Hoisting tool for prefabricated box girder reinforcement cage
By designing hoisting equipment for the precast box girder steel reinforcement skeleton, and adopting a triangular hanger main body and a multi-point hoisting structure, the problems of low hoisting efficiency and safety hazards were solved, achieving a stable and efficient hoisting process and high-quality construction results.
Patent Information
- Application Number
- CN202420475344.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-12
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-12
AI Technical Summary
The existing precast box girder steel reinforcement cage hoisting efficiency is low and there are safety hazards. The steel reinforcement cage is prone to local deformation during hoisting, which affects construction quality and safety.
Design a hoisting tool for the steel reinforcement skeleton of precast box girders, including a triangular hoist body, a lifting plate, Z-shaped steel bars, Z-shaped steel bars, and a wire rope hook structure. The stability and safety of the hoisting process are ensured through multi-point hoisting and limit buckles.
It improved hoisting efficiency, reduced local deformation of the steel reinforcement cage, ensured construction safety and quality, and enhanced the stability of the overall hoisting process.
Smart Images

Figure CN222007013U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of hoisting a prefabricated box girder steel bar frame, in particular to a hoisting tool for a prefabricated box girder steel bar frame. Background Art
[0002] Prefabricated box girder steel frame hoisting technology is an advanced technology used in bridge construction. It prefabricates the steel frame of the box girder in the bridge prefabrication yard and then hoists it into the mold for concrete pouring to improve the efficiency and quality of bridge construction. The application background of this technology mainly includes the following points:
[0003] 1. The scale of bridge construction is constantly expanding: With the rapid development of the economy, the pace of infrastructure construction is also accelerating, especially bridge construction. Prefabricated box girder steel frame hoisting technology can improve the efficiency of bridge construction and meet the growing demand for bridge construction.
[0004] 2. Construction safety issues: During the transfer of the prefabricated box girder steel frame from the binding area to the mold, there are safety hazards whether the gantry crane hook directly acts on the steel frame or is loaded and transported by a trolley. For example, severe deformation of the steel bars at the hook hoisting location causes the skeleton to change in force and overturn as a whole; bumps during the trolley transportation cause the skeleton to overturn sideways and injure workers on site. Using lifting equipment to assist can significantly improve construction safety.
[0005] 3. Improved requirements for project quality: With the continuous improvement of people's requirements for project quality, the traditional hoisting of steel skeletons will cause local deformation of the steel skeleton due to the concentrated stress points, which makes it difficult to control the thickness of the steel protection layer. The prefabricated box girder steel skeleton hoisting technology can ensure that the steel skeleton is evenly stressed during the hoisting process, greatly eliminating skeleton deformation, ensuring quality while eliminating the hidden dangers brought to subsequent pouring.
[0006] 4. Improve construction efficiency: The prefabricated box girder steel frame hoisting technology can reduce the time for on-site transportation of steel frame, speed up the progress of bridge construction and reduce construction costs.
[0007] In short, the prefabricated box girder steel frame hoisting technology has the advantages of improving the quality, efficiency and safety of bridge construction, and is in line with the development trend of modern bridge construction. Summary of the invention
[0008] The technical problem to be solved by the utility model is to provide a prefabricated box girder steel frame hoisting device, which can effectively solve the problem of low efficiency of steel frame hoisting in the existing prefabricated box girder production, and at the same time solve the problem of serious local deformation of the steel frame and even safety hazards during the hoisting process.
[0009] In order to solve the above technical problems, the technical solution adopted by the utility model is: a prefabricated box beam steel bar skeleton hoisting device, comprising three main beams, the three main beams are connected by waist steel bars on both sides and transverse steel bars at the bottom to form a hanger body with a triangular cross section, and Z-shaped steel bars are also arranged on both sides of the hanger body, and the Z-shaped steel bars are used to further strengthen the overall connection stability of the hanger body;
[0010] A lifting plate is welded on the top of the center of the hanger body, and the lifting equipment lifts the hanger body by lifting the lifting plate;
[0011] Two end positions of the transverse reinforcements arranged at the bottom of the hanger body are provided with "J"-shaped reinforcements, steel wire ropes are passed through the "J"-shaped reinforcements, and hooks are arranged at the lower part of the steel wire ropes.
