Steel column correcting equipment

By designing steel column correction equipment connected to support ears and pushers, the steel column correction operation is simplified, the existing equipment has complex structure and cumbersome operation problems are solved, the construction efficiency is improved, and the stability of the calibration equipment is ensured.

CN221989947UActive Publication Date: 2024-11-12CHONGQING CONSTR ENG IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420396402.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-29
Publication Date
2024-11-12
Estimated Expiration
2034-02-28

AI Technical Summary

Technical Problem

The existing steel column correction equipment has complex structure and cumbersome operation, which affects the efficiency of construction.

Method used

A steel column correction device is designed, and the connection and correction is performed using support ears and pushers, which simplifies the installation operation of the equipment and steel columns, and realizes horizontal and vertical through the sliding groove structure of the first locking plate and the second locking plate. Calibration, use jacks to improve calibration efficiency.

Benefits of technology

It achieves convenience and quick operation, improves the construction efficiency of steel structures, and ensures the stability of the equipment through the counterweight structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221989947U_ABST
    Figure CN221989947U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction steel column correction, and discloses steel column correction equipment which is characterized in that an upper steel column and a lower steel column are provided with support lugs; comprising a supporting plate, a first pushing piece horizontally connected to the supporting plate and a second pushing piece vertically connected to the supporting plate. A first locking plate is arranged below the supporting plate and connected with a supporting lug on the lower steel column, a sliding groove is formed in the first locking plate, a second locking plate is connected into the sliding groove in a sliding mode, a locking piece is arranged between the second locking plate and the second pushing piece for connection, and the first locking plate is located between the first pushing piece and the second pushing piece. The purpose of improving the construction efficiency of a steel structure is achieved by simplifying the installation operation between the correction equipment and the steel column.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel column correction in building construction, in particular to steel column correction equipment. Background Art

[0002] Steel column calibration is a very important part of the building structure construction process. It refers to the calibration of the plane position and verticality of the steel column after the foundation construction is completed to ensure the accuracy of the steel column installation in the horizontal and vertical directions. The purpose of steel column calibration is to improve the structural stability of the building, thereby ensuring the safety and reliability of the building structure. In building construction, if the steel column is not calibrated, it will lead to risks such as tilt and deformation during the use of the building.

[0003] Steel column calibration is a complex process involving many aspects, mainly including first using instruments to detect whether there is a misalignment in the horizontal connection between the upper and lower steel columns after docking, whether the steel column is in a vertical state, and then using calibration equipment to make precise adjustments based on the test results, and also considering the influence of temperature, etc. However, due to the heavy weight of steel structures, the structure of existing steel column calibration equipment is mostly complex, and the operation process is relatively complicated. It requires the cooperation of multiple people and a complex installation procedure to align the calibration equipment with the docking position of the steel column at a certain height and perform calibration operations, which affects the efficiency of construction. Utility Model Content

[0004] The utility model aims to provide a steel column correction device, so as to achieve the purpose of improving the steel structure construction efficiency by simplifying the installation operation between the correction device and the steel column.

[0005] To achieve the above-mentioned purpose, the utility model adopts the following technical scheme: steel column correction equipment, the upper steel column and the lower steel column are both provided with support ears; including a support plate, a first pushing member horizontally connected to the support plate and a second pushing member vertically connected to the support plate; a first locking plate is provided under the support plate, the first locking plate is connected to the support ear on the lower steel column, a sliding groove is provided inside the first locking plate, a second locking plate is slidably connected in the sliding groove, and a locking member is provided between the second locking plate and the second pushing member for connection, and the first locking plate is located between the first pushing member and the first pushing member.

[0006] The beneficial effects of this program are:

[0007] 1. Make full use of the lugs on the lower steel column. By connecting the first locking plate under the support plate to the lugs on the lower steel column, the connection between the correction device and the steel column to be corrected can be achieved. The operation is convenient and quick, and the purpose of improving the efficiency of steel structure construction can be achieved.

[0008] 2. The first pusher is used to realize the correction of the horizontal position of the steel column. After the second locking plate is connected and fixed to the second pusher, the second pusher can be used to realize the correction of the verticality and elevation of the steel column. That is, after the correction equipment is installed, all correction operations on the steel column can be completely performed, thereby further improving the correction efficiency.

