Automatic turnover tool for offshore super-large-diameter fan tower drum

By designing the automatic turn-over tooling for the oversized-diameter fan tower at offshore, the rotation mechanism of the base, secondary seat and rotating seat is used, combined with the fixed structure and reinforcement rod, the problems of low lifting efficiency and poor stability of the large-scale fan tower at offshore are solved, and the problem of low lifting efficiency and poor stability of the large-scale fan tower at offshore is realized. Efficient tower installation and reduce construction costs.

CN222007089UActive Publication Date: 2024-11-15CRCC HARBOR & CHANNEL ENG BUREAU GRP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420842576.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-20
Publication Date
2024-11-15
Estimated Expiration
2034-04-20

AI Technical Summary

Technical Problem

During the lifting process of large offshore fan towers, the existing technology is inefficient, and two cranes need to operate in concert, occupy crane resources, increase construction costs, and the large diameter of the tower can lead to difficulties in transportation and lifting.

Method used

Design an automatic turn-over tool for the tower of super large diameter fan at sea, including a base, a secondary seat and a rotating seat. The tower is vertically turned by rotating the rotating seat and the base, and the fixed structure and reinforcement rod are used to improve the stability of the tower. Reduce the collaborative operation of cranes and improve lifting efficiency.

Benefits of technology

By automatically turning over the workpiece, the space occupied by the hoisting ship and the cost of transporting cranes is reduced, the construction cost is reduced, the installation efficiency of the fan tower is improved, and the stability during the tower hoisting process is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222007089U_ABST
    Figure CN222007089U_ABST
Patent Text Reader

Abstract

The utility model discloses an automatic turnover tool for an offshore super-large-diameter fan tower drum, which comprises a base and an auxiliary seat which are arranged on a bearing surface, the base is rotatably provided with a rotating seat, and the end parts of the tower drum are respectively placed on the auxiliary seat of the rotating seat; and the rotating seat is provided with a fixing structure for temporarily fixing the end part of the tower drum, and the fixing structure is suitable for temporarily fixing the end parts of the tower drums with different diameters. The fan tower barrel mounting device has the effect of improving the fan tower barrel mounting efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of wind turbine tower installation, in particular to an automatic turning tool for an offshore wind turbine tower with a super-large diameter. Background Art

[0002] At present, my country's wind power market is developing rapidly, the onshore wind turbine market is gradually saturated, and offshore wind power has become the main development trend. The assembly of offshore wind turbines usually involves first driving the seabed fixed piles into the seabed, then hoisting the tower to the seabed fixed piles, and fixing the tower and the seabed fixed piles through the bolt holes on the tower, and then hoisting the wind turbine and blades to the tower.

[0003] During the installation of large offshore wind turbines, in addition to the need for a lifting ship to provide an operating platform, a transport ship is also required to transport large components such as towers back and forth. Reliable transportation and efficient lifting of towers are crucial to the project schedule. At present, transport ships usually use fixed transport tooling to support both ends of the tower, but due to the limited stability of the transport ship and the large diameter of the tower required, the main body of the tower needs to be lifted to the lifting ship and then flipped into place. This process usually requires two cranes to operate in coordination, with the main crane and auxiliary crane hoisting the two ends of the tower respectively, and performing tasks such as hoisting, flipping and positioning the tower. However, this method is inefficient, occupies crane resources, and increases construction costs, so there is still room for improvement. Utility Model Content

[0004] In order to improve the installation efficiency of wind turbine towers, the present application provides an automatic turning tool for offshore super-large diameter wind turbine towers.

[0005] The automatic turning tooling for an offshore super-large diameter wind turbine tower provided in this application adopts the following technical solution:

[0006] An automatic turning tool for an offshore super-large diameter wind turbine tower comprises a base and a sub-base arranged on a bearing surface, wherein the base is rotatably provided with a rotating seat, and the ends of the tower are respectively placed on the rotating seat and the sub-base; the rotating seat is provided with a fixing structure for temporarily fixing the ends of the tower, and the fixing structure is suitable for temporarily fixing the ends of towers of different diameters.

