Pile foundation structure for complex foundation pit rebuilding engineering

By adopting a combined design of base plate, on-board piles and stable mechanisms in the pile foundation structure, the problems of poor cement flow and low construction efficiency are solved, and efficient construction and strength improvement of the pile foundation structure are achieved, suitable for complex foundation pits project.

CN222008975UActive Publication Date: 2024-11-15GUANGDONG HENGSHI CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420082026.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-12
Publication Date
2024-11-15
Estimated Expiration
2034-01-12

AI Technical Summary

Technical Problem

The existing pile foundation structure has problems of poor cement flow and low construction efficiency during the construction process, especially in complex foundation pit projects.

Method used

Adopt a complex reconstructed foundation pit engineering pile foundation structure including base plate, on-board pile, under-board pile and stabilization mechanism. Through inserting rods, barblocks, conical blocks and spillover grooves, the cement mixture can flow normally and Solid after construction is completed, reducing construction difficulty.

Benefits of technology

It improves the overall performance and strength of the pile foundation structure, allows direct cement pouring, reduces the use of additional equipment, improves construction efficiency and reduces difficulty, and is suitable for complex foundation pit projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222008975U_ABST
    Figure CN222008975U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, and discloses a complex rebuilding foundation pit engineering pile foundation structure which comprises a foundation plate, an on-plate pile is installed at the top of the foundation plate, an under-plate pile is fixedly connected to the bottom of the foundation plate, and corner blocks which are evenly distributed are fixedly connected to the bottom of the foundation plate. The bottom of the base plate is provided with a stabilizing mechanism used for improving the structural stability, and the top of the base plate is provided with a fixing mechanism used for being connected with a pile on a fixing plate. The stabilizing mechanism comprises inserting rods which are fixedly connected to the bottom of the base plate and are uniformly distributed, barb blocks which are fixedly connected to the outer sides of the inserting rods and are uniformly distributed, and conical blocks which are fixedly connected to the bottom ends of the inserting rods. According to the pile foundation structure for complex foundation pit rebuilding engineering, construction can be facilitated, meanwhile, the overall performance and strength of the pile foundation structure can be effectively improved, meanwhile, the construction difficulty is lowered, the pile foundation structure can be suitable for complex foundation pit engineering, and the practical performance of the pile foundation structure is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of building construction, and in particular to a pile foundation structure for a complex foundation pit reconstruction project. Background Art

[0002] A deep foundation consisting of a pile and a pile cap connected to the top of the pile, or a single pile foundation connected by a column and a pile base is called a pile foundation. When carrying out construction, the first thing to do is to build the foundation, which is usually located inside the soil layer to support the fixed building.

[0003] According to a pile foundation structure disclosed in Chinese Patent Publication No. CN218813666U, the patent sets a reinforcing block and a guide member. When the two are in contact, the guide member drives the reinforcing block to expand outward and plug into the inner side of the ground, thereby improving the supporting force of the overall structure and reducing the possibility of the pile foundation sinking under force. However, the patent still has certain shortcomings in the actual application process. During the construction process, the patent connects the first connecting column and the second connecting column, expands the reinforcing block, and then injects cement to allow the cement to flow naturally to the gap between the structures. First, if the first connecting column is not continuously supported, the gap between the structures may be directly blocked, resulting in the inability of cement to flow along the normal path. If the first connecting column is supported, it is necessary to keep the cement in its existing state until it is completely solidified, which will greatly waste the time of on-site equipment, reduce the efficiency of construction, and cause the construction time to be extended. In addition, the actual construction is difficult, which is not practical for complex foundation pit projects. In this regard, the present application proposes a pile foundation structure for complex reconstruction foundation pit projects to solve the above problems. Utility Model Content

[0004] In view of the shortcomings of the existing technology, the present application provides a pile foundation structure for complex reconstruction pit engineering, which has the advantages of being easy to construct and effectively improving the overall performance and strength of the pile foundation structure, thereby solving the shortcomings of the existing pile foundation structure that is inconvenient to construct.

[0005] To achieve the above-mentioned purpose, the present application provides the following technical solutions: A pile foundation structure for a complex foundation pit project, comprising a base plate, a plate pile is installed on the top of the base plate, a plate under pile is fixedly connected to the bottom of the base plate, a uniformly distributed corner block is fixedly connected to the bottom of the base plate, a stabilizing mechanism for improving structural stability is installed on the bottom of the base plate, and a fixing mechanism for connecting and fixing the plate pile is installed on the top of the base plate;

[0006] The stabilizing mechanism includes an insertion rod fixedly connected to the bottom of the base plate and evenly distributed, barbed blocks fixedly connected to the outside of the insertion rod and evenly distributed, and a conical block fixedly connected to the bottom end of the insertion rod; a connecting hole is provided between the insertion rod and the top of the base plate, evenly distributed overflow grooves are provided on the outside of the insertion rod, and a weight-bearing cavity is provided inside the conical block.

