Wind power mixing tower inner cylinder installation work platform
By designing a wind power mixed tower installation platform with detachable annular platform plate and telescopic support rod, the problems of repeated disassembly and assembly and transportation in the existing technology are solved, and the installation of different diameters is quickly adapted to the installation, saving time and space, and improving safety and convenience.
Patent Information
- Application Number
- CN202420004745.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-02
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2034-01-02
AI Technical Summary
When installing wind power mixing towers in the prior art, installation platforms of different diameters need to be repeatedly disassembled and transported, resulting in wasted time, high safety risks, waste of materials and inconvenient space.
A wind power mixed tower inner cylinder installation working platform is designed, adopting an annular socket assembly structure, and through telescopic support rods and removable annular platform plates, it adapts to the inner wall of the mixed tower of different diameters, simplifying the disassembly and assembly and transportation of the platform.
It realizes rapid disassembly and assembly, saves time and space, reduces high-altitude transportation risks, improves safety and operation convenience, and is suitable for installation operations in multi-diameter locations.
Smart Images

Figure CN222025426U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a mixed tower installation platform, in particular to a wind power mixed tower inner barrel installation operation platform. Background Art
[0002] The wind power hybrid tower is a wind power tower made of concrete and steel bars. It is an important component of the wind turbine generator set and is responsible for supporting the wind rotor, transmitting wind power and protecting the internal components of the wind turbine. Since the wind power hybrid tower is relatively high, it is first made into 28 sections, and then the 28 sections are installed together one by one. When installing the wind power hybrid tower in the prior art, the first section is first fixed to the ground, and the installation platform is overlapped in the inner tube of the wind power hybrid tower. Then the second section is lifted and the connection of the two sections is completed on the installation platform. After the installation is completed, the installation platform is removed and then installed on the top of the second section for connecting the second and third sections of the hybrid tower. They are installed in sequence until the top is installed. However, in this process, the mixing tower has four locations where the diameter changes, and the inner diameter becomes smaller as the diameter changes upward. Therefore, at the locations where the diameter changes, the original installation platform needs to be dismantled and transported to the ground, and then an installation platform of suitable diameter is hoisted from the ground. Repeated disassembly and assembly and transportation not only wastes time, but also transports the installation platform from high altitudes many times, which poses a great safety hazard. In addition, four installation platforms need to be made, which wastes materials, and transportation and stacking take up space, which is extremely inconvenient. Utility Model Content
[0003] In order to solve the above deficiencies in the prior art, the utility model aims to provide a wind power hybrid tower inner tube installation work platform, so as to avoid repeated disassembly and assembly, save time and save space.
[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is as follows:
[0005] A wind power tower inner tube installation work platform comprises a first basic platform plate, a second annular platform plate, a third annular platform plate, a fourth annular platform plate, a fifth annular platform plate and a plurality of telescopic support rods;
[0006] One end of the telescopic support rod is fixed on the first basic platform plate, and the other end is fixed on the inner wall of the wind power mixing tower;
[0007] The first basic platform plate, the second annular platform plate, the third annular platform plate, the fourth annular platform plate and the fifth annular platform plate are all detachably connected in sequence through connecting pieces, and the second annular platform plate, the third annular platform plate, the fourth annular platform plate and the fifth annular platform plate are all detachably arranged on the telescopic support rod;
[0008] Openings are arranged at corresponding positions on the second annular platform plate, the third annular platform plate, the fourth annular platform plate and the fifth annular platform plate.
[0009] As a limitation of the present invention, the telescopic support rod includes a first square tube and a second square tube inserted into the first square tube, and the two are positioned and limited in length by bolts.
[0010] As a further limitation of the present invention, an L-shaped fixing plate is fixedly provided at the end of the second square tube, one surface of the fixing plate is fixedly connected to the second square tube, and the other surface of the fixing plate is fixedly connected to the inner wall of the mixing tower.
[0011] As another limitation of the present invention, the connecting members are two square plates, one end of which is respectively fixed on the upper and lower sides of the second annular platform plate, the third annular platform plate, the fourth annular platform plate and the fifth annular platform plate.
[0012] As a limitation of the present invention, the second annular platform plate, the third annular platform plate, the fourth annular platform plate and the fifth annular platform plate are all structures formed by splicing a plurality of arc-shaped plates.
[0013] As a further limitation of the present invention, a guardrail is provided at the edge of the opening.
[0014] Due to the adoption of the above technical solution, the utility model has the following beneficial effects compared with the prior art:
[0015] The utility model utilizes the annular sleeve assembly method to enable the work platform to adapt to different diameters by adding or removing platform plates. The annular sleeve method is quick and convenient to disassemble and assemble, and each annular structure is assembled, which is convenient for transportation and operation, eliminating the trouble of repeatedly replacing platforms of different diameters as a whole. Only one platform is used to adapt to the use of four diameter-changing positions, saving the time for replacement and repeated transportation, and reducing the risk of disassembly and assembly in high altitude transportation, which is safer.
