Anti-seepage structure for slab culvert splicing

By setting up a three-level waterproof structure and connectors at the settlement joints of the cover culvert, the problem of insufficient waterproofness of the cover culvert splicing structure is solved, and higher waterproof performance and structural stability are achieved, and the potential for water leakage is prevented from intensifying.

CN221989134UInactive Publication Date: 2024-11-12GUANGXI EXPRESSWAY INVESTMENT CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420586392.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The waterproofness of the cover culvert splicing structure is insufficient, resulting in water leakage at settlement joints under extreme weather or adverse geological conditions, affecting the safety of the highway structure.

Method used

The three-stage waterproof structure is adopted, including the first waterproof structure, the second waterproof structure and the third waterproof structure. By setting corner settlement joints between the new and old cover plates and the table body, and using shear rods and seamless steel sleeve connectors, Filling materials, water barriers, and polymer sealing parts form a splicing solution that comprehensively improves waterproof performance.

Benefits of technology

The waterproof performance of the splicing of new and old cover culverts is significantly improved, and the friction force in the vertical direction is increased, which facilitates splicing and positioning, and prevents the structure from settled through the connecting parts, effectively preventing the intensification of water leakage risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989134U_ABST
    Figure CN221989134U_ABST
Patent Text Reader

Abstract

The utility model is suitable for the technical field of constructional engineering, and provides an anti-seepage structure for slab culvert splicing, a three-stage waterproof structure is formed by a first waterproof structure, a second waterproof structure and a third waterproof structure, so that the waterproof performance of new and old slab culvert splicing is comprehensively improved; the first settlement joint and the second settlement joint formed by splicing the new cover plate and the old cover plate are both provided with corner structures, friction between the first settlement joint and the second settlement joint in the vertical direction can be increased, splicing and positioning can be facilitated during splicing, meanwhile, the new cover plate and the old cover plate are connected through the first connecting piece and the second connecting piece, and the spliced cover plate culvert structure is prevented from settling due to external factors; therefore, the three-level waterproof structure is further protected, and the hidden danger of water leakage caused by damage of the three-level waterproof structure is prevented.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of construction engineering technology, and in particular relates to an anti-seepage structure for splicing cover culverts. Background Art

[0002] A culvert is a small drainage structure that crosses the roadbed. It is used to drain floodwater across natural valleys and depressions, or to cross large and small roads as a cross-traffic passage for people, livestock and vehicles, or as a canal for farmland irrigation. Figure 1 As shown, the cover culvert 6 includes a cover plate 61, a platform cap 62, a platform body 63, a paving layer 64, a foundation 65, etc. The fill height is 1 to 8 meters, and can even reach 12 meters. When the aperture is large and the embankment is high, the cover culvert is more expensive than the arch culvert, but the construction technology is simpler, the flood discharge capacity is larger, and the cover plate can be manufactured centrally. The tunnel body of the cover culvert is composed of multiple culvert sections. In order to avoid uneven settlement of the culvert due to uneven load or foundation bearing capacity, which in turn causes damage to the culvert, a settlement joint is usually set between adjacent culvert sections of the cover culvert. The settlement joint is closed into a ring and runs through the entire section, and the platform body joint and the cover plate joint are on the same vertical plane. Since the cover culvert is mainly constructed in an underground foundation pit, water seepage and leakage are prone to occur at the settlement joint, so the settlement joints between adjacent culvert sections of the culvert body are generally waterproofed.

[0003] In order to meet the needs of traffic growth, it is necessary to widen and reconstruct existing highways. The reconstruction project needs to shorten the construction period as much as possible and occupy less construction land. When reconstructing highways, widening the old roadbed to achieve road reconstruction and expansion can make full use of the original roadbed.

[0004] In the process of road reconstruction and expansion, the splicing of the cover culvert is an extremely important part. At present, the waterproofness of the splicing structure of the cover culvert is poor, and it is difficult to ensure the structural safety of the reconstructed and expanded highway during its service. In addition, under adverse geological conditions such as extreme weather, weak foundation or uneven foundation, the cover culverts on both sides of the settlement joint will have a large relative displacement due to the different geological conditions on both sides, thereby aggravating the leakage risk of the cover culvert structure at the settlement joint. Utility Model Content

[0005] The present application provides an anti-seepage structure for splicing a cover culvert, which can solve the problem of increased water leakage at the settlement joint position after the new and old cover culverts are spliced.

