Capacitor shell integrated forming die

By introducing cooling components and template components into the capacitor housing mold, cooling water cycle cooling and cutting pipe accelerated injection molding is solved, and the problems of long cooling time and difficult demolding of the capacitor housing mold are improved, and production efficiency is improved.

CN222004266UActive Publication Date: 2024-11-15GUANGDONG ANHONG ELECTRONICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420105265.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-16
Publication Date
2024-11-15
Estimated Expiration
2034-01-16

Smart Images

  • Figure CN222004266U_ABST
    Figure CN222004266U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of capacitor shell injection molds, in particular to a capacitor shell integrated forming mold which comprises a mold frame body, baffles are fixedly installed in the mold frame body, partition plates are fixedly installed in the mold frame body, a cooling assembly is arranged in the mold frame body, and the cooling assembly is connected with the baffle plates. And a mold plate assembly is arranged in the mold frame body, a discharging assembly is arranged below the baffle, and the cooling assembly comprises a water inlet pipe. According to the capacitor shell integrated forming mold, by installing the cooling assembly, through cooperation of a water inlet pipe, an S-shaped through groove and other components, when injection molding of a capacitor shell is carried out, external cooling water can be connected into the mold frame body from the water inlet pipe, then the cooling water can be evenly distributed at the lower end of the mold plate assembly through the S-shaped through groove, and therefore the cooling water can be cooled; and then the water is discharged through the water outlet pipe, so that cooling can be continuously carried out, the cooling time of the capacitor shell mold in the production process is shortened, and demolding is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of capacitor housing injection molds, in particular to an integral molding mold for a capacitor housing. Background Art

[0002] Capacitors are one of the electronic components used in large quantities in electronic equipment. They are widely used in circuits for DC isolation, AC passing, coupling, bypassing, filtering, tuning circuits, energy conversion, control, etc. Capacitors are usually covered with capacitor shells to achieve protection for the capacitors. Therefore, a capacitor shell integrated molding mold is required.

[0003] The production of capacitor shells is an important link in the production of capacitors. Capacitor shells are usually produced and processed by mold injection molding. Ordinary capacitor shell injection molds are time-consuming and labor-intensive to demold during the production process, the mold cooling time is long, and the production efficiency is low. Utility Model Content

[0004] The purpose of the present utility model is to provide a capacitor housing integral molding die, so as to solve the problem that the ordinary capacitor housing mold proposed in the above background technology has a long cooling time during the production process, which makes demoulding laborious and time-consuming. To achieve the above purpose, the present utility model provides the following technical solutions: a capacitor housing integral molding die, including a mold frame, a baffle is fixedly installed inside the mold frame, a partition is fixedly installed inside the mold frame, a cooling assembly is arranged inside the mold frame, a template assembly is arranged inside the mold frame, a blanking assembly is arranged below the baffle, and the cooling assembly includes a water inlet pipe, the water inlet pipe is fixedly connected to one side of the mold frame, and the water inlet pipe passes through the mold frame and extends to the inside of the mold frame.

[0005] Further preferably, the cooling component also includes a serpentine groove, which is fixedly arranged at the bottom of the inner wall of the mold frame, the water inlet pipe is fixedly connected to one side of the serpentine groove, and the other end of the serpentine groove is fixedly connected to a water outlet pipe. By installing the cooling component, the cooperation between the water inlet pipe and the serpentine groove and other components can be achieved when the capacitor housing is injection molded. External cooling water can be connected to the mold frame from the water inlet pipe, and then the cooling water will be evenly distributed at the lower end of the template assembly through the serpentine groove, and then discharged through the water outlet pipe. This is a cycle, which can continuously cool it, thereby shortening the cooling time of the capacitor housing mold during the production process and facilitating demolding.

[0006] Further preferably, the template assembly includes an installation bin, which is fixedly arranged on one side of the mold frame, and an upper template is movably installed inside the installation bin, a handle is fixedly installed on one side of the upper template, and the bottom of the upper template is clamped with a lower template. By installing the template assembly, the staff can first clamp the upper template and the lower template through the cooperation between the installation bin and the upper template and other components, and then push them into the installation bin; a molding space for the capacitor housing is provided between the upper template and the lower template, which facilitates the injection molding of the capacitor housing; after the injection molding is completed, the handle can be used to take out the entire template, thereby facilitating demolding.

[0007] Further preferably, the material discharge assembly includes a first material discharge pipe, the first material discharge pipe is fixedly connected to the interior of the baffle, and one side of the first material discharge pipe is fixedly connected to a second material discharge pipe.