[0009] 3. The first locking plate is set between the first pusher and the first pusher. Since the first locking plate is the most important connection point between the correction equipment and the steel column, the first pusher and the first pusher on both sides of the displacement can also act as a counterweight, thereby ensuring the stability of the equipment after connection.

[0010] Preferably, a fixing plate is provided on the supporting plate, the first pushing member is connected to the fixing plate, and the first pushing member and the second pushing member are both jacks.

[0011] Preferably, a plurality of stiffening plates are provided at equal intervals between the fixing plate and the supporting plate, and the stiffening plates are all right-angled triangles.

[0012] Preferably, the first locking plate is provided with a plurality of through holes, the second locking plate is provided with an inverted U-shaped through groove, and the support plate is provided with a connecting port, which is connected to the sliding groove inside the first locking plate; the second locking plate slides inside the connecting port and the sliding groove, and a plurality of limiting grooves are symmetrically provided on both sides of the inverted U-shaped through groove.

[0013] Preferably, a limit block is provided on the top of the second locking plate, and the width of the limit block is greater than the width of the connecting port, and a first locking hole is provided on the limit block; a locking block is connected to the top of the second pushing member, and a second locking hole is provided on the locking block, and the locking member is arranged between the first locking hole and the second locking hole.

[0014] Preferably, a handle is also provided at the bottom of the support plate.

[0015] Preferably, the end surfaces of the two first locking plates are flush with the end surface of the support plate close to the steel column. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 A three-dimensional diagram of the device before the second locking plate is pulled out in the embodiment of the utility model;

[0017] Figure 2 A three-dimensional diagram of the device after the second locking plate is pulled out in the embodiment of the utility model;

[0018] Figure 3 It is a schematic diagram of the structure between the steel column and the correction device in the embodiment of the utility model;

[0019] Figure 4 It is a three-dimensional diagram of the second locking plate in the embodiment of the utility model. DETAILED DESCRIPTION

[0020] The following is further described in detail through specific implementation methods:

[0021] The figure marks in the drawings of the specification include: lower steel column 1, upper steel column 11, support ear 12, support plate 2, fixing plate 21, stiffening plate 22, first locking plate 3, second locking plate 4, inverted U-shaped through groove 41, limiting groove 42, limiting block 43, first jack 5, second jack 6, locking block 61.

[0022] Example

[0023] The embodiment is basically as shown in the attached Figure 1-4 As shown, Figure 1 The steel column correction device shown in the figure includes a support plate 2, a first pusher fixed horizontally on the support plate 2, and a second pusher fixed vertically on the support plate 2; the horizontally arranged first pusher is used to correct the horizontal position of the steel column, and the vertically arranged second pusher is used to correct the verticality and elevation of the steel column. Based on the difficulty of pushing and correcting the steel column after pre-installation, in this embodiment, the first pusher and the second pusher are both jacks, namely the first jack 5 and the second jack 6. Figure 3 As shown, the steel column docking process includes an upper steel column 11 and a lower steel column 1, and the ends of the upper steel column 11 and the lower steel column 1 are welded and fixed with a plurality of vertical ears 12, and the ears 12 are provided with a plurality of connection holes, and the lifting operation of the steel column is realized through the ears 12.

[0024] like Figure 2 As shown, the first jack 5 is horizontally fixed to the support plate 2 in the following specific manner: a fixing plate 21 is vertically welded and fixed on one end of the top surface of the support plate 2, the right end of the first jack 5 is vertically fixed to the fixing plate 21, and it is ensured that the top of the jack can extend out of the left end of the support plate 2 when it is ejected. At the same time, in order to improve the stability of the fixing plate 21 during the correction process, a plurality of stiffening plates 22 are welded and fixed between the fixing plate 21 and the support plate 2 at equal intervals. In this embodiment, the number of stiffening plates 22 is arranged at intervals of three, and the stiffening plates 22 are all right triangles. The second jack 6 is also vertically fixed to the upper surface of the support plate 2 by welding.

