Earth and stone enclosure frame
By designing an automatically moving baffle and guide rope system, combining the grounding pole and grounding seat, the problem of edge positioning difficulties during the installation of the earth and stone enclosure frame is solved, and construction efficiency and equipment utilization are improved.
Patent Information
- Application Number
- CN202420573933.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-22
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-22
AI Technical Summary
During the installation of the earth and rock enclosure, it is difficult to accurately control the margin of the earth and rock side walls, resulting in repeated adjustments in the installation of the cross baffle, which affects the construction efficiency.
A earth-rock enclosure frame is designed, which automatically moves downward using the gravity of the baffle. Combined with the guide rope and pulley system, the edge of the earth-breaking rod and grounding seat is designed to gradually determine the support strength and installation efficiency.
Accurate positioning and stable support of the edges of earth and rocks is achieved, construction efficiency is improved, and the baffle can be quickly recycled by pulling the guide rope, improving the utilization rate of the equipment.
Smart Images

Figure CN222009847U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of engineering construction equipment, and more specifically, to an earthwork enclosure frame. Background Art
[0002] In the early steps of construction on a construction site, piling up earth and stone is a very important step. Earth and stone is the engineering process of loosening, crushing, excavating and transporting soil and rocks. The excavation of earth and stone plays a key role in the setting of the building foundation.
[0003] In order to avoid landslides or quicksand after the earth and stone is set up, earth and stone enclosures will be set up on the inner wall of the earth and stone during construction to support the edge of the earth and stone by resisting. The earth and stone are usually pre-driven with rails or I-beams on the side walls of the earth and stone, and then cross baffles are installed on the rails while digging. The installation of the cross baffles is usually achieved by fixing them by driving wedges when digging down to a certain height.
[0004] During the installation of earthwork enclosures, the cross baffles need to be installed multiple times. However, it is difficult to accurately control the side wall margins when the earthwork is excavated, resulting in the need to connect the cross baffles between the remaining excavated position and the installation process. If the earthwork collapses at this time, repeated adjustments are required to complete the installation of the cross baffles.
[0005] Therefore, new solutions need to be proposed to solve this problem. Utility Model Content
[0006] In view of the shortcomings of the prior art, the purpose of the utility model is to provide an earth and stone retaining frame, which can automatically move downward by the gravity of the baffle during excavation, gradually determine the edge of the earth and stone, and complete the outline of the earth and stone after the setting is completed, thereby improving construction efficiency.
[0007] The above-mentioned technical purpose of the utility model is achieved through the following technical scheme: the earth and rock enclosure frame includes a plurality of baffles and a plurality of support frames, the top end of the support frame is rotatably connected to a pulley, the pulley is provided with a guide rope, a connecting column for fixing one end of the guide rope is fixedly connected to the baffle, a bracket is rotatably connected to the baffle, a limiting protrusion is fixedly connected to the baffle, a symmetrically arranged sliding groove is opened on the limiting protrusion, and the limiting protrusion is slidably connected to a breaking rod when the limiting protrusion is in the sliding groove position.
[0008] The utility model is further configured as follows: a grounding seat is fixedly connected to the bottom end of the baffle, and the thickness of the grounding seat gradually decreases as it moves away from the connecting column.
[0009] The utility model is further configured as follows: the cross section of the grounding seat is a right triangle, and one of the right angle sides is located on the extension line of the baffle away from the bracket.
[0010] The utility model is further configured as follows: a plurality of soil-breaking spikes are fixedly connected to the bracket, and the central axis of the soil-breaking spikes is vertically arranged to the central axis of the bracket.
[0011] The utility model is further configured as follows: the earth-breaking rod is arranged in a columnar shape, the top end of the earth-breaking rod is fixedly connected to a striking platform, and the bottom end of the earth-breaking rod is arranged in a conical shape.
[0012] The utility model is further configured as follows: the bracket is located on one side of the two earth-breaking rods on the baffle plate close to the center of the baffle plate.
[0013] The utility model is further configured as follows: the bottom end of the support frame is configured as a pointed head, and a grounding plate is fixedly connected to the support frame.
[0014] The utility model is further configured as follows: mounting holes are respectively opened on both sides of the baffle, a support seat is installed between two adjacent baffles, and a protrusion for being inserted into the mounting hole is fixedly connected to the support seat.
[0015] In summary, the utility model has the following beneficial effects:
[0016] When excavating earth and stone, the baffle plate automatically moves downward by gravity, gradually defining the edge of the earth and stone. After the setting is completed, the outline of the earth and stone is also completed, thereby improving construction efficiency. After the earth and stone are set, the baffle plate can be pulled out by pulling the guide rope, thereby improving utilization rate. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the structure of the utility model;
[0018] Figure 2 This is a schematic diagram of the structure of the baffle in the utility model;
[0019] Figure 3 It is a structural schematic diagram of the utility model when two baffles are connected;
[0020] Figure 4 It is a schematic diagram of the internal structure when two baffles are connected in the utility model.