[0012] In a preferred solution, inclined steel bars are symmetrically welded on both sides of the lower part of the lifting plate, one end of the inclined steel bars is connected to the lifting plate, and the other end extends to connect to the main beam end portion at the lower part of both ends of the hanger body.
[0013] In a preferred solution, U-shaped steel bars are symmetrically welded on both sides of the upper part of the lifting plate, and modified U-shaped steel bars are welded on the main beam above the hanger body. The U-shaped steel bars and the modified U-shaped steel bars are fixed by secondary oblique tension through steel wire ropes.
[0014] In a preferred solution, among the three main beams constituting the main body of the hanger, adjacent main beams are fixedly welded by encircling the main beams at both ends of waist-oriented steel bars;
[0015] The waist-direction steel bars include multiple groups, and the multiple groups of waist-direction steel bars are arranged at equal intervals along the axial direction of the main beam.
[0016] In a preferred solution, a rectangular opening is provided near the top of the lifting plate to cooperate with a hook of a lifting device to achieve lifting.
[0017] In a preferred solution, a basket bolt is further provided on the steel wire rope constituting the U-shaped steel bar and the modified U-shaped steel bar, and the steel wire rope is tensioned by tightening the basket bolt.
[0018] The utility model provides a prefabricated box beam steel bar skeleton hoisting device, which has the following beneficial effects by adopting the above structure:
[0019] (1) The lifting plate is welded to the central symmetry of the equipment, and a limit buckle is installed at the hook of the gantry crane, so that when the gantry crane is lifting the equipment and moving, the system can be relatively balanced when the movement speed of the gantry crane is relatively stable, ensuring the safety of the prefabricated beam yard construction;
[0020] (2) The wire rope where the hook is located is strictly limited by the wire rope buckle around the "J"-shaped steel bar. The wire rope will not move on the transverse steel bar during the lifting process, further ensuring the safety of the lifting process.
[0021] (3) By relying on multiple hooks to work together on the surface of the steel skeleton, the local deformation of the steel skeleton can be greatly reduced, ensuring the overall quality level of the steel skeleton and ensuring the smooth progress of subsequent processes. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] The utility model is further described below in conjunction with the accompanying drawings and embodiments:
[0023] Figure 1 It is a schematic diagram of the overall structure of the utility model.
[0024] Figure 2 It is a schematic diagram of the end structure of the utility model.
[0025] Figure 3 It is a schematic diagram of the lifting plate structure of the utility model.
[0026] Figure 4 It is a schematic diagram of the hook structure of the utility model.
[0027] Figure 5 It is a structural schematic diagram of the utility model during hoisting operation.
[0028] In the figure: main beam 1, waist-length steel bars 2, transverse steel bars 3, Z-shaped steel bars 4, lifting plates 5, annular steel bars 6, diagonal steel bars 7, U-shaped steel bars 8, modified U-shaped steel bars 9, basket bolts 10, I-shaped steel bars 11, and hooks 12. DETAILED DESCRIPTION
[0029] like Figure 1-5 A prefabricated box beam steel frame hoisting device includes three main beams 1, which are connected by waist steel bars 2 on both sides and transverse steel bars 3 on the bottom to form a hanger body with a triangular cross section, and Z-shaped steel bars 4 are further arranged on both sides of the hanger body, and the Z-shaped steel bars 4 are used to further strengthen the overall connection stability of the hanger body;
[0030] A lifting plate 5 is welded on the top of the center of the hanger body, and the lifting equipment lifts the hanger body by lifting the lifting plate 5;
[0031] At both ends of the transverse reinforcement 3 arranged at the bottom of the hanger body, there are provided "X"-shaped reinforcements 11, a steel wire rope is passed through the "X"-shaped reinforcement 11, and a hook 12 is arranged at the lower part of the steel wire rope.
