Semi-submersible barge wind power installation ship with full-rotation crane
By setting up a sliding tower and lifting assembly on the semi-submersible barge, the three-dimensional movement of the crane is achieved, which solves the problems of movement and high adaptability in offshore wind power installation, and improves installation efficiency and stability.
Patent Information
- Application Number
- CN202420842605.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-20
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-04-20
AI Technical Summary
Existing semi-submersible barges are difficult to meet the needs of flexible movement and highly adaptable during offshore wind power installation and construction, resulting in low installation efficiency and long cycles.
Design a semi-submersible wind power installation vessel with a full swing crane. By setting up a tower and installation platform on the hull, and equipped with guide components and lifting components, the crane can slide and lift on the tower, achieving three-dimensional movement and adapt to different Installation of wind power equipment at height and location.
It improves the efficiency and flexibility of wind power installation, shortens the installation cycle, enhances the applicability and stability of the installation ship, and ensures the safety and accuracy of the installation operations.
Smart Images

Figure CN222022848U_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of engineering construction, and in particular to a semi-submersible wind power installation ship with a fully revolving crane. Background Art
[0002] With the development of economy and the acceleration of urbanization, it has become an inevitable trend to transform and develop large-scale wind power generation in the surrounding areas of dense cities where land is becoming increasingly scarce, such as mountaintop wind power generation and offshore wind power generation. As the approval of gravity docks by the state decreases year by year, most semi-submersible barges that transport caissons are idle. In order to prevent waste of resources, it is urgent to develop a semi-submersible barge wind power installation ship with a full-slewing crane, which can not only meet the requirements of offshore wind power installation construction, but also ensure the requirements of semi-submersible barge diving construction. Summary of the invention
[0003] In order to meet the requirements of offshore wind power installation and construction, and to ensure the diving construction requirements of the semi-submersible barge, the present application provides a semi-submersible wind power installation ship with a fully rotating crane.
[0004] The semi-submersible wind turbine installation vessel with a fully revolving crane provided in the present application adopts the following technical solution:
[0005] A semi-submersible wind power installation vessel with a fully revolving crane comprises a hull and a fully revolving crane, wherein a pair of towers are arranged on the hull, installation platforms are slidingly arranged on the two towers, and the fully revolving crane is fixedly arranged on the installation platform; a guide assembly for driving the towers to move on the hull is arranged on the hull.
[0006] By adopting the above technical solution, the full-slewing crane is fixed on the installation platform and is set on the tower by sliding, so that the crane can move flexibly on the hull, thereby realizing the precise lifting and installation of wind power equipment. This design greatly improves the efficiency of wind power installation and shortens the installation period.
[0007] Preferably, the installation platform can be installed on the tower in a liftable manner, and a lifting component for driving the installation platform to be lifted and lowered is installed on the tower.
[0008] By adopting the above technical solution, the installation platform can be raised and lowered on the tower through the lifting assembly, which means that the installation vessel can adapt to the installation of wind power equipment of different heights. Whether it is a large wind turbine or a small wind power equipment, the installation requirements can be met by adjusting the height of the installation platform, which greatly enhances the applicability and flexibility of the installation vessel.
[0009] Preferably, the guide assembly includes a pair of first rails, the two first rails are arranged on the deck of the hull along the length direction of the hull, the two towers are respectively slidably installed on the two first rails, and the guide assembly also includes a first driving member for driving the tower to slide on the hull.
[0010] By adopting the above technical solution, due to the existence of the guide assembly and the first driving member, the tower can be easily and quickly moved on the hull to adapt to different operation requirements. Whether it is necessary to move the crane to the front or rear end of the hull, or to adjust the lateral position of the crane, it can be achieved by controlling the movement of the tower.
[0011] Preferably, the guide assembly also includes a second track, which is arranged on the deck of the hull in a direction perpendicular to the length of the hull, and the two towers are slidably installed on the second track. The guide assembly also includes a second driving member for driving the towers to slide on the hull.
[0012] By adopting the above technical solution, adding the design of the second track and the second drive member, the practicality and operating efficiency of the semi-submersible wind turbine installation vessel with a full-rotating crane are further improved by providing three-dimensional mobility, flexible adaptation to changing environments, improving operating efficiency and accuracy, optimizing operating processes, and enhancing structural stability.
[0013] Preferably, a fixing bracket is hinged on the tower, and mounting grooves are provided on both sides of the hull along the extension direction of the first track or the second track, and the fixing bracket is plugged into the hull through the mounting grooves after rotation.
