Hollow pier

By designing prefabricated top piers, countersunk holes, convex bodies and hollow pipe structures in hollow piers, the problem of long construction time for existing hollow piers is solved, the construction efficiency and the combination of pier body and top piers are improved, and the strength is achieved norms and standards.

CN222008629UActive Publication Date: 2024-11-15ZHEJIANG HONEYCOMB INTEGRATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420054876.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-10
Publication Date
2024-11-15
Estimated Expiration
2034-01-10

AI Technical Summary

Technical Problem

The existing hollow piers have a long construction time during the capping process, resulting in low on-site construction efficiency and insufficient bonding between the pier and the top piers, affecting the overall strength.

Method used

A hollow pier structure including a pier body, a top pier, a counterborer, a convex body, an extension body and a hollow tube are designed. The extension body and a hollow tube are installed by prefabricated top pier and mixed casting to improve bonding and construction efficiency.

Benefits of technology

It significantly reduces the installation of brackets and pouring time, improves construction efficiency, reduces construction risks, and makes the overall strength of the bridge pier meet the specification standards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008629U_ABST
    Figure CN222008629U_ABST
Patent Text Reader

Abstract

The utility model discloses a hollow pier which comprises a pier body, the pier body comprises a pier body, a top pier is arranged at the top of the pier body, a bottom pier is arranged at the bottom of the pier body, a plurality of counter bores are formed in the top of the pier body, a plurality of convex bodies are arranged at the bottom of the top pier, the convex bodies are inserted into the counter bores, and pouring spaces are reserved between the bottom faces of the counter bores and the bottom faces of the convex bodies. The top pier is provided with pouring holes in one-to-one correspondence with the convex bodies, the bottoms of the pouring holes penetrate through the lower ends of the convex bodies and communicate with the pouring space at the bottoms of the counter bores, and extending bodies are arranged at the bottoms of the convex bodies and located in the counter bores. The utility model provides a hollow pier which can effectively improve the field construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of bridges, in particular to a hollow pier. Background Art

[0002] With the development of bridge construction technology and the increasing demand for high bridge pier construction, hollow piers have gradually become the first choice for high bridge pier construction because of their small deadweight, ability to clear the foundation load, ability to fully utilize the strength of materials, and ability to save materials and thus reduce the amount of foundation engineering. Hollow piers are constructed using steel sliding formwork, which has a fast construction speed. When capping the hollow pier, the top opening of the pier body needs to be closed, and the top formwork and chamfered formwork are laid before pouring to complete the top pier pouring, thereby capping the top of the pier body. The entire capping process takes a long time to construct, resulting in low on-site construction efficiency. Utility Model Content

[0003] The purpose of the utility model is to overcome the deficiencies of the prior art and provide a hollow pier to effectively improve on-site construction efficiency.

[0004] In order to achieve the above object, the technical solution of the utility model is:

[0005] A hollow pier comprises a pier main body, which comprises a pier body. A top pier is arranged on the top of the pier body, a bottom pier is arranged on the bottom of the pier body, a plurality of countersunk holes are arranged on the top of the pier body, a plurality of convex bodies are arranged on the bottom of the top pier, the convex bodies are inserted into the countersunk holes, a casting space is left between the bottom surfaces of the countersunk holes and the bottom surfaces of the convex bodies, the top pier is provided with casting holes corresponding to the convex bodies one by one, the bottom of the casting holes passes through the lower end of the convex bodies and is connected with the casting space at the bottom of the countersunk holes, an extension body is arranged on the bottom of the convex body, and the extension body is located in the countersunk hole.

[0006] The extension body divides the counterbore into two parts, an upper part and an lower part, and the upper part and the lower part are still connected after the division.

[0007] The outer wall of the extension body is in contact with the inner wall of the countersunk hole. A plurality of extension bodies are arranged along the circumference of the convex body, and a spacing is formed between adjacent extension bodies.

[0008] The outer diameter of the extension is smaller than the inner diameter of the counterbore.

[0009] A notch is provided on the top of the top pier, and the top of the casting hole extends to the bottom surface of the notch.

[0010] A hollow tube is arranged in the casting hole, and the hollow tube is inserted into the casting hole.

[0011] The bottom of the hollow tube extends out of the bottom of the convex body. The hollow tube comprises a folded tube located at the bottom. The folded tube is located below the convex body. The hollow tube is provided with a through hole which is communicated with the countersunk hole.

[0012] A gap is left between the upper end surface of the folded tube and the bottom surface of the convex body.

[0013] Hollow tubes are hollow steel tubes.

[0014] The top pier is provided with a bottom boss, the boss is inserted into the pier body, and the bottom surface of the top pier is in contact with the top surface of the pier body.

