Inverted beam type fan pile foundation capable of improving uplift bearing capacity of pile
By inverting the inverted beam fan pile foundation connecting the foundation piles with the main beam and the outer ring secondary beam, the problem of insufficient pull-up bearing capacity of the traditional fan pile foundation is solved, and the effect of reducing the concrete usage and construction cost is achieved, providing the fan foundation structure with New design reference.
Patent Information
- Application Number
- CN202323595107.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-27
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2033-12-27
AI Technical Summary
Traditional fan pile foundations cannot fully utilize their pull-up bearing capacity, and the concrete consumes a large amount and has poor economicality.
The foundation of the inverted beam fan pile is adopted, including the bearing and the foundation pile. The foundation pile is connected by inverting the main beam and the outer ring secondary beam to reduce the concrete usage and the weight of the upper soil covering, and the cushion layer is used to increase the support force of the bearing and reduce construction excavation. and backfill soil volume.
It effectively improves the pile pull-up bearing capacity, reduces construction costs and overall concrete usage, and provides a new technical reference for fan infrastructure design.
Smart Images

Figure CN222044259U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of inverted beam type fan pile foundation, and in particular relates to an inverted beam type fan pile foundation with improved pile pull-out bearing capacity. Background Art
[0002] With the continuous development and application of wind turbine technology, the design and performance requirements of wind turbine foundation structures are also increasing. The traditional natural foundation wind turbine cap adopts a circular extended foundation form or a beam-slab foundation form, both of which use the deadweight of concrete and the weight of the upper covering soil to balance the horizontal load and bending moment of the wind turbine. The wind turbine pile foundation still uses the form of a natural foundation wind turbine cap. The foundation cap is high, the deadweight of the foundation is large, and the pile foundation is mainly based on compressive bearing capacity, which cannot give full play to its tensile bearing capacity. In addition, the concrete consumption is large and the economy is poor. Utility Model Content
[0003] In view of the defects in the prior art, the utility model provides an inverted beam type wind turbine pile foundation which improves the pull-out bearing capacity of the pile and can effectively solve the above problems.
[0004] The technical solution adopted by the utility model is as follows:
[0005] The utility model provides an inverted beam type wind turbine pile foundation for improving the pull-out bearing capacity of the pile, comprising a cap (9) and a foundation pile (3); the cap (9) comprises a column (1), an inverted main beam (2) and an outer ring secondary beam (4);
[0006] The platform column (1) is located at the center, and the outer periphery of the platform column (1) is radially connected to a plurality of the inverted main beams (2); the ends of the inverted main beams (2) are connected to each other through the outer ring secondary beams (4); and the foundation piles (3) are dispersedly and vertically arranged at the bottom of the inverted main beam (2) and the bottom of the outer ring secondary beams (4).
[0007] Preferably, the support platform (9) is octagonal, circular or shell-shaped; the column (1) comprises a cylindrical upper column (7) and a cylindrical lower column (8) which are coaxially connected.
[0008] Preferably, the diameters of the cylindrical upper column (7) and the cylindrical lower column (8) are the same.
[0009] Preferably, the top surface and the bottom surface of the cylindrical upper column (7) and the cylindrical lower column (8) are both parallel to the ground and are horizontal.
[0010] Preferably, the maximum cross-sectional height of the inverted main beam (2) is the same as the height of the cylindrical lower pedestal (8), and the minimum cross-sectional height of the inverted main beam (2) is the same as the height of the outer ring secondary beam (4).
[0011] Preferably, the anchor cage (6) connected to the wind turbine tower extends into the bottom of the column (1); the upper anchor plate (10) of the anchor cage (6) is located above the column (1), and the lower anchor plate (11) of the anchor cage (6) is located at the bottom of the column (1).
[0012] Preferably, for the foundation pile (3) arranged at the bottom of the inverted main beam (2), the top surface of the foundation pile (3) is an inclined surface (12) parallel to the inclined surface of the bottom of the inverted main beam (2);
[0013] For the foundation pile (3) arranged at the bottom of the outer ring secondary beam (4), the top surface of the foundation pile (3) is a horizontal plane (13) parallel to the bottom surface of the outer ring secondary beam (4), and is connected to the outer ring secondary beam (4) through a steel bar (14).
