Active control agent feeding system for on-line preparation of polypropylene
Through the online preparation system, the dry air pressure is stabilized by using compressors and buffer tanks, and the cylinder group is replaced, the risks and cost problems in the transportation and replacement of active control agents are solved, and safety and economic improvements are achieved.
Patent Information
- Application Number
- CN202420260673.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-02
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-02-02
AI Technical Summary
In the prior art, the transportation and replacement of active control agents provided through cylinder groups can be risky of personal injury and have a high economic cost.
Design an active control agent feeding system for preparing polypropylene online, including a first compressor, a buffer tank and a gas supply pipe, pressurizes the dry air by using the first compressor and stabilizes the pressure through the buffer tank, and uses the second compressor to Active control agent delivery provides power, replacing cylinder sets, reducing handling and switching operations.
It reduces personal injury risks and economic costs, improves production efficiency, and reduces the frequency of use and transportation needs of steel cylinders.
Smart Images

Figure CN222019493U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of polypropylene preparation, in particular to an active control agent feeding system for online preparation of polypropylene. Background Art
[0002] When using the Japanese JPP gas phase production process to prepare polypropylene, a certain amount of dried compressed air needs to be added to the reactor as an active control agent to control the fluidity and EPDM content of the polypropylene product. The existing active control agent is provided by a special manufacturer and uses a 4*4 steel cylinder group. The pressure of the active control agent in the cylinder is about 15MPa. With the use of the active control agent, the pressure of the steel cylinder group gradually decreases. When the pressure drops to about 3.5MPa, a new steel cylinder group needs to be replaced on site, and the used steel cylinders are recycled by the manufacturer.
[0003] When the active control agent is provided by a cylinder group, each group of cylinders weighs 1 ton and is generally transported by forklift. If the safety measures are not properly managed, there is a risk of personal injury during each unloading and transportation process, and it may also cause damage to process pipelines and equipment. At the same time, the cylinder pressure is as high as 15MPa. Operators need to dismantle pipelines and switch valves when putting into use, replacing, and withdrawing the cylinder group. If the operation is improper or the valve pipeline leaks or collapses, there is a great risk to the personal safety of the operator. In addition, the active control agent cylinder group is provided by the manufacturer, and the economic cost is relatively high. Utility Model Content
[0004] The utility model aims to provide an active control agent feeding system for online preparation of polypropylene, so as to solve the problems in the prior art of providing active control agents through steel cylinder groups, and the risks and high costs in transporting and replacing steel cylinders.
[0005] In order to achieve the above object, the utility model provides an active control agent feeding system for online preparation of polypropylene, comprising:
[0006] a first compressor, wherein an air inlet end of the first compressor is connected to a dry air inlet pipe, and an air outlet end of the first compressor is connected to a dry air outlet pipe;
[0007] A buffer tank, wherein the air inlet end of the buffer tank is connected to the dry air outlet pipe, and the air outlet end of the buffer tank is connected to an air supply pipeline;
[0008] The reactor has an air inlet end connected to the air supply pipeline, and the air supply pipeline is also connected to a second compressor.
[0009] Preferably, the air supply pipeline is also connected to a pressure reducing valve, the pressure reducing valve is arranged between the buffer tank and the second compressor, and two groups of the pressure reducing valves are arranged in parallel.
[0010] Preferably, the gas supply pipeline is also connected to a steel cylinder group, and the steel cylinder group is connected between the buffer tank and the pressure reducing valve.
[0011] Preferably, the gas supply pipeline includes a main path and a bypass path arranged in parallel with each other, one end of the bypass path and the main path are both connected to the buffer tank, and the other end are both connected to a side of the cylinder group close to the buffer tank.
[0012] Preferably, a shower and sewage branch is connected to the main road, and a shower and sewage branch is connected between the bypass and the cylinder group.
[0013] Preferably, a flow regulating valve is further arranged on the air supply pipeline, and the flow regulating valve is arranged between the pressure reducing valve and the second compressor, and two groups of the flow regulating valves are arranged in parallel.
