Device for improving hearth differential pressure of circulating fluidized bed boiler

By setting open holes in the circulating fluidized bed boiler to pneumatically transport fly ash to the returner standpipe, the problem of low furnace differential pressure is solved, and the boiler load response and heat transfer efficiency are improved.

CN222026927UActive Publication Date: 2024-11-19JIANGSU XU MINE COMPREHENSIVE UTILIZATION POWER GENERATION CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323578861.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-11-19
Estimated Expiration
2033-12-27

AI Technical Summary

Technical Problem

In the early stage of starting and under low load conditions, the furnace difference is low, resulting in a decrease in heat transfer capacity, which is unable to respond quickly to loads, affecting the flexibility and safety of the unit.

Method used

A hole is set between the first unit of the furnace ash conveying unit and the furnace returner riser, and the captured fly ash is delivered by pneumatically to the returner riser, increasing the material concentration in the furnace, increasing the furnace chamber differential pressure, and switching The valve realizes one-click switching gray input function.

Benefits of technology

It improves the furnace differential pressure, shortens the time for the boiler to quickly rise to the target load, enhances the load response speed and heat transfer efficiency, and improves the unit flexibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222026927U_ABST
    Figure CN222026927U_ABST
Patent Text Reader

Abstract

The utility model discloses a device for improving hearth differential pressure of a circulating fluidized bed boiler. The device comprises a first furnace ash conveying unit, a second furnace ash conveying unit, a first furnace return feeder vertical pipe, a second furnace return feeder vertical pipe, an ash silo and a conveying common pipe. The first ash conveying unit of the first furnace and the first ash conveying unit of the second furnace are connected with the ash silo through a first ash conveying pipeline and a second ash conveying pipeline correspondingly and connected with the conveying common pipe through a third ash conveying pipeline and a fourth ash conveying pipeline correspondingly. The first furnace return feeder vertical pipe and the second furnace return feeder vertical pipe are each provided with an open hole, and the open holes are connected with the conveying common pipe through a fifth ash conveying pipeline and a sixth ash conveying pipeline. The ash conveying capacity of the boiler is not affected, the ash conveying function to the boiler and the ash conveying function to the adjacent boiler are achieved through fly ash conveying of the boiler, ash conveying branches do not affect one another, the one-key switching function is achieved, the hearth differential pressure can be improved, the hearth differential pressure of the circulating fluidized bed boiler can be adjusted and controlled, and the heat transfer efficiency of the boiler is improved. The load response speed of the circulating fluidized bed boiler is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of circulating fluidized bed boilers, in particular to a device for increasing the furnace differential pressure of a circulating fluidized bed boiler. Background Art

[0002] The furnace differential pressure is the pressure difference between the upper area of ​​the combustion chamber and the furnace outlet. It is a parameter that reflects the concentration of circulating materials in the furnace. The more circulating materials there are in the furnace, the greater the furnace differential pressure and the higher the heat transfer coefficient in the furnace, and vice versa. When the furnace differential pressure is low, the heat transfer capacity of the boiler decreases, the bed temperature at the bottom of the boiler is high, and the tube wall is overheated, which affects the boiler load and poses a safety hazard. There are a large number of material circulations and bed materials in the circulating fluidized bed boiler, which makes the proportion of the newly added coal feed to the total material volume small. The circulating ash volume is 20 to 40 times the boiler coal feed volume. It takes a long time for the increase or decrease in coal volume to reflect the changes in the main steam pressure and power generation. Secondly, a large number of refractory and wear-resistant materials are laid in the circulating fluidized bed boiler. Compared with the "explosive" pulverized coal boiler, the fluidized bed boiler has a stronger heat storage capacity and a larger thermal inertia.

[0003] Due to the above two characteristics in the prior art, the response speed of the circulating fluidized bed boiler to the load is relatively slow; especially in the initial startup of the circulating fluidized bed unit and under low-load conditions, when the unit load needs to be increased quickly, but because there are fewer materials that can participate in the circulation in the furnace and the furnace differential pressure is low, if a large amount of coal is fed, it will cause the lower tube wall of the furnace to overheat and the upper temperature to be low, and the load cannot be increased quickly, the unit flexibility is reduced, and it cannot meet the use requirements. Utility Model Content

[0004] In order to solve the above technical problems, the technical solution provided by the utility model is: a device for increasing the furnace differential pressure of a circulating fluidized bed boiler, which is arranged between the first ash conveying unit of the 1# furnace, the first ash conveying unit of the 2# furnace, the riser of the return material device of the 1# furnace, and the riser of the return material device of the 2# furnace; the first ash conveying unit of the 1# furnace and the first ash conveying unit of the 2# furnace are connected to the ash bin through ash conveying pipeline one and ash conveying pipeline two, respectively, and are connected to the conveying common pipe through ash conveying pipeline three and ash conveying pipeline four, respectively; openings are respectively arranged on the riser of the return material device of the 1# furnace and the riser of the return material device of the 2# furnace, and the openings are connected to the conveying common pipe through ash conveying pipeline five and ash conveying pipeline six.

[0005] Furthermore, the common conveying pipe is divided into two and connected to the ash conveying pipeline five and the ash conveying pipeline six through a reducing connector.

[0006] Furthermore, the ash conveying pipeline five and the ash conveying pipeline six are respectively provided with switching valves.

[0007] Compared with the prior art, the utility model has the following advantages: the utility model opens a hole in the upper part of the returner riser of the circulating fluidized bed boiler, and transports the fly ash captured by the boiler bag filter to the returner riser through pneumatic conveying to participate in boiler combustion again, thereby increasing the material concentration inside the boiler, improving the furnace differential pressure, and shortening the time for the boiler to quickly rise to the target load.