[0008] Further preferably, the blanking assembly also includes a first extension tube, the first extension tube is fixedly connected to the other side of the first blanking tube, the other side of the second blanking tube is fixedly connected to the second extension tube, the first extension tube passes through the partition and extends to the other side of the partition. By installing the blanking assembly, the first blanking tube and the second blanking tube and other components can be coordinated to achieve the injection molding material from the first blanking tube and the second blanking tube after the template assembly is installed. Then the injection molding material will enter the upper template and the lower template respectively from the first extension tube and the second extension tube, thereby accelerating the injection molding speed of the capacitor housing and improving production efficiency.

[0009] Further preferably, a connecting hinge is fixedly installed on the back of the mold frame, a sealing plate is fixedly installed on the other side of the connecting hinge, and a handle is fixedly connected to the other side of the sealing plate.

[0010] Compared with the prior art, the utility model has the following beneficial effects:

[0011] In the utility model, by installing the cooling component, the cooperation between the water inlet pipe and the serpentine groove and other components can be realized, so that when the capacitor housing is injected, the external cooling water can be connected to the mold frame from the water inlet pipe, and then the cooling water will be evenly distributed at the lower end of the template component through the serpentine groove, and then discharged through the water outlet pipe, which is a cycle, and can continuously cool it, thereby shortening the cooling time of the capacitor housing mold during the production process and facilitating demoulding.

[0012] In the utility model, by installing the template assembly, the cooperation between the installation bin and the upper template and other components can be realized, so that the staff can first clamp the upper template and the lower template, and then push them into the installation bin. A molding space for the capacitor shell is provided between the upper template and the lower template, which facilitates the injection molding of the capacitor shell. After the injection molding is completed, the entire template can be taken out by using the handle, thereby facilitating demoulding.

[0013] In the utility model, by installing the blanking assembly, the first blanking tube, the second blanking tube and other components can be coordinated to achieve that after the template assembly is installed, the injection material can be injected from the first blanking tube and the second blanking tube, and then the injection material will enter the upper template and the lower template from the first extension tube and the second extension tube respectively, thereby accelerating the injection molding speed of the capacitor housing and improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;

[0015] Figure 2 It is a right side structural schematic diagram of the utility model;

[0016] Figure 3 This is a schematic diagram of the cross-sectional structure of the utility model;

[0017] Figure 4 For this utility model Figure 1 The enlarged structural diagram at A in the middle;

[0018] Figure 5 For this utility model Figure 3 Enlarged structural diagram at B in the middle.

[0019] In the figure: 1. mold frame; 2. baffle; 3. partition; 4. cooling assembly; 401. water inlet pipe; 402. serpentine groove; 403. water outlet pipe; 5. template assembly; 501. installation bin; 502. upper template; 503. handle; 504. lower template; 6. blanking assembly; 601. first blanking pipe; 602. second blanking pipe; 603. first extension pipe; 604. second extension pipe; 7. connecting hinge; 8. closing plate; 9. handle. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technical personnel in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-Figure 5The utility model provides a technical solution: a capacitor housing integrated molding mold, including a mold frame 1, a baffle 2 is fixedly installed inside the mold frame 1, a partition 3 is fixedly installed inside the mold frame 1, a cooling component 4 is arranged inside the mold frame 1, a template component 5 is arranged inside the mold frame 1, a blanking component 6 is arranged below the baffle 2, the cooling component 4 includes a water inlet pipe 401, the water inlet pipe 401 is fixedly connected to one side of the mold frame 1, and the water inlet pipe 401 passes through the mold frame 1 and extends to the inside of the mold frame 1.

[0022] In this embodiment, Figure 1 , Figure 3 and Figure 5 As shown, the cooling component 4 also includes a serpentine groove 402, which is fixedly arranged at the bottom of the inner wall of the mold frame 1, and the water inlet pipe 401 is fixedly connected to one side of the serpentine groove 402, and the other end of the serpentine groove 402 is fixedly connected to the water outlet pipe 403.

[0023] In this embodiment, Figure 1 , Figure 2 and Figure 3 As shown, the template assembly 5 includes an installation bin 501, which is fixedly arranged on one side of the mold frame 1, an upper template 502 is movably installed inside the installation bin 501, a handle 503 is fixedly installed on one side of the upper template 502, and a lower template 504 is clamped on the bottom of the upper template 502.

[0024] In this embodiment, Figure 1 , Figure 3 and Figure 5 As shown, the material discharge assembly 6 includes a first material discharge pipe 601 , which is fixedly connected to the interior of the baffle 2 , and one side of the first material discharge pipe 601 is fixedly connected to a second material discharge pipe 602 .