[0007] By adopting the above technical solution, it is possible to facilitate construction and effectively improve the overall performance and strength of the pile foundation structure, so that the pile foundation structure can be directly poured with cement after the construction is completed, without the need for additional auxiliary support from other equipment, which facilitates the normal and efficient development of on-site construction work and reduces the difficulty of construction.

[0008] Furthermore, first exhaust holes connected to the interior of the weight-bearing cavity are provided on both sides of the left and right sides of the conical block, the barbed block is tilted upward away from the side of the corresponding insertion rod, and the bottom of the connecting hole is connected to the interior of the corresponding weight-bearing cavity.

[0009] By adopting the above technical solution, the cement mixture can flow normally inside the connecting hole and the weight-bearing cavity, so that the barb block is not easy to shake or deviate after being inserted into the ground.

[0010] Furthermore, the number of the overflow grooves on the outside of the same insertion rod is equal to the number of the barb blocks, the overflow grooves are located at the tops of the corresponding barb blocks, and the interior of the overflow grooves is connected to the interior of the connecting hole.

[0011] By adopting the above technical solution, the cement mixture can flow to the outside of the barb block through the overflow groove to solidify.

[0012] Furthermore, the fixing mechanism includes a plug-in assembly installed on the top of the base plate and a fixing assembly installed on the outside of the pile on the plate.

[0013] By adopting the above technical solution, the piles on the sheet can be stably connected and fixed through the cooperation of the plug-in component and the fixing component.

[0014] Furthermore, the plug-in assembly includes a main column fixedly connected to the top of the base plate and two auxiliary columns fixedly connected to the top of the base plate; an injection hole is provided at the top of the pile on the plate, a main groove for plugging the main column is provided at the bottom of the pile on the plate, two auxiliary grooves for plugging two auxiliary columns respectively are provided at the bottom of the pile on the plate, and two flow grooves are provided at the bottom of the pile on the plate.

[0015] By adopting the above technical solution, the sheet piles can be stably placed on the top of the base plate, which is convenient for subsequent work.

[0016] Furthermore, the fixing assembly includes mounting blocks fixedly connected to the outside of the sheet piles and evenly distributed, and anchor bolts passing through the tops of the mounting blocks; through holes are provided on the tops of the anchor bolts, and sockets for inserting the anchor bolts are provided on the tops of the base plates.

[0017] By adopting the above technical solution, the sheet piles can be fixed on the top of the base plate.

[0018] Furthermore, the bottom of the injection hole is connected to the interior of the main groove, and the left and right sides of the main groove are connected to the interiors of the two auxiliary grooves through two flow grooves respectively. Two second exhaust holes respectively connected to the interiors of the two auxiliary grooves are opened on the front of the plate pile, and the second exhaust holes are located at the top of the corresponding front of the auxiliary groove.

[0019] By adopting the above technical solution, the cement mixture inside the injection hole can flow into the auxiliary groove through the main groove and the flow groove.

[0020] Furthermore, a side of the corner block close to the pile under the board is fixedly connected to the outer side of the pile under the board, a side of the corner block away from the pile under the board is an inclined surface, and a cross section of the corner block is a triangle.

[0021] By adopting the above technical solution, the stability of the piles under the slab in the ground can be improved through the triangular corner blocks.

[0022] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0023] The pile foundation structure of this complex reconstruction foundation pit project, through the coordinated use of the sheet-on piles and the fixing mechanism on the top of the base plate and the under-sheet piles and the stabilizing mechanism at the bottom of the base plate, can facilitate construction while effectively improving the overall performance and strength of the pile foundation structure, so that the pile foundation structure can be directly poured with cement after the construction is completed, without the need for additional auxiliary support from other equipment, which facilitates the normal and efficient development of on-site construction work, while also reducing the difficulty of construction. It can be applied to complex foundation pit projects, thereby greatly improving the practical performance of the pile foundation structure. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 This is a schematic diagram of the structure of this application;

[0025] Figure 2 For this application structure Figure 1 A three-dimensional schematic diagram of the middle insertion rod connection structure;

[0026] Figure 3 For this application structure Figure 1 A three-dimensional schematic diagram of the anchor bolt connection structure;

[0027] Figure 4For this application structure Figure 1 A front view of

[0028] Figure 5 For this application structure Figure 1 Cross-sectional view of the central main column connection structure.

