Local reinforcing structure for splicing position of new roadbed and old roadbed

By using a "7"-shaped structure with horizontal and vertical pipe connections and fixing pins at the junction of the old and new roadbeds, combined with triangular frames and unit reinforcements, the problem of uneven settlement at the junction of the old and new roadbeds was solved, achieving stable connection and uniform settlement, and avoiding the generation of longitudinal cracks.

CN222008506UActive Publication Date: 2024-11-15CHINA RAILWAY FIRST GROUP CO LTD +4
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323397531.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-13
Publication Date
2024-11-15
Estimated Expiration
2033-12-13

AI Technical Summary

Technical Problem

Uneven settlement at the junction of the old and new roadbeds can lead to longitudinal cracks, which in turn can cause embankment instability and landslides.

Method used

The system employs a figure-7 structure with horizontal and vertical pipe connections, using fixing pins to secure the old and new roadbeds. Combined with triangular frames and unit reinforcement components, it forms a stable connection and improves the uniformity of settlement.

Benefits of technology

It enhances the stability of the junction between the old and new roadbeds, avoids the generation of longitudinal cracks, and improves the uniformity of settlement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008506U_ABST
    Figure CN222008506U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of roadbed extension, in particular to a local reinforcing structure for the splicing position of a new roadbed and an old roadbed, which comprises a horizontal pipe and a vertical pipe which are fixedly connected, the horizontal pipe and the vertical pipe are perpendicular to each other, and the whole connecting part of the horizontal pipe and the vertical pipe is 7-shaped; a horizontal fixing pin and a vertical fixing pin are inserted into the horizontal pipe and the vertical pipe respectively, the horizontal fixing pin is driven into the side wall of an old roadbed, and the vertical fixing pin is driven into the bottom wall of a foundation pit of a new roadbed. The method has the effects that the splicing position of the new roadbed and the old roadbed is reinforced, the settlement uniformity of the combined position of the new roadbed and the old roadbed is improved, and longitudinal cracks are not prone to being generated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of roadbed expansion, and in particular to a local reinforcement structure at the joint of a new and old roadbed. Background Art

[0002] With the rapid development of highway construction, many routes that are running at full capacity need to be rebuilt and expanded. Highway widening and splicing will inevitably lead to the interaction between the new and old roadbeds. Due to the difference in consolidation time at the junction of the new and old embankments, uneven settlement will occur, causing longitudinal cracks at the junction. Further development will cause embankment instability and landslides.

[0003] Therefore, a local reinforcement structure for the joint between the new and old roadbeds is needed to reinforce the joint between the new and old roadbeds. Utility Model Content

[0004] In order to reinforce the joint between the new and old roadbeds, improve the uniformity of settlement at the junction of the new and old roadbeds and make longitudinal cracks less likely to occur, the present application provides a local reinforcement structure for the joint between the new and old roadbeds.

[0005] The local reinforcement structure at the joint of the new and old roadbed provided in this application adopts the following technical solution:

[0006] A local reinforcement structure at the joint of a new and old roadbed, comprising a fixedly connected horizontal pipe and a vertical pipe, wherein the horizontal pipe and the vertical pipe are perpendicular to each other, and the connection of the horizontal pipe and the vertical pipe forms a "7" shape as a whole;

[0007] A horizontal fixing pin and a vertical fixing pin are inserted into the horizontal pipe and the vertical pipe respectively. The horizontal fixing pin is driven into the side wall of the old roadbed, and the vertical fixing pin is driven into the bottom wall of the foundation pit of the new roadbed.

[0008] By adopting the above technical solution, when the structure of the present application is reinforced, the end of the horizontal pipe away from the vertical pipe is pressed against the side wall of the old roadbed, and the end of the vertical pipe away from the horizontal pipe is pressed against the bottom wall of the foundation pit of the new roadbed. After the horizontal fixing pin and the vertical fixing pin are respectively passed through the horizontal pipe and the vertical pipe, the horizontal fixing pin is driven into the side wall of the old roadbed, and the vertical fixing pin is driven into the bottom wall of the foundation pit of the new roadbed. Then, the staff fills the foundation pit of the new roadbed with soil and rocks, compacts and repairs. The setting of the present application helps to connect the new and old roadbeds into a whole, restrict each other, improve the uniformity of the settlement of the junction of the new and old roadbeds, and is not easy to produce longitudinal cracks.

[0009] Optionally, the ends of the horizontal fixing pin and the vertical fixing pin that are close to each other are fixedly connected to limiting caps, the ends of the horizontal tube and the vertical tube that are close to each other are provided with countersunk holes, and the limiting caps are embedded in the countersunk holes and matched with the countersunk holes.