[0006] The present application provides an anti-seepage structure for splicing a cover plate culvert, comprising a new cover plate, an old cover plate, a new platform body and an old platform body, wherein a first settlement joint is provided between the new cover plate and the old cover plate, and a second settlement joint is provided between the new platform body and the old platform body;

[0007] The first settlement joint and the second settlement joint each have at least one corner, a first connecting piece connecting the new cover plate and the old cover plate is arranged in the first settlement joint, and a second connecting piece connecting the new platform body and the old platform body is arranged in the second settlement joint;

[0008] A first waterproof structure covering the first settlement joint is arranged between the new cover plate and the top of the old cover plate, a second waterproof structure is arranged in the first settlement joint and the second settlement joint, and a third waterproof structure is arranged at the bottom of the first settlement joint, the top of the second settlement joint and the bottom of the second settlement joint.

[0009] Optionally, the first settlement joint and the second settlement joint both have a horizontal section and two vertical sections, the horizontal section is located between the two vertical sections, and two ends of the horizontal section are respectively connected to the bottom end of one vertical section and the top end of the other vertical section.

[0010] Optionally, the first connector and the second connector both include a shear rod and a seamless steel sleeve, the seamless steel sleeve of the first connector is arranged in a new cover plate on one side of the vertical section of the first settlement joint, one end of the shear rod of the first connector is arranged in an old cover plate on the other side of the vertical section of the first settlement joint, and the other end of the shear rod of the first connector is arranged in the seamless steel sleeve of the first connector;

[0011] The seamless steel sleeve of the second connecting piece is arranged in the new platform body on one side of the vertical section of the second settlement joint, one end of the shear rod of the second connecting piece is arranged in the old platform body on the other side of the vertical section of the second settlement joint, and the other end of the shear rod of the second connecting piece is arranged in the seamless steel sleeve of the second connecting piece.

[0012] Optionally, the second waterproof structure includes a filler and a water retaining member, the filler is provided in the first settlement joint and the second settlement joint, and the water retaining member is provided at the corner position of the first settlement joint and the corner position of the second settlement joint.

[0013] Optionally, the filler is asphalt hemp, and the water retaining member is a rubber waterstop. One end of the rubber waterstop located in the first settlement joint is fixed in the new cover plate through a fixing member, and the other end is arranged in the old cover plate; one end of the rubber waterstop located in the second settlement joint is fixed in the new platform body through a fixing member, and the other end is arranged in the old platform body.

[0014] Optionally, the fixing piece is a U-shaped structure, a first groove is provided on the new cover plate located at the corner position of the first settlement joint, a second groove corresponding to the first groove is provided on the old cover plate, a third groove is provided on the new platform at the corner position of the second settlement joint, and a fourth groove corresponding to the third groove is provided on the old platform, one end of the rubber waterstop located in the first settlement joint is fixed in the first groove through the fixing piece, and the other end is clamped in the second groove; one end of the rubber waterstop located in the second settlement joint is fixed in the third groove through the fixing piece, and the other end is clamped in the fourth groove.

[0015] Optionally, the third waterproof structure is a polymer sealing member for sealing and waterproofing.

[0016] Optionally, the third waterproof structure includes a horizontal first section and a vertical second section, the first section and the second section are connected to form a T-shaped structure, a limiting protrusion is provided on one side of the first section close to the second section, the second section of the third waterproof structure located at the bottom of the first settlement joint is inserted into the first settlement joint, the first section covers the bottom of the first settlement joint, and the limiting protrusion is embedded in the new cover plate and the old cover plate;

[0017] The second section of the third waterproof structure located at the top of the second settlement joint is inserted into the second settlement joint, the first section covers the top of the second settlement joint, and the limiting protrusion is embedded in the new platform body and the old platform body;

[0018] The second section of the third waterproof structure located at the bottom of the second settlement joint is inserted in the second settlement joint, the first section covers the bottom of the second settlement joint, and the limiting protrusion is embedded in the new platform body and the old platform body.