[0014] By adopting the above technical solution, the fixing bracket is rotated and inserted into the installation slot on the hull to achieve a fixed connection between the installation platform and the hull. This fixing method can effectively prevent the installation platform from slipping or shaking during the operation, thereby improving the stability of the installation platform and ensuring the safe installation of wind power equipment.
[0015] Preferably, a cover plate for closing the tracks is laid on the first track and the second track.
[0016] By adopting the above technical solution, after the cover plate is arranged on the first track and the second track, the first track and the second track can be concealed, which is convenient for the semi-submersible barge to transport large buildings.
[0017] Preferably, a water tank for balancing the gravity of the full-revolving crane is provided on the hull.
[0018] By adopting the above technical solution, the full-slewing crane, as a large equipment, will generate a large moment and center of gravity offset during operation. By setting a water tank on the hull and adjusting its water volume, the gravity of the crane can be effectively balanced, the tilt and shaking of the hull can be reduced, and the stability of the installation ship during operation can be improved.
[0019] Preferably, a shelf is detachably mounted on the hull clamping plate, and the shelf is used to place the boom of the full-revolving crane in a non-working state.
[0020] By adopting the above technical solution, by placing the boom on the shelf, it is possible to effectively avoid direct contact between the boom and the hull or other equipment, reducing the risk of damage caused by friction or collision. At the same time, the stable support of the shelf also ensures the safety of the boom in a non-working state.
[0021] In summary, the present application includes at least one of the following beneficial technical effects:
[0022] 1. The full-slewing crane is fixed on the installation platform and is set on the tower by sliding, so that the crane can move flexibly on the hull, thereby realizing the precise lifting and installation of wind power equipment. This design greatly improves the efficiency of wind power installation and shortens the installation period;
[0023] 2. The installation platform can be raised and lowered on the tower through the lifting assembly, which means that the installation vessel can adapt to the installation of wind power equipment of different heights. Whether it is a large wind turbine or a small wind power equipment, the installation requirements can be met by adjusting the height of the installation platform, which greatly enhances the applicability and flexibility of the installation vessel;
[0024] 3. Turn the fixing bracket and insert it into the installation slot on the hull to achieve a fixed connection between the installation platform and the hull. This fixing method can effectively prevent the installation platform from slipping or shaking during the operation, thereby improving the stability of the installation platform and ensuring the safe installation of wind power equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a side view of the overall structure of the semi-submersible wind power installation vessel according to an embodiment of the present application.
[0026] Figure 2 It is a front view of the overall structure of the semi-submersible wind power installation vessel according to an embodiment of the present application.
[0027] Figure 3 It is a top view of the overall structure of the semi-submersible wind power installation vessel according to an embodiment of the present application.
[0028] Description of reference numerals:
[0029] 1. Hull; 2. Full-revolving crane; 3. Tower; 4. Mounting platform; 5. Shelving rack; 6. Guide assembly; 61. First track; 62. Second track; 7. Fixed bracket. DETAILED DESCRIPTION
[0030] The following is combined with Figure 1-3 This application is described in further detail.
[0031] The embodiment of the present application discloses a semi-submersible wind power installation vessel with a fully revolving crane.
[0032] Reference Figure 1 and Figure 2 The semi-submersible wind power installation vessel includes a hull 1 and a full-revolving crane 2. A pair of towers 3 are arranged on the hull 1. Installation platforms 4 are slidingly arranged on the two towers 3. The full-revolving crane 2 is fixed on the installation platform 4. A shelf 5 is detachably installed on the clamping plate of the hull 1. The shelf 5 is used to place the boom of the full-revolving crane 2 in a non-working state; a guide component 6 for driving the tower 3 to move on the hull 1 is arranged on the hull 1.
[0033] Reference Figure 3 The guide assembly 6 includes a pair of first rails 61, and the two first rails 61 are arranged on the deck of the hull 1 along the length direction of the hull 1. The two towers 3 are slidably installed on the two first rails 61 respectively, and the guide assembly 6 also includes a first driving member for driving the towers 3 to slide on the hull 1; the guide assembly 6 also includes a second rail 62, and the second rail 62 is arranged on the deck of the hull 1 along a direction perpendicular to the length direction of the hull 1. The two towers 3 are slidably installed on the second rail 62, and the guide assembly 6 also includes a second driving member for driving the towers 3 to slide on the hull 1.
