Precast pile for foundation reinforcement

By adopting a combined structure of insert rods and pile covers in prefabricated piles, the interspersed connection between prefabricated piles and soil layers is enhanced, and the problem of insufficient connection strength in the prior art is solved, and a more solid pile burial and concrete curing effect is achieved. .

CN221989280UActive Publication Date: 2024-11-12BEIJING TUNGDUN MUNICIPAL CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323534708.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-23
Publication Date
2024-11-12
Estimated Expiration
2033-12-23

AI Technical Summary

Technical Problem

The connection strength between existing prefabricated piles and soil layers is poor, resulting in limited gaps and unsolid connections after concrete curing.

Method used

Using a structure including pile body, insert rod, pile cover, operating rod and pushing member, the pile body is pushed out through the insert rod and inserted into the soil layer, and then concrete is injected through the grouting hole on the pile cover to enhance the prefabricated pile and soil layer. The interpolation structure uses springs and reinforcement cylinders to increase the sliding connection strength of the insert rod, and improves the inflow and vibration effect of concrete through the slurry holes.

Benefits of technology

The connection strength between prefabricated piles and soil layer is improved, the stability and construction convenience of the pile body are enhanced, and the full curing and compactness of the concrete is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989280U_ABST
    Figure CN221989280U_ABST
Patent Text Reader

Abstract

The precast pile for foundation reinforcement relates to the technical field of foundation reinforcement and comprises a pile body, the top end of the pile body is open, and slurry discharging holes are formed in the side wall of the pile body; the inserting rod slidably penetrates through the pile body, and the height of the inserting rod is gradually increased in the direction away from the central axis of the pile body; the pile cover sleeves the top end of the pile body and is provided with a grouting hole; the bottom end of the operating rod is provided with threads and is coaxially connected with the pile body in a threaded manner; the pushing piece is coaxially and fixedly connected with the operating rod, the bottom end of the pushing piece is in a circular truncated cone shape, the cross section is gradually increased in the direction towards the pile cover, and the circular truncated cone face abuts against the inserting rod; a reinforcing cylinder is fixedly connected into the pile body, and the inserting rod is connected into the reinforcing cylinder in a sliding mode. A baffle ring is fixedly connected to the inserting rod, and a spring is arranged between the baffle ring and the reinforcing cylinder; the end, facing the pushing piece, of the inserting rod is a convex spherical surface. The precast pile has the effect of improving the connection strength between the precast pile and the soil layer.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of foundation reinforcement, and in particular to a prefabricated pile for foundation reinforcement. Background Art

[0002] The foundation pit is a pit dug at the foundation design location according to the base elevation and foundation plane dimensions. After the foundation pit construction is completed, the ground inside the foundation pit needs to be reinforced. The current reinforcement method is generally to drive precast piles into the ground. The precast piles are hollow and have slurry discharge holes on the side walls. After the precast piles are driven into the ground to the required depth, concrete is poured into the precast piles. After the concrete solidifies, the precast piles can be buried in the ground.

[0003] With respect to the above-mentioned related technologies, the inventors found that the gap between the precast pile and the soil layer is limited, the concrete flowing out of the slurry discharge hole is limited, and after the concrete solidifies, the connection strength between the precast pile and the soil layer is poor. Utility Model Content

[0004] In order to improve the connection strength between the precast piles and the soil layer, the present application provides a precast pile for foundation reinforcement.

[0005] The present application provides a prefabricated pile for foundation reinforcement using the following technical solution:

[0006] A prefabricated pile for foundation reinforcement, comprising:

[0007] The pile body has an opening at the top and grout discharge holes on the side walls;

[0008] The insertion rod is slidably arranged on the pile body and gradually increases in height in a direction away from the central axis of the pile body;

[0009] The pile cap is sleeved on the top of the pile body and is provided with grouting holes;

[0010] An operating rod, the bottom end of which is provided with a thread, and the coaxial thread is connected to the pile body;

[0011] The pusher is coaxially fixedly connected to the operating rod, and the bottom end is in a frustum shape, the cross section of which gradually increases in the direction toward the pile cover, and the frustum surface abuts against the insertion rod.

