Prefabricated concrete inspection well joint
By processing the exit pipe interface on the top of the precast concrete inspection well joint and using arc-shaped steel waterproof casing and water-stop rubber ring, the problems of long construction cycle and inconvenient connection in the existing technology are solved, and the sewage outlet pipe is realized Check the efficient connection and sealing of well joints, suitable for rural environments.
Patent Information
- Application Number
- CN202420682648.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-03
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-04-03
AI Technical Summary
The existing cast reinforced concrete inspection well has a long construction cycle and harsh construction conditions, which is not suitable for implementation in rural residential houses. The precast concrete or plastic inspection wells are inconvenient at the exit pipe connection, making it difficult to adapt to the complex situation of farmers' sewage pipelines.
Design a precast concrete inspection well joint, which carries multiple sewage outlet pipes into the interior of the interface by processing the outlet pipe interface on the top of the joint body, and uses the inner and outer connections to combine arc-shaped steel waterproof casing and water stop Glue rings ensure sealing and structural strength.
The connection between the sewage outlet pipe and the inspection well joint is simplified, dimensional consistency is ensured, and the connection difficulty is reduced. Water seepage and water leakage are avoided through the water stop rubber ring and wing ring, which improves the applicability and safety of construction.
Smart Images

Figure CN222025217U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of water supply and drainage, in particular to a prefabricated concrete inspection well joint. Background Art
[0002] In order to prevent and resolve major accident hazards in housing construction and municipal infrastructure projects, reduce construction safety risks, promote the elimination of backward processes, equipment and materials in the housing and urban and rural construction industries, and improve the safety level of housing construction and municipal infrastructure projects, the brick-building process of sewage inspection wells is replaced by one-piece finished inspection wells or reinforced concrete cast-in-place processes.
[0003] Rural villages are usually built around historically formed original homesteads, with people living in groups or along roads and rivers. The overall layout is varied and disorderly, with illegal construction and random stacking and storage.
[0004] The existing cast-in-place reinforced concrete inspection wells have a long construction period and relatively harsh construction conditions, making them unsuitable for implementation before and after rural residential houses. At the same time, due to the complexity of farmers' sewage outlet pipes and the different diameters of the pipes, there are many inconveniences in the construction of prefabricated concrete inspection wells or plastic inspection wells at the outlet pipe connections. Utility Model Content
[0005] In order to overcome the long construction period and relatively harsh construction conditions of the existing cast-in-place reinforced concrete inspection wells, which are not suitable for implementation before and after rural residential houses, and at the same time, due to the complexity of the sewage outlet pipes of farmers and the different elevation pipe diameters, there are many inconveniences when constructing precast concrete inspection wells or plastic inspection wells at the outlet pipe connection. The embodiment of the present application provides a precast concrete inspection well joint. By processing the outlet pipe interface on the top of the inspection well joint body, the outlet pipe waterproof part carries three to four sewage outlet pipes and is pre-buried in the outlet pipe interface, and the sewage outlet pipe is used to connect the inner and outer sides of the inspection well joint body. After the sewage outlet pipe is connected to one end of the sewage outlet pipe, the domestic sewage can be discharged into the interior of the inspection well joint body through the sewage outlet pipe and the sewage outlet pipe, and discharged from the sewage main pipe. The structure of the present design is conducive to ensuring that the sizes of the domestic sewage outlet pipes are the same and reducing the difficulty of connecting the sewage outlet pipe with the inspection well joint body.
[0006] The technical solution adopted by the embodiment of the present application to solve the technical problem is:
[0007] A prefabricated concrete inspection well joint comprises an inspection well joint body and an outlet pipe waterproof part, wherein two sewage main pipe interfaces are processed at the bottom of the inspection well joint body, an outlet pipe interface is processed at the top of the inspection well joint body, and a plurality of sewage outlet pipes are arranged inside the outlet pipe waterproof part.