[0029] In the figure: 1. base plate; 2. piles on the plate; 3. piles under the plate; 4. corner block; 500. stabilizing mechanism; 501. insertion rod; 502. barbed block; 503. conical block; 504. connecting hole; 505. overflow groove; 506. load-bearing cavity; 507. first exhaust hole; 600. fixing mechanism; 601. main column; 602. auxiliary column; 603. mounting block; 604. anchor bolt; 605. injection hole; 606. main groove; 607. auxiliary groove; 608. flow groove; 609. second exhaust hole; 610. through hole. DETAILED DESCRIPTION

[0030] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.

[0031] See also Figure 1-5 , the present application provides a technical solution: a pile foundation structure for a complex foundation pit project, comprising a base plate 1, a plate pile 2 is installed on the top of the base plate 1, a plate under pile 3 is fixedly connected to the bottom of the base plate 1, a uniformly distributed corner block 4 is fixedly connected to the bottom of the base plate 1, a stabilizing mechanism 500 for improving structural stability is installed at the bottom of the base plate 1, and a fixing mechanism 600 for connecting and fixing the plate pile 2 is installed on the top of the base plate 1;

[0032] Through the coordinated use of the sheet piles 2 and the fixing mechanism 600 on the top of the base plate 1 and the under-sheet piles 3 and the stabilizing mechanism 500 at the bottom of the base plate 1, it is possible to facilitate construction while effectively improving the overall performance and strength of the pile foundation structure. After the construction of the pile foundation structure, cement can be directly poured without the need for additional auxiliary support from other equipment, which facilitates the normal and efficient development of on-site construction work and reduces the difficulty of construction. It can be used in complex foundation pit projects, thereby greatly improving the practical performance of the pile foundation structure.

[0033] It should be noted that the side of the corner block 4 close to the pile 3 under the board is fixedly connected to the outer side of the pile 3 under the board, the side of the corner block 4 away from the pile 3 under the board is an inclined surface, and the cross-section of the corner block 4 is a triangle. The triangular corner block 4 can improve the stability of the pile 3 under the board in the ground.

[0034] In this embodiment, the stabilizing mechanism 500 is a structure used to enable the pile foundation structure to be stably arranged on the ground.

[0035] like Figure 1 , Figure 2 and Figure 5 As shown, the stabilizing mechanism 500 includes an insertion rod 501 fixedly connected to the bottom of the base plate 1 and evenly distributed, a barb block 502 fixedly connected to the outside of the insertion rod 501 and evenly distributed, and a conical block 503 fixedly connected to the bottom end of the insertion rod 501; a connecting hole 504 is provided between the insertion rod 501 and the top of the base plate 1, an evenly distributed overflow groove 505 is provided on the outside of the insertion rod 501, and a weight-bearing cavity 506 is provided inside the conical block 503.

[0036] It should be noted that the barb block 502 is tilted upward away from the side of the corresponding insertion rod 501, so that the barb block 502 is not easy to shake and deviate after being inserted into the ground. The left and right sides of the conical block 503 are both provided with first exhaust holes 507 connected to the inside of the weight-bearing cavity 506. The bottom of the connecting hole 504 is connected to the inside of the corresponding weight-bearing cavity 506, so that the cement mixture can flow normally inside the connecting hole 504 and the weight-bearing cavity 506.

[0037] When the cement mixture flows downward through the connecting hole 504, the air inside the connecting hole 504 and the weight chamber 506 will be discharged through the first exhaust hole 507, so that the cement mixture can fill the connecting hole 504 and the weight chamber 506. After the cement mixture inside the weight chamber 506 solidifies, it can cooperate with the outer conical block 503 to play a good counterweight role, so that the center of gravity can be kept stable.

[0038] In addition, the number of overflow grooves 505 on the outside of the same insertion rod 501 is equal to the number of barb blocks 502, the overflow grooves 505 are located at the top of the corresponding barb blocks 502, and the interior of the overflow grooves 505 is connected to the interior of the connecting hole 504. The cement mixture can flow to the outside of the barb block 502 through the overflow grooves 505 to solidify, thereby increasing the overall strength and performance of the barb block 502.

[0039] In this embodiment, the fixing mechanism 600 is used to make the pile foundation structure form an integral structure.

