss bridge anchoring operation platform have been achieved, reducing the complexity of on-site construction, saving time and manpower, improving construction efficiency and safety, and reducing construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989118U_ABST
    Figure CN221989118U_ABST
Patent Text Reader

Abstract

The utility model discloses a reusable personnel platform structure for anchoring a steel bridge, which mainly comprises a steel plate platform (5) and a steel string web member (1), a long steel plate (3) is arranged on the steel plate platform (5), a bolt (4) is arranged on the long steel plate (3), and the long steel plate (3) is connected with a short steel plate (2) through the bolt (4); the short steel plates (2) and the base plates (10) connect the steel chord web members (1) with the platform through the bolts (4), steel pipes (6) are arranged on the periphery of the steel plate platform (5), a perforated steel plate (7) is arranged in the middle of the steel plate platform (5), and the bolts (4) are arranged on the perforated steel plate (7). According to the utility model, the personnel operation platform for anchoring the steel truss girder bridge can be quickly built.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the relevant field of bridge jacking construction, and specifically relates to a reusable personnel platform structure for steel bridge anchoring. Background Art

[0002] Steel truss bridge is a bridge structure with good bearing capacity and durability, which is widely used in transportation construction fields such as roads, railways and highways. Due to its advantages such as large spanning capacity, industrialized manufacturing and fast installation speed, steel truss bridge has become one of the most selected bridge types. The spans of bridges currently built are getting larger and larger, so it is necessary to extend the chord web of steel truss bridge to meet the demand for large spans of steel truss bridges. Extending the chord web requires personnel to anchor in mid-air, which puts the operators in danger.

[0003] After the steel truss bridge is hoisted, it needs to be anchored with high-strength bolts. The main function of high-strength bolts is to connect and fix different components. They bear important loads of the entire project. The quality and strength of the connection are directly related to the stability and safety of the structure.

[0004] Therefore, the correct anchor bolts are very important. Currently, manual anchoring is used, and a work platform needs to be built for workers to use. There are two traditional anchoring work platforms. One type requires workers to wear safety ropes after the lifting is completed, and a platform is tied to the place where anchoring is required for personnel to operate. The second type is to set up a platform directly on the steel truss, and the workers perform anchoring operations on the platform. After the operation is completed, the platform is cut off.

[0005] The existing technical solutions have the following defects: The first traditional method is very troublesome to work at high altitude, the safety and stability of the operating platform where personnel are tied cannot be guaranteed, it is time-consuming and labor-intensive, very dangerous, and the safety of personnel cannot be guaranteed. The second traditional method will damage the main beam, affecting the service life of the main beam, and the method is complicated, requiring a lot of manpower and wasting materials.

[0006] Therefore, it is necessary to design a reusable personnel operating platform. This reusable personnel operating platform can be assembled before the steel truss beam section is hoisted. When the hoisting is completed, the operating platform has been built. At this time, the personnel can directly carry out the anchoring work. After the work is completed, the platform can be disassembled and reused without causing damage to the main beam. It is easy to install, saves time, saves manpower and material resources, improves construction safety, improves construction efficiency, and saves construction costs. Utility Model Content

[0007] The technical problem to be solved by the utility model is: a reusable personnel operating platform structure for anchoring a steel truss bridge, which allows the platform to be quickly connected to the steel truss, meets the demand for rapid anchoring of the steel truss after it is hoisted, does not damage the main beam, is easy to disassemble, has a fast construction speed and high efficiency.

[0008] To achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a reusable personnel operating platform structure for anchoring steel truss bridges, comprising a steel plate platform and a steel chord web member, wherein the steel plate platform is provided with a long steel plate, the long steel plate is provided with bolts, and the long steel plate is connected to the short steel plate by the bolts; the short steel plate and the pad are connected to the steel chord web member and the platform by bolts, and an anti-slip pad is provided between the pad and the steel chord web member; the steel plate platform is provided with steel pipes around it, a steel plate with holes is provided in the middle, and bolts are provided on the steel plate with holes.

[0009] The utility model realizes the rapid construction of a personnel operating platform for anchoring a steel truss bridge.

[0010] The steel plate platform has a length of 3.0 m, a width of 1.0 m and a thickness of 3.0 cm.

[0011] The long steel plate has a width of 0.5 m, a height of 1.5 m and a thickness of 1.0 cm.

[0012] The short steel plate has a width of 0.5 m, a height of 0.5 m and a thickness of 1.0 cm.

[0013] The steel pipe has a height of 1.0 m, a diameter of 20 mm and a wall thickness of 2.0 mm.

[0014] The perforated steel plate has a width of 0.4 m, a height of 0.3 m, a thickness of 1 cm, and a hole diameter of 24 mm.

[0015] The bolt diameter is 24 mm.

[0016] Beneficial effects of the utility model:

[0017] The utility model creates a reusable personnel operating platform structure for anchoring steel truss bridges, which has good temporary support characteristics and reusability, realizes the rapid construction of the anchoring operating platform for steel truss bridges, improves the safety of building the anchoring operating platform, reduces the complexity of on-site construction, and improves construction efficiency. The operating platform is connected to the steel chord web by bolts, and the process is simple. It is installed in advance before the steel truss is hoisted, the operation is simple, and time is saved. After the anchoring is completed, it can be immediately disassembled and reused, saving construction costs and not causing damage to the main beam. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the work structure of the personnel operating platform;

[0019] Figure 2 It is a schematic diagram of the connection details between the personnel operating platform and the chord web;

[0020] Figure 3 It is a schematic diagram of the connection of the personnel operating platform.