[0008] In a possible implementation, the cross-sections of the outlet pipe waterproof component and the outlet pipe interface are both fan-shaped, and the outlet pipe waterproof component is inserted from the outside to the inside of the inspection well joint body and is adapted to be connected inside the outlet pipe interface.
[0009] In a possible implementation, the outlet pipe waterproof component includes an arc-shaped steel waterproof casing, the inner side of the arc-shaped steel waterproof casing is poured with concrete mortar, and the concrete mortar is wrapped around the outside of the sewage outlet pipe.
[0010] In a possible implementation, the outlet pipe interface is arranged directly above one of the sewage main pipe interfaces, and the angle of the fan-shaped cross-section of the outlet pipe waterproof part is not greater than one hundred and twenty degrees.
[0011] In a possible implementation, a water-stopping rubber ring is processed on the outer wall of the middle part of the sewage outlet pipe, and the water-stopping rubber ring is buried inside the concrete mortar.
[0012] In a possible implementation, the waterproof rubber ring is made of self-expanding rubber.
[0013] In a possible implementation, the outlet pipe waterproof part is processed with water-stop wing rings around its periphery, and the water-stop wing rings are filled in the interior of the outlet pipe interface.
[0014] In summary, the present invention includes at least one of the following beneficial technical effects:
[0015] 1. By processing the outlet pipe interface on the top of the inspection well joint body, the outlet pipe waterproof part carries three to four sewage outlet pipes to be pre-buried inside the outlet pipe interface, and the sewage outlet pipe is used to connect the inside and outside of the inspection well joint body. After the sewage outlet pipe is connected to one end of the sewage outlet pipe, the domestic sewage can be discharged into the interior of the inspection well joint body through the sewage outlet pipe and the sewage outlet pipe, and discharged from the sewage main pipe. This structure of the design is conducive to ensuring that the sizes of the domestic sewage outlet pipes are the same and reducing the difficulty of connecting the sewage outlet pipe with the inspection well joint body;
[0016] 2. By processing a water-stop rubber ring on the outer wall of the sewage outlet pipe and processing a water-stop wing ring on the surface of the outlet pipe waterproof part, when the outlet pipe waterproof part is pre-buried inside the outlet pipe interface and the sewage outlet pipe is poured into the interior of the arc-shaped steel waterproof casing on the outlet pipe waterproof part using concrete mortar, the water-stop rubber ring can be used to ensure the sealing of the connection between the outlet pipe waterproof part and the sewage outlet pipe, and the water-stop wing ring can be used to ensure the sealing of the connection between the outlet pipe waterproof part and the inspection well joint body, thereby avoiding the phenomenon of insufficient strength or water seepage and leakage at the connection points of the outlet pipe waterproof part and the sewage outlet pipe, and the connection points of the outlet pipe waterproof part and the inspection well joint body. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0018] Figure 2 This is a schematic diagram of the structure of the main body of the inspection well joint of the utility model;
[0019] Figure 3 It is a structural schematic diagram of the utility model in which the waterproof part of the household pipe and the water-stop rubber ring are disconnected.