[0040] like Figure 3 , Figure 4 and Figure 5 As shown, the fixing mechanism 600 includes a plug-in assembly mounted on the top of the base plate 1 and a fixing assembly mounted on the outside of the sheet pile 2;

[0041] The plug-in assembly includes a main column 601 fixedly connected to the top of the base plate 1 and two auxiliary columns 602 fixedly connected to the top of the base plate 1; an injection hole 605 is provided at the top of the board pile 2, a main groove 606 for plugging in the main column 601 is provided at the bottom of the board pile 2, two auxiliary grooves 607 for plugging in the two auxiliary columns 602 respectively are provided at the bottom of the board pile 2, and two flow grooves 608 are provided at the bottom of the board pile 2.

[0042] It should be noted that the fixing assembly includes a mounting block 603 fixedly connected to the outside of the sheet pile 2 and evenly distributed, and an anchor bolt 604 passing through the top of the mounting block 603; a through hole 610 is provided on the top of the anchor bolt 604, and a socket for the anchor bolt 604 to be plugged in is provided on the top of the base plate 1, and the anchor bolt 604 passes through the corresponding socket and extends to the inside of the ground, and there is a certain gap between the anchor bolt 604 and the inner side of the corresponding mounting block 603, and there is a certain gap between the anchor bolt 604 and the socket, and a third exhaust hole connected to the inside of the socket is provided on the top of the anchor bolt 604, so that the cement mixture can flow normally into the inside of the socket after being injected through the through hole 610, and the internal air will be discharged normally through the third exhaust hole, or the cement mixture can be directly injected into the socket and then the anchor bolt 604 is inserted, and then the cement mixture is injected into the inside of the through hole 610, and it can be rotated according to actual needs, so that the sheet pile 2 can be stably fixed on the top of the base plate 1.

[0043] In addition, the bottom of the injection hole 605 is connected to the inside of the main groove 606, and the left and right sides of the main groove 606 are respectively connected to the inside of the two auxiliary grooves 607 through two flow grooves 608. Two second exhaust holes 609 are opened on the front of the sheet pile 2 and are respectively connected to the inside of the two auxiliary grooves 607. The second exhaust holes 609 are located at the top of the front of the corresponding auxiliary groove 607, so that the cement mixture in the injection hole 605 can flow into the inside of the auxiliary groove 607 through the main groove 606 and the flow groove 608;

[0044] When the cement mixture is injected through the injection hole 605, the air inside will be discharged through the two second exhaust holes 609. At the same time, when the cement mixture flows to the bottom of the auxiliary groove 607, the air inside the auxiliary groove 607 will gradually be discharged through the second exhaust holes 609, so that the cement mixture can fill the inside and bottom of the sheet pile 2.

[0045] The working principle of the above embodiment is:

[0046] During the construction of the pile foundation structure of the complex reconstruction foundation pit project, the land is first compacted, and then the piles 3 under the plate and the insertion rods 501 are driven into the ground, so that the base plate 1 is placed on the ground surface in a close fit. Under the action of the barbed blocks 502, the stability of the base plate 1 can be greatly improved, making it less likely to deviate and slide. The piles 2 on the plate are moved to the top of the base plate 1, and the main column 601 and the auxiliary column 602 are respectively inserted into the inner sides of the main groove 606 and the auxiliary groove 607. The anchor bolts 604 are inserted into the top of the corresponding mounting blocks 603, and are passed through the top of the base plate 1 and inserted into the ground, and the pile foundation structure is completed. In the initial installation step, the cement mixture is injected into the space between the inner side of the main groove 606 and the outer side of the main column 601 through the injection hole 605. Under the action of the two second exhaust holes 609 on the front side, the air can be discharged normally, so that the cement mixture can flow normally, so that the cement mixture moves to the bottom of the inner side of the two auxiliary grooves 607 through the flow grooves 608 on both sides, and then slowly fills the auxiliary grooves 607. When the cement mixture flows out through the second exhaust holes 609, the injection can be stopped. At this time, the injection hole 605, the main groove 606, and the auxiliary groove 607 are all filled with cement mixture;

[0047] Then inject the cement mixture into the through hole 610 to fill it up and overflow to the outside of the anchor bolt 604. Finally, inject the cement mixture into the connecting hole 504 to fill the load-bearing cavity 506 and flow to the outside of the barb block 502 through the overflow grooves 505 on both sides. After waiting for the cement mixture to solidify, a stable, extremely strong and non-settling pile foundation structure can be obtained.