[0014] Preferably, a cushion layer (5) is wrapped around the lower inclined surface of the inverted main beam (2), the bottom surface of the outer ring secondary beam (4) and the bottom surface of the column (1).
[0015] Preferably, the cushion layer (5) is a plain concrete cushion layer, and the concrete strength grade is not less than C15; the cushion layer (5) is directly connected to the bottom surfaces of the cap (9), and is arranged between the cap (9) and the foundation soil. The thickness of the cushion layer (5) is 100-200 mm, and extends 100-200 mm outside the cap (9); the lower surface of the cushion layer (5) is a flat horizontal surface or an inclined surface.
[0016] Preferably, the platform column (1), the inverted main beam (2) and the outer ring secondary beam (4) are integrally formed by casting reinforced concrete.
[0017] The utility model provides an inverted beam type fan pile foundation with improved pile pull-out bearing capacity, which has the following advantages:
[0018] The utility model provides an inverted beam type fan pile foundation with improved pull-out bearing capacity of the pile. The main beam of the beam-slab fan foundation is inverted, which can reduce the amount of concrete, reduce the weight of the upper covering soil, reduce the amount of excavation and backfilling earthwork during construction, reduce the compressive bearing capacity of the pile, and can give full play to the pull-out bearing capacity of the pile foundation, while reducing the cost, providing a new technical reference for the design and application of the fan foundation structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 A schematic plan view of an inverted beam type wind turbine pile foundation for improving the pull-out bearing capacity of the pile provided by the utility model;
[0020] Figure 2 It is a cross-sectional schematic diagram of an inverted beam type fan pile foundation for improving the pull-out bearing capacity of the pile according to the utility model;
[0021] Figure 3 It is a schematic diagram of the connection between the pile foundation and the cap of the utility model. DETAILED DESCRIPTION
[0022] In order to make the technical problems, technical solutions and beneficial effects solved by the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.
[0023] The utility model provides an inverted beam type fan pile foundation with improved pull-out bearing capacity of the pile. The main beam of the beam-slab fan foundation is inverted, which can reduce the amount of concrete, reduce the weight of the upper covering soil, reduce the amount of excavation and backfilling earthwork during construction, reduce the compressive bearing capacity of the pile, and can give full play to the pull-out bearing capacity of the pile foundation, while reducing the cost, providing a new technical reference for the design and application of the fan foundation structure.
[0024] refer to Figures 1 to 3 The utility model provides an inverted beam type wind turbine pile foundation for improving the pull-out bearing capacity of the pile, including a cap 9 and a foundation pile 3; the cap 9 includes a column 1, an inverted main beam 2 and an outer ring secondary beam 4; the column 1, the inverted main beam 2 and the outer ring secondary beam 4 can be integrally formed by casting reinforced concrete. In the present application, the shape of the cap 9 can be octagonal, circular, shell-shaped or other shapes, etc. The present application does not limit the specific shape of the cap 9, and other shapes are all extensions of the present utility model and are within the protection scope of the present patent application.
[0025] The column 1 is located at the center, and the periphery of the column 1 is radially connected to multiple inverted main beams 2; the ends of each inverted main beam 2 are interconnected through an outer ring secondary beam 4; at the bottom of the inverted main beam 2 and the bottom of the outer ring secondary beam 4, one or more circles of columnar foundation piles 3 are dispersedly arranged vertically.
[0026] In the present application, the column 1 includes a cylindrical upper column 7 and a cylindrical lower column 8 which are coaxially connected. The diameters of the cylindrical upper column 7 and the cylindrical lower column 8 are the same. The top and bottom surfaces of the cylindrical upper column 7 and the cylindrical lower column 8 are parallel to the ground and are horizontal.
[0027] The maximum cross-sectional height of the inverted main beam 2 is the same as the height of the cylindrical lower pedestal 8 , and the minimum cross-sectional height of the inverted main beam 2 is the same as the height of the outer ring secondary beam 4 .
[0028] The anchor cage 6 connected to the wind turbine tower extends into the bottom of the column 1; the upper anchor plate 10 of the anchor cage 6 is located above the column 1, and the lower anchor plate 11 of the anchor cage 6 is located at the bottom of the column 1. The diameter of the cylindrical upper column 7 is related to the diameter of the anchor cage 6.