[0020] Description of the drawings: 1. Sewage main pipe interface; 2. Inspection well joint body; 3. Sewage outlet pipe; 4. Outlet pipe waterproofing parts; 5. Outlet pipe interface; 6. Waterstop rubber ring; 7. Waterstop wing ring. DETAILED DESCRIPTION
[0021] The technical solution in the embodiment of the present application is to solve the problems of the above-mentioned background technology, and the overall idea is as follows:
[0022] Embodiment 1:
[0023] This embodiment introduces a specific structure of a precast concrete inspection well joint. Figure 1-Figure 3 As shown, it includes an inspection well joint body 2 and an outlet pipe waterproof part 4, the bottom of the inspection well joint body 2 is processed with two sewage main pipe interfaces 1, the top of the inspection well joint body 2 is processed with an outlet pipe interface 5, and the outlet pipe waterproof part 4 is provided with multiple sewage outlet pipes 3;
[0024] When laying the sewage pipe, the inspection well joint body 2 is used as a node, the sewage main pipe is connected to the sewage main pipe interface 1 on the inspection well joint body 2, and the sealing work is done well, and then the sewage outlet pipe is connected to one end of the sewage outlet pipe 3. During use, the domestic sewage is discharged into the interior of the inspection well joint body 2 through the sewage outlet pipe and the sewage outlet pipe 3, and is discharged from the sewage main pipe;
[0025] Secondly, in order to facilitate the connection of multiple sewage outlet pipes 3 with the inspection well joint body 2, such as Figure 1 and Figure 2 As shown, the cross-sections of the outlet pipe waterproof member 4 and the outlet pipe interface 5 are both fan-shaped. By inserting the outlet pipe waterproof member 4 from the outside to the inside of the inspection well joint body 2, the adapter can be connected inside the outlet pipe interface 5, and the outlet pipe waterproof member 4 is used to support the sewage outlet pipe 3 to discharge sewage to the inside of the inspection well joint body 2;
[0026] Furthermore, in order to prevent the sewage in the manhole joint body 2 from flowing out through the sewage outlet pipe 3 and the outlet pipe waterproof member 4 to the outside and affecting the surrounding soil environment, Figure 3As shown, the outlet pipe waterproof part 4 includes an arc-shaped steel waterproof casing. After the sewage outlet pipe 3 passes through the outlet pipe waterproof part 4 and is connected to the inside of the inspection well joint body 2, micro-expanded fine stone concrete is poured between the sewage outlet pipe 3 and the outlet pipe waterproof part 4, so as to fill the gap between the sewage outlet pipe 3 and the outlet pipe waterproof part 4. After the concrete mortar is wrapped around the outside of the sewage outlet pipe 3, sewage can be prevented from flowing out from between the sewage outlet pipe 3 and the outlet pipe waterproof part 4.
[0027] At the same time, in order to ensure that after the household pipe interface 5 is processed on the top of the inspection well joint body 2, the inspection well joint body 2 maintains the original structural strength, such as Figure 1 and Figure 2 As shown, the household outlet pipe interface 5 is arranged right above a sewage main pipe interface 1. By arranging the household outlet pipe interface 5 on the top of the sewage main pipe interface 1, when the inspection well joint body 2 is buried underground, the sewage outlet pipe can be buried along the ditch dug for the sewage main pipe, and after being connected with the sewage household outlet pipe 3, the household sewage can flow into the interior of the inspection well joint body 2 and be discharged from the interior of the sewage main pipe to the outside;
[0028] In addition, by setting the cross section of the arc-shaped steel waterproof casing of the outlet pipe waterproof member 4 to be fan-shaped, and the angle of the fan-shaped surface is not greater than 120 degrees, it only occupies one-third of the cross-sectional circle of the inspection well joint body 2, which is conducive to ensuring the overall structural strength of the inspection well joint body 2, and there will be no phenomenon of insufficient strength or water seepage or leakage at the interface between the outlet pipe waterproof member 4 and the inspection well joint body 2;
[0029] Furthermore, in order to avoid the situation that sewage leaks through the outer wall of the sewage outlet pipe 3 when the sewage outlet pipe 3 is buried inside the concrete casting layer on the outlet pipe waterproof member 4, as shown in FIG. Figure 3 As shown, a water-stop rubber ring 6 is processed at the outer wall of the middle part of the sewage outlet pipe 3, and the water-stop rubber ring 6 is made of self-expanding rubber. By burying the water-stop rubber ring 6 inside the concrete mortar, the water-stop rubber ring 6 is used to enhance the connection between the sewage outlet pipe 3 and the concrete casting layer, which is conducive to ensuring the connection effect between the concrete casting layer and the outer wall of the sewage outlet pipe 3;
[0030] At the same time, in order to prevent the sewage from leaking from the inside of the inspection well joint body 2 to the outside due to the gap between the surface of the outlet pipe waterproof member 4 and the inner wall of the outlet pipe interface 5 when the outlet pipe waterproof member 4 is placed inside the outlet pipe interface 5, as shown in FIG. Figure 3As shown, the outlet pipe waterproof part 4 is processed with water-stop wing rings 7 around it. By filling the water-stop wing ring 7 into the interior of the outlet pipe interface 5 and building concrete mortar inside the outlet pipe interface 5, the gap between the surface of the outlet pipe waterproof part 4 and the inner wall of the outlet pipe interface 5 can be sealed, and the outlet pipe waterproof part 4 can be prevented from being separated from the outside of the outlet pipe waterproof part 4 by the sewage pressure inside the inspection well joint body 2.