[0019] Optionally, the first waterproof structure includes a polystyrene board layer, a waterproof reinforcement layer and an asphalt waterproof layer which are laid on the top of the new cover plate and the old cover plate in sequence from bottom to top.

[0020] The above solution of the present application has the following beneficial effects:

[0021] The anti-seepage structure provided in the present application forms a three-level waterproof structure through the first waterproof structure, the second waterproof structure and the third waterproof structure to comprehensively improve the waterproof performance of the splicing of the new and old cover culverts; the first settlement joint and the second settlement joint of the new and old cover culverts both have a corner structure, which can increase the friction between the two in the vertical direction and facilitate the splicing positioning during splicing. At the same time, the new and old cover culverts are connected by the first connecting member and the second connecting member to prevent the spliced ​​cover culvert structure from settling due to external factors, thereby further protecting the three-level waterproof structure and preventing it from being damaged, thereby aggravating the risk of water leakage.

[0022] Other beneficial effects of the present application will be described in detail in the subsequent specific implementation section. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0024] Figure 1 It is a schematic diagram of the side structure of a slab culvert in the prior art;

[0025] Figure 2 A schematic diagram of the side structure of a new cover plate and an old cover plate of an anti-seepage structure provided in an embodiment of the present application when they are spliced ​​together;

[0026] Figure 3 A schematic diagram of the side structure of a new platform body and an old platform body of an anti-seepage structure provided in an embodiment of the present application when they are spliced ​​together.

[0027] [Description of Reference Numerals]

[0028] 101, new cover; 102, new platform body; 201, old cover; 202, old platform body;

[0029] 11. First settlement joint; 12. Second settlement joint;

[0030] 111, horizontal section; 112, vertical section;

[0031] 21. a first connecting member; 22. a second connecting member;

[0032] 211. Shear rod; 212. Seamless steel sleeve;

[0033] 3. The first waterproof structure;

[0034] 31. Polystyrene board layer; 32. Waterproof reinforcement layer; 33. Asphalt waterproof layer;

[0035] 4. Second waterproof structure;

[0036] 41. Filler; 42. Water retaining member; 43. Fixing member;

[0037] 5. The third waterproof structure;

[0038] 51, first section; 52, second section; 53, limiting protrusion;

[0039] 6. Cover culvert;

[0040] 61. Cover plate; 62. Platform cap; 63. Platform body; 64. Paving layer; 65. Foundation. DETAILED DESCRIPTION

[0041] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present application. However, it should be clear to those skilled in the art that the present application may also be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present application.

[0042] It should be understood that when used in the present specification and the appended claims, the term "comprising" indicates the presence of described features, wholes, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or combinations thereof.

[0043] It should also be understood that the term “and / or” used in the specification and appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0044] As used in the specification and appended claims of this application, the term "if" can be interpreted as "when" or "uponce" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrase "if it is determined" or "if [described condition or event] is detected" can be interpreted as meaning "uponce it is determined" or "in response to determining" or "uponce [described condition or event] is detected" or "in response to detecting [described condition or event]", depending on the context.

[0045] In addition, in the description of the present application specification and the appended claims, the terms "first", "second", "third", etc. are only used to distinguish the descriptions and cannot be understood as indicating or implying relative importance.

[0046] References to "one embodiment" or "some embodiments" etc. described in the specification of this application mean that one or more embodiments of the present application include specific features, structures or characteristics described in conjunction with the embodiment. Therefore, the statements "in one embodiment", "in some embodiments", "in some other embodiments", "in some other embodiments", etc. that appear in different places in this specification do not necessarily refer to the same embodiment, but mean "one or more but not all embodiments", unless otherwise specifically emphasized in other ways. The terms "including", "comprising", "having" and their variations all mean "including but not limited to", unless otherwise specifically emphasized in other ways.

[0047] The anti-seepage structure for splicing cover culverts and culverts provided by the present application is exemplarily described below in conjunction with specific embodiments.