[0029] In the present application, for the foundation pile 3 arranged at the bottom of the inverted main beam 2, the top surface of the foundation pile 3 is an inclined surface 12, which is parallel to the inclined surface at the bottom of the inverted main beam 2;
[0030] For the foundation pile 3 arranged at the bottom of the outer ring secondary beam 4 , the top surface of the foundation pile 3 is a horizontal plane 13 parallel to the bottom surface of the outer ring secondary beam 4 , and is connected to the outer ring secondary beam 4 through a steel bar 14 .
[0031] In the present application, a cushion layer 5 is wrapped around the lower inclined surface of the inverted main beam 2, the bottom surface of the outer ring secondary beam 4 and the bottom surface of the column 1. The cushion layer 5 is a plain concrete cushion layer, and the concrete strength grade is not less than C15; the cushion layer 5 is directly connected to the bottom surfaces of the cap 9, and is arranged between the cap 9 and the foundation soil. The thickness of the cushion layer 5 is 100-200mm, extending 100-200mm outside the cap 9, and the lower surface of the cushion layer 5 is a flat horizontal surface or an inclined surface.
[0032] Specifically, continuous pile foundation construction is carried out on the ground according to the designed pile foundation position to ensure that the top elevation of the pile foundation after driving meets the requirements. In particular, when the foundation pile 3 is set under the inverted main beam 2, the concrete on the top of the pile is chiseled to meet the inclination requirements of the inclined surface 12 of the foundation pile 3 to avoid conflict with the inverted main beam 2 or the outer ring secondary beam 4 steel bars. It is also ensured that the top surface has sufficient anchoring length of steel bars to extend into the inverted main beam 2 or the outer ring secondary beam 4 to ensure connection with the cap 9.
[0033] The excavation of the foundation pit is used to bury the cap 9, wherein after the side walls of the foundation pit are vertically excavated to a certain depth, the inner walls are tilted and gathered from the outside to the center line of the foundation pit. The cushion layer 5 is laid, and the cushion layer thickness is 100-200mm. The width is 100-200mm on both sides of the width of the cap 9. The cushion layer 5 is a concrete cushion layer, and the strength grade is not less than C15. The lower surface of the concrete cushion layer is a horizontal or inclined flat surface. The horizontal surface is parallel to the bottom surface of the column 1 and the bottom surface of the outer ring secondary beam 4, and the inclined flat surface is parallel to the bottom surface of the inverted main beam 2, which has the function of supporting the cap. Install the anchor cage 6, level it until the accuracy requirements are met, and then cut and tie the steel bars of the cap. After the steel bars are tied, cast the concrete cap.
[0034] The utility model inverts the existing beam-slab type cap, and the inverted main beam 2, the outer ring secondary beam 4 and the lower surface of the column 1 are in contact with the cushion layer 5, and the outer ring secondary beam 4 and the top surface of the column 1 are parallel to the horizontal ground. The utility model is applicable to wind power generation projects with all pile foundation conditions, and is only used to illustrate the core ideas and technical features of the utility model, and is not limited to the current number of pile foundations, pile foundation dimensions, column height, number of inverted main beams, dimensions of inverted main beams, dimensions of outer ring secondary beams, buried depth of the cap, shape of the cap, etc. The purpose of this description is to help designers and researchers in the field understand the content of this application and implement it. The patent scope of the present invention should not be defined only by this embodiment. Even if the same changes or modifications are made on the basis of the principles disclosed in this application, they should still be regarded as belonging to the patent scope of this application.
[0035] The utility model provides an inverted beam type fan pile foundation for improving the pull-out bearing capacity of the pile, which has the following advantages:
[0036] 1) By improving the shape of the foundation, the thickness of the upper covering soil can be reduced, the amount of earth excavation and backfilling during the construction of the wind turbine foundation can be reduced, the construction period can be accelerated, and the cost can be reduced.
[0037] 2) By improving the shape of the foundation, the deadweight of the foundation is greatly reduced, the weight of the covering soil is reduced, the pull-out bearing capacity of the piles is maximized, the compressive bearing capacity of the pile foundation is reduced, the number and length of piles are optimized, and the overall concrete consumption of the wind turbine foundation is greatly reduced, thereby reducing the construction cost.