[0032] In the preferred solution, inclined steel bars 7 are symmetrically welded on both sides of the lower part of the lifting plate 5, one end of the inclined steel bars 7 is connected to the lifting plate 5, and the other end extends to connect to the end of the main beam 1 at the lower part of the two ends of the hanger body.
[0033] In the preferred solution, U-shaped steel bars 8 are symmetrically welded on both sides of the upper part of the lifting plate 5, and modified U-shaped steel bars 9 are welded on the main beam 1 above the hanger body. The U-shaped steel bars 8 and the modified U-shaped steel bars 9 are fixed by secondary oblique tension through steel wire ropes.
[0034] In a preferred solution, among the three main beams 1 constituting the main body of the hanger, adjacent main beams 1 are fixedly welded by encircling the main beams 1 at both ends of the waist-oriented steel bars 2;
[0035] In a preferred solution, the two ends of the waist-direction steel bars 2 are fixedly welded around the main beam 1. The waist-direction steel bars 2 are arranged every 1 meter along the longitudinal direction.
[0036] In the preferred solution, two transverse parts of the Z-shaped steel bar 4 are welded between the main beams to play a supporting role and further strengthen the structure. The Z-shaped steel bar 4 is arranged every 1 meter along the longitudinal direction, and is waist-symmetrical between the two.
[0037] In a preferred solution, a rectangular opening is provided near the top of the lifting plate 5 for cooperating with a hook of a lifting device to achieve lifting.
[0038] In a preferred embodiment, a turnbuckle bolt 10 is further provided on the steel wire rope between the U-shaped steel bar 8 and the modified U-shaped steel bar 9, and the steel wire rope is tensioned by tightening the turnbuckle bolt 10;
[0039] The turnbuckle bolt 10 is divided into a hook head and a round hole head. The hook head acts on the U-shaped steel bar 8 welded on the lifting plate 5, and the round hole head passes a steel wire rope.
[0040] In a preferred solution, the "X"-shaped steel bar 11 is welded to both ends of the transverse steel bar 3, and a steel wire rope passes through the gap therebetween. The steel wire rope is wrapped around the overlapping part and fixed with two steel wire rope buckles.
[0041] In the preferred scheme, the two legs of the modified U-shaped steel bar 9 are mirror-welded at the top quarter of the main beam 1, and the head of the modified U-shaped steel bar 9 is connected to the U-shaped steel bar 8 by a steel wire rope. After the two ends of the steel wire rope are folded, each end is fixed by three steel wire rope clips. The end of the steel wire rope close to the lifting plate 5 is connected to the U-shaped steel bar 8 on the lifting plate by a basket bolt 10. The two ends of the basket bolt 10 are tightened to make the steel wire rope taut so as to fully bear the force.
[0042] In the preferred solution, the improved hook 12 is hung on the steel wire passing through the "J"-shaped steel bar 11. The structure is divided into the main outline structure, the nut locking device, and the small circle limiting device. After the hanging object enters the hook, the locking nut is screwed upward until it completely covers the movable notch of the hook, and then the hook cannot be opened and moved. After the hanging object enters the small circle area, the small circle limiting device is rotated downward, passes through the elastic triangular limiting position, and then is limited below the right angle side of the triangle.
[0043] When carrying out the hoisting operation of the prefabricated box girder steel frame:
[0044] The work location is located in the prefabricated beam yard, and the operation method is to cooperate with the gantry crane to lift the prefabricated box beam steel frame.
[0045] In the prefabricated beam yard, workers tie the top plate steel bars or bottom web steel bars on the frame. After passing the quality inspection, they immediately prepare to lift them into the mold.