[0014] Preferably, the gas supply pipeline is also connected to an emergency shut-off valve, and the emergency shut-off valve is arranged between the pressure reducing valve and the flow regulating valve.
[0015] Preferably, a water inlet pipe and a water outlet pipe are also connected to the first compressor, and the water inlet pipe and the water outlet pipe are interconnected to form a cooling water loop.
[0016] Preferably, both the water inlet pipe and the water outlet pipe are connected with shower and sewage branches.
[0017] Preferably, a safety valve and a pressure gauge are provided on the top of the buffer tank, a shower and sewage branch is connected to the bottom of the buffer tank, and a pressure relief valve is connected to the side of the buffer tank.
[0018] Compared with the prior art, the embodiment of the utility model is an active control agent feeding system for online preparation of polypropylene, and its beneficial effects are: a first compressor and a buffer tank are connected to the air supply pipeline, the first compressor is connected to the external dry air supply equipment through the dry air inlet pipe, the dry air as the active control agent is pressurized by the first compressor and then transported to the buffer tank, the buffer tank can temporarily store the dry air and ensure the pressure of the dry air is stable, and then the dry air is transported to the reactor through the air supply pipeline as the active control agent, and the second compressor is used to provide power for the transportation of the active control agent, thereby replacing the existing steel cylinder group as the feeding equipment of the active control agent, reducing the transportation and switching operations of the steel cylinders, and reducing the risk of personal injury; in addition, the dry air does not need to be provided separately by the manufacturer, which reduces the economic cost and increases the production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 The utility model is a schematic structural diagram of an active control agent feeding system for online preparation of polypropylene.
[0020] In the figure, 1. the first compressor, 2. the buffer tank, 3. the second compressor, 4. the reactor, 5. the dry air inlet pipe, 6. the dry air outlet pipe, 7. the air supply pipeline, 8. the pressure reducing valve, 9. the cylinder group, 10. the main line, 11. the bypass, 12. the flow regulating valve, 13. the emergency shut-off valve, 14. the water inlet pipe, 15. the water outlet pipe, 16. the shower and sewage branch, 17. the pressure gauge, 18. the safety valve, 19. the pressure relief valve. DETAILED DESCRIPTION
[0021] The following is a further detailed description of the specific implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0022] A preferred embodiment of the active control agent feeding system for online preparation of polypropylene of the utility model is as follows: Figure 1 As shown, the active control agent feeding system for online preparation of polypropylene includes a first compressor 1, a buffer tank 2, a second compressor 3 and a reactor 4. The first compressor 1, the buffer tank 2, the second compressor 3 and the reactor 4 are connected in sequence. The first compressor 1 is used for compressing dry air as an active control agent, the buffer tank 2 is used for storing dry air and stabilizing the pressure, and the second compressor 3 is used for transporting dry air to the reactor 4.
[0023] The air inlet end of the first compressor 1 is connected to a dry air inlet pipe 5, and the air outlet end of the first compressor 1 is connected to a dry air outlet pipe 6. The dry air inlet pipe 5 is used to connect to the instrument air equipment of the utility project to transport the instrument air into the first compressor 1. The instrument air can provide dry air as an active control machine. The first compressor 1 compresses and boosts the dry air and then discharges it through the dry air outlet pipe 6.
[0024] In this embodiment, the first compressor 1 is a diaphragm compressor with a shaft power of 1KW and a maximum flow rate of 2Nm 3 / h, the instrument air pressure entering the dry air inlet pipe 5 is 0.7Mpa. After being pressurized by the first compressor 1, the pressure of the dry air discharged from the dry air outlet pipe 6 is 3.55Mpa, which meets the pressure requirement of the dry air entering the reactor 4.