[0012] By adopting the above technical solution, after the pile body is driven into the ground, the operating rod is rotated to move downward, and the pushing member can move accordingly. The round table surface pushes the insertion rod out of the pile body and inserts it into the soil layer. Then concrete is injected into the pile through the grouting holes on the pile cover. After the concrete is solidified, the burial of the precast pile is completed. Compared with the method of only using concrete pouring in the related art, there are more interlaced structures between the precast pile and the soil layer, which improves the connection strength between the precast pile and the soil layer.

[0013] Optionally, a reinforcement tube is fixedly connected in the pile body, and the insertion rod is slidably connected in the reinforcement tube.

[0014] By adopting the above technical solution, the reinforcing tube can enhance the strength of the inserted rod sliding connection pile body.

[0015] Optionally, a retaining ring is fixedly connected to the insert rod, and a spring is provided between the retaining ring and the reinforcing tube.

[0016] By adopting the above technical solution, the spring can push the retaining ring to make the insertion rod move toward the central axis of the pile body, so that the insertion rod remains retracted in the pile body when the pushing member does not push it, making it easier to drive the pile body into the ground.

[0017] Optionally, one end of the insertion rod facing the pushing member is a convex spherical surface.

[0018] By adopting the above technical solution, the truncated table surface of the pushing member abuts against the convex spherical surface, so that the end of the insertion rod can be pushed out of the pile body more smoothly.

[0019] Optionally, a threaded barrel threadably connected to the operating rod is fixedly connected to the bottom end of the pile body.

[0020] By adopting the above technical solution, the operating rod can be moved along the central axis direction of the pile body by rotating the operating rod.

[0021] Optionally, the pile cap is fixedly connected to a plurality of support plates along the circumferential direction, and the support plates are connected to the ground in the foundation pit through anchor bolts.

[0022] By adopting the above technical solution, the anchor bolts fix the support plate on the ground, which can keep the pile cover in a buckled state with the pile body, making it difficult for debris to fall into the pile body.

[0023] Optionally, a slide groove penetrating upward is provided on the circumferential side wall at the top end of the pile body, and a slide bar adapted to the slide groove is provided in the pile cover.

[0024] By adopting the above technical solution, the pile cover can stop the pile body from rotating. When the operating rod is turned, the pile body will not rotate accordingly, which makes it easier for construction workers to install the prefabricated piles.

[0025] Optionally, the insertion rod is hollow, and a slurry hole is provided on the side wall.

[0026] By adopting the above technical solution, concrete can enter the plug rod from the slurry hole, and then enter the gap between the plug rod and the soil layer from the opening of the plug rod, thereby improving the connection strength between the precast pile and the soil layer. At the same time, it is also convenient to send the vibrating rod into the pile body from the top to vibrate the concrete.

[0027] In summary, the present application includes at least one of the following beneficial technical effects:

[0028] 1. After the pile body is driven into the ground, the operating rod is rotated downward, and the pusher can move accordingly. The round table surface pushes the insertion rod out of the pile body and inserts it into the soil layer. Then concrete is injected into the pile through the grouting hole on the pile cover. After the concrete is solidified, the precast pile is buried. Compared with the method of only using concrete pouring in the related art, there are more interlaced structures between the precast pile and the soil layer, which improves the connection strength between the precast pile and the soil layer;

[0029] 2. The spring can push the retaining ring to make the rod move toward the center axis of the pile body, so that the rod remains retracted in the pile body when the pusher does not push it, making it easier to drive the pile body into the ground;

[0030] 3. The pile cap can stop the pile from rotating. When the operating rod is turned, the pile will not rotate, making it easier for construction workers to install prefabricated piles.

[0031] 4. Concrete can enter the plug rod from the slurry hole, and then enter the gap between the plug rod and the soil layer from the opening of the plug rod, thereby improving the connection strength between the precast pile and the soil layer. At the same time, it is also convenient to send the vibrating rod into the pile body from the top to vibrate the concrete. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application;

[0033] Figure 2 is a cross-sectional view of an embodiment of the present application;

[0034] Figure 3 yes Figure 2 Enlarged view of part A in the middle;

[0035] Figure 4 yes Figure 2 Enlarged view of middle part B;

[0036] In the figure, 1, pile body; 11, slurry discharge hole; 12, reinforcement tube; 13, threaded tube; 14, slide groove; 2, insertion rod; 21, retaining ring; 22, spring; 23, slurry hole; 3, pile cover; 31, grouting hole; 32, support plate; 33, slide bar; 4, operating rod; 5, pushing member. DETAILED DESCRIPTION

[0037] The following is combined with Figure 1 -Attached Figure 4 , further details of this application are given.

