False roof structure suitable for pillar-free mining of thick and large steeply inclined ore body

By designing the staggered steel mesh structure and the use of waste glass powder, a false top structure suitable for mining of thick, sharp and inclined ore bodies without ore columns was constructed, which solved the problem that the false top structure in the existing technology is difficult to ensure the safety of the mining site. , improves tensile strength and shear resistance, and realizes the resource utilization of waste glass.

CN222045781UActive Publication Date: 2024-11-22CHINA NONFERROUS METALS INTL MINING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420888941.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-26
Publication Date
2024-11-22
Estimated Expiration
2034-04-26

AI Technical Summary

Technical Problem

The existing technology is difficult to build a safe false top structure in the mining of thick and sharply inclined ore bodies without ore columns, especially under the empty field method, due to mining disturbances and overpressure effects, the stress concentration in the ore columns, and engineering geological conditions. Complexity leads to low recovery efficiency and difficulty in ensuring safety.

Method used

A false top structure including a base, a filler and a support frame is designed, and an interlaced multi-layer steel mesh is arranged in the filling body, and the slurry prepared by mixing waste glass powder, full tailing sand and cement is consolidated. The base is made of crushed ore level The support frame is connected by a hooked stand and a lock buckle to improve the construction efficiency and tensile strength.

Benefits of technology

It improves the construction efficiency and tensile strength of the false top, can withstand bending moments and shear forces at large spans, reduces the risk of damage at the junction of ore rocks, realizes safe protection of mining roof panels, and through the reuse of waste glass, Reduces environmental pollution and filling costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222045781U_ABST
    Figure CN222045781U_ABST
Patent Text Reader

Abstract

The false roof structure comprises a base and a filling body arranged on the base, a supporting frame extending into the filling body is arranged on the base, and a first reinforcing mesh, a second reinforcing mesh and a third reinforcing mesh are arranged in the position, close to the bottom, in the filling body at intervals in the vertical direction; the first reinforcing mesh, the second reinforcing mesh and the third reinforcing mesh are all arranged on the supporting frame, and the first reinforcing mesh, the second reinforcing mesh and the third reinforcing mesh are arranged in a pairwise staggered mode. The false roof structure can resist various damage forms, so that pillar-free mining of the thick and large steeply inclined ore body is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of mining engineering, in particular to a false roof structure suitable for pillar-free mining of thick and steeply inclined ore bodies. Background Art

[0002] For thick, steeply inclined metal ore bodies with stable rock conditions, the underground mining method is generally the open-pit and subsequent filling method. The middle section of the ore body is divided, and the ore room in the middle section is mined in two steps. Due to the investment restrictions on mine construction, the mining sequence of the ore body is usually downward, with mining and filling in sequence from top to bottom in the middle section. Horizontal pillars are left between the middle sections as a solid roof of the stope to control the convergence of the surrounding rock, carry the upper filling body, and ensure the safety of production operations. In order to reduce the mining loss rate, after the mining and filling of the upper and lower ore rooms of the pillars are completed, the small section is used to carry out strong mining operations on the pillars. Due to the influence of mining disturbance and the overburden of filling, the stress concentration in the pillars is large, the engineering geological conditions are complex, the mining technology is difficult, the operation safety is difficult to guarantee, and the mining efficiency is low. The open-pit method has a large exposure space and a long exposure time. Personnel and equipment are not allowed to enter the stope without the protection of a safe roof. Therefore, the idea of ​​building an artificial false roof at the bottom of the stope to provide a safe roof for the subsequent horizontal pillar mining is often difficult to achieve. In addition, the publicly available information on false roof structures and construction technologies is generally applicable to downward horizontal / entry filling mining. Its construction process is relatively complex, and its bearing capacity is difficult to meet the stability requirements of open-field mining with large spaces and long-term exposure. Utility Model Content

[0003] In view of the problems existing in the prior art, the utility model provides a false roof structure suitable for pillar-free mining of thick and steeply inclined ore bodies.