[0015] The beneficial effects of the utility model are:

[0016] By installing the prefabricated top pier on the top of the pier body and then mixing the two together, the time for setting up the scaffolding and pouring the top pier is reduced, which greatly increases the on-site construction efficiency and reduces the construction risks brought by long-term construction.

[0017] By setting up the extension body, the connection between the pier body and the top pier is improved, so that the overall strength of the pier can meet the standard. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 is a cross-sectional view of an embodiment;

[0019] Figure 2 for Figure 1 The enlarged view of point A in the middle;

[0020] Figure 3 for Figure 1 Sectional view of the middle top pier in the MM direction.

[0021] In the figure: the pier body 1, the pier body 11, the countersunk hole 111, the bottom pier 12, the top pier 13, the recess 131, the protrusion 132, the extension body 1321, the boss 133, the casting hole 134, the hollow tube 2, the through hole 21, and the folded tube 22. DETAILED DESCRIPTION

[0022] The technical solution of the utility model is further described below through embodiments and in conjunction with the accompanying drawings.

[0023] like Figure 1 As shown, a hollow pier includes a pier body 1, the pier body 1 includes a pier body 11, a top pier 13 is provided on the top of the pier body 11, a bottom pier 12 is provided on the bottom of the pier body 11, the interior of the pier body 11 is a hollow structure, the top pier 13 and the bottom pier 12 cast the upper and lower ends of the pier body 11 respectively to form a closed structure, a boss 133 is provided at the bottom of the top pier 13, the boss 133 is inserted into the pier body 11, and the bottom surface of the top pier 13 is in contact with the top surface of the bottom pier 12. The top pier 13 is prefabricated, and when the pier body 11 is capped, the prefabricated top pier 13 is directly installed on the top of the pier body 11, thereby improving construction efficiency.

[0024] like Figure 2 As shown, the top of the pier body 11 is provided with a plurality of countersunk holes 111, which are recessed and extend downward along the top of the pier body 11 to form a circular hole structure. The bottom of the top pier 13 is provided with a plurality of convex bodies 132, which extend downward along the bottom surface of the top pier 13 to form a convexity, as shown in FIG. Figure 3The figure shows the distribution diagram of the protrusions 132 . The corresponding countersunk holes 111 have the same distribution as the protrusions 132 , and the protrusions 132 are inserted into the countersunk holes 111 .

[0025] like Figure 2 As shown, after the protrusion 132 is inserted into the counterbore 111, the bottom surface of the protrusion 132 is located above the inner wall of the bottom of the counterbore 111, so that a casting space is formed between the bottom surface of the counterbore 111 and the bottom surface of the protrusion 132. An extension body 1321 is provided at the bottom of the protrusion 132, and the extension body 1321 extends outward along the outer wall of the bottom of the protrusion 132 to form a bulge. The extension body 1321 is located in the counterbore 111, and the extension body 1321 divides the counterbore 111 into two parts, an upper part and an lower part.

[0026] like Figure 2 As shown, the extension body 1321 can be configured such that its outer wall fits the inner wall of the counterbore 111. Figure 3 As shown, multiple extension bodies 1321 are provided along the circumference of the convex body 132, and gaps are formed between adjacent extension bodies 1321, so that the upper and lower parts of the countersunk hole 111 divided by the extension bodies 1321 are connected up and down through the gaps between the adjacent extension bodies 1321. When concrete building materials are poured at the bottom of the countersunk hole 111, the building materials flow upward along the gaps between the adjacent extension bodies 1321 and form a pouring of the countersunk hole 111 space located above the extension bodies 1321. After pouring, the countersunk hole 111 is completely filled, and the extension bodies 1321 are tightly wrapped up and down by the building materials to form a fastening, so that the convex body 132 and the pier body 11 are cast into one body. The spaced extension bodies 1321 are arranged, so that the outer wall area of ​​the extension bodies 1321 is greatly increased, and the bonding effect between the extension bodies 1321 and the inner wall of the countersunk hole 111 can be improved during pouring, so as to enhance the bonding force between the pier body 11 and the top pier 13.

[0027] The extension body 1321 can also be configured as a disc-shaped structure protruding outward along the outer wall of the convex body 132. The outer diameter of the extension body 1321 is configured to be smaller than the inner diameter of the countersunk hole 111, so that a gap is formed between the outer wall of the extension body 1321 and the inner wall of the countersunk hole 111, thereby forming a casting channel. Compared with the spaced extension body 1321 setting, the integral extension body 1321 improves the fracture resistance of the extension body 1321.