[0048] Compared with the prior art, the pile foundation structure of the complex reconstruction pit engineering project, through the coordinated use of the sheet piles 2 and the fixing mechanism 600 on the top of the base plate 1 and the under-sheet piles 3 and the stabilizing mechanism 500 at the bottom of the base plate 1, can facilitate construction while effectively improving the overall performance and strength of the pile foundation structure, so that the pile foundation structure can be directly poured with cement after the construction is completed, without the need for additional auxiliary support from other equipment, which is convenient for the normal and efficient development of on-site construction work, and also reduces the difficulty of construction. It can be suitable for use in complex pit engineering, thereby greatly improving the practical performance of the pile foundation structure and solving the problem that the existing pile foundation structure is inconvenient to construct.

Claims

1. A pile foundation structure for a complex foundation pit reconstruction project, comprising a base plate (1), characterized in that: The top of the base plate (1) is equipped with a plate pile (2), the bottom of the base plate (1) is fixedly connected with a plate under pile (3), the bottom of the base plate (1) is fixedly connected with evenly distributed corner blocks (4), the bottom of the base plate (1) is equipped with a stabilizing mechanism (500) for improving structural stability, and the top of the base plate (1) is equipped with a fixing mechanism (600) for connecting and fixing the plate pile (2); The stabilizing mechanism (500) comprises an insertion rod (501) fixedly connected to the bottom of the base plate (1) and evenly distributed, a barbed block (502) fixedly connected to the outside of the insertion rod (501) and evenly distributed, and a conical block (503) fixedly connected to the bottom end of the insertion rod (501); a connecting hole (504) is provided between the insertion rod (501) and the top of the base plate (1), evenly distributed overflow grooves (505) are provided on the outside of the insertion rod (501), and a weight-bearing cavity (506) is provided inside the conical block (503).

2. A pile foundation structure for complex foundation pit reconstruction according to claim 1, characterized in that: The left and right sides of the conical block (503) are both provided with first exhaust holes (507) connected to the interior of the weight-bearing cavity (506); the side of the barbed block (502) away from the corresponding insertion rod (501) is tilted upward; and the bottom of the connecting hole (504) is connected to the interior of the corresponding weight-bearing cavity (506).

3. The pile foundation structure for complex foundation pit reconstruction according to claim 1 is characterized by: The number of the overflow grooves (505) on the outside of the same insertion rod (501) is equal to the number of the barb blocks (502), the overflow grooves (505) are located at the top of the corresponding barb blocks (502), and the interior of the overflow grooves (505) is connected to the interior of the connecting hole (504).

4. The pile foundation structure for complex foundation pit reconstruction according to claim 1 is characterized by: The fixing mechanism (600) comprises a plug-in component installed on the top of the base plate (1) and a fixing component installed on the outside of the pile (2) on the plate.

5. A pile foundation structure for complex foundation pit reconstruction according to claim 4, characterized in that: The plug-in assembly comprises a main column (601) fixedly connected to the top of the base plate (1) and two auxiliary columns (602) fixedly connected to the top of the base plate (1); an injection hole (605) is provided at the top of the on-board pile (2), a main groove (606) for plugging the main column (601) is provided at the bottom of the on-board pile (2), two auxiliary grooves (607) for plugging the two auxiliary columns (602) respectively are provided at the bottom of the on-board pile (2), and two flow grooves (608) are provided at the bottom of the on-board pile (2).

6. The pile foundation structure for complex foundation pit reconstruction according to claim 4 is characterized by: The fixing assembly comprises a mounting block (603) fixedly connected to the outside of the sheet pile (2) and evenly distributed, and an anchor bolt (604) passing through the top of the mounting block (603); a through hole (610) is provided on the top of the anchor bolt (604), and a socket for plugging the anchor bolt (604) is provided on the top of the base plate (1).

7. The pile foundation structure for complex foundation pit reconstruction according to claim 5 is characterized by: The bottom of the injection hole (605) is connected to the interior of the main groove (606), and the left and right sides of the main groove (606) are respectively connected to the interior of the two auxiliary grooves (607) through two flow grooves (608), and the front surface of the plate pile (2) is provided with two second exhaust holes (609) respectively connected to the interior of the two auxiliary grooves (607), and the second exhaust holes (609) are located at the top of the front surface of the corresponding auxiliary groove (607).

8. The pile foundation structure for complex foundation pit reconstruction according to claim 1, characterized in that: The side of the corner block (4) close to the under-board pile (3) is fixedly connected to the outer side of the under-board pile (3), the side of the corner block (4) away from the under-board pile (3) is an inclined surface, and the cross-section of the corner block (4) is a triangle.