[0025] The air inlet end of the buffer tank 2 is connected to the dry air outlet pipe 6, and the air outlet end of the buffer tank 2 is connected to the air supply pipe 7. The dry air is compressed and pressurized by the first compressor 1 and enters the buffer tank 2 through the dry air outlet pipe 6. The buffer tank 2 can store the dry air and buffer the dry air at the same time. When the working state of the first compressor 1 fluctuates, the buffer tank 2 can ensure that the pressure of the dry air entering the air supply pipe 7 is stable.
[0026] The air inlet end of the reactor 4 is connected to the air supply pipeline 7, and the air supply pipeline 7 is also connected to the second compressor 3, and the second compressor 3 is connected between the buffer tank 2 and the reactor 4. The second compressor 3 can provide power for the transportation of dry air, and when the pressure of the dry air decreases during the transportation process, the dry air can be pressurized by the second compressor 3 and then transported into the reactor 4.
[0027] The active control agent feeding system for online preparation of polypropylene is provided with a first compressor 1 and a buffer tank 2 connected with an air supply pipeline 7. The first compressor 1 is connected with an external dry air supply device through a dry air intake pipe 5. The dry air as the active control agent is pressurized by the first compressor 1 and then transported to the buffer tank 2. The buffer tank 2 can temporarily store the dry air and ensure the pressure of the dry air is stable. Then, the dry air is transported to the reactor 4 through the air supply pipeline 7 as the active control agent. The second compressor 3 is used to provide power for the transportation of the active control agent, thereby replacing the existing steel cylinder group 9 as the active control agent feeding equipment, reducing the operations of carrying and switching the steel cylinders, and reducing the risk of personal injury. In addition, the dry air does not need to be provided separately by the manufacturer, which reduces the economic cost and increases the production efficiency.
[0028] Preferably, the air supply pipeline 7 is also connected with a pressure reducing valve 8, which is arranged between the buffer tank 2 and the second compressor 3, and two groups of pressure reducing valves 8 are arranged in parallel.
[0029] A pressure reducing valve 8 is arranged between the buffer tank 2 of the air supply pipeline 7 and the second compressor 3. The pressure reducing valve 8 can reduce the pressure of the dry air to meet the working requirements of the reactor 4. In this embodiment, the pressure reducing valve 8 can reduce the pressure of the dry air in the air supply pipeline 7 from 3.55MPa to 3.1Mpa. Two groups of pressure reducing valves 8 are arranged in parallel, and the two groups of pressure reducing valves 8 have the effect of one for use and one for backup.
[0030] Preferably, the gas supply pipeline 7 is also connected to a steel cylinder group 9 , and the steel cylinder group 9 is connected between the buffer tank 2 and the pressure reducing valve 8 .
[0031] The steel cylinder group 9 is connected to the gas supply pipeline 7. As an existing active control agent feeding device, the steel cylinder group 9 can be kept in a standby state. When the first compressor 1 and the buffer tank 2 are shut down for maintenance, the steel cylinder group 9 can be used for feeding to ensure the normal operation of the process. In this embodiment, there are two groups of steel cylinder groups 9, one for use and one for standby. The internal pressure of the steel cylinder group 9 is 15M Pa, which is reduced to about 3.2MPa by the pressure reducing valve 8 and then enters the reactor 4. When the pressure inside the steel cylinder group 9 is reduced to 3.5MPa, a new steel cylinder group 9 can be replaced.
[0032] Preferably, the gas supply pipeline 7 includes a main path 10 and a bypass path 11 arranged in parallel with each other, and one end of the bypass path 11 and the main path 10 are connected to the buffer tank 2, and the other end is connected to the side of the cylinder group 9 close to the buffer tank 2.
[0033] The main road 10 and the bypass 11 are arranged in parallel, and one of the main road 10 and the bypass 11 is used and the other is reserved. The main road 10 can be used for daily feeding, and when the main road 10 needs to be repaired, the bypass 11 can be used for feeding.