[0021] In the figure: 1, baffle; 2, support frame; 3, pulley; 4, guide rope; 5, connecting column; 6, bracket; 7, limiting protrusion; 8, earth-breaking rod; 9, grounding seat; 10, earth-breaking thorn; 11, striking platform; 12, grounding plate; 13, mounting hole; 14, support seat; 15, protrusion. DETAILED DESCRIPTION
[0022] The utility model is described in detail below in conjunction with the accompanying drawings and embodiments.
[0023] A kind of earthwork enclosure frame, such as Figure 1 As shown, it includes a plurality of baffles 1. After the baffles 1 are installed, the outer parts will form the inner wall of the earth and stone, and support the side walls of the earth and stone. It also includes a plurality of support frames 2. During the installation of the baffles 1, the ratio of the number of support frames 2 to the number of baffles 1 is four to one. Four support frames 2 are installed on the construction site to form a quadrilateral, preferably an isosceles trapezoid, to prevent the excavator from approaching the support frames 2 during the excavation process. After the support frames 2 are fixed, the guide ropes 4 and the baffles 1 are installed. The setting of the pulley 3 can reduce the sliding Dynamic friction prolongs the service life of the guide rope 4. The baffle 1 is placed on the upper side of the edge of the earth and stone. The guide rope 4 connects the support frame 2 with the guide rope 4. During operation, the excavator digs out the soil on the side of the baffle 1 close to the center of the earth and stone, so that the lower side of the baffle 1 becomes empty. At this time, the guide rope 4 is released, and the baffle 1 moves downward under its own gravity. When the excavator digs to the specified position, the baffle 1 is grounded and the bracket 6 is turned down to contact the ground. At this time, the bracket 6 is erected, and the other end is against the side wall of the earth and stone.
[0024] like Figure 1-4 As shown, a limiting protrusion 7 is fixedly connected to the baffle 1, a sliding groove is arranged inside the limiting protrusion 7, and the limiting protrusion 7 is slidably connected to a breaking rod 8 through the sliding groove. After the baffle 1 is fixed, the breaking rod 8 is hit, so that the breaking rod 8 impacts the bottom surface of the earth, realizes sinking and fixing, and improves the supporting effect of the baffle 1.
[0025] like Figure 1-4 As shown, the bottom end of the baffle 1 is fixedly connected with a grounding seat 9, and the grounding seat 9 is on the lower side of the baffle 1. The first position that contacts the bottom surface of the earth is the grounding seat 9. The thickness of the grounding seat 9 gradually decreases as it moves away from the connecting column 5, which makes the grounding seat 9 form a pointed end. When the baffle 1 is pressed down, the grounding seat 9 can be impacted and moved downward and sunk into the soil. When the baffle 1 is grounded, the top of the baffle 1 is knocked by an excavator, and the soil at the bottom can be pushed away through the grounding seat 9 to reinforce the baffle 1 and improve the supporting capacity of the baffle 1 to the side wall of the earth and stone. The cross-section of the grounding seat 9 is set in a right-angled triangle, and one of the right-angle sides of the cross-section of the grounding seat 9 is on the extension line of the side of the baffle 1 away from the bracket 6. Such a setting will increase the contact surface with the side wall of the earth and stone. At the same time, in the process of knocking and pressing the baffle 1 down, the position deviation of the baffle 1 can be reduced, thereby reducing the error.
[0026] like Figure 1-4 As shown, a soil-breaking spike 10 is fixedly connected to the bracket 6. After the baffle 1 is set, the bracket 6 is rotated downward to make the bracket 6 grounded. At this time, the bracket 6 is knocked to make the soil-breaking spike 10 penetrate into the ground, thereby improving the supporting strength of the baffle 1.
[0027] like Figure 1-4As shown, the breaking rod 8 is arranged in a columnar shape, and a striking platform 11 is fixedly connected to the top of the breaking rod 8. After the baffle 1 is installed, the excavator can hammer the breaking rod 8 into the soil by striking the striking platform 11. The cylindrical arrangement can facilitate the subsequent processing of the bottom end into a cone shape, and the cone shape can reduce the contact surface when breaking the soil and increase the pressure applied.
[0028] like Figure 2-4 As shown, the bracket 6 is located on the side of the two breaking rods 8 on the baffle 1 close to the center of the baffle 1. By staggering the bracket 6 and the baffle 1, the two can avoid contact during recovery, and can be disassembled in no fixed order, which is convenient for use.
[0029] like Figure 1-4 As shown, the bottom end of the support frame 2 is pointed, which can more efficiently break the ground. The grounding plate 12 fixedly connected to the support frame 2 contacts the ground after the support frame 2 is knocked in, helping the construction workers to determine the placement of the support frame 2.