[0048] like Figure 2 and Figure 3As shown, the present application provides an anti-seepage structure for splicing a cover plate culvert, comprising a new cover plate 101, an old cover plate 201, a new platform body 102 and an old platform body 202, a first settlement joint 11 is provided between the new cover plate 101 and the old cover plate 201, and a second settlement joint 12 is provided between the new platform body 102 and the old platform body 202; the first settlement joint 11 and the second settlement joint 12 each have at least one corner, and a connection between the new cover plate 101 and the old cover plate 201 is provided in the first settlement joint 11. 1, a second connecting piece 21 connecting the new platform body 102 and the old platform body 202 is arranged in the second settlement joint 12; a first waterproof structure 3 covering the first settlement joint 11 is arranged between the top of the new cover plate 101 and the old cover plate 201, a second waterproof structure 4 is arranged in the first settlement joint 11 and the second settlement joint 12, and a third waterproof structure 5 is arranged at the bottom of the first settlement joint 11, the top of the second settlement joint 12 and the bottom of the second settlement joint 12.

[0049] In the above embodiment, the first settlement joint 11 and the second settlement joint 12 each have at least one corner to increase the friction between the two adjacent cover culverts, and the two adjacent cover culverts are connected by the first connector 21 and the second connector 22 to prevent the two adjacent cover culverts from moving relative to each other in the vertical plane after splicing due to extreme weather, bad geology, etc., so as to effectively control the uneven settlement of the cover culvert structure on both sides of the first settlement joint 11 and the second settlement joint 12. In addition, the first settlement joint 11 and the second settlement joint 12 both have a corner setting, which can also facilitate the splicing and positioning of the two adjacent cover culverts.

[0050] The first waterproof structure 3 is used for waterproof protection of the outer side of the top cover plate of the cover plate culvert. The second waterproof structure 4 is used for waterproof protection of the cover plate and the inside of the platform body that penetrate through the first waterproof structure 3. The third waterproof structure 5 is used to block the flow of water entering the second settlement joint 12 through the first settlement joint 11, and to intercept the flow of water in the second settlement joint 12 to prevent leakage.

[0051] The anti-seepage structure provided in the present application forms a three-level waterproof structure through the first waterproof structure 3, the second waterproof structure 4 and the third waterproof structure 5 to comprehensively improve the waterproof performance of the new and old cover culverts; the first settlement joint 11 and the second settlement joint 12 of the new and old cover culverts have a corner structure, which can increase the friction between the two in the vertical direction and facilitate the splicing positioning during splicing. At the same time, the new and old cover culverts are connected by the first connecting member 21 and the second connecting member 22 to prevent the cover culvert structure after splicing from settling due to external factors, thereby further protecting the three-level waterproof structure and preventing it from being damaged and causing the risk of water leakage to increase.

[0052] It can be understood that the first settlement joint 11 and the second settlement joint 12 each have at least one corner, that is, the extension shape of the first settlement joint 11 and the second settlement joint 12 can be an S-curve, a broken line, or a combination of the two.

[0053] In one embodiment, if Figure 2 and Figure 3 As shown, the first settlement joint 11 and the second settlement joint 12 both have a horizontal section 111 and two vertical sections 112 , the horizontal section 111 is located between the two vertical sections 112 , and the two ends of the horizontal section 111 are respectively connected to the bottom end of one vertical section 112 and the top end of the other vertical section 112 .

[0054] In the above embodiment, the horizontal section 111 and the two vertical sections 112 form a stepped zigzag shape between the first settlement joint 11 and the second settlement joint 12. This arrangement can facilitate the splicing and positioning of the new and old cover culverts, and can also prevent the cover culvert structure formed by the splicing of the new and old cover plates from moving relative to each other at the positions of the first settlement joint 11 and the second settlement joint 12.

[0055] In a specific embodiment, Figure 2 and Figure 3 As shown, the first connecting member 21 and the second connecting member 22 both include a shear rod 211 and a seamless steel sleeve 212. The seamless steel sleeve 212 of the first connecting member 21 is arranged in the new cover plate 101 on one side of the vertical section 112 of the first settlement joint 11, one end of the shear rod 211 of the first connecting member 21 is arranged in the old cover plate 201 on the other side of the vertical section 112 of the first settlement joint 11, and the other end of the shear rod 211 of the first connecting member 21 is arranged in the seamless steel sleeve 212 of the first connecting member 21; the seamless steel sleeve 212 of the second connecting member 22 is arranged in the new platform body 102 on one side of the vertical section 112 of the second settlement joint 12, one end of the shear rod 211 of the second connecting member 22 is arranged in the old platform body 202 on the other side of the vertical section 112 of the second settlement joint 12, and the other end of the shear rod 211 of the second connecting member 22 is arranged in the seamless steel sleeve 212 of the second connecting member 22.