[0010] By adopting the above technical solution, the countersunk hole can limit the limiting cap, thereby limiting the horizontal fixing pin and the vertical fixing pin, thereby improving the stability of the horizontal fixing pin and the vertical fixing pin.

[0011] Optionally, it also includes a connecting rod, the two ends of which are respectively connected to the horizontal tube and the vertical tube, and a triangular frame is formed between the connecting rod, the horizontal tube and the vertical tube.

[0012] By adopting the above technical solution, the triangle has a stable shape, thereby improving the stability of the combination of the new and old roadbeds.

[0013] Optionally, one end of the connecting rod is hinged to the horizontal tube, and the other end of the connecting rod is provided with a mounting side ear, and the mounting side ear is fixed to the vertical tube by screws.

[0014] By adopting the above technical solution, the formation and fixation of the triangle frame are facilitated.

[0015] Optionally, the triangular parts of the two triangular frames are fixedly connected by a transverse connecting rod to form a unit reinforcement piece, and a plurality of the unit reinforcement pieces are arranged in sequence along the length direction of the joint of the new and old roadbeds.

[0016] By adopting the above technical solution, the two triangular frames are connected by the horizontal connecting rod to form a whole. When installing the horizontal fixing pins and the vertical fixing pins, the staff can first place the unit reinforcement on the bottom wall of the foundation pit of the new roadbed. Due to the structure of the unit reinforcement, the unit reinforcement can be stably placed on the bottom wall of the foundation pit of the new roadbed, and does not need to be supported by hand like a separate triangular frame, which is convenient to operate. After placement, the horizontal fixing pins and the vertical fixing pins can be driven in accordingly.

[0017] Optionally, a positioning pin is fixedly connected to the bottom surface of the horizontal connecting rod located at the bottom, and the positioning pin is inserted into the bottom wall of the foundation pit of the new roadbed. The depth of the positioning pin inserted into the bottom wall of the foundation pit of the new roadbed is H1, and the depth of the vertical fixing pin driven into the bottom wall of the foundation pit of the new roadbed is H2, and H1<H2.

[0018] By adopting the above technical solution, when the unit reinforcement is placed on the bottom wall of the foundation pit of the new roadbed, it can be pressed downward so that the positioning nails are pre-inserted into the bottom wall of the foundation pit of the new roadbed, thereby improving the stability of the placement of the unit reinforcement.

[0019] Optionally, the ends of the horizontal fixing pin and the vertical fixing pin away from the limiting cap are pointed.

[0020] By adopting the above technical solution, it is convenient to insert the horizontal fixing pins and the vertical fixing pins into the corresponding roadbed.

[0021] Optionally, the top end of the connecting rod is hinged to the horizontal tube, and the mounting side ear is arranged at the bottom end of the connecting rod.

[0022] In summary, the present application includes at least one of the following beneficial technical effects:

[0023] 1. When the structure is reinforced by the present application, the end of the horizontal tube away from the vertical tube is pressed against the side wall of the old roadbed, and the end of the vertical tube away from the horizontal tube is pressed against the bottom wall of the foundation pit of the new roadbed. After the horizontal fixing pin and the vertical fixing pin are passed through the horizontal tube and the vertical tube respectively, the horizontal fixing pin is driven into the side wall of the old roadbed, and the vertical fixing pin is driven into the bottom wall of the foundation pit of the new roadbed. Then, the staff fills the foundation pit of the new roadbed with soil and rocks, compacts it, and repairs it. The setting of the present application helps to connect the new and old roadbeds into a whole, restrict each other, improve the uniformity of the settlement of the junction of the new and old roadbeds, and prevent longitudinal cracks from occurring.

[0024] 2. The two ends of the connecting rod are connected to the horizontal pipe and the vertical pipe respectively, and a triangular frame is formed between the connecting rod, the horizontal pipe and the vertical pipe. The triangle has a stable shape, thereby improving the stability of the combination of the new and old roadbeds;

[0025] 3. Due to the structure of the unit reinforcement, the unit reinforcement can be stably placed on the bottom wall of the foundation pit of the new roadbed without the need for hand support like a separate triangular frame. After placement, the horizontal fixing pins and vertical fixing pins can be driven in accordingly, which is easy to operate. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of the overall structure of a local reinforcement structure at the joint of a new and old roadbed in an embodiment of the present application.

[0027] Figure 2 It is a structural schematic diagram used to display the unit reinforcement in the embodiment of the present application.

[0028] Figure 3 It is a structural schematic diagram used to display the triangular frame in the embodiment of the present application.

[0029] Explanation of the reference numerals: 1. horizontal tube; 2. vertical tube; 3. horizontal fixing pin; 31. limiting cap; 32. countersunk hole; 4. vertical fixing pin; 5. old roadbed; 6. new roadbed; 7. connecting rod; 71. mounting side ear; 8. positioning nail; 9. horizontal connecting rod; 91. unit reinforcement. DETAILED DESCRIPTION

[0030] The following is combined with Figure 1-3 This application is described in further detail.