[0007] By adopting the above technical solution, the tower is first placed on the rotating seat and the auxiliary seat, and one end of the tower is temporarily fixed to the rotating seat by using a fixed structure, and then the end of the tower close to the auxiliary seat is lifted by a crane, and the rotating seat and the base are rotated relative to the horizontal plane until the tower is vertical, and then the tower and the rotating seat are separated, which is convenient to operate and reduces the need for two cranes to operate in coordination. The main crane and the auxiliary crane are used to lift the two ends of the tower respectively, and the tower is lifted, turned over and put into place, thereby improving the installation efficiency of the wind turbine tower, while reducing the space occupied by the lifting ship and the cost of the transportation crane, thereby reducing the construction cost.

[0008] Preferably, the rotating seat is provided with a receiving groove, the receiving groove is used to place the tower end, and the receiving groove is opened on both sides, the fixing structure includes an adjustment plate arranged on the rotating seat, the adjustment plate is arranged on one side of the receiving groove, and the adjustment plate closes one side of the receiving groove; the adjustment plate is provided with a plurality of adjustment holes, the length and width of the adjustment holes are both larger than the diameter of the bolt hole, and the adjustment plate and the tower are fixed by bolts and nuts.

[0009] By adopting the above technical solution, the receiving groove is used to support the tower, and the adjusting plate is used to close one side of the receiving groove, so that when the tower is hoisted and turned over, the adjusting plate supports the tower, thereby reducing the load of the crane lifting the tower. At the same time, an adjusting hole is opened on the adjusting plate for bolt insertion, so that the tower is fixed to the rotating seat through the bolt hole, the adjusting hole and the adjusting plate, thereby improving the stability of the tower during hoisting. At the same time, the length and width of the adjusting hole are greater than the diameter of the bolt hole, so that the adjusting plate can be used to fix towers of different diameters, thereby improving the application range of the rotating seat.

[0010] Preferably, the adjustment plate is also provided with a fixing hole, which is located on one side of the adjustment plate close to the bottom of the receiving groove, and the width of the fixing hole is consistent with the diameter of the bolt hole. When the tower is placed in the receiving groove, the part of the tower close to the bottom of the receiving groove is fixed to the fixing hole by bolts and nuts.

[0011] By adopting the above technical solution, bolts are inserted into the fixing holes and bolt holes, and nuts are used to fix the part of the tower located at the bottom of the receiving groove and the adjustment plate. At the same time, the width of the fixing hole is consistent with the diameter of the bolt hole, so that the tower is not easy to slide relative to the rotating seat during the hoisting process, thereby further improving the stability of the tower during the hoisting process.

[0012] Preferably, the rotating seat is further provided with a reinforcement structure, and the reinforcement structure is used to fix the tower end placed in the receiving groove to the rotating seat.

[0013] By adopting the above technical solution and setting up a reinforcement structure, the stability of the tower during hoisting is further improved.

[0014] Preferably, the reinforcement structure includes a plurality of reinforcement rods arranged on the rotating seat, the reinforcement rods are provided with reinforcement holes, the width of the reinforcement holes is consistent with the width of the bolt holes, and the plurality of reinforcement rods and the tower are fixed by bolts and nuts.

[0015] By adopting the above technical solution, one end of the reinforcement rod is fixed to the rotating seat, and the other end is fixed to the tower by bolts and nuts, and the width of the reinforcement hole is consistent with the width of the bolt hole. When the tower slides relative to the rotating seat, under the principle of two points determining a straight line, the tower is restricted by the reinforcement rod, which greatly improves the stability of the tower during hoisting.

[0016] Preferably, the reinforcement rod is rotatably disposed on the rotating seat, and the length of the reinforcement hole is greater than the length of the bolt hole.

