Double-pile-casing structure of rotary drilling rig for sand-rich stratum in riverside area
By using the design of using the outer casing length smaller than the inner casing in the sand-rich formation pile foundation construction in the riverside area, combined with the reinforced bar frame and positioning guide structure, the concentricity and residue problems of the double casing structure are solved, and more efficient construction and Extraction process.
Patent Information
- Application Number
- CN202420402003.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-01
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-01
AI Technical Summary
The existing double-carriage structure cannot guarantee the concentricity between the outer casing and the inner casing during the sand-rich formation pile foundation construction in the riverside area, resulting in excessive friction or offset, and the drilling residue is prone to fall into the gap, affecting the removal. Difficulty and construction efficiency.
The length of the outer casing is smaller than that of the inner casing. A steel frame and a positioning guide structure are provided in the inner casing, including guide grooves, guide protrusions, hanging lugs and sealing seals to ensure the concentricity of the vibration and prevent residue from falling into the gap.
The positioning guide structure ensures the concentricity and stability of the inner guard, reduces friction, prevents drilling residue from entering the gap, and improves removal efficiency and construction safety.
Smart Images

Figure CN222010112U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of bridge construction, and in particular to a double casing structure for rotary drilling in sand-rich strata in riverside areas. Background Art
[0002] When constructing pile foundations in sandy strata in riverside areas, it is necessary to pass through thick sand layers, and the groundwater is extremely abundant, which makes it easy for the holes to collapse. When the casing is buried too deep and passes through the sand layer, the friction between the inner and outer walls of the steel casing will increase significantly, making it difficult to pull out the casing. Double casings are used for pile foundation construction, that is, a section of about 4.5m outer casing is first driven in to reduce the friction when the long casing is driven out, and then the inner casing is vibrated into place with a pile hammer. After the hole is formed and poured, the inner and outer casings are pulled out in reverse order with a pile hammer. This work is completed before the concrete begins to set.
[0003] Therefore, the current construction unit has adopted a double casing drilling construction process, and the current double casing structure still has certain defects. First, the concentricity of the outer casing and the inner casing cannot be guaranteed. In order to reduce friction and facilitate the removal of the inner casing, there will be a certain gap between the outer casing and the inner casing. When the gap is too large, the inner casing is very likely to shift during the vibration process. When the gap is too small, the deviation during the removal process causes excessive friction between the inner casing and the outer casing, making it difficult to remove the inner casing. In addition, due to the existence of the gap, after the vibration of the inner casing is completed, when the hole is continued to be drilled by the rotary drilling rig, the residue of the drilling hole is very likely to fall into the gap between the two, resulting in excessive friction when the inner casing is removed.
[0004] Therefore, it is necessary to improve the existing double casing structure to solve the above technical problems. Utility Model Content
[0005] The main purpose of the present application is to provide a double casing structure for rotary drilling in sand-rich strata in riverside areas, which utilizes the tie rod holes of the solid pier body to firstly ensure the concentricity of the two during vibration while ensuring the smooth removal of the inner casing, and secondly to prevent the residues of the drilling from falling into the gap between the two.
[0006] In order to achieve the above-mentioned objectives, in the first aspect, the present application provides a double casing structure for rotary drilling in sand-rich strata in riverside areas, comprising an outer casing, an inner casing arranged inside the outer casing, and a steel frame arranged inside the inner casing, the length of the outer casing is smaller than the length of the inner casing, the length of the steel frame is larger than the length of the inner casing, a positioning guide structure is arranged between the outer casing and the inner casing, the positioning guide structure comprises a plurality of guide grooves opened on the inner side wall of the outer casing, a guide protrusion arranged on the outer side wall of the inner casing and cooperating with the guide groove, a plurality of lifting ears fixedly arranged on the outer side wall of the upper end portion of the inner casing, and a sealing seal detachably connected to the lifting ears.
[0007] As a further improvement, the plugging seals are a plurality of arc-shaped rubber pieces, the number of the plugging seals is the same as the number of the lifting ears, and the outer diameter of the plugging seals is greater than the inner diameter of the outer casing.