[0056] In the above embodiment, the seamless steel sleeve 212 of the first connecting member 21 can be first embedded in the new cover plate 101 on one side of the vertical section 112 of the first settlement joint 11, and the seamless steel sleeve 212 of the second connecting member 22 can be first embedded in the new platform body 102 on one side of the vertical section 112 of the second settlement joint 12; one end of the shear rod 211 of the first connecting member 21 can be first embedded in the old cover plate 201 on the other side of the vertical section 112 of the first settlement joint 11, and be arranged opposite to the seamless steel sleeve 212 of the first connecting member 21, and one end of the shear rod 211 of the second connecting member 22 can be first embedded in the old platform body 202 on the other side of the vertical section 112 of the second settlement joint 12, and be arranged opposite to the seamless steel sleeve 212 of the second connecting member 22. When the new and old cover culverts are spliced, one end of the shear rod 211 in the first connecting member 21 is inserted into the seamless steel sleeve 212 in the first connecting member 21 to form a mortise and tenon structure to connect the new cover 101 and the old cover 201, and one end of the shear rod 211 in the second connecting member 22 is inserted into the seamless steel sleeve 212 in the second connecting member 22 to form a mortise and tenon structure to connect the new platform body 102 and the old platform body 202.

[0057] The seamless steel sleeve 212 may be pre-filled with butter to facilitate the insertion of the shear rod 211 and prevent the shear rod 211 from rusting.

[0058] In one embodiment, if Figure 2 and Figure 3 As shown, the second waterproof structure 4 includes a filler 41 and a water retaining member 42 . The filler 41 is provided in both the first settlement joint 11 and the second settlement joint 12 . The water retaining member 42 is provided at the corner position of the first settlement joint 11 and the corner position of the second settlement joint 12 .

[0059] In the above embodiment, the filler 41 is mainly used for waterproofing and moisture-proofing in the first settlement joint 11 and the second settlement joint 12, and the filler 41 can be made of materials such as asphalt hemp, polyethylene foam, etc. The water retaining member 42 is mainly used for water retaining and flow blocking at the corner position of the first settlement joint 11 and the corner position of the second settlement joint 12.

[0060] In a specific embodiment, Figure 2 and Figure 3 As shown, the filler 41 is asphalt hemp, and the water retaining member 42 is a rubber waterstop. One end of the rubber waterstop located in the first settlement joint 11 is fixed in the new cover plate 101 through a fixing member 43, and the other end is arranged in the old cover plate 201; one end of the rubber waterstop located in the second settlement joint 12 is fixed in the new platform body 102 through a fixing member 43, and the other end is arranged in the old platform body 202.

[0061] In the above implementation, the asphalt hemp is used for waterproofing and moisture-proofing in the first settlement joint 11 and the second settlement joint 12, and can also be used as a buffer between the new and old cover culvert structures.

[0062] Specifically, the rubber waterstop can adopt an embedded steel-edged rubber waterstop.

[0063] In a specific embodiment, Figure 2 and Figure 3 As shown, the fixing member 43 is a U-shaped structure, a first groove is provided on the new cover plate 101 located at the corner position of the first settlement joint 11, a second groove corresponding to the first groove is provided on the old cover plate 201, a third groove is provided on the new platform body 102 at the corner position of the second settlement joint 12, and a fourth groove corresponding to the third groove is provided on the old platform body 202, one end of the rubber waterstop located in the first settlement joint 11 is fixed in the first groove by the fixing member 43, and the other end is clamped in the second groove; one end of the rubber waterstop located in the second settlement joint 12 is fixed in the third groove by the fixing member 43, and the other end is clamped in the fourth groove.

[0064] In the above embodiment, the first groove and the third groove are both provided with slots for clamping the two side edges of the U-shaped structure, and the inner spacing of the two side edges of the U-shaped structure is greater than the width of the rubber waterstop. One end of the rubber waterstop located in the first settlement joint 11 can be clamped in the first groove through the fixing member 43, and when the new and old cover culverts are spliced, the other end of the rubber waterstop can be clamped in the second groove. The installation process of the rubber waterstop located in the second settlement joint 12 is similar, and will not be repeated here.