[0017] By adopting the above technical solution, the reinforcement rod is rotatably set on the rotating seat, so that the work of disassembling and assembling the reinforcement rod on the rotating seat is reduced; at the same time, the length of the reinforcement hole is greater than the length of the bolt hole, and the reinforcement rod is rotated until the bolt can be inserted into the reinforcement hole, the adjustment hole and the bolt hole at the same time, which is convenient for operation, increases the practical range of the reinforcement rod, and flexibly adjusts the position of the reinforcement rod.

[0018] Preferably, the bottom wall of the receiving groove is covered with a rubber pad.

[0019] By adopting the above technical solution, when the tower is hoisted, the rubber pad is used to increase the friction between the tower and the bottom wall of the receiving groove, reduce the slippage of the tower, and further improve the stability of the tower during overweight hoisting.

[0020] Preferably, the base is further provided with a pulley plate, the pulley plate is provided with a plurality of rollers, the pulley plate can be raised and lowered, and the pulley plate can rise to the bottom of the base to abut against the bearing surface, and the rollers are separated from the bearing surface.

[0021] By adopting the above technical solution, when the placement position of the tower needs to be changed, the position of the base needs to be adjusted. By arranging pulley plates and rollers on the base, it is easy to move the base and improve the efficiency of moving the base.

[0022] Preferably, the base is provided with a lifting hydraulic cylinder, the pulley plate is arranged on the piston rod of the hydraulic cylinder, and the piston rod of the hydraulic cylinder faces the bearing surface; when the hydraulic cylinder drives its piston rod to contract, the pulley plate can rise to the bottom of the base and abut the bearing surface, and the roller is separated from the bearing surface.

[0023] By adopting the above technical solution, a hydraulic cylinder is set to drive the pulley plate to rise and fall, so that when the base needs to be moved, the weight of the base and the rotating seat is supported by the hydraulic cylinder to prevent the base from sliding against the deck of the lifting ship, causing wear of the deck of the lifting ship and the base. At the same time, when the base needs to be placed, the hydraulic cylinder is started to drive the pulley plate to rise, so that the bottom of the base abuts against the bearing surface, thereby reducing the influence of the pulley plate and the roller on the base and the rotating seat supporting the tower.

[0024] In summary, the present application includes at least one of the following beneficial technical effects:

[0025] 1. By setting up a base, a sub-base, a rotating base and a fixed structure, a crane is used to lift the end of the tower close to the sub-base, and the rotating base and the base are rotated relative to the horizontal plane until the tower is vertical. The tower and the rotating base are separated, which is easy to operate and reduces the need for two cranes to work together. The main crane and the auxiliary crane are used to lift the two ends of the tower respectively, and the tower is lifted, turned over and put into place, which improves the installation efficiency of the wind turbine tower, while reducing the space occupied by the lifting ship and the cost of the transportation crane, thereby reducing the construction cost.

[0026] 2. By setting the reinforcement rod and the reinforcement hole, when the tower slides relative to the rotating seat, the tower is restricted by the reinforcement rod under the principle of two points determining a straight line, which greatly improves the stability of the tower during the hoisting process. At the same time, by rotating the reinforcement rod on the rotating seat, the work of disassembling and assembling the reinforcement rod on the rotating seat is reduced; at the same time, the length of the reinforcement hole is greater than the length of the bolt hole, and the reinforcement rod is rotated until the bolt can be inserted into the reinforcement hole, the adjustment hole and the bolt hole at the same time, which is convenient for operation, increases the practical range of the reinforcement rod, and flexibly adjusts the position of the reinforcement rod. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall structure of an offshore super-large diameter wind turbine tower automatic turning tool supporting the tower in an embodiment of the present application.

[0028] Figure 2 It is a schematic diagram of the structure of the base and the rotating seat of the embodiment of the present application.

[0029] Figure 3 yes Figure 2 Enlarged view of part A in the middle.