[0028] like Figure 1 , Figure 2 As shown, the top pier 13 is provided with a pouring hole 134 corresponding to the convex body 132, the bottom of the pouring hole 134 passes through the lower end of the convex body 132 and is connected with the pouring space at the bottom of the countersunk hole 111, and the top of the top pier 13 is provided with a notch 131, and the top of the pouring hole 134 extends to the bottom surface of the notch 131. During pouring, the material is poured into the notch 131, and the material enters the countersunk hole 111 along the pouring hole 134, and the material is poured until the notch 131 is completely filled, thereby completing the combination between the pier body 11 and the top pier 13.

[0029] like Figure 1 , Figure 2 As shown, in order to further improve the bonding force between the pier body 11 and the top pier 13, a hollow tube 2 is provided in the casting hole 134. The hollow tube 2 is a hollow steel tube, and the hollow tube 2 is inserted into the casting hole 134. The top of the hollow tube 2 is flush with the bottom of the notch 131, and the bottom of the hollow tube 2 extends out of the bottom of the convex body 132. The bottom of the hollow tube 2 is bent along the radial direction of the casting hole 134 to form a folded tube 22. The folded tube 22 is located below the convex body 132, and a gap is left between the upper end surface of the folded tube 22 and the bottom surface of the convex body 132. A through hole 21 is provided in the hollow tube 2, and the top of the through hole 21 is connected to the notch 131, and the bottom of the through hole 21 is connected to the countersunk hole 111.

[0030] During pouring, after the material is fed into the recess 131, the material is passed along the top of the through hole 21 and passes out from the through hole 21 at the outer end of the folded tube 22 into the countersunk hole 111. After the pouring is completed, the folded tube 22 is combined with the material at the bottom of the countersunk hole 111 to improve the bonding force between the pier body 11 and the top pier 13. In addition, by setting the hollow tube 2, when prefabricating the top pier 13, there is no need to lay an additional template to form the pouring hole 134.

[0031] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A hollow pier, comprising a pier body (1), wherein the pier body (1) comprises a pier shaft (11), a top pier (13) is provided at the top of the pier shaft (11), and a bottom pier (12) is provided at the bottom of the pier shaft (11), characterized in that: The top of the pier body (11) is provided with a plurality of countersunk holes (111), the bottom of the top pier (13) is provided with a plurality of protrusions (132), the protrusions (132) are inserted into the countersunk holes (111), a casting space is left between the bottom surface of the countersunk holes (111) and the bottom surface of the protrusions (132), the top pier (13) is provided with casting holes (134) corresponding to the protrusions (132) one by one, the bottom of the casting hole (134) passes through the lower end of the protrusion (132) and is connected to the casting space at the bottom of the countersunk hole (111), and the bottom of the protrusion (132) is provided with an extension body (1321), and the extension body (1321) is located in the countersunk hole (111).

2. A hollow pier as claimed in claim 1, characterized in that: The extension body (1321) divides the counterbore (111) into two parts, an upper part and an lower part, and the upper and lower parts are still connected after the division.

3. A hollow pier as claimed in claim 2, characterized in that: The outer wall of the extension body (1321) is in contact with the inner wall of the counterbore (111), and a plurality of extension bodies (1321) are provided along the circumference of the convex body (132), with spacing formed between adjacent extension bodies (1321).

4. A hollow pier as claimed in claim 2, characterized in that: The outer diameter of the extension body (1321) is smaller than the inner diameter of the counterbore (111).

5. A hollow pier as claimed in claim 1, characterized in that: The top of the top pier (13) is provided with a notch (131), and the top of the casting hole (134) extends to the bottom surface of the notch (131).

6. A hollow pier as claimed in claim 1, characterized in that: A hollow tube (2) is provided in the casting hole (134), and the hollow tube (2) is inserted into the casting hole (134).

7. A hollow pier as claimed in claim 6, characterized in that: The bottom of the hollow tube (2) extends out of the bottom of the protrusion (132), the hollow tube (2) comprises a folded tube (22) located at the bottom, the folded tube (22) is located below the protrusion (132), and the hollow tube (2) is provided with a through hole (21), and the through hole (21) is connected to the countersunk hole (111).

8. A hollow pier as claimed in claim 7, characterized in that: A distance is left between the upper end surface of the folded tube (22) and the bottom surface of the convex body (132).

9. A hollow pier as claimed in claim 6, characterized in that: The hollow tube (2) is a hollow steel tube.

10. A hollow pier as claimed in claim 1, characterized in that: The top pier (13) is provided with a bottom boss (133), the boss (133) is inserted into the pier body (11), and the bottom surface of the top pier (13) is in contact with the top surface of the pier body (11).