[0038] 3) The lower part of the inverted main beam is an inclined plane with a small inclination angle, which reduces the difficulty of foundation pit excavation and support, and makes the construction simple and safe.
[0039] 4) It is suitable for all kinds of geological conditions suitable for pile foundations, such as loess, sandy soil and clay soil, and has strong applicability.
[0040] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be considered as the protection scope of the present invention.
Claims
1. An inverted beam type wind turbine pile foundation for improving the pull-out bearing capacity of the pile, characterized in that: It comprises a cap (9) and foundation piles (3); the cap (9) comprises a column (1), an inverted main beam (2) and an outer ring secondary beam (4); The platform column (1) is located at the center, and the outer periphery of the platform column (1) is radially connected to a plurality of the inverted main beams (2); the ends of the inverted main beams (2) are connected to each other through the outer ring secondary beams (4); and the foundation piles (3) are dispersedly and vertically arranged at the bottom of the inverted main beam (2) and the bottom of the outer ring secondary beams (4).
2. The inverted beam type wind turbine pile foundation for improving the pull-out bearing capacity of the pile according to claim 1, characterized in that: The support platform (9) is in an octagonal or circular shape; the platform column (1) comprises a cylindrical upper platform column (7) and a cylindrical lower platform column (8) which are coaxially connected.
3. The inverted beam type wind turbine pile foundation for improving the pull-out bearing capacity of the pile according to claim 2, characterized in that: The diameters of the cylindrical upper column (7) and the cylindrical lower column (8) are the same.
4. The inverted beam type wind turbine pile foundation for improving the pull-out bearing capacity of the pile according to claim 2, characterized in that: The top surface and the bottom surface of the cylindrical upper column (7) and the cylindrical lower column (8) are both parallel to the ground and are horizontal.
5. The inverted beam type wind turbine pile foundation for improving the pull-out bearing capacity of the pile according to claim 2, characterized in that: The maximum cross-sectional height of the inverted main beam (2) is the same as the height of the cylindrical lower pedestal (8), and the minimum cross-sectional height of the inverted main beam (2) is the same as the height of the outer ring secondary beam (4).
6. The inverted beam type wind turbine pile foundation for improving the pull-out bearing capacity of the pile according to claim 1, characterized in that: An anchor cage (6) connected to the wind turbine tower extends into the bottom of the column (1); an upper anchor plate (10) of the anchor cage (6) is located above the column (1), and a lower anchor plate (11) of the anchor cage (6) is located at the bottom of the column (1).
7. The inverted beam type wind turbine pile foundation for improving the pull-out bearing capacity of the pile according to claim 1, characterized in that: For the foundation pile (3) arranged at the bottom of the inverted main beam (2), the top surface of the foundation pile (3) is an inclined surface (12) parallel to the inclined surface at the bottom of the inverted main beam (2); For the foundation pile (3) arranged at the bottom of the outer ring secondary beam (4), the top surface of the foundation pile (3) is a horizontal plane (13) parallel to the bottom surface of the outer ring secondary beam (4), and is connected to the outer ring secondary beam (4) through a steel bar (14).
8. The inverted beam type wind turbine pile foundation for improving the pull-out bearing capacity of the pile according to claim 1, characterized in that: A cushion layer (5) is wrapped around the lower inclined surface of the inverted main beam (2), the bottom surface of the outer ring secondary beam (4) and the bottom surface of the platform column (1).
9. The inverted beam type wind turbine pile foundation for improving the pull-out bearing capacity of the pile according to claim 8, characterized in that: The cushion layer (5) is a plain concrete cushion layer, and the concrete strength grade is not less than C15; the cushion layer (5) is directly connected to the bottom surfaces of the cap (9), and is arranged between the cap (9) and the foundation soil. The thickness of the cushion layer (5) is 100-200 mm, and extends 100-200 mm outside the cap (9); the lower surface of the cushion layer (5) is a flat horizontal surface or an inclined surface.
10. The inverted beam type wind turbine pile foundation for improving the pull-out bearing capacity of the pile according to claim 1, characterized in that: The platform column (1), the inverted main beam (2) and the outer ring secondary beam (4) are integrally formed by casting reinforced concrete.