[0038] This application proposes a prefabricated pile for foundation reinforcement, referring to Figure 1 and Figure 2, including a pile body 1, an insert rod 2, a pile cover 3, an operating rod 4 and a pushing member 5. The pile body 1 is hollow with an opening on the top, and is inserted into the ground in the foundation pit; the insert rod 2 is slidably connected to the side wall of the pile body 1; the operating rod 4 is threadedly connected to the pile body 1; the pushing member 5 is fixedly connected to the operating rod 4, and abuts against the end of the insert rod 2; the pile cover 3 is sleeved at the opening of the pile body 1, and is provided with a grouting hole 31. After the pile body 1 is driven into the ground, the operating rod 4 is rotated to move downward, and the pushing member 5 can move accordingly, and the insert rod 2 is pushed out of the pile body 1 and inserted into the soil layer, and then concrete is injected into the pile body 1 through the grouting hole 31 on the pile cover 3. After the concrete is solidified, the burial of the precast pile is completed. Compared with the method of only using concrete pouring in the related art, there are more interlaced structures between the precast pile and the soil layer, which improves the connection strength between the precast pile and the soil layer.

[0039] The pile body 1 is a cylindrical structure with an upper opening and a pointed tip at the bottom. The side wall of the pile body 1 is provided with a plurality of slurry discharge holes 11 for concrete to pass through. A connecting rod is welded at the bottom end of the pile body 1 near the tip, and a threaded barrel 13 is welded on the connecting rod, and the threaded barrel 13 coincides with the central axis of the pile body 1. In the embodiment of the present application, four connecting rods are provided, which are evenly distributed along the circumference of the inner side wall of the pile body 1.

[0040] The operating rod 4 is a round rod, the bottom end of which is provided with an external thread and is threadedly connected to the threaded tube 13 , and the top end of which is provided with a hexagonal column slot and passes through the pile body 1 .

[0041] Reference Figure 2 and Figure 3 The pile cover 3 is in the shape of a cylindrical cover and is sleeved on the top opening of the pile body 1. A slide groove 14 that passes vertically upward is provided on the circumferential outer wall of the top of the pile body 1, and a slide bar 33 is welded on the circumferential inner wall of the pile cover 3. The slide bar 33 is slidably arranged in the slide groove 14, so that the pile cover 3 can only move axially along the pile body 1, and has a rotation-stopping effect on the pile body 1. Four support plates 32 are evenly welded on the circumferential outer wall of the pile cover 3, and the support plates 32 are provided with through holes. The support plates 32 can be fixed to the ground in the foundation pit by practical anchor bolts, thereby fixing the position of the pile cover 3. A plurality of grouting holes 31 are provided on the pile cover 3, and the grouting holes 31 are used by construction personnel to grout into the pile body 1 to enhance the connection strength between the precast pile and the soil layer.

[0042] Reference Figure 2 and Figure 4 The pusher 5 is a rotating body in a hollow cylinder shape. The upper part of the pusher 5 is a cylindrical cylinder body, and the lower part is a truncated cone cylinder body, and the cross section of the lower part gradually decreases along the direction toward the threaded cylinder 13. The pusher 5 is welded to the operating rod 4, and a reinforcing rod is also welded between the upper part of the pusher 5 and the operating rod 4 to enhance the connection strength between the pusher 5 and the operating rod 4.