[0008] A further improvement is that the rubber piece is fixed to the lifting ear by a fastener.
[0009] As a further improvement, the inner diameter of the outer casing is the pile diameter + 0.4 m, and the inner diameter of the inner casing is the pile diameter + 0.2 m.
[0010] As a further improvement, the length of the outer casing is 4.5 m, and the inner casing is manufactured in sections, with the length of each section of the inner casing being 2-3 m.
[0011] As a further improvement, the length direction of the guide groove extends along the length direction of the outer casing, and the depth direction extends along the radial direction of the outer casing.
[0012] A further improvement is that the end surface of the guide protrusion is an arc surface.
[0013] A further improvement is that a gap retaining member is provided between the steel bar skeleton and the inner casing.
[0014] The utility model provides a double casing structure for rotary drilling in sand-rich strata in riverside areas. Compared with the prior art, the utility model has the following beneficial effects: by arranging a positioning guide structure between the outer casing and the inner casing, the concentricity of the two casings during vibration is ensured while maintaining a certain gap; in addition, by arranging a blocking seal, the residue of the drilling hole is effectively prevented from falling into the gap; and the disassembly connection method does not affect the use of the lifting ear of the inner casing during the removal process. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The drawings constituting a part of this application are used to provide a further understanding of this application, so that other features, purposes and advantages of this application become more obvious. The schematic embodiment drawings and their descriptions of this application are used to explain this application and do not constitute an improper limitation on this application. In the drawings:
[0016] Figure 1 It is a schematic diagram of the utility model;
[0017] Figure 2 is a schematic diagram of the outer casing;
[0018] Figure 3 Schematic diagram of inner casing.
[0019] Among them: 1. Inner casing; 2. Outer casing; 3. Lifting ear; 4. Guide groove; 5. Guide protrusion; 6. Sealing element; 7. Steel reinforcement frame. DETAILED DESCRIPTION
[0020] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0021] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0022] In the present application, the terms "upper", "lower", "left", "right", "front", "back", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings. These terms are mainly used to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to have a specific orientation, or to be constructed and operated in a specific orientation.
[0023] In addition, some of the above terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in this application can be understood according to specific circumstances.
[0024] In addition, the term "plurality" shall mean two or more.
[0025] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0026] like Figure 1-Figure 3As shown, a double casing structure for rotary drilling in sand-rich strata in riverside areas includes an outer casing 2, an inner casing 1 arranged inside the outer casing 2, and a steel skeleton 7 arranged in the inner casing 1. The length of the outer casing 2 is smaller than the length of the inner casing 1, and the length of the steel skeleton 7 is larger than the length of the inner casing 1. A positioning guide structure is arranged between the outer casing 2 and the inner casing 1, and the positioning guide structure includes a plurality of guide grooves 4 opened on the inner side wall of the outer casing 2, guide protrusions arranged on the outer side wall of the inner casing 1 and matching with the guide grooves 4, a plurality of lifting ears 3 fixedly arranged on the outer side wall of the upper end of the inner casing 1, and a sealing seal 6 detachably connected to the lifting ears 3.
[0027] It should be noted that the installation and removal process of the entire casing structure is as follows: first, the outer casing 2 is installed by using a rotary drilling rig + crawler crane + vibrating hammer, and its verticality and depth are ensured by checking, and then the inner casing 1 is installed. Since the verticality of the outer casing 2 is ensured, it is only necessary to ensure the concentricity of the inner casing 1 and the outer casing 2 to ensure the verticality of the inner casing 1. Therefore, through the cooperation of each guide protrusion 5 and the guide groove 4, the inner casing 1 is always concentric with the outer casing 2 during the vibration installation process, and in the removal stage, due to the inner casing The contact area between the guide protrusion 5 on the tube 1 and the guide groove 4 is small, which will not affect its removal. In addition, after the inner casing 1 is installed in place, it is necessary to continue drilling by means of a rotary drill. At this time, a plugging seal 6 is installed on the lifting ear 3 to ensure that residues will not fall into the gap between the inner casing 1 and the outer casing 2. Compared with the current method of filling with sandbags, it is not only efficient and easy to disassemble and assemble, but also avoids the risk of sand and stones falling into the gap after the sandbags are squeezed, rubbed and ruptured. Moreover, in the removal stage, only the plugging seal 6 needs to be removed.
