Waterproof non-curing construction structure for pile head

By setting a combination structure of concrete pad, coating layer and self-adhesive waterproof membrane on the outside of the pile head, the sealing problem at the gap between the pile head and the concrete pad is solved, achieving efficient waterproofing effect and construction adaptability, especially excellent performance in low temperature environment construction.

CN222009008UActive Publication Date: 2024-11-15SINOHYDRO BUREAU 1 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420591296.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-11-15
Estimated Expiration
2034-03-26

AI Technical Summary

Technical Problem

In existing technologies, the waterproofing structure for pile heads has poor sealing performance at the gap between the concrete cushion and the pile head, leading to frequent water seepage and affecting the quality of the project.

Method used

The structure employs a combination of concrete subbase, cold primer, waterproof coating layer, non-curing asphalt waterproof coating, self-adhesive waterproof membrane, waterproof protective layer, and waterproof sealant, which is then fixed with pressure plates and bolts to form a waterproof non-curing construction structure, improving sealing and firmness.

Benefits of technology

It effectively seals gaps and capillaries, adapts to complex construction surfaces, and is especially effective in low-temperature environments, significantly improving waterproofing and enhancing the waterproofing and stability of the pile head.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222009008U_ABST
    Figure CN222009008U_ABST
Patent Text Reader

Abstract

The utility model discloses a pile head waterproof non-curing construction structure, and particularly relates to the technical field of pile head waterproof structure construction, the pile head waterproof non-curing construction structure comprises a concrete cushion layer laid on the outer side of a pile head, the outer side of the pile head is a rounding part, the top of the concrete cushion layer is coated with cold primer oil, and the top of the cold primer oil is coated with a waterproof coating layer. The top of the waterproof coating layer is coated with non-curing asphalt waterproof coating, and self-adhesive waterproof coiled materials are fixedly bonded to the outer wall of the top of the non-curing asphalt waterproof coating and the outer side wall of the rounding part. The concrete cushion layer, the cold primer oil, the waterproof coating layer, the non-curing asphalt waterproof coating, the self-adhesive waterproof coiled material, the waterproof protective layer and the waterproof sealant are matched to form a waterproof non-curing structure, the self-adhesive waterproof coiled material asphalt non-curing construction technology is adopted, the non-curing asphalt waterproof coating can seal cracks and capillary pores, and the non-curing asphalt waterproof coating can seal the cracks and the capillary pores. The waterproof coating can adapt to complex construction working faces, is constructed in a low-temperature environment, and is excellent in waterproof effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pile head waterproof structure construction, in particular to a pile head waterproof non-solidification construction structure. Background Art

[0002] With the continuous development of urban construction, the construction of high-rise buildings and super high-rise buildings is increasing, the depth and number of basements are also increasing, and construction projects with underground civil air defense, underground shopping malls, underground parking lots, etc. are becoming more and more common. However, the basement leakage caused by it has also increased, which has seriously affected the quality of construction projects and brought great inconvenience to the normal use and management of basements. Foundation waterproofing is crucial to the structure. Foundation leakage may cause many problems, so foundation waterproofing should be done well from the beginning. In particular, it is necessary to ensure the construction effect of the foundation pedestal and pile head waterproofing. The pile head waterproofing membrane is wrapped around the reinforced concrete pile and extended to the surface of the concrete cushion layer around the reinforced concrete pile. This is a common practice. This kind of wrapped waterproofing membrane pile head method must cut the waterproofing membrane around the pile and overlap it, and the joints are prone to form water channels.

[0003] For example, the prior art publication number CN217150174U is a waterproof structure based on a cement pile head of a construction pile. The utility model uses an additional layer of waterproof membrane to solidify the waterproof ability in a small range, thereby strengthening the waterproof ability of the weak links of the pile head body itself, such as edge corners, and the connection between prefabricated steel bars and the pile head body.

[0004] However, the above-mentioned prior art still has the following problems when used: currently, most of the pile head waterproof details adopt cement-based penetrating crystalline waterproof coating on the pile top and pile body, the bottom plate SBS waterproof membrane is sealed with sealing material around the pile body, and the pile body anchor steel bar is added with water-expanding water-stop ring, but the waterproof structure ignores the gap between the concrete cushion layer and the pile head, the concrete construction joint at the junction of the pile head and the foundation bottom plate, and the waterproof details have poor sealing effect, which greatly affects the quality of the project. Based on this, the utility model provides a pile head waterproof non-solidification construction structure with high waterproof sealing effect. Utility Model Content

[0005] To this end, the utility model provides a pile head waterproof non-solidification construction structure to solve the problem in the prior art that SBS modified asphalt waterproof membrane is not tightly pasted during construction, and there is a gap between the waterproof membrane and the cushion layer, which makes water seepage maintenance difficult.