[0016] In summary, the utility model saves the trouble of repeated disassembly and transportation, saves time, saves space, is easy to transport, and is suitable for making a temporary working platform for installing a wind power hybrid tower. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The present invention is described in further detail below in conjunction with the accompanying drawings and specific embodiments.
[0018] Figure 1 It is a schematic diagram of the top view of the structure of an embodiment of the utility model;
[0019] Figure 2 This is a schematic cross-sectional structure diagram of a telescopic support rod according to an embodiment of the utility model;
[0020] Figure 3 The schematic diagram is a top view of the structure of an embodiment of the utility model installed on a wind power mixing tower.
[0021] In the figure: 1. first basic platform plate; 2. second annular platform plate; 3. third annular platform plate; 4. fourth annular platform plate; 5. fifth annular platform plate; 6. telescopic support rod; 61. first square tube; 62. second square tube; 7. connecting piece; 8. fixing plate; 9. guardrail; 10. wind turbine hybrid tower. DETAILED DESCRIPTION
[0022] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and understand the present invention, and are not used to limit the present invention.
[0023] Embodiment A wind power tower inner tube installation work platform
[0024] like Figure 1 As shown, this embodiment includes a first basic platform plate 1, a second annular platform plate 2, a third annular platform plate 3, a fourth annular platform plate 4, a fifth annular platform plate 5 and a plurality of telescopic support rods 6. The telescopic support rods 6 are fixed on the inner wall of the wind power mixing tower 10 and used as a skeleton for support. The first basic platform plate 1, the second annular platform plate 2, the third annular platform plate 3, the fourth annular platform plate 4 and the fifth annular platform plate 5 are laid on the telescopic support rods 6 to form an operating platform for carrying people and tools for installing the wind power mixing tower 10.
[0025] There are 28 sections in total in the wind power hybrid tower 10, with a height of 110.4m (4m per section, 2.4m in the 28th section). There are four diameter changes in the wind power hybrid tower 10, with diameters of 9m → 7.8m → 6.6m → 5.4m → 4.9m, that is, the higher the wind power hybrid tower 10 is, the smaller the diameter at the diameter change point is. Therefore, the installation work platform also changes from large to small. According to the diameter of the inner wall of the wind power hybrid tower 10, the fifth annular platform plate 5, the fourth annular platform plate 4, the third annular platform plate 3 and the second annular platform plate 2 can be removed in sequence to adapt to different inner diameters.
[0026] like Figure 2 As shown, the telescopic support rod 6 includes a first square tube 61 and a second square tube 62, and the second square tube 62 is inserted into the first square tube 61. The first square tube 61 is provided with a first through hole, and the second square tube 62 is provided with five groups of second through holes. The length of the second square tube 62 extending out of the first square tube 61 is limited by bolts passing through the first through hole on the first square tube 61 and the second through holes at different positions on the second square tube 62. The positions of the five groups of second through holes on the second square tube 62 correspond to the positions after the second annular platform plate 2 to the fifth annular platform plate 5 are installed in sequence, that is, the distance of the second square tube 62 retracting one end inward can correspond to the distance shortened after removing a platform plate. When fixing, it is fixed by bolts passing through the first through hole and the second through hole.
[0027] The first basic platform plate 1 is circular with a through hole in the middle. The first basic platform plate 1 is the inner platform plate and will not be removed. Therefore, one end of the first square tube 61 is fixed to the first basic platform plate 1, and the other end is fixed to the inner wall of the wind power mixing tower 10. An L-shaped fixing plate 8 is fixed to the end of the second square tube 62 that is not connected to the first square tube 61. One surface of the fixing plate 8 is fixedly connected to the bottom of the second square tube 62, and the other surface is fixedly connected to the inner wall of the wind power mixing tower 10 by bolts.
[0028] like Figure 1 As shown, the second annular platform plate 2, the third annular platform plate 3, the fourth annular platform plate 4 and the fifth annular platform plate 5 are detachably connected in sequence, and all of them are in the shape of a circular ring. The second annular platform plate 2 is sleeved on the outer ring of the first basic platform plate 1 and fixed by a connecting piece 7; the third annular platform plate 3 is sleeved on the outer ring of the second annular platform plate 2 and fixed by a connecting piece 7; the fourth annular platform plate 4 is sleeved on the outer ring of the third annular platform plate 3 and fixed by a connecting piece 7; the fifth annular platform plate 5 is sleeved on the outer ring of the fourth annular platform plate 4 and fixed by a connecting piece 7; the second annular platform plate 2 and the fifth annular platform plate 5 are both detachably fixed to the telescopic support rod 6 by bolts.
[0029] The second annular platform plate 2, the third annular platform plate 3, the fourth annular platform plate 4 and the fifth annular platform plate 5 are all structures formed by splicing a plurality of arc-shaped plates. In this embodiment, the second annular platform plate 2, the third annular platform plate 3, the fourth annular platform plate 4 and the fifth annular platform plate 5 are all assembled into three pieces and fixedly connected by the connecting member 7. The three pieces are convenient for disassembly, assembly and transportation.
