ALC wallboard construction equipment

By introducing flue gas treatment mechanism and material collection mechanism into ALC wall panel cutting equipment, the problem of failure to effectively handle flue gas and small particles during the cutting process is solved, the adsorption of flue gas and centralized collection of waste is realized, and the work is improved Environmental safety and efficiency.

CN222039150UActive Publication Date: 2024-11-22WUHAN HECHUANG JUSHENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420607791.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-27
Publication Date
2024-11-22
Estimated Expiration
2034-03-27

AI Technical Summary

Technical Problem

The flue gas and small particles generated by existing ALC wall panel cutting equipment during the cutting process are not effectively adsorbed, affecting the health of staff.

Method used

A kind of ALC wall panel construction equipment including a flue gas treatment mechanism is designed. The equipment uses flue gas activated carbon by installing a flue gas treatment box, an adsorption fan and a filter protection net on the outer wall of the construction bench. The flue gas filtration process is carried out, and the flue gas treatment box is driven to move through the electric slide rail to follow the cutting knife group to realize the adsorption and filtration of the flue gas. At the same time, the equipment is equipped with a material collection mechanism, which uses adsorption magnets and electromagnets to collect the waste generated from cutting.

Benefits of technology

Effectively adsorb and filter the flue gas and small particles generated during cutting, preventing them from being sucked in by staff, improving the safety of the working environment, and reducing the mess on the site through the function of collecting waste, improving work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222039150U_ABST
    Figure CN222039150U_ABST
Patent Text Reader

Abstract

The utility model discloses ALC wallboard construction equipment, and relates to the technical field of construction equipment, the ALC wallboard construction equipment comprises a construction table top, a construction rack, an electric slide rail, a construction electric pole, a construction cutter group and a follow-up moving groove, the inner wall of the follow-up moving groove is provided with a follow-up moving rod, the outer wall of the follow-up moving rod is provided with a follow-up moving slide block in a surrounding manner, the outer wall of the follow-up moving slide block is provided with a follow-up moving connecting rod, and the follow-up moving connecting rod is connected with the construction rack. A flue gas treatment box is mounted at the bottom of the follow-up connecting rod, an adsorption electric fan is mounted on the inner wall of the flue gas treatment box, a filter protection net is mounted on the inner wall of the flue gas treatment box, and flue gas activated carbon is mounted on the outer wall of the filter protection net. The flue gas treatment mechanism is installed, flue gas activated carbon and the filter protection net are connected and installed in the flue gas treatment box, the flue gas treatment box and the construction cutter set move at the same time all the time, and flue gas is adsorbed into the flue gas treatment box and filtered through the flue gas activated carbon; and the situation that a large amount of flue gas and dust are inhaled into the body by workers to affect the body health is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction equipment, in particular to ALC wall panel construction equipment. Background Art

[0002] ALC wall panels are a new type of building material with superior performance. This type of wall panel is mainly made of raw materials such as lime, cement, and fine ash captured after coal combustion. It is a porous concrete panel made through high-pressure steam curing. It has the characteristics of light weight, high strength, thermal insulation, etc. It is an emerging green and environmentally friendly material and is often used as wall decoration. It has good durability and sound insulation. When ALC wall panels are used, they need to be constructed. The ALC wall panel cutting machine is one of the ALC wall panel construction equipment. It is used to cut ALC wall panels into the required size to meet different construction needs. It has the advantages of high precision, easy operation and high cutting efficiency. It is often suitable for indoor and outdoor ALC wall panel cutting operations.

[0003] Patent document CN214238429U discloses a polystyrene cutting device for thermal insulation wall panels, which discloses that "specifically includes a workbench, a vertical plate is fixedly installed above the workbench, a first lead screw is installed on the vertical plate, a movable plate is threadedly sleeved on the first lead screw, a second lead screw is installed below the movable plate, a mounting plate is also threadedly sleeved on the second lead screw, a saw blade is installed below the mounting plate through a mounting seat, an operating table is installed above the workbench, a slider is movably installed on the operating table, and a clamping mechanism for clamping the wall panel is fixedly installed on the slider; the utility model can adjust the distance between the saw blade and the thermal insulation board under the joint action of the first lead screw, the first motor, the second lead screw and the second motor, and can cut thermal insulation boards of different thicknesses, can facilitate cutting of thermal insulation boards of different lengths, and can facilitate moving the clamping mechanism, thereby greatly increasing the work efficiency of the staff."