[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0007] A pile head waterproof non-solidification construction structure, comprising a concrete cushion layer laid on the outside of the pile head, the outside of the pile head is a rounded portion, the top of the concrete cushion layer is coated with cold primer oil, the top of the cold primer oil is coated with a waterproof coating layer, the top of the waterproof coating layer is coated with a non-solidified asphalt waterproof coating, the top outer wall of the non-solidified asphalt waterproof coating and the outer wall of the rounded portion are fixedly bonded with self-adhesive waterproof membranes, the outer wall of the self-adhesive waterproof membrane is cast with a waterproof protective layer, and a waterproof sealant is placed between the top of the concrete cushion layer, the outer wall of the pile head and the bottom of the rounded portion to improve the sealing between the concrete cushion layer, the pile head and the rounded portion.

[0008] Furthermore, the waterproof coating layer is radially laid on the outside of the pile head in the horizontal direction to play a waterproof role on the top of the cold primer.

[0009] Furthermore, the non-curing asphalt waterproof coating is radially laid on the waterproof coating layer in the horizontal direction. The non-curing asphalt waterproof coating can seal cracks and pores, can adapt to complex construction work surfaces, and can be constructed in low temperature environments. It has excellent waterproofing effect, thereby greatly improving the waterproofness of the waterproof coating layer.

[0010] Furthermore, the self-adhesive waterproofing membrane is a polymer self-adhesive film, which is used to improve the waterproofness of the non-curing asphalt waterproofing coating.

[0011] Furthermore, the concrete cushion layer is C15 concrete, and the cold primer oil is made of No. 1 petroleum asphalt and an organic solvent, which is used to improve the sealing between the concrete cushion layer and the rounded part.

[0012] Furthermore, a plurality of steel bars are fixedly provided inside the pile head, and the plurality of steel bars extend above the pile head. An expansion water stop ring is sleeved at the root of the outer wall of each steel bar to improve the sealing between the steel bar and the pile head.

[0013] Furthermore, a pressure plate is provided on the outer wall of the waterproof protective layer, and the bottom of the pressure plate is in contact with the top of the rounded portion and the top of the concrete cushion layer. The pressure plate can be used to improve the firmness of the entire waterproof non-solidification.

[0014] Furthermore, the top of the pressure plate is fixed to the rounded portion by a plurality of bolts, and a plurality of pins are fixedly arranged on the bottom of the pressure plate away from the pile head. The plurality of pins all penetrate the bottom of the concrete cushion layer, and the plurality of pins are inserted into the base layer around the pile head, thereby improving the stability of the pressure plate.

[0015] The utility model has the following advantages:

[0016] 1. The utility model forms a waterproof non-curing structure by combining concrete cushion, cold primer, waterproof coating layer, non-curing asphalt waterproof coating, self-adhesive waterproof membrane, waterproof protective layer and waterproof sealing paste, and adopts self-adhesive waterproof membrane asphalt non-curing construction technology. The non-curing asphalt waterproof coating can seal cracks and pores, can adapt to complex construction surfaces, and can be constructed in low temperature environments with excellent waterproof effect.

[0017] 2. By setting a pressure plate on the waterproof protective layer, fixing the pressure plate and the rounded part together with bolts, and inserting multiple nails at the bottom of the pressure plate through the concrete cushion layer and the base layer around the pile head, the pressure plate is used to improve the firmness of the waterproof protective layer, self-adhesive waterproof membrane, non-curing asphalt waterproof coating, waterproof coating, cold primer and concrete cushion layer. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the implementation of the utility model or the technical solution in the prior art, the following is a brief introduction to the drawings required for the implementation or the prior art description. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.

[0019] The structures, proportions, sizes, etc. illustrated in this specification are only used to match the contents disclosed in the specification so as to facilitate understanding and reading by persons familiar with the technology. They are not used to limit the conditions under which the present invention can be implemented, and therefore have no substantial technical significance. Any structural modification, change in proportion or adjustment of size shall still fall within the scope of the technical contents disclosed in the present invention without affecting the effects and purposes that can be achieved by the present invention.

[0020] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0021] Figure 2 It is a cross-sectional view of the overall structure of the utility model;

[0022] Figure 3 For the utility model Figure 2 Enlarged view of part A in the middle;

[0023] Figure 4 It is a partial cross-sectional view of the utility model;

[0024] Figure 5 It is a cross-sectional view of the pressing plate of the present utility model.