[0031] The present application embodiment discloses a local reinforcement structure at the joint of the new and old roadbeds. Figure 1-3The local reinforcement structure at the joint of the new and old roadbeds includes a local reinforcement structure at the joint of the new and old roadbeds, including a fixedly connected horizontal pipe 1 and a vertical pipe 2, the horizontal pipe 1 and the vertical pipe 2 are perpendicular to each other, and the horizontal pipe and the vertical pipe are connected in a "7" shape. A horizontal fixing pin 3 and a vertical fixing pin 4 are respectively inserted in the horizontal pipe 1 and the vertical pipe 2, the horizontal fixing pin 3 is driven into the side wall of the old roadbed 5, and the vertical fixing pin 4 is driven into the bottom wall of the foundation pit of the new roadbed 6. The ends of the horizontal fixing pin 3 and the vertical fixing pin 4 away from the limiting cap 31 are pointed, so as to facilitate the insertion of the horizontal fixing pin 3 and the vertical fixing pin 4 into the corresponding roadbed.

[0032] When the structure of the present application is reinforced, the end of the horizontal pipe 1 away from the vertical pipe 2 is pressed against the side wall of the old roadbed 5, and the end of the vertical pipe 2 away from the horizontal pipe 1 is pressed against the bottom wall of the foundation pit of the new roadbed 6. After the horizontal fixing pin 3 and the vertical fixing pin 4 are respectively passed through the horizontal pipe 1 and the vertical pipe 2, the horizontal fixing pin 3 is driven into the side wall of the old roadbed 5, and the vertical fixing pin 4 is driven into the bottom wall of the foundation pit of the new roadbed 6. Then, the staff fills the foundation pit of the new roadbed 6 with soil and rocks, compacts it, and repairs it. The setting of the present application helps to connect the new and old roadbeds into a whole, restrict each other, improve the uniformity of the settlement of the junction of the new and old roadbeds, and is not easy to produce longitudinal cracks.

[0033] The ends of the horizontal fixing pin 3 and the vertical fixing pin 4 that are close to each other are fixedly connected to the limiting cap 31, and the ends of the horizontal tube 1 and the vertical tube 2 that are close to each other are provided with countersunk holes 32, and the limiting cap 31 is embedded in the countersunk holes 32 and is adapted to the countersunk holes 32. The countersunk holes 32 can limit the limiting cap 31, thereby limiting the horizontal fixing pin 3 and the vertical fixing pin 4, and improving the stability of the horizontal fixing pin 3 and the vertical fixing pin 4.

[0034] The local reinforcement structure at the joint of the new and old roadbeds also includes a connecting rod 7, the two ends of which are respectively connected to the horizontal pipe 1 and the vertical pipe 2, and a triangular frame is formed between the connecting rod 7, the horizontal pipe 1 and the vertical pipe 2. The triangle has a stable shape, thereby improving the stability of the combination of the new and old roadbeds. One end of the connecting rod 7 is hinged to the horizontal pipe 1 through a hinge, and the other end of the connecting rod 7 is provided with a mounting side ear 71, which is fixed to the vertical pipe 2 by screws to facilitate the formation and fixation of the triangular frame. The top end of the connecting rod 7 is hinged to the horizontal pipe 1, and the mounting side ear 71 is provided at the bottom end of the connecting rod 7.

[0035] The triangles of the two triangular frames are fixedly connected by a horizontal connecting rod 9 to form a unit reinforcement 91. A plurality of unit reinforcements 91 are arranged in sequence along the length direction of the joint of the new and old roadbeds. Only one is shown in this embodiment. The two triangular frames are connected by the horizontal connecting rod 9 to form a whole. When the staff installs the horizontal fixing pin 3 and the vertical fixing pin 4, they can first place the unit reinforcement 91 on the bottom wall of the foundation pit of the new roadbed 6. Due to the structure of the unit reinforcement 91, the unit reinforcement 91 can be stably placed on the bottom wall of the foundation pit of the new roadbed 6 without the need for hand support like a separate triangular frame, which is easy to operate. After placement, the horizontal fixing pin 3 and the vertical fixing pin 4 can be driven in accordingly.

[0036] A positioning pin 8 is fixedly connected to the bottom surface of the bottommost horizontal connecting rod 9, and the positioning pin 8 is inserted into the bottom wall of the foundation pit of the new roadbed 6. The depth of the positioning pin 8 inserted into the bottom wall of the foundation pit of the new roadbed 6 is H1, and the depth of the vertical fixing pin 4 driven into the bottom wall of the foundation pit of the new roadbed 6 is H2, H1<H2. When the unit reinforcement 91 is placed on the bottom wall of the foundation pit of the new roadbed 6, it can be pressed downward, so that the positioning pin 8 is pre-inserted into the bottom wall of the foundation pit of the new roadbed 6, thereby improving the stability of the placement of the unit reinforcement 91.