[0004] However, the polystyrene cutting equipment for insulation wall panels in the above-mentioned public document mainly considers that it is convenient to cut insulation boards of different lengths and to move the clamping mechanism, thereby greatly increasing the work efficiency of the staff, but it is not convenient to adsorb the smoke and small particles generated during cutting.

[0005] In view of this, it is necessary to develop a fume treatment mechanism that can adsorb and treat the fume and small particles generated during cutting. Utility Model Content

[0006] The purpose of the utility model is to provide an ALC wall panel construction device to solve the technical problem proposed in the above background technology that the ALC wall panel construction device has a smoke treatment function.

[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an ALC wall panel construction device, comprising: a construction table, a construction platform is installed on the top of the construction table, an electric slide is installed at the bottom of the construction platform, a construction pole is installed at the output end of the electric slide, a construction knife group is installed at the output end of the construction pole, and a fume treatment mechanism is provided on the outer wall of the construction platform, and the fume treatment mechanism is used to adsorb and treat the fume and small particles generated during cutting;

[0008] The smoke treatment mechanism includes a follow-shift groove, which is arranged on the outer wall of the construction platform, and the follow-shift groove is located behind the electric slide rail, the inner wall of the follow-shift groove is installed with a follow-shift rod, and the outer wall of the follow-shift rod is surrounded by a follow-shift slider, the outer wall of the follow-shift slider is installed with a follow-shift connecting rod, and the bottom of the follow-shift connecting rod is installed with a smoke treatment box, the outer wall of the smoke treatment box is installed with a connecting rod, and one end of the connecting rod is fixedly connected to the outer wall of the construction pole, the inner wall of the smoke treatment box is provided with air holes, the inner wall of the smoke treatment box is installed with an adsorption electric fan, the inner wall of the smoke treatment box is installed with a filter protection net, the outer wall of the filter protection net is provided with a locking screw groove, the outer wall of the smoke treatment box is installed with a locking screw, and one end of the locking screw extends to the inside of the locking screw groove, the outer wall of the filter protection net is installed with flue gas activated carbon, the bottom of the flue gas activated carbon is provided with a splicing screw groove, and the outer wall of the filter protection net is installed with a splicing screw.

[0009] Preferably, the inner wall of the construction table is provided with a construction groove, a locking frame is installed on the top of the construction table, the inner wall of the locking frame is provided with a locking screw groove, the inner wall of the locking screw groove is installed with a locking screw, and a locking block is installed at the bottom of the locking screw.

[0010] Preferably, a material collecting mechanism is provided at the bottom of the construction table, and the material collecting mechanism is used to collect waste generated during cutting.

[0011] Preferably, the material receiving mechanism comprises a material receiving frame, an outer wall of the material receiving frame is installed with an adsorption magnet, a disassembly groove is provided at the bottom of the construction table, and an electromagnet is installed on the inner wall of the disassembly groove.

[0012] Preferably, the inner wall of the material receiving frame is provided with a material distribution hole, and the outer wall of the material distribution hole is installed with a retractable material distribution tube.

[0013] Preferably, a distribution frame is installed around the outer wall of the retractable distribution tube.

[0014] Preferably, a movable sleeve is installed on the outer wall of the material receiving frame, a movable sleeve rod is installed on the inner wall of the movable sleeve, and one end of the movable sleeve rod extends to the outer wall of the material distributing frame.

[0015] Compared with the prior art, the beneficial effects of the utility model are:

[0016] 1. The utility model is equipped with a smoke treatment mechanism to adsorb the smoke and small particles generated during cutting. When cutting the ALC wallboard, a large amount of smoke dust will be generated, and the smoke dust will be adsorbed into the human body, which will affect the health of the body. This needs to be improved. First, the splicing screw is twisted into the splicing screw groove, and the smoke activated carbon is connected to the filter protection net. Then, the filter protection net is moved to the smoke treatment box, and the locking screw is fixed to the locking screw groove. Then, the filter protection net and the smoke activated carbon are installed. In the smoke treatment box, when the electric slide rail works to drive the construction pole to move, and the linkage rod is connected to the construction pole, the smoke treatment box moves with the construction pole, and the follow-up slider moves on the follow-up rod, so that the smoke treatment box always moves simultaneously with the construction knife group, and the adsorption fan works to adsorb the smoke into the smoke treatment box, and the filter protection net is used to block larger impurities, and the smoke is filtered through the smoke activated carbon and discharged through the air holes, so as to avoid a large amount of smoke dust being inhaled into the body by the staff and affecting their health;

