Transportation device for building materials
By designing a building material transport device with limiting and buffering mechanisms, the problems of material damage and worker stress during high-altitude transport by inclined conveyors are solved, achieving safe and efficient transport and coordination of building materials. It is suitable for the inclined transport of building materials such as bricks and boards.
Patent Information
- Application Number
- CN202420349447.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-26
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-02-26
AI Technical Summary
When transporting building materials from low to high places, existing inclined conveyors are prone to causing material damage and increasing the workload of workers at high places. Furthermore, coordination between workers at high and low places is difficult, which affects transportation efficiency.
A building material transport device was designed, comprising a frame, conveyor belt, fixed plate, rotating shaft, disc, arc-shaped hole, elliptical plate, spherical pin, elastic component, and baffle. Through the cooperation of limiting mechanism and buffer component, the safe and efficient transport of building materials is achieved.
It effectively avoids damage to building materials from falling at heights, reduces the need for communication between workers at different heights, improves transportation efficiency, and maintains flexibility without affecting the transportation of powdery and granular materials.
Smart Images

Figure CN222023437U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building transportation, in particular to a transportation device for building materials. Background Art
[0002] In construction projects, the transportation of building materials (such as bricks, wood boards, etc.) is an important link, which involves transporting building materials from the production site or warehouse to the construction site or transporting building materials from the construction site to the designated construction area, all to improve construction efficiency. When transporting building materials from a low place to a high place on the construction site (for example, transporting building materials from the first floor to the second floor), in order to improve the transportation efficiency and convenience of building materials, construction workers will use climbing conveyors, which can easily transport building materials upward to a high place and ensure that the materials are safely and efficiently transported to the designated place.
[0003] The climbing conveyor is usually operated by two workers. One worker stands at a lower position and continuously places the building materials at the starting point of the climbing conveyor, and the other worker stands at a higher position to receive the building materials delivered by the climbing conveyor. However, once the building materials are placed on the climbing conveyor, they cannot be stopped unless the machine is stopped. If the worker standing at a higher position needs to place the building materials reasonably after receiving the building materials, etc., and needs to leave the climbing conveyor for a short period of time, the worker at a higher position may not be able to receive the next building material being delivered during this period, which may easily cause the building materials to fall and cause greater work pressure to the worker at a higher position. The workers at a higher position and a lower position often need to maintain effective communication to avoid uncoordinated operations, which will have a certain impact on transportation efficiency. To this end, we propose a transportation device for building materials. Utility Model Content
[0004] The purpose of the utility model is to provide a construction material transportation device to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a transportation device for building materials, comprising a frame and a conveyor belt, wherein a fixing plate is symmetrically fixedly connected at the rear edge of the upper end of the frame, and a rotating shaft is penetrated through the inner walls of the two fixing plates and rotatably installed, a disc is fixedly connected between the two rotating shafts, and a limiting mechanism is respectively provided between the two rotating shafts and the two fixing plates, and the limiting mechanism comprises two arc holes and an elliptical plate, the elliptical plate is fixedly sleeved at the outer wall of the rotating shaft away from the fixing plate, and a spherical pin is slidably inserted through the inner wall of the elliptical plate away from the rotating shaft, an elastic component is provided between the spherical pin and the elliptical plate, the two arc holes are symmetrically opened on the outer wall of the fixing plate, and the hemispherical end of the spherical pin is slidably matched with one of the arc holes, the outer wall of the disc is fixedly connected with a connecting plate, and a baffle is installed in front of the connecting plate through a buffer component, and the bottom ends of the connecting plate and the baffle are close to the conveyor belt.
[0006] Preferably, the elastic component includes a connecting ring, which is fixedly sleeved on the outer wall of the spherical pin, and the connecting ring is located between the fixed plate and the elliptical plate, and a second spring is fixedly connected between the connecting ring and the elliptical plate, and the second spring is slidably sleeved on the outer wall of the spherical pin.
[0007] Preferably, the buffer assembly includes two guide columns, the two guide columns are symmetrically slidably inserted into the inner wall of the connecting plate, and the front ends of the two guide columns are fixedly connected to the rear end of the baffle, and a spring 1 is slidably sleeved on the outer walls of the two guide columns, and the two springs 1 are fixedly connected between the baffle and the connecting plate.
[0008] Preferably, a groove is formed through the front end of the connecting plate near the upper edge.
[0009] Preferably, the connecting plate and the disc are an integrally formed structure.
[0010] Preferably, a connecting line between the two arc-shaped surface areas is parallel to the upper end surface of the frame.