[0028] In order to improve the sealing between the outer casing 2 and the inner casing 1, the blocking seal 6 is a plurality of arc-shaped rubber parts, the number of the blocking seals 6 is the same as the number of the lifting ears 3, the outer diameter of the blocking seal 6 is larger than the inner diameter of the outer casing 2, and the rubber parts are fixed to the lifting ears 3 by fasteners, which can be bolts or screws.
[0029] In order to ensure that the inner casing 1 and the outer casing 2 have sufficient strength for vibration and prevent deformation, the inner diameter of the outer casing 2 is the pile diameter + 0.4m, and the inner diameter of the inner casing 1 is the pile diameter + 0.2m.
[0030] Since the inner casing 1 is not only subjected to the friction of the outer sand layer but also to the adhesive force of the concrete during the removal stage, in order to reduce the resistance encountered in removing the inner casing 1, the length of the outer casing 2 is 4.5m, and the inner casing 1 is manufactured in sections, with the length of each section of the inner casing 1 being 2-3m, that is, the length of the contact section between the inner casing 1 and the sand layer is smaller than the length of the contact section between the outer casing 2 and the sand layer. The length direction of the guide groove 4 extends along the length direction of the outer casing 2, and the depth direction extends along the radial direction of the outer casing 2. In order to reduce friction, the end face of the guide protrusion 5 is an arc surface.
[0031] In order to ensure the concentricity of the steel skeleton 7 and the inner casing 1 when pouring the pile body, a gap retainer is provided between the steel skeleton 7 and the inner casing 1 .
[0032] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A double casing structure for rotary drilling in sand-rich strata in riverside areas, characterized in that: The invention comprises an outer casing, an inner casing arranged inside the outer casing, and a steel frame arranged inside the inner casing. The length of the outer casing is smaller than the length of the inner casing, and the length of the steel frame is larger than the length of the inner casing. A positioning guide structure is arranged between the outer casing and the inner casing. The positioning guide structure comprises a plurality of guide grooves opened on the inner wall of the outer casing, guide protrusions arranged on the outer wall of the inner casing and matching with the guide grooves, a plurality of lifting ears fixedly arranged on the outer wall of the upper end of the inner casing, and a sealing seal detachably connected to the lifting ears.
2. A double casing structure for rotary drilling in sand-rich strata in riverside areas as claimed in claim 1, characterized in that: The plugging seals are a plurality of arc-shaped rubber pieces, the number of the plugging seals is the same as the number of the lifting ears, and the outer diameter of the plugging seals is greater than the inner diameter of the outer casing.
3. A double casing structure for rotary drilling in sand-rich strata in riverside areas as claimed in claim 2, characterized in that: The rubber piece is fixed on the lifting ear through a fastener.
4. A double casing structure for rotary drilling in sand-rich strata in riverside areas as claimed in claim 1, characterized in that: The inner diameter of the outer casing is the pile diameter + 0.4 m, and the inner diameter of the inner casing is the pile diameter + 0.2 m.
5. A double casing structure for rotary drilling in sand-rich strata in riverside areas as claimed in claim 4, characterized in that: The length of the outer casing is 4.5m, and the inner casing is manufactured in sections, and the length of each section of the inner casing is 2-3m.
6. A double casing structure for rotary drilling in sand-rich strata in riverside areas as claimed in claim 1, characterized in that: The length direction of the guide groove extends along the length direction of the outer casing, and the depth direction of the guide groove extends along the radial direction of the outer casing.
7. A double casing structure for rotary drilling in sand-rich strata in riverside areas as claimed in claim 6, characterized in that: The end surface of the guide protrusion is an arc surface.
8. The double casing structure for rotary drilling in sand-rich strata in riverside areas as claimed in claim 1, characterized in that: A gap retaining member is arranged between the steel bar skeleton and the inner casing.
Citation Information
Cited By
Steel casing structure of rotary excavating pile
CN223813764U