[0004] The technical solution adopted by the utility model to solve the above-mentioned technical problems is: a false roof structure suitable for pillar-free mining of thick and steeply inclined ore bodies, comprising a base and a filling body arranged on the base, the base is provided with a support frame extending into the filling body, the filling body is provided with a first steel mesh, a second steel mesh and a third steel mesh at intervals along the vertical direction near the bottom, the first steel mesh, the second steel mesh and the third steel mesh are all arranged on the support frame, and the first steel mesh, the second steel mesh and the third steel mesh are staggered in pairs.

[0005] Furthermore, the first steel mesh includes a first positioning steel mesh, a first sharp-bend steel mesh and a first slow-bend steel mesh connected in sequence, the first positioning steel mesh is horizontal, the first sharp-bend steel mesh is convex, the first slow-bend steel mesh is convex, the first positioning steel mesh is formed by a plurality of transverse positioning ribs and a plurality of longitudinal positioning ribs crisscrossing, the first sharp-bend steel mesh is formed by a plurality of transverse sharp-bend ribs and a plurality of longitudinal sharp-bend straight ribs crisscrossing, the transverse sharp-bend ribs are isosceles trapezoidal and include a sharp-bend horizontal portion and a sharp-bend inclined portion located on both sides of the sharp-bend horizontal portion, the first slow-bend steel mesh is formed by a plurality of transverse slow-bend ribs and a plurality of longitudinal slow-bend straight ribs crisscrossing, the transverse slow-bend ribs are isosceles trapezoidal and include a sharp-bend horizontal portion and a sharp-bend inclined portion located on both sides of the sharp-bend horizontal portion.

[0006] Furthermore, the second steel mesh includes a second positioning steel mesh, a second slow-bend steel mesh and a third slow-bend steel mesh connected in sequence, the second positioning steel mesh is horizontal and has the same structural size as the first positioning steel mesh, the second slow-bend steel mesh is concave and has the same structural size as the first slow-bend steel mesh, and the third slow-bend steel mesh is convex and has the same structural size as the first slow-bend steel mesh.

[0007] Furthermore, the third steel mesh includes a third positioning steel mesh, a fourth slow-bend steel mesh and a second sharp-bend steel mesh connected in sequence, the third positioning steel mesh is horizontal and has the same structural size as the first positioning steel mesh, the fourth slow-bend steel mesh is concave and has the same structural size as the first slow-bend steel mesh, and the second sharp-bend steel mesh is concave and has the same structural size as the first sharp-bend steel mesh.

[0008] Furthermore, the support frame includes two relatively arranged support members, and the support members include a hook-mounted frame arranged at intervals along the length direction of the filling body, and the hook-mounted frame includes a base plate and a column vertically arranged on the base plate, and three hooks are arranged on the column at intervals along the vertical direction, and the first steel mesh, the second steel mesh and the third steel mesh are all provided with rings hooked with the hooks.

[0009] Furthermore, the two ends of the longitudinal positioning ribs are respectively provided with rings, the two ends of the transverse sharp bend ribs are respectively provided with rings, the two ends of the transverse slow bend ribs are respectively provided with rings, the two opposite rings on the first positioning steel mesh and the first sharp bend steel mesh along the length direction of the first steel mesh are connected by a lock, and the two opposite rings on the first sharp bend steel mesh and the first slow bend steel mesh along the length direction of the first steel mesh are connected by a lock.

[0010] Furthermore, two opposite rings on the second positioning steel mesh and the second slow-bend steel mesh along the length direction of the second steel mesh are connected by a lock, and two opposite rings on the second slow-bend steel mesh and the third slow-bend steel mesh along the length direction of the first steel mesh are connected by a lock.