[0025] In the figure: 1. Pile head; 2. Concrete cushion layer; 3. Rounded part; 4. Cold primer; 5. Waterproof coating layer; 6. Non-curing asphalt waterproof coating; 7. Self-adhesive waterproof membrane; 8. Waterproof protective layer; 9. Waterproof sealant; 10. Steel bars; 11. Expansion water stop ring; 12. Pressure plate; 13. Bolts; 14. Nails. DETAILED DESCRIPTION

[0026] The following is a specific embodiment of the present invention. People familiar with the technology can easily understand the other advantages and functions of the present invention from the contents disclosed in this specification. Obviously, the described embodiment is a part of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0027] Refer to the instruction manual Figure 1-5 The utility model provides a pile head waterproof non-solidification construction structure, including a concrete cushion layer 2 laid on the outside of the pile head 1, the concrete cushion layer 2 is C15 concrete, the cold primer 4 is made of No. 10 petroleum asphalt and an organic solvent, and is used to improve the sealing between the concrete cushion layer 2 and the rounded portion 3, the outside of the pile head 1 is the rounded portion 3, the top of the concrete cushion layer 2 is painted with cold primer 4, the top of the cold primer 4 is coated with a waterproof coating layer 5, the waterproof coating layer 5 is radially laid on the outside of the pile head 1 along the horizontal direction, and is used to play a waterproof role on the top of the cold primer 4, the top of the waterproof coating layer 5 is coated with a non-solidified asphalt waterproof coating 6, and the non-solidified asphalt waterproof coating 6 is radially laid on the waterproof coating layer 5 along the horizontal direction, and is used to improve the waterproof property of the waterproof coating layer 5.

[0028] A concrete cushion layer 2 is laid on the outside of the pile head 1, and then a cold primer 4 is applied on the concrete cushion layer 2. The cold primer 4 is a solution prepared by dissolving No. 10 petroleum asphalt in organic solvents such as kerosene and gasoline, which can seal the capillary pores between the concrete cushion layer 2 and the rounded portion 3, so that the concrete cushion layer 2 has waterproof ability. Then, a waterproof coating layer 5 is applied on the top of the cold primer 4. The waterproof coating layer 5 is radially laid on the outside of the pile head 1 in the horizontal direction. Specifically, its radial width is 450-500mm and its thickness is 1.5mm. The non-curing asphalt waterproof coating 6 is heated to form a liquid, the pile head 1 is laid on the waterproof coating layer 5, and radially in the horizontal direction. It is laid on the outside of the pile head 1, with a radial width of 450-500mm and a thickness of 1.5-2mm. The use of non-solidified asphalt can seal the cracks and pores between the pile head 1 and the concrete cushion layer 2, can adapt to complex construction work surfaces, and will not solidify for a long time after contact with the air, always maintaining the characteristics of a viscous colloid, with strong self-healing ability, sticky when touched and difficult to peel off, and still has good bonding properties at around 20°C. Secondly, the material of the non-solidified asphalt is a viscous paste, which has low requirements for the base layer around the pile head 1 and does not require special treatment, shortens the construction period, can be constructed in a low temperature environment, and has excellent waterproofing effect, so the waterproofness of the pile head 1 can be greatly improved.

[0029] Refer to the instruction manual Figure 1-5 , the top outer wall of the non-curing asphalt waterproof coating 6 and the outer side wall of the rounded portion 3 are fixedly bonded with a self-adhesive waterproof membrane 7. Specifically, the self-adhesive waterproof membrane 7 is a polymer self-adhesive film, which is used to improve the waterproofness of the non-curing asphalt waterproof coating 6. The outer wall of the self-adhesive waterproof membrane 7 is cast with a waterproof protective layer 8. A waterproof sealant 9 is placed between the top of the concrete cushion 2, the outer wall of the pile head 1 and the bottom of the rounded portion 3. Specifically, the waterproof sealant 9 is a waterproof sealing material made of a mixture of rubber, asphalt and additives, which has the characteristics of simple construction, strong self-healing ability, non-toxic and pollution-free, green and environmentally friendly, etc., and is used to improve the sealing between the concrete cushion 2, the pile head 1 and the rounded portion 3;

[0030] Furthermore, a plurality of steel bars 10 are fixedly arranged inside the pile head 1, and the plurality of steel bars 10 extend above the pile head 1. An expansion water stop ring 11 is sleeved at the root of the outer wall of each steel bar 10 to improve the sealing between the steel bar 10 and the pile head 1.

[0031] Moreover, a pressure plate 12 is provided on the outer wall of the waterproof protective layer 8, and the bottom of the pressure plate 12 is in contact with the top of the rounded portion 3 and the top of the concrete cushion layer 2. The pressure plate 12 can be used to improve the firmness of the entire waterproof non-solidification. The top of the pressure plate 12 is fixed to the rounded portion 3 by a plurality of bolts 13, and a plurality of pins 14 are fixed on the side of the bottom of the pressure plate 12 away from the pile head 1. The plurality of pins 14 all penetrate the bottom of the concrete cushion layer 2, and the plurality of pins 14 are inserted into the base layer around the pile head 1, thereby improving the stability of the pressure plate 12.