[0037] The implementation principle of the local reinforcement structure at the joint of the new and old roadbeds in the embodiment of the present application is as follows: when the structure of the present application is reinforced, when the unit reinforcement piece 91 is placed on the bottom wall of the foundation pit of the new roadbed 6, it is pressed downward so that the positioning nail 8 is pre-inserted into the bottom wall of the foundation pit of the new roadbed 6, and the end of the horizontal pipe 1 away from the vertical pipe 2 is pressed against the side wall of the old roadbed 5, and then the end of the vertical pipe 2 away from the horizontal pipe 1 is pressed against the bottom wall of the foundation pit of the new roadbed 6, and then the horizontal fixing pin 3 and the vertical fixing pin 4 are respectively passed through the horizontal pipe 1 and the vertical pipe 2, and then the horizontal fixing pin 3 is driven into the side wall of the old roadbed 5, and the vertical fixing pin 4 is driven into the bottom wall of the foundation pit of the new roadbed 6. Then, the staff fills the foundation pit of the new roadbed 6 with soil and rocks, compacts and repairs; through the setting of the present application, it is helpful to connect the new and old roadbeds into a whole, restrict each other, and improve the uniformity of the settlement of the joint part of the new and old roadbeds, and it is not easy to produce longitudinal cracks.

[0038] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A local reinforcement structure at the joint of new and old roadbeds, characterized by: It comprises a horizontal pipe (1) and a vertical pipe (2) which are fixedly connected, wherein the horizontal pipe (1) and the vertical pipe (2) are perpendicular to each other, and the horizontal pipe (1) and the vertical pipe (2) are connected so that the whole is in a "7" shape; A horizontal fixing pin (3) and a vertical fixing pin (4) are respectively inserted into the horizontal pipe (1) and the vertical pipe (2); the horizontal fixing pin (3) is driven into the side wall of the old roadbed (5), and the vertical fixing pin (4) is driven into the bottom wall of the foundation pit of the new roadbed (6).

2. A local reinforcement structure at the joint of new and old roadbed according to claim 1, characterized in that: The ends of the horizontal fixing pin (3) and the vertical fixing pin (4) that are close to each other are fixedly connected to a limiting cap (31); the ends of the horizontal tube (1) and the vertical tube (2) that are close to each other are provided with a countersunk hole (32); the limiting cap (31) is embedded in the countersunk hole (32) and is compatible with the countersunk hole (32).

3. The local reinforcement structure at the joint of new and old roadbed according to claim 1 is characterized by: It also comprises a connecting rod (7), the two ends of which are respectively connected to the horizontal tube (1) and the vertical tube (2), and a triangular frame is formed between the connecting rod (7), the horizontal tube (1) and the vertical tube (2).

4. A local reinforcement structure at the joint of new and old roadbed according to claim 3, characterized in that: One end of the connecting rod (7) is hinged to the horizontal tube (1), and the other end of the connecting rod (7) is provided with a mounting side ear (71), and the mounting side ear (71) is fixed to the vertical tube (2) by means of screws.

5. The local reinforcement structure at the joint of the new and old roadbed according to claim 3 is characterized by: The triangular parts of the two triangular frames are fixedly connected by a transverse connecting rod (9) to form a unit reinforcement piece (91). A plurality of the unit reinforcement pieces (91) are arranged in sequence along the length direction of the joint between the new and old roadbeds.

6. A local reinforcement structure at the joint of new and old roadbed according to claim 5, characterized in that: A positioning nail (8) is fixedly connected to the bottom surface of the horizontal connecting rod (9) located at the bottom, and the positioning nail (8) is inserted into the bottom wall of the foundation pit of the new roadbed (6). The depth of the positioning nail (8) inserted into the bottom wall of the foundation pit of the new roadbed (6) is H1, and the depth of the vertical fixing pin (4) driven into the bottom wall of the foundation pit of the new roadbed (6) is H2, wherein H1<H2.

7. The local reinforcement structure at the joint of new and old roadbed according to claim 2 is characterized by: The ends of the horizontal fixing pin (3) and the vertical fixing pin (4) away from the limiting cap (31) are arranged in a pointed shape.

8. The local reinforcement structure at the joint of new and old roadbed according to claim 4 is characterized by: The top end of the connecting rod (7) is hinged to the horizontal tube (1), and the mounting side ear (71) is arranged at the bottom end of the connecting rod (7).