[0021] Among them: 1 is the steel chord web, 2 is the short steel plate, 3 is the long steel plate, 4 is the bolt, 5 is the steel plate platform, 6 is the steel pipe, 7 is the perforated steel plate, 8 is the hole, 9 is the anti-slip pad, and 10 is the pad. DETAILED DESCRIPTION

[0022] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the utility model belong to the scope of protection of the utility model.

[0023] In an example of the utility model, a reusable personnel platform structure for anchoring a steel bridge is provided, which includes a steel chord web 1, a short steel plate 2, a long steel plate 3, bolts 4, a steel plate platform 5, a steel pipe 6, a perforated steel plate 7, holes 8, an anti-slip pad 9, and a pad 10.

[0024] In an example of the utility model, a reusable personnel platform structure for anchoring a steel bridge is provided, which includes a steel plate platform 5 and a steel chord web member 1; a long steel plate 3 is provided on the steel plate platform 5, and bolts 4 are provided on the long steel plate 3, and the long steel plate 3 is connected to the short steel plate 2 by the bolts 4; the short steel plate 2 and the pad 10 are connected to the steel chord web member 1 and the overall platform structure by bolts 4, and an anti-slip pad 9 is provided between the pad 10 and the steel chord web member 1; steel pipes 6 are provided around the steel plate platform 5, and a perforated steel plate 7 is provided in the middle, and bolts 4 are provided on the perforated steel plate 7, and the overall platform structure is reinforced by bolts 4.

[0025] The reusable personnel platform structure for steel bridge anchoring is characterized in that the steel plate platform 5 is 3.0 m long, 1.0 m wide and 3.0 cm thick.

[0026] The reusable personnel platform structure for steel bridge anchoring is characterized in that a long steel plate 3 is provided on the steel plate platform, and the long steel plate 3 has a width of 0.5 m, a height of 1.5 m, and a thickness of 1.0 cm.

[0027] The reusable personnel platform structure for steel bridge anchoring is characterized in that the short steel plate 2 has a width of 0.5 m, a height of 0.5 m, and a thickness of 1.0 cm.

[0028] The reusable personnel platform structure for steel bridge anchoring is characterized in that a steel pipe 6 is provided on the steel plate platform 5 as a guardrail, the steel pipe 6 has a height of 1.0m, a diameter of 20mm, and a wall thickness of 2.0mm.

[0029] The reusable personnel platform structure for steel bridge anchoring is characterized in that a perforated steel plate 7 is provided in the middle of the steel plate platform 5, the perforated steel plate 7 has a width of 0.4m, a height of 0.3m, a thickness of 1cm, and a hole diameter of 24mm.

[0030] The reusable personnel platform structure for anchoring a steel bridge is characterized in that the short steel plate 2 is connected to the long steel plate 3 by bolts 4, and the diameter of the bolts 4 is 24 mm.

[0031] The reusable personnel platform structure for anchoring a steel bridge is characterized in that both the short steel plate 2 and the pad 10 are provided with double rows of bolts 4.

[0032] The present invention is not limited to the above specific embodiments. For technicians in the field of bridges, any equivalent modifications and substitutions made to the present invention are also within the scope of the present invention. Therefore, equivalent changes and modifications made without departing from the spirit and scope of the present invention should be included in the scope of the present invention.

Claims

1. A reusable personnel platform structure for steel bridge anchoring, characterized in that: The reusable personnel platform structure for steel bridge anchoring mainly comprises a steel plate platform (5) and a steel chord web member (1). The steel plate platform (5) is provided with a long steel plate (3), and the long steel plate (3) is provided with bolts (4), and the long steel plate (3) is connected to the short steel plate (2) by the bolts (4); the short steel plate (2) and the pad (10) are connected to the steel chord web member (1) and the platform by bolts (4), and an anti-slip pad (9) is provided between the pad (10) and the steel chord web member (1); the steel plate platform (5) is provided with steel pipes (6) around it, and a perforated steel plate (7) is provided in the middle, and the perforated steel plate (7) is provided with bolts (4).

2. A reusable personnel platform structure for steel bridge anchoring according to claim 1, characterized in that: The steel plate platform (5) has a length of 3.0 m, a width of 1.0 m and a thickness of 3.0 cm.

3. The reusable personnel platform structure for steel bridge anchoring according to claim 1, characterized in that: The short steel plate is 0.5m wide, 0.5m high and 1.0cm thick.

4. The reusable personnel platform structure for steel bridge anchoring according to claim 1, characterized in that: A long steel plate (3) is arranged on the steel plate platform (5), and the long steel plate (3) has a width of 0.5 m, a height of 1.5 m and a thickness of 1.0 cm.

5. The reusable personnel platform structure for steel bridge anchoring according to claim 1, characterized in that: A steel pipe (6) is provided on the steel plate platform (5) as a guardrail. The steel pipe has a height of 1.0 m, a diameter of 20 mm, and a wall thickness of 2.0 mm.

6. The reusable personnel platform structure for steel bridge anchoring according to claim 1, characterized in that: A perforated steel plate (7) is provided in the middle of the steel plate platform (5). The steel plate has a width of 0.4 m, a height of 0.3 m, a thickness of 1 cm, and a hole diameter of 24 mm.

7. The reusable personnel platform structure for steel bridge anchoring according to claim 1, characterized in that: The short steel plate (2) is connected to the long steel plate (3) via bolts (4), and the bolt diameter is 24 mm.

8. The reusable personnel platform structure for steel bridge anchoring according to claim 1, characterized in that: The short steel plate (2) and the backing plate (10) are both provided with double rows of bolts.