[0008] The utility model uses the fly ash conveying of the boiler without affecting the existing ash conveying capacity of the boiler, and has the functions of conveying ash to the current furnace and to the adjacent furnace at the same time, and the ash conveying branches do not affect each other, and the function of one-key switching can be realized, and the furnace differential pressure can be increased, and the furnace differential pressure of the circulating fluidized bed boiler can be adjusted and controlled, thereby improving the heat transfer efficiency of the boiler and improving the response speed of the circulating fluidized bed boiler load. BRIEF DESCRIPTION OF THE DRAWINGS

[0009] Figure 1 The utility model is a connection schematic diagram of a device for increasing the furnace differential pressure of a circulating fluidized bed boiler. DETAILED DESCRIPTION

[0010] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.

[0011] In the description of the embodiments of the present utility model, it should be noted that if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside", etc. indicate an orientation or position relationship based on the orientation or position relationship shown in the accompanying drawings, or the orientation or position relationship in which the utility model product is usually placed when in use, it is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In addition, the terms "first", "second", "third", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0012] In addition, the terms "horizontal", "vertical", "overhanging" and the like do not mean that the components must be absolutely horizontal or overhanging, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0013] In the description of the embodiments of the present invention, "multiple" means at least 2.

[0014] In the description of the embodiments of the present utility model, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.

[0015] Example:

[0016] Combined with Figure 1 The present embodiment discloses a device for increasing the furnace differential pressure of a circulating fluidized bed boiler, which is arranged between the first ash conveying unit 1 of the 1# furnace, the first ash conveying unit 2 of the 2# furnace, the riser pipe 3 of the return device of the 1# furnace, and the riser pipe 4 of the return device of the 2# furnace; in the specific implementation, the elbows on the eastern side of the first ash conveying unit 1# furnace and the first ash conveying unit 2# furnace are replaced with tees, and the tees of the first ash conveying unit 1# furnace and the first ash conveying unit 2# furnace are connected through the ash conveying pipeline 15 and the ash conveying pipeline 25 respectively. Pipeline two 6 is connected to the ash storage, ash conveying pipeline one 5 and ash conveying pipeline two 6 are original ash conveying pipes, and are connected to the common conveying pipe 9 through ash conveying pipeline three 7 and ash conveying pipeline four 8 respectively. The common conveying pipe adopts φ194*10 (DN175) carbon steel pipeline, which is arranged on the integrated pipe rack behind the furnace; openings are respectively arranged on the 1# furnace return material device riser 3 and the 2# furnace return material device riser 4, which are connected to the common conveying pipe 9 through ash conveying pipeline five 10 and ash conveying pipeline six 11. The common conveying pipe 9 is divided into two and connected with the ash conveying pipeline five 10 and the ash conveying pipeline six 11 through the reducer 12 (DN175 to DN150); the ash conveying pipeline one 5 is also connected with the 2# furnace air preheater through the ash conveying pipeline seven 14; valves are respectively arranged on the ash conveying pipeline one 5, the ash conveying pipeline two 6, the ash conveying pipeline three 7, the ash conveying pipeline four 8, the common conveying pipe 9 and the ash conveying pipeline seven 14.

[0017] Switching valves 13 are respectively provided on the ash conveying pipeline five 10 and the ash conveying pipeline six 11; the switching valves are dome valves or starting plug gates, and the switching valves are connected to the remote PLC control system, and fly ash transportation is realized by remotely controlling the valve switch, realizing a one-key switching function.

[0018] The above description of the utility model and its implementation methods is not restrictive. The drawings show only one implementation method of the utility model, and the actual structure is not limited thereto. In short, if ordinary technicians in this field are inspired by it and design structural methods and embodiments similar to the technical solution without creativity without departing from the purpose of the invention of the utility model, they should all fall within the protection scope of the utility model.

Claims

1. A device for increasing the furnace differential pressure of a circulating fluidized bed boiler, characterized in that: It is arranged between the first ash conveying unit of furnace No. 1, the first ash conveying unit of furnace No. 2, the vertical pipe of returner of furnace No. 1 and the vertical pipe of returner of furnace No. 2; the first ash conveying unit of furnace No. 1 and the first ash conveying unit of furnace No. 2 are connected to the ash bin through ash conveying pipeline No. 1 and ash conveying pipeline No. 2 respectively, and are connected to the common conveying pipe through ash conveying pipeline No. 3 and ash conveying pipeline No. 4 respectively; openings are respectively arranged on the vertical pipe of returner of furnace No. 1 and the vertical pipe of returner of furnace No. 2, and the openings are connected to the common conveying pipe through ash conveying pipeline No. 5 and ash conveying pipeline No.

6.

2. The device for increasing the furnace differential pressure of a circulating fluidized bed boiler according to claim 1, characterized in that: The conveying common pipe is divided into two and connected to the ash conveying pipeline five and the ash conveying pipeline six through a reducing connector.

3. The device for increasing the furnace differential pressure of a circulating fluidized bed boiler according to claim 1, characterized in that: The ash conveying pipeline five and the ash conveying pipeline six are respectively provided with switching valves.

4. The device for increasing the furnace differential pressure of a circulating fluidized bed boiler according to claim 3, characterized in that: The switching valve is a dome valve or a starter gate.

5. The device for increasing the furnace differential pressure of a circulating fluidized bed boiler according to claim 1, characterized in that: The ash conveying pipeline 1 is also connected to the 2# furnace air preheater through the ash conveying pipeline 7.

6. The device for increasing the furnace differential pressure of a circulating fluidized bed boiler according to claim 1, characterized in that: Valves are respectively arranged on the ash conveying pipeline one, the ash conveying pipeline two, the ash conveying pipeline three, the ash conveying pipeline four, the common conveying pipe and the ash conveying pipeline seven.