[0043] The plug rod 2 is slidably inserted into the side wall of the pile body 1, and the end away from the operating rod 4 is tilted upward. The plug rod 2 is a cylinder, and the end facing the operating rod 4 is a convex spherical surface, which abuts the pusher 5; the other end is open, and the plug rod 2 is hollow as a whole. The plug rod 2 is also provided with a slurry hole 23, which is used for concrete to flow in, so as to enhance the connection strength between the precast pile and the soil layer. A reinforcement tube 12 is welded on the inner wall of the pile body 1, and the plug rod 2 is slidably connected in the reinforcement tube 12. The reinforcement tube 12 can enhance the connection strength of the plug rod 2. A retaining ring 21 is integrally formed on the circumferential outer wall of the plug rod 2, and the retaining ring 21 is located on the side of the reinforcement tube 12 close to the operating rod 4. A spring 22 is slidably sleeved on the plug rod 2, and the two ends of the spring 22 are respectively bonded to the retaining ring 21 and the end of the reinforcement tube 12, so as to push the plug rod 2 toward the operating rod 4, so as to ensure that when the pile body 1 is driven into the ground, the plug rod 2 is in a state of being retracted in the pile body 1.

[0044] In the implementation example of the present application, the insertion rods 2 are arranged in multiple rows along the axial direction of the pile body 1, and four insertion rods 2 are evenly distributed in each row, and the insertion rods 2 in adjacent rows are aligned.

[0045] The implementation principle of the embodiment of the present application is as follows: after the foundation pit construction is completed, the pile body 1 is driven into the predetermined location to ensure that the pile sinking depth is in place. The pile cover 3 is put on the top of the pile body 1, and the pile cover 3 is fixed to the ground with anchor bolts, and the upper end of the operating rod 4 extends out of the pile cover 3. Use a sleeve wrench to insert the slot at the top of the operating rod 4, turn the operating rod 4, and the operating rod 4 rotates downward under the action of the threaded tube 13, and the frustum of the pusher 5 will push the insertion rod 2, and the insertion rod 2 is obliquely inserted into the soil layer until the cylindrical outer surface of the upper part of the pusher 5 abuts against the insertion rod 2. Pour concrete into the pile body 1 through the grouting hole 31 and vibrate it to make it dense. After the concrete solidifies, the burial of the prefabricated pile is completed.

[0046] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A prefabricated pile for foundation reinforcement, characterized in that: include: The pile body (1) has an open top and a slurry discharge hole (11) on the side wall; The insertion rod (2) is slidably disposed on the pile body (1) and gradually increases in height in a direction away from the central axis of the pile body (1); A pile cap (3) is sleeved on the top of the pile body (1) and is provided with a grouting hole (31); An operating rod (4) having a thread at the bottom end thereof and being coaxially threadedly connected to the pile body (1); The pushing member (5) is coaxially fixedly connected to the operating rod (4), and has a bottom end in a frustum shape, with a cross section gradually increasing in a direction toward the pile cover (3), and a frustum surface abutting against the insertion rod (2).

2. A prefabricated pile for foundation reinforcement according to claim 1, characterized in that: A reinforcement tube (12) is fixedly connected inside the pile body (1), and the insertion rod (2) is slidably connected inside the reinforcement tube (12).

3. A prefabricated pile for foundation reinforcement according to claim 2, characterized in that: A retaining ring (21) is fixedly connected to the insert rod (2), and a spring (22) is provided between the retaining ring (21) and the reinforcing tube (12).

4. The prefabricated pile for foundation reinforcement according to claim 2, characterized in that: The end of the insertion rod (2) facing the pushing member (5) is a convex spherical surface.

5. The prefabricated pile for foundation reinforcement according to claim 1, characterized in that: A threaded barrel (13) threadably connected to the operating rod (4) is fixedly connected to the inner bottom end of the pile body (1).

6. The prefabricated pile for foundation reinforcement according to claim 1, characterized in that: The pile cover (3) is fixedly connected to a plurality of support plates (32) along the circumferential direction, and the support plates (32) are connected to the ground in the foundation pit via anchor bolts.

7. The prefabricated pile for foundation reinforcement according to claim 6, characterized in that: A sliding groove (14) extending upward is provided on the circumferential side wall at the top end of the pile body (1), and a sliding strip (33) adapted to the sliding groove (14) is provided in the pile cover (3).

8. The prefabricated pile for foundation reinforcement according to claim 1, characterized in that: The insertion rod (2) is hollow, and a slurry hole (23) is provided on the side wall.