AI Technical Summary
Existing building mold shells are prone to damage during disassembly, resulting in wasted time and resources, and are insufficient in practicality.
A new type of building mold shell was designed, using screws, mobile plates, connecting rods, push plates, slide rods and reinforcement blocks. The moving plates and push plates are driven to extend out through the rotation of the screw, combining the pull rings and slide rods to achieve convenient removal. and support the top of the housing through bolts and support plates to increase the strength of the outer wall.
It realizes the convenient disassembly of building mold shells and sealing during pouring, avoids the mold shells crushing under concrete gravity and stress deformation of the outer walls, and extends the service life.
Smart Images

Figure CN222045043U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building formwork, in particular to a novel building formwork. Background Art
[0002] Building formwork is a formwork (mold) product used in construction projects. It is made through specific technologies such as plastic compression. They are mainly used in buildings that require larger space and bearing capacity, such as garages, factories, warehouses, waiting rooms, libraries, underground garages, large shopping malls, multi-storey factories, teaching buildings and civil defense projects.
[0003] The use of building formwork can reduce the weight of the building, ensure the smooth progress of the construction, and shorten the construction period. In the existing technology, most of the formwork has the problem of being unchanged when disassembled and easily damaged during the disassembly process, making it difficult for the plastic formwork to fall off, resulting in unnecessary waste of time and resources and insufficient practicality. Therefore, it is necessary to redesign a new building formwork to address the above problems. Utility Model Content
[0004] The utility model aims to solve the shortcomings in the prior art and proposes a new type of building formwork.
[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:
[0006] The top end face of the sliding panel also is provided with an interlocking structure, and the interlocking structures are arranged on the interlocking structures. The interlocking structures are arranged on the interlocking structures to interlock the two guide rails and the two guide rails are connected with each other with a different interlocking structure.
[0007] Preferably, the connection mechanism comprises two connection rods fixedly mounted on the inner top wall of the shell, and ends of the two connection rods are fixedly connected to the outer wall of the stabilizing sleeve on the same side.
[0008] Preferably, the connecting mechanism comprises a connecting block rotatably mounted on the end of the bolt, and the end of the connecting block is fixedly connected to the bottom wall of the support plate.
[0009] Preferably, the elastic mechanism comprises a spring mounted on the outer wall of the slide rod, and two ends of the spring are elastically connected to the upper end surface of the mounting block and the bottom wall of the second limiting plate respectively.
[0010] Preferably, a connecting plate is fixedly mounted on the bottom wall of the shell, and a first sealing gasket is fixedly mounted on the bottom wall of the connecting plate.
[0011] Preferably, a second sealing gasket that cooperates with the bottom wall of the push plate is fixedly installed inside the storage groove, and the first sealing gasket and the second sealing gasket are both made of vulcanized rubber.
[0012] Beneficial effects of the utility model:
[0013] 1. By setting components such as a screw, a movable plate, a connecting rod and a push plate, the screw can drive the movable plate to move when it rotates, and the movable plate can drive the push plate to extend from the storage groove through two connecting plates, so that the shell can be pushed out by the extended push plate, and then the slide rod can be pulled by the pull ring, and the slide rod drives the second limit plate to contact the mounting block. At this time, the mounting block is subjected to force to drive the shell to move to complete convenient demoulding.
[0014] 2. By setting components such as bolts, connecting blocks, support plates and reinforcement blocks, the bolts are rotated so that the bolts drive the support plates to contact the inner top wall of the shell through the cooperation of the connecting blocks, thereby supporting the top of the shell to prevent the shell from being crushed under the gravity of the concrete, and through the cooperation of multiple reinforcement blocks, the strength of the outer wall of the shell can be increased, thereby preventing the outer wall from being deformed by force. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the structure of a new type of building formwork proposed by the utility model;
[0016] Figure 2 for Figure 1 Schematic diagram of the vertical section structure;
[0017] Figure 3 This is a schematic diagram of the bottom structure of a new type of building formwork proposed by the utility model;
[0018] Figure 4 for Figure 2 A schematic diagram of the structure enlargement at point A;
[0019] Figure 5 for Figure 3 Schematic diagram of the enlarged structure at point B in FIG.