[0030] Description of reference numerals:

[0031] 11. Base; 12. Rotating seat; 121. Receiving groove; 122. Rubber pad; 13. Sub-seat; 2. Adjusting plate; 21. Adjusting hole; 22. Fixing hole; 3. Reinforcement rod; 31. Reinforcement hole; 4. Tower; 41. Connecting hole; 51. Hydraulic cylinder; 52. Pulley plate; 53. Roller; 6. Pad. DETAILED DESCRIPTION

[0032] The following is combined with Figure 1-3 This application is described in further detail.

[0033] The present application embodiment discloses an automatic turning tool for an offshore wind turbine tower with a super large diameter. Figure 1-Figure 3The automatic turning tooling for the offshore super-large diameter wind turbine tower includes a base 11 and a sub-base 13 placed on a bearing surface. In this embodiment, the bearing surface is the deck of a lifting ship. A rotating seat 12 is rotatably arranged on the top of the base 11. The rotating seat 12 is arc-shaped. Both ends of the rotating seat 12 are rotatably connected to the base 11, so that the rotating seat 12 can rotate relative to the base 11; a receiving groove 121 is recessed at the top of the rotating seat 12. By placing the two ends of the tower 4 in the receiving groove 121 and on the sub-base 13 respectively, the tower 4 is placed on the lifting ship. The receiving groove 121 is arc-shaped, and the receiving groove 121 is opened on both sides. The bottom wall of the receiving groove 121 is covered with a rubber pad 122.

[0034] Reference Figure 2 as well as Figure 3 The rotating seat 12 is also fixed with a fixing structure for temporarily fixing the end of the tower 4. In this embodiment, the fixing structure is an adjustment plate 2 fixed on the rotating seat 12. The adjustment plate 2 is fixed to one side of the rotating seat 12 along the width direction, and the adjustment plate 2 closes one side of the receiving groove 121, so that when the tower 4 is hoisted and flipped over, the adjustment plate 2 supports the tower 4.

[0035] Reference Figure 2 as well as Figure 3 The top of the adjustment plate 2 is flush with the top of the rotating seat 12, and the adjustment plate 2 is provided with a plurality of adjustment holes 21. In the present embodiment, there are two adjustment holes 21, and the length direction of the adjustment hole 21 is parallel to the length direction of the top of the adjustment plate 2, and the length and width of the adjustment hole 21 are both greater than the diameter of the bolt hole. The bolt can be inserted into the adjustment hole 21 of the adjustment plate 2 and the bolt hole of the tower 4 at the same time, so that the adjustment plate 2 and the tower 4 are fixed by bolts and nuts, thereby temporarily fixing the tower 4 and the rotating seat 12, and the adjustment plate 2 can be used to fix towers 4 of different diameters.

[0036] Reference Figure 2 as well as Figure 3 A fixing hole 22 is also provided at the bottom of the adjusting plate 2. The width of the fixing hole 22 is consistent with the width of the bolt hole. The bolt can be inserted into the fixing hole 22 and the bolt hole at the same time, so that the part of the tower 4 located at the bottom of the receiving groove 121 is fixed to the adjusting plate 2 by bolts and nuts.

[0037] Reference Figure 2 as well as Figure 3, a reinforcement structure for connecting the end of the tower 4 is also provided on the side of the rotating seat 12 where the adjustment plate 2 is fixed. In this embodiment, the reinforcement structure is a reinforcement rod 3 that is rotatably connected to the side of the rotating seat 12 where the adjustment plate 2 is fixed. There are four reinforcement rods 3, and two reinforcement rods 3 are respectively provided at both ends of the rotating seat 12. One end of the reinforcement rod 3 is rotatably connected to the rotating seat 12, and the other end is provided with a reinforcement hole 31. The width of the reinforcement hole 31 is consistent with the width of the bolt hole, so that the bolt can be inserted into the reinforcement hole 31, the adjustment hole 21 and the bolt hole at the same time, so that the reinforcement rod 3, the adjustment plate 2 and the tower 4 are fixed by bolts and nuts, thereby improving the stability of the tower 4 fixed on the adjustment plate 2. The length of the reinforcement hole 31 is greater than the length of the bolt hole. By rotating the reinforcement rod 3, the reinforcement hole 31 can be adjusted until the bolt can be inserted into the reinforcement hole 31, the adjustment hole 21 and the bolt hole at the same time.