[0030] like Figure 2-4 As shown, mounting holes 13 are opened on both sides of the baffle 1. After the baffle 1 is installed, a support seat 14 is installed between two adjacent baffles 1. The two adjacent mounting holes 13 are filled by the protrusions 15 on the support seat 14. When the baffle 1 is subjected to force, the force is transferred to the adjacent baffle 1 to improve the supporting strength.
[0031] Structural principle:
[0032] During the installation of the baffle 1, the ratio of the number of support frames 2 to baffle 1 is four to one. Four support frames 2 are installed on the construction site to form a quadrilateral, preferably an isosceles trapezoid, to prevent the excavator from approaching the support frame 2 during the excavation process. After the support frame 2 is fixed, the guide rope 4 and the baffle 1 are erected. The baffle 1 is placed on the upper side of the edge of the earth and stone, and the guide rope 4 connects the support frame 2 with the guide rope 4. During the operation, the excavator digs out the soil on the side of the baffle 1 close to the center of the earth and stone, so that the lower side of the baffle 1 becomes empty. The baffle 1 moves downward due to its own weight. When the excavator digs to the specified position, the excavator hits the top of the baffle 1, so that the baffle 1 is inserted into the ground and grounded. After the erection is completed, the two support frames 2 close to the earth and stone side are removed, leaving the other two support frame 2 columns for support; after the baffle 1 is inserted, it hits the breaking rod 8, so that the breaking rod 8 is removed into the ground to improve the support strength.
[0033] The grounding seat 9 in contact with the bottom surface of the earthwork gradually reduces its thickness to form a pointed end as it moves away from the connecting column 5; by using an excavator to knock on the top of the baffle 1, the soil at the bottom can be pushed away through the grounding seat 9 to reinforce the baffle 1. The cross-section of the grounding seat 9 is set in a right-angled triangle, which can increase the contact surface with the side wall of the earthwork. At the same time, in the process of knocking and pressing the baffle 1, the position deviation of the baffle 1 can be reduced, thereby reducing the error.
[0034] The bracket 6 is fixedly connected with a soil-breaking spike 10. After the baffle 1 is set, the bracket 6 is rotated downward to make the bracket 6 grounded. At this time, the bracket 6 is knocked to make the soil-breaking spike 10 penetrate into the ground, thereby improving the supporting strength of the baffle 1.
[0035] After the baffle 1 is installed, the support seat 14 is installed between two adjacent baffles 1, and the two adjacent mounting holes 13 are installed through the protrusion 15 on the support seat 14. When the baffle 1 is subjected to force, the force is transmitted to the adjacent baffle 1, thereby improving the support strength.
[0036] After the earthwork construction is completed, the baffle 1 can be lifted up by using the support frame 2 and reused in the subsequent process to improve the utilization rate.
[0037] The above is only a preferred embodiment of the present invention. The protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.
Claims
1. A soil and rock enclosure frame, comprising a plurality of baffles (1), Features: The invention also comprises a plurality of support frames (2), the top end of the support frame (2) is rotatably connected to a pulley (3), the pulley (3) is provided with a guide rope (4), the baffle (1) is fixedly connected to a connecting column (5) for fixing one end of the guide rope (4), the baffle (1) is rotatably connected to a bracket (6), the baffle (1) is fixedly connected to a limiting protrusion (7), the limiting protrusion (7) is provided with a symmetrically arranged sliding groove, and the limiting protrusion (7) is slidably connected to a soil breaking rod (8) in the sliding groove position.
2. The earthwork enclosure frame according to claim 1, Features: The bottom end of the baffle (1) is fixedly connected to a grounding seat (9), and the thickness of the grounding seat (9) gradually decreases as it moves away from the connecting column (5).
3. The earthwork enclosure frame according to claim 2, Features: The cross section of the grounding seat (9) is in the form of a right triangle, and one of the right angles is located on the extension line of the baffle (1) away from the bracket (6).
4. The earthwork enclosure frame according to claim 1, Features: A plurality of soil-breaking spikes (10) are fixedly connected to the support (6), and the central axis of the soil-breaking spikes (10) is arranged perpendicular to the central axis of the support (6).
5. The earthwork retaining frame according to claim 1, Features: The earth-breaking rod (8) is arranged in a columnar shape, the top end of the earth-breaking rod (8) is fixedly connected to a striking platform (11), and the bottom end of the earth-breaking rod (8) is arranged in a conical shape.
6. The earthwork retaining frame according to claim 1, Features: The bracket (6) is located on one side of the two earth-breaking rods (8) on the baffle (1) close to the center of the baffle (1).
7. The earthwork retaining frame according to claim 1, Features: The bottom end of the support frame (2) is pointed, and a grounding plate (12) is fixedly connected to the support frame (2).
8. The earthwork retaining frame according to claim 1, Features: The baffle (1) is provided with mounting holes (13) on both sides, a support seat (14) is installed between two adjacent baffles (1), and a protrusion (15) for snapping into the mounting hole (13) is fixedly connected to the support seat (14).