[0011] Compared with the prior art, the utility model has the following beneficial effects: through the cooperation of the fixed plate, rotating shaft, disc, arc hole, elliptical plate, spherical pin, elastic component, connecting plate and baffle, when the climbing conveyor transports building materials such as bricks and boards from a low place to a high place, if the workers standing at a high place need to reasonably place the building materials after taking over the building materials, etc., which requires them to leave the climbing conveyor for a short period of time, under the action of the baffle, the building materials can be prevented from being damaged and the workers at the high place can be prevented from causing greater work pressure, and the communication and operation coordination between the workers at the high and low places can be reduced, thereby improving the transportation efficiency. When transporting building materials such as powder and granules from a low place to a high place, the baffle can be easily stored without causing any impact, and can be used flexibly. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0013] Figure 2 For the utility model Figure 1 Schematic diagram of the structure at A in the middle;
[0014] Figure 3 It is a partial cross-sectional view of the utility model;
[0015] Figure 4 For the utility model Figure 3 Schematic diagram of the structure at B in the middle;
[0016] Figure 5 It is a display diagram of the elliptical plate, spherical pin, spring 2 and connecting ring of the utility model;
[0017] Figure 6 This is a display diagram of the connecting plate, groove and disc of the utility model.
[0018] In the accompanying drawings, the list of parts represented by each number is as follows: 1. Conveyor belt; 2. Frame; 3. Connecting plate; 4. Groove; 5. Disc; 6. Fixed plate; 7. Rotating shaft; 8. Arc hole; 9. Elliptical plate; 10. Baffle; 11. Guide column; 12. Spring 1; 13. Spherical pin; 14. Spring 2; 15. Connecting ring. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] Embodiment 1
[0021] See also Figure 1-Figure 6, a construction material transportation device shown in the figure includes a frame 2 and a conveyor belt 1, a fixed plate 6 is symmetrically fixedly connected at the rear edge of the upper end of the frame 2, and a rotating shaft 7 is rotatably installed through the inner walls of the two fixed plates 6, a disc 5 is fixedly connected between the two rotating shafts 7, and a limiting mechanism is respectively provided between the two rotating shafts 7 and the two fixed plates 6, the limiting mechanism includes two arc holes 8 and an elliptical plate 9, the elliptical plate 9 is fixedly sleeved on the outer wall of the rotating shaft 7 away from the fixed plate 6, and a spherical pin 13 is slidably inserted through the inner wall of the elliptical plate 9 away from the rotating shaft 7, an elastic component is provided between the spherical pin 13 and the elliptical plate 9, two arc holes 8 are symmetrically opened on the outer wall of the fixed plate 6, and the hemispherical end of the spherical pin 13 is slidably matched with one of the arc holes 8, the outer wall of the disc 5 is fixedly connected with a connecting plate 3, and a baffle 10 is installed in front of the connecting plate 3 through a buffer component, and the bottom ends of the connecting plate 3 and the baffle 10 are both close to the conveyor belt 1.
[0022] See also Figure 3 In the figure, the elastic component includes a connecting ring 15, which is fixedly sleeved on the outer wall of the spherical pin 13, and the connecting ring 15 is located between the fixed plate 6 and the elliptical plate 9, and a spring 2 14 is fixedly connected between the connecting ring 15 and the elliptical plate 9, and the spring 2 14 is slidably sleeved on the outer wall of the spherical pin 13.
[0023] See also Figure 3 and Figure 6 In the figure, a groove 4 is formed through the front end of the connecting plate 3 near the upper edge; specifically, the groove 4 is provided to facilitate holding the connecting plate 3 and rotating it.
[0024] See also Figure 6 In the figure, the connecting plate 3 and the disc 5 are an integrally formed structure; specifically, the connecting plate 3 and the disc 5 have good stability.
[0025] See also Figure 4 In the figure, the centerline between the two arcuate holes 8 is parallel to the upper end surface of the frame 2; specifically, only when the connecting plate 3 rotates 180 degrees, the spherical pin 13 will leave one of the arcuate holes 8 that originally slidably fits and then be inserted into the other arcuate hole 8. The connecting plate 3 can be rotated 180 degrees to be well away from the conveyor belt 1.
[0026] In this embodiment, first, the frame 2 can be installed on the support frame and supported on the ground. When transporting building materials such as bricks and boards from a low place to a high place, first move the frame 2 to a suitable place on the construction site, then start the climbing conveyor, and the conveyor belt 1 rotates accordingly. The workers at the low place intermittently place the building materials on the conveyor belt 1, and the intermittent time depends on the on-site conditions. The workers at the high place can take the multiple building materials transported one by one at the tail of the conveyor belt 1. If the workers standing at the high place need to reasonably place the building materials after taking over the building materials, etc., which requires leaving the climbing conveyor for a short period of time, the next building material transported will be blocked by the baffle 10 at this time, and the conveyor belt 1 will operate as usual. The workers at the low place can continue to place the building materials on the conveyor belt 1 intermittently, and the workers at the high place can pick up the building materials blocked by the baffle 10 after returning to their positions, thereby avoiding damage to the building materials and causing greater work pressure to the workers at the high place. The communication between the workers at the high and low places can be reduced, and the operation coordination can be improved to improve the transportation efficiency.