[0025] The bottom surface of the support plate 2 is vertically welded with a first locking plate 3, which is connected to the lug 12 on the lower steel column 1 to install the calibration device at the interface to be calibrated. The first locking plate 3 is located between the first jack 5 and the second jack 6, that is, after the calibration device is installed using the first locking plate 3 as a connection point, the first jack 5 and the second jack 6 located on both sides of the connection point can also act as a counterweight. Figure 2As shown, in this embodiment, two first locking plates 3 are fixed at intervals, and the interval between the two first locking plates 3 is slightly larger than the thickness of the upper lug 12 of the lower steel column 1, so as to ensure that the lug 12 on the lower steel column 1 can enter between the two first locking plates 3. The two first locking plates 3 are symmetrically provided with a plurality of through holes corresponding to the connection holes on the lug 12, and the connection between the lower steel column 1 and the first locking plates 3 can be achieved by respectively setting bolts in the corresponding through holes and connection holes, so as to complete the installation of the correction device. At the same time, the end faces of the two first locking plates 3 are flush with the end faces of the support plate 2 close to the steel column. After the first locking plates 3 are connected to the lug 12 on the lower steel column 1, the first locking plates 3 and the support plate 2 are set to abut against the surface of the lower steel column 1, so as to prevent the correction device from tilting and affecting the correction accuracy. After the correction device is installed, the horizontal position of the upper steel column 11 can be finely adjusted by starting the first jack 5 according to the detection results.

[0026] At the same time, a slide groove (not shown) is provided inside one of the first locking plates 3, and a second locking plate 4 is slidably connected in the slide groove; and Figure 1 As shown, in this embodiment, a first locking plate 3 relatively far from the first jack 5 is provided with a slide groove inside, and the first locking plate 3 relatively close to the first jack 5 is solid, so as to ensure the strength of the connection between the correction device and the lower steel column 1. Correspondingly, a connection port is opened on the support plate 2, and the connection port is connected to the slide groove inside the first locking plate 3, as shown in FIG. Figure 1 In the state shown, the second locking plate 4 is now slidably connected to the inside of one of the first locking plates 3; after the second locking plate 4 is pulled out, its top is fixedly connected to the top of the second jack 6 by a locking piece, so that when the second jack 6 starts to be ejected, the second locking plate 4 will be pushed up vertically. In this embodiment, the locking piece between the second locking plate 4 and the second jack 6 is also a bolt, and the specific locking method is: a limit block 43 is welded and fixed on the top of the second locking plate 4, and it is ensured that the width of the limit block 43 is greater than the width of the connecting port, so as to limit the top of the second locking plate 4 from sliding down to be flush with the top of the connecting port at most, while also facilitating the staff to pull the second locking plate 4 outward; then, a first locking hole is opened on the limit block 43, and a locking block 61 is welded and fixed on the top of the second jack 6, and a second locking hole is also opened on the locking block 61, and the first locking hole and the second locking hole are coaxial and equal-sized circular holes, and the bolt is inserted between the first locking hole and the second locking hole to achieve a fixed connection between the second jack 6 and the second locking plate 4.

[0027] like Figure 4As shown, an inverted U-shaped through groove 41 is provided on the second locking plate 4, and the inverted U-shaped through groove 41 ensures that the second locking plate 4 can still slide up and down when the first locking plate 3 and the upper support ear 12 of the lower steel column 1 are connected by a plurality of bolts. At the same time, a plurality of limiting grooves 42 are symmetrically provided on both sides of the inverted U-shaped through groove 41, and the limiting grooves 42 are all provided on the side of the second locking plate 4 facing the second jack 6; a plurality of bolts are provided between the second locking plate 4 and the upper support ear 12 of the lower steel column 1 for connection, and when the bolts are used for connection, the nuts of the bolts are respectively located in the limiting grooves 42 symmetrically on both sides of the inverted U-shaped through groove 41, and the connecting bolts are limited by the limiting grooves 42, so as to ensure that when the second jack 6 corrects the verticality and elevation of the upper steel column 11 connected to the second locking plate 4, no relative displacement occurs between the bolts and the second locking plate 4, thereby ensuring the stability of the connection. In addition, in order to ensure the strength of the connection structure between the second locking plate 4 and the upper steel column 11 support ear 12, a second locking plate 4 can be added on the other side of the support ear 12, and the added second locking plate 4 can be a free plate or can be set in the same way as sliding connection in the first locking plate 3. When the same way of sliding connection in the first locking plate 3 is selected, the corresponding first locking plate 3 below also needs to have a slide groove inside, and ensure that the two extended second locking plates 4 will not interfere with or contact the first jack 5. In addition, an inverted U-shaped handle is welded and fixed at the bottom of the support plate 2 (for the convenience of display, the handle is not shown in the figure), which is convenient for workers to operate.