[0017] 2. The utility model is equipped with a material collecting mechanism to collect the waste generated during cutting. When ALC wall panels are cut, a large amount of waste chips will be generated, and the existing construction equipment does not have the function of centrally collecting the waste chips. In this regard, an improvement is made by firstly fitting the adsorption magnet to the electromagnet, and the electromagnet is energized to adsorb the adsorption magnet. The material collecting frame is installed under the construction groove, and the waste chips enter the material collecting frame through the construction groove. When there are a lot of waste chips, the waste chips in the material collecting frame enter the material dividing frame through the material dividing hole and the retractable material dividing pipe, and the retractable material dividing pipe automatically opens due to the weight of the waste chips themselves. The movable sleeve rod moves in the movable sleeve, and the retractable material dividing pipe is assisted to open, so that more waste chips can be received, thereby facilitating the collection of the waste generated during cutting. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0019] Figure 2 This is a schematic diagram of the vertical structure of the locking frame of the utility model;

[0020] Figure 3 This is a partial structural schematic diagram of the construction platform of the utility model;

[0021] Figure 4 It is a schematic diagram of the structure of the connecting rod part of the utility model;

[0022] Figure 5 This is a partial structural schematic diagram of the smoke treatment box of the utility model;

[0023] Figure 6It is a partial structural schematic diagram of the material receiving frame of the utility model.

[0024] In the figure: 1. construction table; 2. construction platform; 3. electric slide rail; 4. construction pole; 5. construction knife group; 6. construction groove; 7. locking frame; 8. locking screw groove; 9. locking screw; 10. locking block; 11. shifting groove; 12. shifting rod; 13. shifting slider; 14. shifting connecting rod; 15. flue gas treatment box; 16. connecting rod; 17. air vent; 18. adsorption fan; 19. filter protection net; 20. locking screw groove; 21. locking screw; 22. flue gas activated carbon; 23. splicing screw groove; 24. splicing screw; 25. material collection frame; 26. replacement groove; 27. electromagnet; 28. adsorption magnet; 29. ​​material distribution hole; 30. retractable material distribution pipe; 31. material distribution frame; 32. movable sleeve; 33. movable sleeve rod. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0026] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "two ends", "one end", "the other end" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0027] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0028] See also Figure 1 , Figure 2 and Figure 3, an ALC wall panel construction equipment, comprising: a construction table 1, a construction table 2 is installed on the top of the construction table 1, an electric slide rail 3 is installed at the bottom of the construction table 2, a construction pole 4 is installed at the output end of the electric slide rail 3, a construction knife group 5 is installed at the output end of the construction pole 4, a construction groove 6 is provided on the inner wall of the construction table 1, a locking frame 7 is installed on the top of the construction table 1, the inner wall of the locking frame 7 is provided with a locking screw groove 8, a locking screw 9 is installed on the inner wall of the locking screw groove 8, and a locking block 10 is installed at the bottom of the locking screw 9 to prevent the ALC wall panel from being placed on the construction table 1, twisting the locking screw 9 to drive the locking block 10 to fix the part of the ALC wall panel that does not need to be cut, thereby fixing the position of the ALC wall surface, and then the construction pole 4 works to drive the construction knife group 5 to move, and the blade on the construction knife group 5 rotates to cut the ALC wall panel, and then the electric slide rail 3 drives the construction knife group 5 to move, thereby completing the cutting work of the ALC wall panel.