[0046] At this time, the hoisting device starts to work. The gantry crane used to hoist the steel bars in the prefabricated beam field extends the hook into the rectangular opening of the lifting plate of the device, and then lifts the device. Since the lifting plate is welded to the central symmetry of the device, and the gantry crane hook is installed with a limit buckle, the gantry crane can keep the system relatively balanced when the gantry crane moves at a relatively stable speed during the lifting and moving process, ensuring the safety of the prefabricated beam field construction.
[0047] The gantry crane hoists the tool to the top of the steel frame. Taking the hoisting of the top plate steel bars as an example, adjust the position of the tool so that the tool is located at the relative center of the top plate steel bars. Then continue to lower the tool so that the hook can contact the steel frame, unscrew the limit nut, open the hook and the limit buckle, insert the steel bar, adjust the position so that the steel bar enters the small circle area of the improved hook, then close the limit buckle and reset the limit nut.
[0048] The operation is repeated in this way, and all hooks are connected to the steel bars, thus completing the connection between the steel bar skeleton and the tool. Then, the tool is lifted. Since the steel wire rope where the improved hook is located is strictly limited to the periphery of the "J"-shaped steel bar by the steel wire rope buckle, the steel wire rope will not move on the horizontal steel bar during the lifting process, further ensuring the safety of the lifting process.
[0049] Because many improved hooks work together on the surface of the steel frame, the local deformation of the steel frame can be greatly reduced, ensuring the overall quality level of the steel frame and ensuring the smooth progress of subsequent processes.
Claims
1. A prefabricated box beam steel bar frame hoisting device, comprising three main beams (1), the three main beams (1) being connected by waist steel bars (2) on both sides and transverse steel bars (3) at the bottom to form a hanger body with a triangular cross section, characterized in that: Z-shaped steel bars (4) are also provided on both sides of the hanger body, and the Z-shaped steel bars (4) are used to further strengthen the overall connection stability of the hanger body; A lifting plate (5) is welded on the top of the center position of the hanger body, and the lifting equipment lifts the hanger body by lifting the lifting plate (5); At both ends of the transverse reinforcement (3) provided at the bottom of the hanger body, there are provided "J"-shaped reinforcements (11), a steel wire rope is passed through the "J"-shaped reinforcement (11), and a hook (12) is provided at the bottom of the steel wire rope.
2. A prefabricated box beam steel bar skeleton hoisting tool according to claim 1, characterized in that: The lower sides of the lifting plate (5) are symmetrically welded with inclined steel bars (7), one end of the inclined steel bars (7) is connected to the lifting plate (5), and the other end extends to be connected to the end of the main beam (1) at the lower parts of the two ends of the hanger body.
3. A prefabricated box beam reinforcement skeleton hoisting tool according to claim 1 or 2, characterized in that: U-shaped steel bars (8) are symmetrically welded on both sides of the upper part of the lifting plate (5), and modified U-shaped steel bars (9) are welded on the upper main beam (1) of the hanger body. The U-shaped steel bars (8) and the modified U-shaped steel bars (9) are fixed by secondary oblique tension through steel wire ropes.
4. The prefabricated box beam reinforcement skeleton hoisting tool according to claim 1, characterized in that: Among the three main beams (1) constituting the main body of the hanger, adjacent main beams (1) are fixedly welded by waist-oriented steel bars (2) that surround the main beams (1) at both ends; The waist-direction steel bars (2) comprise a plurality of groups, and the plurality of groups of waist-direction steel bars (2) are arranged at equal intervals along the axial direction of the main beam (1).
5. The prefabricated box beam reinforcement skeleton hoisting tool according to claim 1, characterized in that: A rectangular opening is provided near the top of the lifting plate (5) for cooperating with a hook of a lifting device to achieve lifting.
6. The prefabricated box beam reinforcement skeleton hoisting tool according to claim 3, characterized in that: A basket bolt (10) is also provided on the steel wire rope between the U-shaped steel bar (8) and the modified U-shaped steel bar (9), and the steel wire rope is tensioned by tightening the basket bolt (10).