[0011] Furthermore, the two opposite rings on the third positioning steel mesh and the fourth slow-bend steel mesh along the length direction of the third steel mesh are connected by a lock, and the two opposite rings on the fourth slow-bend steel mesh and the second sharp-bend steel mesh along the length direction of the third steel mesh are connected by a lock.

[0012] Furthermore, the filling body is formed by mixing waste glass powder, whole tailings, cement and water to prepare a slurry, which is then consolidated and hardened. The base is formed by paving crushed ore to a thickness of 150-200 mm.

[0013] Furthermore, the false roof structure has a beam head and a beam body, the filling body has a beam body and a beam head, the first positioning steel mesh, the second positioning steel mesh and the third positioning steel mesh are located at the beam head, the first sharp bend steel mesh, the first slow bend steel mesh, the second slow bend steel mesh, the third slow bend steel mesh, the fourth slow bend steel mesh and the second sharp bend steel mesh.

[0014] The beneficial effects of the present application are: 1. The first steel mesh, the second steel mesh and the third steel mesh of the present application are all prefabricated components, which improves the efficiency of false roof construction, facilitates transportation and on-site construction, and can provide conditions for mechanized false roof paving operations; laying crushed ore at the bottom can buffer the blasting impact of medium and deep hole blasting on the false roof during mining in the lower mine room, thereby improving the completeness of the false roof; arranging multiple layers of positioning steel mesh at the beam head can improve the ability of large-span false roof to resist flexural damage and improve the tensile strength of the false roof; arranging sharp-bend steel mesh and slow-bend steel mesh structures at the beam body can withstand the main tensile stress generated by bending moment and shear force, thereby improving the shear resistance of the beam-shaped false roof at the junction of ore and rock.

[0015] 2. Recycling of waste glass. Currently, most waste glass is treated by landfill and high-temperature incineration. Since glass is non-degradable, it causes serious environmental pollution. The main component of glass is amorphous silica, which has a certain degree of volcanic ash activity. Therefore, adding it to the cementitious filling body as a potential auxiliary cementitious material can realize the resource utilization of waste glass, which has great environmental significance. Waste glass powder can replace part of the cementitious material, which can maximize the mechanical properties of the cementitious filling material while ensuring the working performance, while reducing the filling cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of the utility model;

[0017] Figure 2 A cross-sectional view of the cross section of the utility model

[0018] Figure 3 for Figure 2 Sectional view of AA in the middle;

[0019] Figure 4 This is a schematic diagram of the structure of the first positioning steel mesh of the utility model;

[0020] Figure 5 This is a schematic diagram of the structure of the first sharp-bend steel mesh of the utility model;

[0021] Figure 6 This is a schematic diagram of the structure of the first slow-bending steel mesh of the utility model;

[0022] Figure 7 This is a schematic diagram of the structure of the hook stand of the utility model;

[0023] Figure 8 This is a schematic diagram of the structure of the lock buckle of the utility model;

[0024] Fig. 9 This is a diagram of the use state of the false roof structure of the utility model;

[0025] Fig.10 for Fig. 9 Middle BB section;

[0026] Fig.11 for Fig. 9 mid-CC section;

[0027] Fig.12 for Fig.10 Middle DD section.

[0028] Markings in the figure: 1, base, 2, support frame, 21, hook frame, 211, bottom plate, 212, column, 213, hook, 3, filling body, 4, first steel mesh, 41, first positioning steel mesh, 411, transverse positioning ribs, 412, longitudinal positioning ribs, 42, first sharp bend steel mesh, 421, transverse sharp bend ribs, 422, longitudinal sharp bend straight ribs, 43, first slow bend steel mesh, 431, transverse slow bend ribs, 432, longitudinal slow bend straight Rebar, 5, second steel mesh, 51, second positioning steel mesh, 52, second slow-bend steel mesh, 53, third slow-bend steel mesh, 6, third steel mesh, 61, third positioning steel mesh, 62, fourth slow-bend steel mesh, 63, second sharp-bend steel mesh, 7, ring, 8, lock, 9, beam head, 10, beam body, 11, surrounding rock, 12, horizontal mine pillar, 13, mine room, 14, connecting tunnel, 15, vein tunnel, 16, access mining area. DETAILED DESCRIPTION