[0029] See also Figure 1 , Figure 4 and Figure 5The outer wall of the construction platform 2 is provided with a smoke treatment mechanism, which is used to adsorb and treat the smoke and small particles generated during cutting. The smoke treatment mechanism includes a moving groove 11, which is arranged on the outer wall of the construction platform 2, and the moving groove 11 is located behind the electric slide rail 3. The inner wall of the moving groove 11 is equipped with a moving rod 12, and the outer wall of the moving rod 12 is surrounded by a moving slider 13, and the outer wall of the moving slider 13 is equipped with a moving connecting rod 14, and the bottom of the moving connecting rod 14 is equipped with a smoke treatment box 15, and the outer wall of the smoke treatment box 15 is equipped with a connecting rod 16, and the connecting rod 16 is connected to the outer wall of the moving slider 13. One end of the movable rod 16 is fixedly connected to the outer wall of the construction pole 4, the inner wall of the smoke treatment box 15 is provided with an air vent 17, the inner wall of the smoke treatment box 15 is installed with an adsorption fan 18, the inner wall of the smoke treatment box 15 is installed with a filter protection net 19, the outer wall of the filter protection net 19 is provided with a locking screw groove 20, the outer wall of the smoke treatment box 15 is installed with a locking screw 21, and one end of the locking screw 21 extends to the inside of the locking screw groove 20, the outer wall of the filter protection net 19 is installed with flue gas activated carbon 22, the bottom of the flue gas activated carbon 22 is provided with a splicing screw groove 23, and the filter protection net 19 is provided with a locking screw groove 20. The outer wall is equipped with a splicing screw 24. When the ALC wallboard is cut, a large amount of smoke dust will be generated. The smoke dust will be absorbed by the human body and affect the health of the body. Therefore, it is necessary to improve this. First, the splicing screw 24 is twisted into the splicing screw groove 23, and the smoke activated carbon 22 is connected to the filter protection net 19. Then, the filter protection net 19 is moved to the smoke treatment box 15, and the locking screw 21 is fixed to the locking screw groove 20. Then, the filter protection net 19 and the smoke activated carbon 22 are installed in the smoke treatment box 15. Then, when the electric slide rail 3 When the construction pole 4 is driven to move by the work, and the connecting rod 16 is connected to the construction pole 4, the smoke treatment box 15 moves with the construction pole 4, and the follow-moving slider 13 moves on the follow-moving rod 12, so that the smoke treatment box 15 always moves simultaneously with the construction knife group 5, and the adsorption fan 18 works to adsorb the smoke into the smoke treatment box 15, and the filtering protection net 19 is used to block larger impurities, and the smoke is filtered through the smoke activated carbon 22 and discharged through the air vent 17, thereby avoiding a large amount of smoke dust being inhaled into the body by the staff and affecting their health.

[0030] See also Figure 1 and Figure 6A material receiving mechanism is provided at the bottom of the construction table 1, and the material receiving mechanism is used to collect the waste generated during cutting. The material receiving mechanism includes a material receiving frame 25, and an adsorption magnet 28 is installed on the outer wall of the material receiving frame 25. A disassembly groove 26 is provided at the bottom of the construction table 1, and an electromagnet 27 is installed on the inner wall of the disassembly groove 26. A material distribution hole 29 is provided on the inner wall of the material distribution hole 29, and a retractable material distribution pipe 30 is installed on the outer wall of the retractable material distribution pipe 30. A material distribution frame 31 is installed around the outer wall of the retractable material distribution pipe 30, and a movable sleeve 32 is installed on the outer wall of the material receiving frame 25. A movable sleeve rod 33 is installed on the inner wall of the movable sleeve 32, and one end of the movable sleeve rod 33 extends to the outer wall of the material distribution frame 31. A large amount of waste will be generated when cutting the ALC wallboard. However, the existing construction equipment does not have the function of collecting waste chips in a centralized manner, so an improvement is made. First, the adsorption magnet 28 is fitted with the electromagnet 27, and the electromagnet 27 is energized to adsorb the adsorption magnet 28. The receiving frame 25 is installed under the construction groove 6, and the waste chips enter the receiving frame 25 through the construction groove 6. When there are a lot of waste chips, the waste chips in the receiving frame 25 enter the dividing frame 31 through the dividing hole 29 and the retractable dividing pipe 30, and the retractable dividing pipe 30 automatically opens due to the weight of the waste chips themselves, and the movable sleeve rod 33 moves in the movable sleeve 32, which assists the retractable dividing pipe 30 to open, so that more waste chips can be received, thereby facilitating the collection of waste generated during cutting.

[0031] Working principle: prevent the ALC wall panel from being placed on the construction table 1, twist the locking screw 9 to drive the locking block 10 to fix the part of the ALC wall panel that does not need to be cut, and then fix the position of the ALC wall surface. Then the construction pole 4 drives the construction knife group 5 to move, and the blade on the construction knife group 5 rotates to cut the ALC wall panel. Then the electric slide rail 3 drives the construction knife group 5 to move, and the cutting work of the ALC wall panel is completed. When cutting the ALC wall panel, a large amount of smoke and dust will be generated, and the smoke and dust will be absorbed into the human body and affect its health. , it is necessary to make improvements to this. First, twist the splicing screw 24 into the splicing screw groove 23, then connect the flue gas activated carbon 22 with the filter protection net 19, then move the filter protection net 19 to the flue gas treatment box 15, fix the locking screw 21 into the locking screw groove 20, and then install the filter protection net 19 and the flue gas activated carbon 22 in the flue gas treatment box 15. Then, when the electric slide rail 3 works to drive the construction pole 4 to move, and the connecting rod 16 is connected to the construction pole 4, the flue gas treatment box 15 moves with the construction pole 4, and the moving slider 13 is on the moving rod 12. The fume treatment box 15 is moved so that it always moves with the construction knife group 5, and the adsorption fan 18 works to adsorb the fume into the fume treatment box 15, and the filter protection net 19 is used to block larger impurities, and the fume is filtered through the fume activated carbon 22 and discharged through the air vents 17, thereby avoiding the situation where a large amount of fume dust is inhaled into the body by the workers and affects their health. When cutting the ALC wallboard, a large amount of waste chips will be generated, and the existing construction equipment does not have the function of centrally collecting the waste chips. In order to improve this, firstly, the adsorption magnet 28 and the electric The magnet 27 is fitted, and the electromagnet 27 is energized to attract the adsorption magnet 28, and the receiving frame 25 is installed below the construction groove 6, so that the waste chips enter the receiving frame 25 through the construction groove 6. When there are a lot of waste chips, the waste chips in the receiving frame 25 enter the dividing frame 31 through the dividing hole 29 and the retractable dividing tube 30, and the retractable dividing tube 30 automatically opens due to the weight of the waste chips themselves, and the movable sleeve rod 33 moves in the movable sleeve 32, which assists the retractable dividing tube 30 to open, so that more waste chips can be received, thereby facilitating the collection of waste generated during cutting.