[0027] When transporting powdery and granular building materials from a low place to a high place, such powdery and granular building materials often only need to be piled up in one place. At this time, in order to avoid the baffle 10 from blocking the transportation of the powdery and granular building materials, the connecting plate 3 is held and rotated upward, and the connecting plate 3 can drive the disc 5 to rotate, and the disc 5 can drive the two rotating shafts 7 to rotate in the inner walls of the two fixed plates 6 respectively, and each rotating shaft 7 will drive the elliptical plate 9 connected to it to rotate, and each elliptical plate 9 will drive the spherical pin 13, the spring 14 and the connecting ring 15 connected to it to rotate. When rotating together, the hemispherical end of each spherical pin 13 will slide out of a corresponding arc hole 8, and each spherical pin 13 will slide outward and drive the connecting ring 15 to squeeze the spring 2 14, until each spherical pin 13 is rotated to correspond to another arc hole 8, under the action of the spring 2 14, each spherical pin 13 is automatically inserted and pressed against the other arc hole 8, thereby limiting the rotation of the connecting plate 3 to a certain extent, so that the connecting plate 3 can be easily folded up, and vice versa, the connecting plate 3 can be turned back and maintained in a certain fixed state, which is flexible to use.
[0028] Embodiment 2
[0029] See also Figure 3 The present embodiment further explains Example 1. The buffer assembly in the figure includes two guide columns 11, and the two guide columns 11 are symmetrically slidably inserted into the inner wall of the connecting plate 3, and the front ends of the two guide columns 11 are fixedly connected to the rear end of the baffle 10, and springs 12 are slidably sleeved on the outer walls of the two guide columns 11, and the two springs 12 are fixedly connected between the baffle 10 and the connecting plate 3.
[0030] In this embodiment, when the transported building materials are blocked by the baffle 10, because the transported building materials have a certain kinetic energy, under the buffering effect of the spring 12, the collision between the fragile building materials and the baffle 10 can be avoided, which may cause the building materials to be chipped, etc., making the transportation of building materials safer.
[0031] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0032] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction material transport device, comprising a frame (2) and a conveyor belt (1), characterized in that: A fixing plate (6) is symmetrically fixedly connected at the rear edge of the upper end of the frame (2); a rotating shaft (7) is rotatably installed through the inner walls of the two fixing plates (6); a disk (5) is fixedly connected between the two rotating shafts (7); and a limiting mechanism is provided between the two rotating shafts (7) and the two fixing plates (6), respectively. The limiting mechanism comprises two arc holes (8) and an elliptical plate (9); the elliptical plate (9) is fixedly sleeved on the outer wall of the rotating shaft (7) away from the fixing plate (6), and the inner wall of the elliptical plate (9) is away from the rotating shaft. A spherical pin (13) is slidably inserted at (7), an elastic component is provided between the spherical pin (13) and the elliptical plate (9), the two arc holes (8) are symmetrically opened on the outer wall of the fixed plate (6), the hemispherical end of the spherical pin (13) is slidably matched with one of the arc holes (8), the outer wall of the disc (5) is fixedly connected with a connecting plate (3), a baffle (10) is installed in front of the connecting plate (3) through a buffer component, and the bottom ends of the connecting plate (3) and the baffle (10) are close to the conveyor belt (1).
2. A construction material transport device according to claim 1, characterized in that: The elastic component comprises a connecting ring (15), the connecting ring (15) is fixedly sleeved on the outer wall of the spherical pin (13), and the connecting ring (15) is located between the fixed plate (6) and the elliptical plate (9), and a second spring (14) is fixedly connected between the connecting ring (15) and the elliptical plate (9), and the second spring (14) is slidably sleeved on the outer wall of the spherical pin (13).
3. A construction material transport device according to claim 1, characterized in that: The buffer assembly comprises two guide columns (11), the two guide columns (11) are symmetrically slidably inserted into the inner wall of the connecting plate (3), and the front ends of the two guide columns (11) are fixedly connected to the rear end of the baffle (10), and springs (12) are slidably sleeved on the outer walls of the two guide columns (11), and the two springs (12) are fixedly connected between the baffle (10) and the connecting plate (3).
4. A construction material transport device according to claim 1, characterized in that: A groove (4) is formed through the front end of the connecting plate (3) near the upper edge.
5. The construction material transport device according to claim 1, characterized in that: The connecting plate (3) and the disc (5) are an integrally formed structure.
6. A construction material transport device according to claim 1, characterized in that: The connecting line between the two arc-shaped holes (8) is parallel to the upper end surface of the frame (2).