[0030] The connecting member 7 is two square plates, one end of which is fixedly mounted on the upper and lower sides of the second annular platform plate 2, the third annular platform plate 3, the fourth annular platform plate 4 and the fifth annular platform plate 5. This embodiment is described by taking the connection between the second annular platform plate 2 and the first basic platform plate 1 as an example, and a plurality of connecting members 7 are fixedly mounted on the inner edge of the second annular platform plate 2, wherein one square plate of the connecting member 7 is fixedly mounted on one side of the second annular platform plate 2, and the other square plate is fixedly mounted on the other side of the second annular platform plate 2. When connecting, the outer ring of the first basic platform plate 1 is aligned with the outer ring of the second annular platform plate 2, and the first basic platform plate 1 is inserted between the two square plates, and the two square plates are fixedly connected to the first basic platform plate 1 by bolts. The connection between the third annular platform plate 3 and the second annular platform plate 2, the connection between the fourth annular platform plate 4 and the third annular platform plate 3, and the connection between the fifth annular platform plate 5 and the fourth annular platform plate 4 are all the same as the above connection.
[0031] The second annular platform plate 2, the third annular platform plate 3, the fourth annular platform plate 4, and the fifth annular platform plate 5 are provided with openings at corresponding positions, and guardrails 9 are fixed at the two edges of the openings. The guardrails 9 are a plug-in assembly structure. When the fifth annular platform plate 5, the fourth annular platform plate 4, the third annular platform plate 3, and the second annular platform plate 2 are removed in sequence, the guardrails 9 can also be partially removed as the diameter is shortened. When operating the inner wall of the wind power mixing tower 10 at the opening, two boards can be temporarily overlapped.
[0032] like Figure 3 As shown, when using this embodiment, since the bottom diameter of the wind power mixing tower 10 is the largest, the entire installation work platform is first installed completely, and it is hoisted at the connection section of the two wind power mixing towers 10, and the fixing plate 8 at the end of the telescopic support rod 6 is connected to the end of the wind power mixing tower 10 by bolts, and then the second section of the wind power mixing tower 10 is hoisted, and the two sections are assembled on the installation platform. After the installation of both ends is completed, the installation platform is removed from the wind power mixing tower 10, hoisted to the connection between the third section and the second section, and the installation work platform is fixed to the wind power mixing tower 10 again. The operation is performed on the platform to complete the connection between the second section and the third section, and the fifth annular platform plate 5 is removed until the diameter change of the wind power mixing tower 10, and the second square tube 62 is retracted inwardly and then fixed on the wind power mixing tower 10. The operation is performed in sequence, and the fourth annular platform plate 4, the third annular platform plate 3 and the second annular platform plate 2 are removed at the diameter change of the wind power mixing tower 10 respectively, and the installation is completed using the first basic platform plate 1 at the last diameter change.
[0033] It should be noted that the above is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims
1. A wind power tower inner tube installation work platform, Features: It includes a first basic platform plate, a second annular platform plate, a third annular platform plate, a fourth annular platform plate, a fifth annular platform plate and a plurality of telescopic support rods; One end of the telescopic support rod is fixed on the first basic platform plate, and the other end is fixed on the inner wall of the wind power mixing tower; The first basic platform plate, the second annular platform plate, the third annular platform plate, the fourth annular platform plate and the fifth annular platform plate are all detachably connected in sequence through connecting pieces, and the second annular platform plate, the third annular platform plate, the fourth annular platform plate and the fifth annular platform plate are all detachably arranged on the telescopic support rod; Openings are arranged at corresponding positions on the second annular platform plate, the third annular platform plate, the fourth annular platform plate and the fifth annular platform plate.
2. A wind power tower inner tube installation work platform according to claim 1, Features: The telescopic support rod comprises a first square tube and a second square tube inserted in the first square tube, and the two are positioned and limited in length by bolts.
3. A wind power tower inner tube installation work platform according to claim 2, Features: An L-shaped fixing plate is fixedly arranged at the end of the second square tube, one surface of the fixing plate is fixedly connected to the second square tube, and the other surface of the fixing plate is fixedly connected to the inner wall of the mixing tower.
4. A wind turbine hybrid tower inner tube installation work platform according to any one of claims 1 to 3, Features: The connecting members are two square plates, one end of which is fixedly arranged on the upper and lower sides of the second annular platform plate, the third annular platform plate, the fourth annular platform plate and the fifth annular platform plate respectively.
5. A wind power tower inner tube installation work platform according to claim 4, Features: The second annular platform plate, the third annular platform plate, the fourth annular platform plate and the fifth annular platform plate are all structures formed by splicing a plurality of arc-shaped plates.
6. A wind turbine hybrid tower inner tube installation work platform according to any one of claims 1-3 and 5, Features: A guardrail is provided at the edge of the opening.