[0034] Preferably, a shower and sewage branch 16 is connected to the main path 10 , and a shower and sewage branch 16 is connected between the bypass 11 and the cylinder group 9 .
[0035] The drainage branch 16 can guide and discharge unnecessary gas, liquid and other impurities in the gas supply pipeline, and prevent damage accidents such as blockage and leakage from occurring on the main road 10 and the gas supply pipeline 7.
[0036] Preferably, a flow regulating valve 12 is further arranged on the air supply pipeline 7 , and the flow regulating valve 12 is arranged between the pressure reducing valve 8 and the second compressor 3 , and two groups of the flow regulating valves 12 are arranged in parallel.
[0037] According to the production situation of polypropylene, the flow rate of the gas supply pipeline 7 can be adjusted by the flow regulating valve 12. Two groups of flow regulating valves 12 are arranged in parallel, and the two groups of flow regulating valves 12 play the effect of one for use and one for backup.
[0038] Preferably, the gas supply pipeline 7 is also connected to an emergency shut-off valve 13 , and the emergency shut-off valve 13 is arranged between the pressure reducing valve 8 and the flow regulating valve 12 .
[0039] An emergency shut-off valve 13 is arranged between the pressure reducing valve 8 and the flow regulating valve 12 of the gas supply pipeline 7. In case of an emergency in production, such as damage to upstream and downstream equipment, the emergency shut-off valve 13 can be used to disconnect the gas supply pipeline 7 to ensure production safety.
[0040] Preferably, a water inlet pipe 14 and a water outlet pipe 15 are further connected to the first compressor 1 , and the water inlet pipe 14 and the water outlet pipe 15 are interconnected to form a cooling water loop.
[0041] During the preparation of polypropylene, the first compressor 1 is in a non-stop working state, and the water inlet pipe 14 and the water outlet pipe 15 flow through the first compressor 1. The internal cooling water can cool the first compressor 1 to prevent the first compressor 1 from being damaged due to excessive temperature. In this embodiment, the water inlet pipe 14 and the water outlet pipe 15 are both connected to the waterway of the public project to achieve recycling.
[0042] Preferably, both the water inlet pipe 14 and the water outlet pipe 15 are connected with a shower and sewage branch 16 .
[0043] The drainage branch 16 can guide and discharge unnecessary gas, liquid and other impurities in the cooling water circuit to prevent blockage, leakage and other damage accidents in the cooling water circuit.
[0044] Preferably, a safety valve 18 and a pressure gauge 17 are provided on the top of the buffer tank 2 , a shower and sewage branch 16 is connected to the bottom of the buffer tank 2 , and a pressure relief valve 19 is connected to the side of the buffer tank 2 .
[0045] The pressure gauge 17 can detect the pressure in the buffer tank 2, so that the personnel can grasp the pressure of the buffer tank 2 in real time. When the pressure inside the buffer tank 2 is too high, the safety valve 18 on the top of the buffer tank 2 can open automatically to release the pressure of the buffer tank 2 and keep the pressure in the buffer tank 2 stable. In this embodiment, the opening pressure of the safety valve 18 is 3.6MPa. When the pressure in the buffer tank 2 is greater than 3.6MPa, the safety valve 18 can open automatically.
[0046] The drainage branch 16 at the bottom of the buffer tank 2 can discharge unnecessary gas, liquid and impurities in the buffer tank 2; a pressure relief valve 19 is arranged on the side of the buffer tank 2, and the pressure of the buffer tank 2 can be relieved through the pressure relief valve 19 when the buffer tank 2 is inspected and repaired.
[0047] The working process of the utility model is as follows: when preparing polypropylene, the dry air inlet pipe 5 is connected to the instrument air of the public engineering, the dry air of the instrument air enters the first compressor 1 through the dry air inlet pipe 5, the first compressor 1 compresses and works to increase the compression pressure of the dry air, and enters the buffer tank 2 through the dry air outlet pipe 6, and the buffer tank 2 is used to keep the dry air pressure stable; the dry air flows through the main path 10 of the air supply pipeline 7 through the pressure reducing valve 8, the emergency shut-off valve 13, and the flow regulating valve 12 in sequence to enter the second compressor 3, and is driven by the second compressor 3 to enter the reactor 4.