[0020] In the figure: 1 shell, 2 connecting plate, 3 first sealing gasket, 4 connecting plate, 5 screw, 6 rocker, 7 moving plate, 8 first limit plate, 9 connecting rod, 10 push plate, 11 stabilizing sleeve, 12 connecting rod, 13 second sealing gasket, 14 bolt, 15 connecting block, 16 support plate, 17 mounting block, 18 sliding rod, 19 second limit plate, 20 spring, 21 pull ring, 22 reinforcement block. DETAILED DESCRIPTION
[0021] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0022] Reference Figure 1-5 A novel building formwork shell comprises a shell 1, a connecting plate 2 is fixedly installed on the bottom wall of the shell 1, a first sealing gasket 3 is fixedly installed on the bottom wall of the connecting plate 2, a screw 5 is rotatably installed inside the shell 1 through a connecting plate 4, a movable plate 7 is threadedly installed on the outer wall of the screw 5, a first limit plate 8 matched with the movable plate 7 is fixedly installed on the end of the screw 5, a push plate 10 is fixedly connected to the upper end surface of the movable plate 7 through two connecting rods 9, a receiving groove matched with the push plate 10 is opened on the upper end surface of the shell 1, a movable opening matched with two connecting rods 9 is opened on the bottom wall of the receiving groove, and a stabilizing sleeve 11 is slidably installed on the two connecting rods 9, and the inner top wall of the shell 1 is fixedly connected to the outer walls of the two stabilizing sleeves 11 through a connecting mechanism, The connection mechanism includes two connection rods 12 fixedly mounted on the inner top wall of the shell 1, and the ends of the two connection rods 12 are fixedly connected to the outer wall of the stabilizing sleeve 11 on the same side. Through the cooperation between the stabilizing sleeve 11 and the connecting rod 9, a limiting effect can be exerted on the movable plate 7, so that the movable plate 7 can only move axially along the outer wall of the screw 5. A second sealing gasket 13 that cooperates with the bottom wall of the push plate 10 is fixedly mounted inside the storage groove. The first sealing gasket 3 and the second sealing gasket 13 are both made of vulcanized rubber. Vulcanized rubber refers to vulcanized rubber, which has the characteristics of not being sticky and not easy to break, and also has high elasticity, heat resistance, tensile strength and insolubility in organic solvents, etc., which can achieve a good sealing effect.
[0023] Two bolts 14 are rotatably installed on the upper end surface of the connecting plate 4, and the ends of the two bolts 14 are rotatably installed with a support plate 16 through a connecting mechanism. The connecting mechanism includes a connecting block 15 rotatably installed at the end of the bolt 14, and the end of the connecting block 15 is fixedly connected to the bottom wall of the support plate 16. Slide rods 18 are slidably installed on the inner walls of both sides of the shell 1 through mounting blocks 17. Second limit plates 19 are fixedly installed at the ends of the two slide rods 18. The bottom walls of the two second limit plates 19 are connected to the upper end surface of the mounting block 17 on the same side through an elastic mechanism. The elastic mechanism includes a spring 20 installed on the outer wall of the slide rod 18, and the two ends of the spring 20 are elastically connected to the upper end surface of the mounting block 17 and the bottom wall of the second limit plate 19 respectively. Pull rings 21 are rotatably installed on the outer walls of the two slide rods 18. The spring 20 is initially in a contracted state, and a plurality of reinforcement blocks 22 are fixedly installed on the inner wall of the shell 1.
[0024] When the utility model is used, the initial state of the push plate 10 is inside the storage groove, and the bottom wall of the push plate 10 will squeeze the second sealing gasket 13, thereby ensuring the sealing between the push plate 10 and the storage groove. During pouring, the first sealing gasket 3 of the bottom wall of the connecting plate 2 can increase the sealing between the connecting plate 2 and the bottom plate. Through the cooperation of the first sealing gasket 3 and the second sealing gasket 13, the poured concrete can be prevented from leaking from the gap. When the shell 1 is used, the bolt 14 is rotated so that the bolt 14 drives the support plate 16 to contact the inner top wall of the shell 1 through the cooperation of the connecting block 15, thereby supporting the top of the shell 1 to prevent the shell 1 from being crushed under the gravity of the concrete, and through the cooperation of multiple reinforcing blocks 22, the strength of the outer wall of the shell 1 can be increased, thereby preventing the outer wall from being deformed by force, and the cooperation of the support plate 16 and the reinforcing block 22 can increase the service life of the shell 1.