[0032] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

Claims

1. An ALC wall panel construction device, comprising: a construction table (1), a construction platform (2) installed on the top of the construction table (1), an electric slide rail (3) installed on the bottom of the construction platform (2), a construction pole (4) installed at the output end of the electric slide rail (3), and a construction knife group (5) installed at the output end of the construction pole (4), characterized in that: The outer wall of the construction platform (2) is provided with a fume treatment mechanism, and the fume treatment mechanism is used to adsorb the fume and small particles generated during cutting; The smoke treatment mechanism comprises a follow-up groove (11), wherein the follow-up groove (11) is arranged on the outer wall of the construction platform (2), and the follow-up groove (11) is located behind the electric slide rail (3), the inner wall of the follow-up groove (11) is installed with a follow-up rod (12), the outer wall of the follow-up rod (12) is surrounded by a follow-up slider (13), the outer wall of the follow-up slider (13) is installed with a follow-up connecting rod (14), the bottom of the follow-up connecting rod (14) is installed with a smoke treatment box (15), the outer wall of the smoke treatment box (15) is installed with a linkage rod (16), and one end of the linkage rod (16) is fixedly connected to the outer wall of the construction pole (4), and the smoke treatment box ( The inner wall of the flue gas treatment box (15) is provided with an air vent (17), the inner wall of the flue gas treatment box (15) is installed with an adsorption fan (18), the inner wall of the flue gas treatment box (15) is installed with a filter protection net (19), the outer wall of the filter protection net (19) is provided with a locking screw groove (20), the outer wall of the flue gas treatment box (15) is installed with a locking screw (21), and one end of the locking screw (21) extends to the inside of the locking screw groove (20), the outer wall of the filter protection net (19) is installed with flue gas activated carbon (22), the bottom of the flue gas activated carbon (22) is provided with a splicing screw groove (23), and the outer wall of the filter protection net (19) is installed with a splicing screw (24).

2. The ALC wall panel construction equipment according to claim 1, characterized in that: The inner wall of the construction table (1) is provided with a construction groove (6), the top of the construction table (1) is provided with a locking frame (7), the inner wall of the locking frame (7) is provided with a locking screw groove (8), the inner wall of the locking screw groove (8) is provided with a locking screw (9), and the bottom of the locking screw (9) is provided with a locking block (10).

3. The ALC wall panel construction equipment according to claim 1, characterized in that: A material collecting mechanism is provided at the bottom of the construction table (1), and the material collecting mechanism is used to collect waste generated during cutting.

4. The ALC wall panel construction equipment according to claim 3, characterized in that: The material receiving mechanism comprises a material receiving frame (25), the outer wall of which is provided with an adsorption magnet (28), and the bottom of the construction table (1) is provided with a dismantling groove (26), the inner wall of which is provided with an electromagnet (27).

5. The ALC wall panel construction equipment according to claim 4, characterized in that: The inner wall of the material receiving frame (25) is provided with a material distribution hole (29), and the outer wall of the material distribution hole (29) is installed with a retractable material distribution tube (30).

6. The ALC wall panel construction equipment according to claim 5, characterized in that: A distribution frame (31) is installed around the outer wall of the retractable distribution pipe (30).

7. The ALC wall panel construction equipment according to claim 6, characterized in that: A movable sleeve (32) is installed on the outer wall of the material receiving frame (25), a movable sleeve rod (33) is installed on the inner wall of the movable sleeve (32), and one end of the movable sleeve rod (33) extends to the outer wall of the material distributing frame (31).