[0025] In this embodiment, Figure 1 , Figure 3 and Figure 5 As shown, the material discharge assembly 6 also includes a first extension tube 603, which is fixedly connected to the other side of the first material discharge tube 601, and the other side of the second material discharge tube 602 is fixedly connected to the second extension tube 604, and the first extension tube 603 passes through the partition 3 and extends to the other side of the partition 3.

[0026] In this embodiment, Figure 1 , Figure 2 and Figure 4 As shown, a connecting hinge 7 is fixedly installed on the back of the mold frame 1, a sealing plate 8 is fixedly installed on the other side of the connecting hinge 7, and a handle 9 is fixedly connected to the other side of the sealing plate 8.

[0027] The use method and advantages of the utility model: When the capacitor housing integral molding mold is used, the working process is as follows:

[0028] like Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown, first, by installing the cooling component 4, the cooperation between the water inlet pipe 401 and the serpentine groove 402 and other components can be realized, when the capacitor housing is injected, the external cooling water can be connected to the mold frame 1 from the water inlet pipe 401, and then the cooling water will be evenly distributed on the lower end of the template component 5 through the serpentine groove 402, and then discharged through the water outlet pipe 403, which is a cycle, and can continuously cool it, thereby shortening the cooling time of the capacitor housing mold during the production process and facilitating demoulding, and then by installing the template component 5, the cooperation between the installation bin 501 and the upper template 502 and other components can be realized, and the staff can first clamp the upper template 502 and the lower template 504, and then connect Then, push it into the installation bin 501, a molding space for the capacitor shell is provided between the upper template 502 and the lower template 504, which facilitates the injection molding of the capacitor shell. After the injection molding is completed, the handle 503 can be used to take out the entire template, which facilitates demoulding. Then, by installing the blanking component 6, the first blanking tube 601 and the second blanking tube 602 can be used to cooperate with each other, so that after the template component 5 is installed, the injection molding material can be injected from the first blanking tube 601 and the second blanking tube 602, and then the injection molding material will enter the upper template 502 and the lower template 504 from the first extension tube 603 and the second extension tube 604 respectively, thereby accelerating the injection molding speed of the capacitor shell and improving production efficiency.

[0029] The above shows and describes the basic principle, main features and advantages of the utility model. Technical staff in this industry should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model will have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection of the utility model is defined by the attached claims and their equivalents.

Claims

1. A capacitor housing integral molding mold, comprising a mold frame (1), characterized in that: A baffle (2) is fixedly installed inside the mold frame (1), a partition (3) is fixedly installed inside the mold frame (1), a cooling component (4) is arranged inside the mold frame (1), a template component (5) is arranged inside the mold frame (1), a blanking component (6) is arranged below the baffle (2), and the cooling component (4) includes a water inlet pipe (401), the water inlet pipe (401) is fixedly connected to one side of the mold frame (1), and the water inlet pipe (401) passes through the mold frame (1) and extends to the inside of the mold frame (1).

2. The capacitor housing integral molding die according to claim 1, characterized in that The cooling component (4) also includes a serpentine groove (402), which is fixedly arranged at the bottom of the inner wall of the mold frame (1), and the water inlet pipe (401) is fixedly connected to one side of the serpentine groove (402), and the other end of the serpentine groove (402) is fixedly connected to a water outlet pipe (403).

3. The capacitor housing integral molding die according to claim 2, characterized in that: The template assembly (5) comprises an installation bin (501), wherein the installation bin (501) is fixedly arranged on one side of the mold frame (1), an upper template (502) is movably installed inside the installation bin (501), a handle (503) is fixedly installed on one side of the upper template (502), and a lower template (504) is clamped on the bottom of the upper template (502).

4. The capacitor housing integral molding die according to claim 3, characterized in that: The material discharge assembly (6) comprises a first material discharge pipe (601), wherein the first material discharge pipe (601) is fixedly connected to the interior of the baffle (2), and one side of the first material discharge pipe (601) is fixedly connected to a second material discharge pipe (602).

5. The capacitor housing integral molding die according to claim 4, characterized in that: The material discharge assembly (6) also includes a first extension tube (603), which is fixedly connected to the other side of the first material discharge tube (601), and the other side of the second material discharge tube (602) is fixedly connected to a second extension tube (604), and the first extension tube (603) passes through the partition (3) and extends to the other side of the partition (3).

6. The capacitor housing integral molding die according to claim 5, characterized in that: A connecting hinge (7) is fixedly installed on the back of the mold frame (1), a sealing plate (8) is fixedly installed on the other side of the connecting hinge (7), and a handle (9) is fixedly connected to the other side of the sealing plate (8).