[0025] When it is necessary to demould the shell 1, the rocker 6 can be rotated to drive the screw 5 to rotate. The screw 5 can drive the movable plate 7 to move when rotating. The movable plate 7 can drive the push plate 10 to extend from the storage groove through the two connecting rods 9, thereby the shell 1 can be pushed out through the extended push plate 10. The first limit plate 8 installed at the end of the screw 5 can limit the movable plate 7 to prevent the movable plate 7 from detaching from the outer wall of the screw 5. Then, the slide bar 18 can be dragged through the pull ring 21, and the slide bar 18 drives the second limit plate 19 to contact the mounting block 17. At this time, the mounting block 17 is subjected to force to drive the shell 1 to move to complete convenient demoulding. During pouring, the spring 20 can drive the pull ring 21 to move to the inside of the shell 1 through the slide bar 18, thereby preventing the slide bar 18 and the pull ring 21 from leaking out and affecting the pouring.
[0026] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A novel building formwork, comprising a shell (1), characterized in that: A screw rod (5) is rotatably mounted inside the shell (1) through a connecting plate (4); a movable plate (7) is threadedly mounted on the outer wall of the screw rod (5); a first limit plate (8) cooperating with the movable plate (7) is fixedly mounted on the end of the screw rod (5); a push plate (10) is fixedly connected to the upper end surface of the movable plate (7) through two connecting rods (9); a receiving groove cooperating with the push plate (10) is provided on the upper end surface of the shell (1); a movable opening cooperating with the two connecting rods (9) is provided on the bottom wall of the receiving groove; both connecting rods (9) are slidably mounted with a stabilizing sleeve (11); the inner top wall of the shell (1) is connected to the two stabilizing sleeves (11) through a connecting mechanism. 1) The outer wall is fixedly connected, two bolts (14) are rotatably installed on the upper end surface of the connecting plate (4), and the ends of the two bolts (14) are rotatably installed with support plates (16) through a connecting mechanism. The inner walls on both sides of the shell (1) are slidably installed with sliding rods (18) through mounting blocks (17), and the ends of the two sliding rods (18) are fixedly installed with second limit plates (19). The bottom walls of the two second limit plates (19) are connected to the upper end surface of the mounting block (17) on the same side through an elastic mechanism. Pull rings (21) are rotatably installed on the outer walls of the two sliding rods (18), and a plurality of reinforcement blocks (22) are fixedly installed on the inner wall of the shell (1).
2. A new type of building formwork according to claim 1, characterized in that: The connection mechanism comprises two connection rods (12) fixedly mounted on the inner top wall of the housing (1), and the ends of the two connection rods (12) are fixedly connected to the outer wall of the stabilizing sleeve (11) on the same side.
3. A new type of building formwork according to claim 2, characterized in that: The connection mechanism comprises a connection block (15) rotatably mounted on the end of the bolt (14), and the end of the connection block (15) is fixedly connected to the bottom wall of the support plate (16).
4. A new type of building formwork according to claim 3, characterized in that: The elastic mechanism comprises a spring (20) mounted on the outer wall of the slide rod (18), and two ends of the spring (20) are elastically connected to the upper end surface of the mounting block (17) and the bottom wall of the second limiting plate (19) respectively.
5. A new type of building formwork according to claim 4, characterized in that: A connecting plate (2) is fixedly mounted on the bottom wall of the shell (1), and a first sealing gasket (3) is fixedly mounted on the bottom wall of the connecting plate (2).
6. A new type of building formwork according to claim 5, characterized in that: A second sealing gasket (13) is fixedly installed inside the storage groove and matches the bottom wall of the push plate (10); the first sealing gasket (3) and the second sealing gasket (13) are both made of vulcanized rubber.