[0065] Specifically, Figure 2 and Figure 3 As shown, the first groove and the second groove are respectively located at the horizontal section 111 of the first settlement joint 11 (i.e., the corner position of the first settlement joint 11), and the third groove and the fourth groove are respectively located at the horizontal section 111 of the second settlement joint 12 (i.e., the corner position of the second settlement joint 12).

[0066] The fixing member 43 may also be a structure such as an expansion screw.

[0067] In one embodiment, if Figure 2 and Figure 3 As shown, the third waterproof structure 5 is a polymer sealing member for sealing and waterproofing.

[0068] In the above embodiment, the polymer plugging member is light in material, and there is no need to worry about increasing the overall weight of the cover culvert. The polymer plugging member can be made by reacting a certain ratio of polyether polyol, chain extender and isocyanate with a catalyst, and other similar materials.

[0069] In one embodiment, if Figure 2 and Figure 3As shown, the third waterproof structure 5 includes a horizontal first section 51 and a vertical second section 52, the first section 51 and the second section 52 are connected to form a T-shaped structure, a limiting protrusion 53 is arranged on one side of the first section 51 close to the second section 52, the second section 52 of the third waterproof structure 5 located at the bottom of the first settlement joint 11 is inserted into the first settlement joint 11, the first section 51 covers the bottom of the first settlement joint 11, and the limiting protrusion 53 is embedded in the new cover plate 101 and the old cover plate 201; The second section 52 of the third waterproof structure 5 at the top of the second settlement joint 12 is inserted into the second settlement joint 12, the first section 51 covers the top of the second settlement joint 12, and the limiting protrusion 53 is embedded in the new platform body 102 and the old platform body 202; the second section 52 of the third waterproof structure 5 located at the bottom of the second settlement joint 12 is inserted into the second settlement joint 12, the first section 51 covers the bottom of the second settlement joint 12, and the limiting protrusion 53 is embedded in the new platform body 102 and the old platform body 202.

[0070] In the above embodiment, the second ends of the multiple third waterproof structures 5 are respectively used to seal the bottom of the first settlement joint 11, the top of the second settlement joint 12 and the bottom of the second settlement joint 12, and the limiting protrusions 53 on the first ends of the third waterproof structures 5 at the corresponding positions can be respectively embedded in the new cover plate 101, the old cover plate 201, the new platform body 102 and the old platform body 202 to facilitate installation and positioning and avoid displacement of the third waterproof structure 5.

[0071] It can be understood that corresponding limiting slots are respectively provided at positions of the new cover plate 101 , the old cover plate 201 , the new platform body 102 and the old platform body 202 corresponding to the limiting protrusions 53 .

[0072] In one embodiment, if Figure 2 As shown, the first waterproof structure 3 includes a polystyrene board layer 31, a waterproof reinforcement layer 32 and an asphalt waterproof layer 33 which are sequentially laid on the top of the new cover plate 101 and the old cover plate 201 from bottom to top.

[0073] In the above embodiment, the polystyrene board layer 31 is a polystyrene board with excellent water resistance, moisture resistance and corrosion resistance attached to the new cover plate 101 and the old cover plate 201. The asphalt waterproof layer 33 is paved with asphalt waterproofing membrane, which plays the role of outermost waterproofing and protection. The waterproof reinforcement layer 32 is a transition additional layer between the polystyrene board layer 31 and the asphalt waterproofing layer 33, and can specifically be a composite polymer modified asphalt waterproofing membrane.

[0074] Specifically, Figure 2 As shown, the width of the waterproof reinforcement layer 32 is greater than the width of the first settlement joint 11 and less than the width of the asphalt waterproof layer 33 and the polystyrene board layer 31, and the waterproof reinforcement layer 32 is located above the first settlement joint 11, which saves costs while ensuring waterproof performance.