[0031] Specifically, during the production process of the prefabricated concrete inspection well joint:
[0032] First, in the inspection well mold, the inspection well joint body 2 is cast according to the existing concrete casting technology, and the household pipe interface 5 is reserved at the top of the inspection well joint body 2;
[0033] Then, the outlet pipe interface 5 is trimmed on the inspection well joint body 2 so that the overall span of the outlet pipe interface 5 with a fan-shaped cross section is about 120°, and the inner wall of the outlet pipe interface 5 is kept flat;
[0034] Next, a curved steel waterproof casing is embedded inside the outlet pipe interface 5, so that the water-stop wing ring 7 processed on the surface of the outlet pipe waterproof part 4 is supported on the inner wall of the outlet pipe interface 5. Under the premise of ensuring the sealing performance, the curved rectangular waterproof casing is embedded inside, and the curved steel waterproof casing is used to make up for the structural strength of the hole. The sewage outlet pipe 3 is passed through the curved steel waterproof casing on the outlet pipe waterproof part 4 until it is connected to the well body, and then the gap between the curved steel waterproof casing and the outer wall of the sewage outlet pipe 3 is filled with micro-expanded fine stone concrete.
[0035] Finally, it should be noted that: Obviously, the above embodiments are only examples for clearly explaining the present invention, and are not intended to limit the implementation methods. For ordinary technicians in the relevant field, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from this are still within the scope of protection of the present invention.
Claims
1. A prefabricated concrete inspection well joint, characterized in that: include: Inspection well joint body (2); Outlet pipe waterproofing parts (4); The bottom of the inspection well joint body (2) is processed with two sewage main pipe interfaces (1), the top of the inspection well joint body (2) is processed with an outlet pipe interface (5), and the outlet pipe waterproof part (4) is internally provided with a plurality of sewage outlet pipes (3).
2. A precast concrete inspection well joint as claimed in claim 1, characterized in that: The outlet pipe waterproof component (4) and the outlet pipe interface (5) are both fan-shaped in cross-section; the outlet pipe waterproof component (4) is inserted from the outside to the inside of the inspection well joint body (2) and is adapted to be connected inside the outlet pipe interface (5).
3. A precast concrete inspection well joint as claimed in claim 1, characterized in that: The outlet pipe waterproof component (4) comprises an arc-shaped steel waterproof casing, the inner side of which is poured with concrete mortar, and the concrete mortar is wrapped around the outside of the sewage outlet pipe (3).
4. A precast concrete inspection well joint as claimed in claim 2, characterized in that: The outlet pipe interface (5) is arranged directly above one of the sewage main pipe interfaces (1), and the angle of the fan-shaped cross-section of the outlet pipe waterproof component (4) is not greater than one hundred and twenty degrees.
5. A precast concrete inspection well joint as claimed in claim 1, characterized in that: A water-stop rubber ring (6) is processed on the outer wall of the middle part of the sewage outlet pipe (3), and the water-stop rubber ring (6) is buried inside the concrete mortar.
6. A precast concrete inspection well joint as claimed in claim 5, characterized in that: The water-stop rubber ring (6) is made of self-expanding rubber.
7. A precast concrete inspection well joint as claimed in claim 1, characterized in that: The four sides of the outlet pipe waterproof part (4) are processed with water-stop wing rings (7), and the water-stop wing rings (7) are filled in the interior of the outlet pipe interface (5).