[0038] Reference Figure 2 as well as Figure 3 , the reinforcing rod 3 is also provided with a pad 6, the side length of the pad 6 is greater than the width of the reinforcing hole 31, and the pad 6 is provided with a sleeve hole (not shown in the figure), the diameter of the sleeve hole is consistent with the diameter of the bolt hole, so that the pad 6 is sleeved on the bolt through the sleeve hole, when the bolt is simultaneously passed through the tower 4, the adjustment plate 2, the reinforcing rod 3 and the pad 6, the pad 6 is located on the side of the reinforcing rod 3 away from the adjustment plate 2, and the nut is located on the side of the pad 6 away from the adjustment plate 2, so that when the nut is tightened, the bolt and the nut simultaneously press the tower 4, the adjustment plate 2, the reinforcing rod 3 and the pad 6, and the pad 6 increases the contact area between the nut and the reinforcing rod 3, thereby improving the stability of the reinforcing rod 3. The bolts passed through the fixing holes 22 are also sleeved with the pad 6, thereby improving the stability of the fixing of the part of the tower 4 located at the bottom of the receiving groove 121 and the adjustment plate 2.

[0039] Reference Figure 2 as well as Figure 3 Four hydraulic cylinders 51 are also fixed at the bottom of the base 11. The four hydraulic cylinders 51 are fixed at the four corners of the base 11, and the piston rods of the four hydraulic cylinders 51 face the deck of the lifting ship. The piston rods of the hydraulic cylinders 51 are fixed with pulley plates 52. The pulley plates 52 are rotatably connected with rollers 53 along the thickness direction and on the side away from the hydraulic cylinders 51. The hydraulic cylinders 51 drive the pulley plates 52 to rise and fall, and the hydraulic cylinders 51 can drive their piston rods to contract and drive the pulley plates 52 to rise until the bottom of the base 11 abuts against the deck of the lifting ship, and the rollers 53 are separated from the deck of the lifting ship, so that the base 11 is stably placed on the deck of the lifting ship.

[0040] The implementation principle of the automatic turning tool for an offshore super-large diameter wind turbine tower in the embodiment of the present application is as follows:

[0041] When the tower 4 needs to be hoisted, the base 11 and the auxiliary seat 13 are first placed on the deck of the hoisting ship, and then the tower 4 is hoisted from the transport ship to the rotating seat 12 and the auxiliary seat 13, and the two ends of the tower 4 are respectively placed in the receiving groove 121 and on the auxiliary seat 13. Then, the bolts are inserted into the fixing holes 22 and the bolt holes of the tower 4, and the tower 4 and the adjustment plate 2 are pre-tightened with nuts, and the tower 4 can move relative to the adjustment plate 2; then the reinforcing rods 3 are rotated respectively, and the bolts are inserted into the bolt holes, the adjustment holes 21 and the reinforcing holes 31, and then the pad 6 is sleeved on the bolts, and then the nuts are screwed into the bolts, and all the nuts are tightened with the bolts, so that the tower 4 is fixed on the adjustment plate 2. Then the end of the tower 4 close to the auxiliary seat 13 is hoisted by a crane until the tower 4 is perpendicular to the deck of the hoisting ship, and then the bolts and nuts are removed, and the turning of the tower 4 is completed.

[0042] When the position of the base 11 needs to be moved, the hydraulic cylinder 51 is started to drive the pulley plate 52 to approach the deck of the lifting ship until the hydraulic cylinder 51 supports the base 11, and then the base 11 is pulled by a crane to move, thereby facilitating the movement of the base 11 and improving the efficiency of moving the base 11.