[0048] In summary, the embodiment of the utility model provides an active control agent feeding system for online preparation of polypropylene, which is provided with a first compressor and a buffer tank connected to an air supply pipeline, the first compressor is connected to an external dry air supply device through a dry air inlet pipe, the dry air used as the active control agent is pressurized by the first compressor and then transported to the buffer tank, the buffer tank can temporarily store the dry air and ensure the stability of the pressure of the dry air, and then the dry air is transported to the reactor through the air supply pipeline as the active control agent, and the second compressor is used to provide power for the transportation of the active control agent, thereby replacing the existing steel cylinder group as the feeding equipment of the active control agent, reducing the transportation and switching operations of the steel cylinders, and reducing the risk of personal injury; in addition, the dry air does not need to be provided separately by the manufacturer, which reduces the economic cost and increases the production efficiency.
[0049] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principle of the present invention. These improvements and substitutions should also be regarded as the protection scope of the present invention.
Claims
1. An activity control agent feeding system for online preparation of polypropylene, characterized in that: include: a first compressor, wherein an air inlet end of the first compressor is connected to a dry air inlet pipe, and an air outlet end of the first compressor is connected to a dry air outlet pipe; A buffer tank, wherein the air inlet end of the buffer tank is connected to the dry air outlet pipe, and the air outlet end of the buffer tank is connected to an air supply pipeline; The reactor has an air inlet end connected to the air supply pipeline, and the air supply pipeline is also connected to a second compressor.
2. The active control agent feeding system for online preparation of polypropylene according to claim 1, characterized in that: The air supply pipeline is also connected with a pressure reducing valve, which is arranged between the buffer tank and the second compressor, and two groups of the pressure reducing valves are arranged in parallel.
3. The active control agent feeding system for online preparation of polypropylene according to claim 2, characterized in that: The gas supply pipeline is also connected to a steel cylinder group, and the steel cylinder group is connected between the buffer tank and the pressure reducing valve.
4. The active control agent feeding system for online preparation of polypropylene according to claim 3, characterized in that: The gas supply pipeline includes a main path and a bypass path arranged in parallel with each other. One end of the bypass path and the main path are both connected to the buffer tank, and the other ends are both connected to a side of the cylinder group close to the buffer tank.
5. The active control agent feeding system for online preparation of polypropylene according to claim 4, characterized in that: The main road is connected with a shower and sewage branch, and the bypass and the cylinder group are connected with a shower and sewage branch.
6. The active control agent feeding system for online preparation of polypropylene according to claim 2, characterized in that: A flow regulating valve is also arranged on the air supply pipeline. The flow regulating valve is arranged between the pressure reducing valve and the second compressor. Two groups of the flow regulating valves are arranged in parallel.
7. The active control agent feeding system for online preparation of polypropylene according to claim 6, characterized in that: The gas supply pipeline is also connected to an emergency shut-off valve, which is arranged between the pressure reducing valve and the flow regulating valve.
8. The active control agent feeding system for online preparation of polypropylene according to any one of claims 1 to 7, characterized in that: The first compressor is also connected to a water inlet pipe and a water outlet pipe, and the water inlet pipe and the water outlet pipe are interconnected to form a cooling water loop.
9. The active control agent feeding system for online preparation of polypropylene according to claim 8, characterized in that: The water inlet pipe and the water outlet pipe are both connected with shower and sewage branch lines.
10. The active control agent feeding system for online preparation of polypropylene according to any one of claims 1 to 7, characterized in that: A safety valve and a pressure gauge are arranged on the top of the buffer tank, a shower and sewage branch is connected to the bottom of the buffer tank, and a pressure relief valve is connected to the side of the buffer tank.