[0032] A self-adhesive waterproof membrane 7 is bonded to the non-curing asphalt waterproof coating 6. The self-adhesive waterproof membrane 7 cooperates with the waterproof protective layer 8. The self-adhesive waterproof membrane 7 adopts a polymer self-adhesive film and has excellent waterproof performance. The waterproof protective layer 8 adopts C25 fine stone concrete, and the thickness of the waterproof protective layer 8 is 100 mm, which can further improve the waterproof performance of the pile head 1. Then, a waterproof sealing paste 9 is placed between the top of the concrete cushion layer 2, the outer wall of the pile head 1 and the bottom of the rounded portion 3. The waterproof sealing paste 9 has an axial height of 10 mm along the outer edge of the pile head 1 and a radial width of 10 mm along the outer edge of the pile head 1 in a triangular shape. A pressing plate 12 is provided on the waterproof protective layer 8. The pressing plate 12 and the rounded portion 3 are fixed together by bolts 13. Multiple pins 14 at the bottom of the pressing plate 12 penetrate the concrete cushion layer 2 and are plugged into the base layer around the pile head 1. The pressing plate 12 is used to improve the firmness of the waterproof protective layer 8, the self-adhesive waterproof membrane 7, the non-curing asphalt waterproof coating 6, the waterproof coating, the cold primer 4 and the concrete cushion layer 2.

[0033] Although the utility model has been described in detail above with general descriptions and specific embodiments, it is obvious to those skilled in the art that some modifications or improvements can be made to the utility model. Therefore, these modifications or improvements made without departing from the spirit of the utility model are within the scope of protection claimed by the utility model.

Claims

1. A pile head waterproof non-solidification construction structure, characterized in that: It comprises a concrete cushion layer (2) laid on the outside of a pile head (1), the outside of the pile head (1) is a rounded portion (3), the top of the concrete cushion layer (2) is coated with a cold primer (4), and the top of the cold primer (4) is coated with a waterproof coating layer (5); The top of the waterproof coating layer (5) is coated with a non-curing asphalt waterproof coating (6), the top outer wall of the non-curing asphalt waterproof coating (6) and the outer side wall of the rounded portion (3) are both fixedly bonded with a self-adhesive waterproof coiled material (7), and the outer wall of the self-adhesive waterproof coiled material (7) is cast with a waterproof protective layer (8); A waterproof sealant (9) is placed between the top of the concrete cushion layer (2), the outer wall of the pile head (1) and the bottom of the rounded portion (3) to improve the sealing performance between the concrete cushion layer (2), the pile head (1) and the rounded portion (3).

2. A pile head waterproof non-solidification construction structure according to claim 1, characterized in that: The waterproof coating layer (5) is radially laid on the outside of the pile head (1) in the horizontal direction, and is used to play a waterproof role on the top of the cold primer oil (4).

3. A pile head waterproof non-solidification construction structure according to claim 1, characterized in that: The non-curing asphalt waterproof coating (6) is radially laid on the waterproof coating layer (5) along the horizontal direction, so as to improve the waterproof property of the waterproof coating layer (5).

4. A pile head waterproof non-solidification construction structure according to claim 1, characterized in that: The self-adhesive waterproof coiled material (7) is a polymer self-adhesive film and is used to improve the waterproofness of the non-curing asphalt waterproof coating (6).

5. The pile head waterproof non-solidification construction structure according to claim 1, characterized in that: The concrete cushion layer (2) is C15 concrete, and is used to improve the sealing performance between the concrete cushion layer (2) and the rounded portion (3).

6. The pile head waterproof non-solidification construction structure according to claim 1, characterized in that: A plurality of steel bars (10) are fixedly arranged inside the pile head (1), and the plurality of steel bars (10) extend above the pile head (1). An expansion water stop ring (11) is sleeved at the root of the outer wall of each steel bar (10) to improve the sealing performance between the steel bar (10) and the pile head (1).

7. The pile head waterproof non-solidification construction structure according to claim 1, characterized in that: The outer wall of the waterproof protective layer (8) is provided with a pressing plate (12), and the bottom of the pressing plate (12) is in contact with the top of the rounded portion (3) and the top of the concrete cushion layer (2).

8. A pile head waterproof non-solidification construction structure according to claim 7, characterized in that: The top of the pressing plate (12) and the rounded portion (3) are fixed by a plurality of bolts (13), and a plurality of inserting nails (14) are fixedly arranged on the side of the bottom of the pressing plate (12) away from the pile head (1), and the plurality of inserting nails (14) all penetrate the bottom of the concrete cushion layer (2).