[0043] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An automatic turning tool for an offshore super-large diameter wind turbine tower, characterized in that: The utility model comprises a base (11) and a sub-base (13) arranged on a bearing surface, wherein the base (11) is rotatably provided with a rotating base (12), and the ends of the tower (4) are respectively placed on the rotating base (12) and the sub-base (13); the rotating base (12) is provided with a fixing structure for temporarily fixing the ends of the tower (4), and the fixing structure is suitable for temporarily fixing the ends of towers (4) of different diameters.

2. The automatic turning tool for offshore super-large diameter wind turbine tower according to claim 1 is characterized in that: The rotating seat (12) is provided with a receiving groove (121), the receiving groove (121) is used to place the end of the tower (4), and the receiving groove (121) is opened on both sides, and the fixing structure comprises an adjustment plate (2) arranged on the rotating seat (12), the adjustment plate (2) is arranged on one side of the receiving groove (121), and the adjustment plate (2) closes one side of the receiving groove (121); the adjustment plate (2) is provided with a plurality of adjustment holes (21), the length and width of the adjustment holes (21) are both greater than the diameter of the bolt holes, and the adjustment plate (2) and the tower (4) are fixed by bolts and nuts.

3. The automatic turning tool for offshore super-large diameter wind turbine tower according to claim 2 is characterized in that: The adjustment plate (2) is further provided with a fixing hole (22), the fixing hole (22) being located on one side of the adjustment plate (2) close to the bottom of the receiving groove (121), the width of the fixing hole (22) being consistent with the diameter of the bolt hole, and when the tower (4) is placed in the receiving groove (121), the part of the tower (4) close to the bottom of the receiving groove (121) is fixed to the fixing hole (22) by bolts and nuts.

4. The automatic turning tool for offshore super-large diameter wind turbine tower according to claim 3 is characterized in that: The rotating seat (12) is also provided with a reinforcement structure, and the reinforcement structure is used to fix the end of the tower (4) placed in the receiving groove (121) to the rotating seat (12).

5. The automatic turning tool for offshore super-large diameter wind turbine tower according to claim 4 is characterized in that: The reinforcement structure comprises a plurality of reinforcement rods (3) arranged on the rotating seat (12), the reinforcement rods (3) being provided with reinforcement holes (31), the width of the reinforcement holes (31) being consistent with the width of the bolt holes, and the plurality of reinforcement rods (3) and the tower (4) being fixed by bolts and nuts.

6. The automatic turning tool for offshore super-large diameter wind turbine tower according to claim 5 is characterized in that: The reinforcement rod (3) is rotatably disposed on the rotating seat (12), and the length of the reinforcement hole (31) is greater than the length of the bolt hole.

7. The automatic turning tool for offshore super-large diameter wind turbine tower according to claim 2 is characterized in that: The bottom wall of the receiving groove (121) is covered with a rubber pad (122).

8. The automatic turning tool for offshore super-large diameter wind turbine tower according to claim 1 is characterized in that: The base (11) is also provided with a pulley plate (52), and the pulley plate (52) is provided with a plurality of rollers (53). The pulley plate (52) can be raised and lowered, and the pulley plate (52) can rise to the bottom of the base (11) to abut against the bearing surface, and the rollers (53) are separated from the bearing surface.

9. The automatic turning tool for offshore super-large diameter wind turbine tower according to claim 8, characterized in that: The base (11) is provided with a lifting hydraulic cylinder (51), the pulley plate (52) is arranged on the piston rod of the hydraulic cylinder (51), and the piston rod of the hydraulic cylinder (51) faces the bearing surface; when the hydraulic cylinder (51) drives its piston rod to contract, the pulley plate (52) can rise to the bottom of the base (11) and abut against the bearing surface, and the roller (53) is separated from the bearing surface.