[0034] In this embodiment, the first driving member and the second driving member are both mobile carts, and the first track 61 and the second track 62 are both installed with mobile carts. After the worker starts the mobile cart to push the tower 3, the tower 3 is moved, thereby moving the full-revolving crane 2.
[0035] The installation platform 4 can be installed on the tower 3 in a liftable manner. A lifting component for driving the installation platform 4 to be lifted and lowered is installed on the tower 3. In this embodiment, the lifting component includes a hydraulic lifting module. The hydraulic lifting module is fixedly installed on the tower 3. The output end of the hydraulic lifting module is fixedly connected to the installation platform 4. After the worker starts the hydraulic lifting module, the full-revolving crane 2 can be lifted and lowered.
[0036] A fixing bracket 7 is hinged on the tower 3 , and mounting grooves are provided on both sides of the hull 1 along the extending direction of the first track 61 or the second track 62 . The fixing bracket 7 is plugged into the hull 1 through the mounting grooves after rotation.
[0037] An installation groove is opened on the hull 1, and the first track 61 and the second track 62 are both located in the installation groove. Cover plates for closing the tracks are laid on the first track 61 and the second track 62. The cover plates are covered on the first track 61 and the second track 62, so that the deck surface of the hull 1 is flat, which is convenient for transportation by the semi-submersible barge.
[0038] A water tank for balancing the gravity of the full-revolving crane 2 is provided on the hull 1 . The worker first checks the levelness of the hull 1 at this time, and then sets the water tank at a corresponding position to adjust the levelness of the hull 1 .
[0039] The implementation principle of a semi-submersible wind power installation vessel with a fully revolving crane in an embodiment of the present application is as follows: after the fully revolving crane 2 is converted onto the semi-submersible barge, when lifting is required, the position to which the fully revolving crane 2 needs to be moved is found out through calculation, and the fully revolving crane 2 is moved through the guide assembly 6 for lifting.
[0040] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A semi-submersible wind turbine installation vessel with a fully revolving crane, characterized in that: The invention comprises a hull (1) and a fully revolving crane (2); the hull (1) is provided with a pair of towers (3); mounting platforms (4) are slidingly provided on the two towers (3); the fully revolving crane (2) is fixedly mounted on the mounting platforms (4); and the hull (1) is provided with a guide assembly (6) for driving the towers (3) to move on the hull (1).
2. A semi-submersible wind turbine installation vessel with a fully revolving crane according to claim 1, characterized in that: The installation platform (4) is installed on the tower (3) in a liftable manner, and a lifting component for driving the installation platform (4) to move up and down is installed on the tower (3).
3. A semi-submersible wind turbine installation vessel with a fully revolving crane according to claim 1, characterized in that: The guide assembly (6) comprises a pair of first rails (61), wherein the two first rails (61) are arranged on the deck of the hull (1) along the length direction of the hull (1), and the two towers (3) are respectively slidably mounted on the two first rails (61). The guide assembly (6) also comprises a first driving member for driving the towers (3) to slide on the hull (1).
4. A semi-submersible wind turbine installation vessel with a fully revolving crane according to claim 3, characterized in that: The guide assembly (6) further comprises a second track (62), wherein the second track (62) is arranged on the deck of the hull (1) in a direction perpendicular to the length of the hull (1), and the two towers (3) are slidably mounted on the second track (62). The guide assembly (6) further comprises a second driving member for driving the towers (3) to slide on the hull (1).
5. A semi-submersible wind turbine installation vessel with a fully revolving crane according to claim 4, characterized in that: A fixing bracket (7) is hingedly connected to the tower (3), and mounting grooves are provided on both sides of the hull (1) along the extension direction of the first track (61) or the second track (62), and the fixing bracket (7) is plugged into the hull (1) through the mounting groove after rotation.
6. A semi-submersible wind turbine installation vessel with a fully revolving crane according to claim 4, characterized in that: Cover plates for closing the tracks are laid on the first track (61) and the second track (62).
7. A semi-submersible wind turbine installation vessel with a fully revolving crane according to claim 1, characterized in that: The hull (1) is provided with a water tank for balancing the gravity of the full-revolving crane (2).
8. The semi-submersible wind turbine installation vessel with a fully revolving crane according to claim 1, characterized in that: A shelf (5) is detachably mounted on the clamping plate of the hull (1), and the shelf (5) is used to place the boom of the full-revolving crane (2) in a non-working state.