[0075] The above is a preferred embodiment of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles described in the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. An anti-seepage structure for splicing a cover plate culvert, comprising a new cover plate, an old cover plate, a new platform body and an old platform body, wherein a first settlement joint is provided between the new cover plate and the old cover plate, and a second settlement joint is provided between the new platform body and the old platform body, and characterized in that: The first settlement joint and the second settlement joint each have at least one corner, a first connecting piece connecting the new cover plate and the old cover plate is arranged in the first settlement joint, and a second connecting piece connecting the new platform body and the old platform body is arranged in the second settlement joint; A first waterproof structure covering the first settlement joint is arranged between the new cover plate and the top of the old cover plate, a second waterproof structure is arranged in the first settlement joint and the second settlement joint, and a third waterproof structure is arranged at the bottom of the first settlement joint, the top of the second settlement joint and the bottom of the second settlement joint.

2. The anti-seepage structure according to claim 1, characterized in that: The first settlement joint and the second settlement joint both have a horizontal section and two vertical sections, the horizontal section is located between the two vertical sections, and the two ends of the horizontal section are respectively connected to the bottom end of one vertical section and the top end of the other vertical section.

3. The anti-seepage structure according to claim 2, characterized in that: The first connector and the second connector both include a shear rod and a seamless steel sleeve, the seamless steel sleeve of the first connector is arranged in the new cover plate on one side of the vertical section of the first settlement joint, one end of the shear rod of the first connector is arranged in the old cover plate on the other side of the vertical section of the first settlement joint, and the other end of the shear rod of the first connector is arranged in the seamless steel sleeve of the first connector; The seamless steel sleeve of the second connecting piece is arranged in the new platform body on one side of the vertical section of the second settlement joint, one end of the shear rod of the second connecting piece is arranged in the old platform body on the other side of the vertical section of the second settlement joint, and the other end of the shear rod of the second connecting piece is arranged in the seamless steel sleeve of the second connecting piece.

4. The anti-seepage structure according to claim 1, characterized in that: The second waterproof structure includes a filler and a water retaining member. The filler is disposed in both the first settlement joint and the second settlement joint. The water retaining member is disposed at a corner position of the first settlement joint and a corner position of the second settlement joint.

5. The anti-seepage structure according to claim 4, characterized in that: The filler is asphalt hemp, and the water retaining member is a rubber waterstop. One end of the rubber waterstop located in the first settlement joint is fixed in the new cover plate through a fixing member, and the other end is arranged in the old cover plate; one end of the rubber waterstop located in the second settlement joint is fixed in the new platform body through a fixing member, and the other end is arranged in the old platform body.

6. The anti-seepage structure according to claim 5, characterized in that: The fixing piece is a U-shaped structure, a first groove is provided on the new cover plate at the corner position of the first settlement joint, a second groove corresponding to the first groove is provided on the old cover plate, a third groove is provided on the new platform at the corner position of the second settlement joint, a fourth groove corresponding to the third groove is provided on the old platform, one end of the rubber waterstop located in the first settlement joint is fixed in the first groove by the fixing piece, and the other end is clamped in the second groove; one end of the rubber waterstop located in the second settlement joint is fixed in the third groove by the fixing piece, and the other end is clamped in the fourth groove.

7. The anti-seepage structure according to claim 1, characterized in that: The third waterproof structure is a polymer sealing member for sealing and waterproofing.

8. The anti-seepage structure according to claim 7, characterized in that: The third waterproof structure includes a horizontal first section and a vertical second section, the first section and the second section are connected to form a T-shaped structure, a limiting protrusion is provided on one side of the first section close to the second section, the second section of the third waterproof structure located at the bottom of the first settlement joint is inserted into the first settlement joint, the first section covers the bottom of the first settlement joint, and the limiting protrusion is embedded in the new cover plate and the old cover plate; The second section of the third waterproof structure located at the top of the second settlement joint is inserted into the second settlement joint, the first section covers the top of the second settlement joint, and the limiting protrusion is embedded in the new platform body and the old platform body; The second section of the third waterproof structure located at the bottom of the second settlement joint is inserted into the second settlement joint, the first section covers the bottom of the second settlement joint, and the limiting protrusion is embedded in the new platform body and the old platform body.

9. The anti-seepage structure according to claim 1, characterized in that: The first waterproof structure includes a polystyrene board layer, a waterproof reinforcement layer and an asphalt waterproof layer which are sequentially laid on the top of the new cover plate and the old cover plate from bottom to top.