[0028] The specific implementation process is as follows: After the upper steel column 11 is docked on the top of the lower steel column 1 by hoisting the lug 12 of the upper steel column 11 with the hoisting equipment to achieve pre-installation, the horizontal position and verticality of the upper and lower steel columns 1 are first detected by the instrument, and then the correction device is fixed on the lower steel column 1 through two first locking plates 3. According to the detection results, the first jack 5 is started to correct the horizontal position of the upper steel column 11.

[0029] After the horizontal position calibration is completed, the second locking plate 4 located inside the first locking plate 3 is pulled upward. Figure 1 The status shown changes to Figure 2 In the state shown, the second locking plate 4 is connected to the second jack 6 by the locking bolts, and then the second locking plate 4 is fixedly connected to the support ear 12 on the upper steel column 11 by multiple bolts. According to the test results, the vertically arranged second jack 6 is started to correct the verticality and elevation of the steel column.

[0030] After the calibration is completed, remove the bolts connecting the first locking plate 3 and the lower steel column 1 ear 12, and the first locking plate 3 and the upper steel column 11 ear 12, and complete the removal of the calibration equipment from the steel column; and remove the connecting bolts between the second locking plate 4 and the second jack 6, and slide the second locking plate 4 into the first locking plate 3 below again for the next round of calibration.

[0031] The above is only an embodiment of the utility model, and the common knowledge such as the known specific technical solutions and / or characteristics in the solution is not described in detail here. It should be pointed out that for those skilled in the art, several deformations and improvements can be made without departing from the technical solution of the utility model, which should also be regarded as the protection scope of the utility model, and these will not affect the effect of the implementation of the invention and the practicality of the patent. The scope of protection required by this application shall be based on the content of its claims, and the specific implementation methods and other records in the specification can be used to interpret the content of the claims.

Claims

1. Steel column correction equipment, the upper steel column and the lower steel column are both provided with support ears, characterized in that: It includes a support plate, a first pushing member horizontally connected to the support plate and a second pushing member vertically connected to the support plate; a first locking plate is provided under the support plate, the first locking plate is connected to the support ear on the lower steel column, a sliding groove is provided inside the first locking plate, a second locking plate is slidably connected in the sliding groove, and a locking member is provided between the second locking plate and the second pushing member for connection, and the first locking plate is located between the first pushing member and the first pushing member.

2. The steel column correction device according to claim 1, characterized in that: A fixing plate is arranged on the supporting plate, the first pushing member is connected to the fixing plate, and both the first pushing member and the second pushing member are jacks.

3. The steel column correction device according to claim 2, characterized in that: A plurality of stiffening plates are arranged at equal intervals between the fixing plate and the supporting plate, and the stiffening plates are all right-angled triangles.

4. The steel column correction device according to claim 3 is characterized in that: The first locking plate is provided with a plurality of through holes, the second locking plate is provided with an inverted U-shaped through groove, and the support plate is provided with a connecting port, which is connected to the sliding groove inside the first locking plate; the second locking plate slides inside the connecting port and the sliding groove, and a plurality of limiting grooves are symmetrically provided on both sides of the inverted U-shaped through groove.

5. The steel column correction device according to claim 4, characterized in that: A limit block is provided on the top of the second locking plate, and the width of the limit block is greater than the width of the connecting port, and a first locking hole is provided on the limit block; a locking block is connected to the top of the second pushing member, and a second locking hole is provided on the locking block, and the locking member is arranged between the first locking hole and the second locking hole.

6. The steel column correction device according to claim 1, characterized in that: A handle is also provided at the bottom of the support plate.

7. The steel column correction device according to claim 1, characterized in that: The end surfaces of the two first locking plates are flush with the end surface of the support plate close to the steel column.