[0029] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model is further described in detail in conjunction with the accompanying drawings and embodiments. It should be understood that in the description of the utility model, unless otherwise specified, the meaning of "multiple" is two or more; the orientation or position relationship indicated by the terms "upper", "lower", "left", "right", "inner", "outer", "front end", "rear end", "head", "tail", etc. is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the utility model. In addition, the terms "first", "second", "third", etc. are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0030] See also Figure 1-12 The utility model provides a false roof structure suitable for pillar-free mining of thick and steeply inclined ore bodies, including a base 1 and a filling body 3 arranged on the base 1, a support frame 2 extending into the filling body 3 is provided on the base 1, and a first steel mesh 4, a second steel mesh 5 and a third steel mesh 6 are arranged at intervals in the vertical direction near the bottom of the filling body 3, the first steel mesh 4, the second steel mesh 5 and the third steel mesh 6 are all arranged on the support frame 2, and the first steel mesh 4, the second steel mesh 5 and the third steel mesh 6 are staggered in pairs.

[0031] Combination Figure 2-6 The first steel mesh 4 includes a first positioning steel mesh 41, a first sharp-bend steel mesh 42 and a first slow-bend steel mesh 43 connected in sequence. The first positioning steel mesh 41 is horizontal, the first sharp-bend steel mesh 42 is convex, and the first slow-bend steel mesh 43 is convex. The first positioning steel mesh 41 is formed by a plurality of transverse positioning ribs 411 and a plurality of longitudinal positioning ribs 412 staggered in a criss-cross manner. The first sharp-bend steel mesh 42 is formed by a plurality of transverse sharp-bend ribs 421 and a plurality of longitudinal sharp-bend straight ribs 422 staggered in a criss-cross manner. The transverse sharp-bend ribs 421 are isosceles trapezoidal and include a sharp-bend horizontal portion and a sharp-bend inclined portion located on both sides of the sharp-bend horizontal portion. The first slow-bend steel mesh 43 is formed by a plurality of transverse slow-bend ribs 431 and a plurality of longitudinal slow-bend straight ribs 432 staggered in a criss-cross manner. The transverse slow-bend ribs 431 are isosceles trapezoidal and include a slow-bend horizontal portion and a slow-bend inclined portion located on both sides of the slow-bend horizontal portion.

[0032] The length of the transverse positioning rib 411 is 3m, the spacing between two adjacent transverse positioning ribs 411 is 1000mm, the length of the longitudinal positioning rib 412 is 2m, the spacing between two adjacent longitudinal positioning ribs 412 is 600mm, there are two longitudinal positioning ribs 412, the total length of the transverse sharp bend rib 421 projection is 3.0m, the angle between the sharp bend inclined part and the horizontal part of the transverse sharp bend rib 421 is 50°, the length of the sharp bend horizontal part is 1.0m, the projection length of the sharp bend inclined part is 1.0m, there are two longitudinal sharp bend straight ribs 422, the angle between the gentle bend inclined part and the gentle bend horizontal part of the transverse slow bend rib 431 is 31°, the length of the transverse slow bend rib 431 is 1.0m, the projection length of the sharp bend inclined part is 1.0m, the longitudinal sharp bend straight ribs 422 are ... longitudinal sharp bend straight ribs 422 are 2 The total projected length is 3.0m, the length of the horizontal part of the transverse slow-bend reinforcement 431 is 1.0m, and the projected length of the inclined part of the slow-bend reinforcement is 1.0m. The transverse positioning reinforcement 411, the longitudinal positioning reinforcement 412, the transverse sharp-bend reinforcement 421, the longitudinal sharp-bend straight reinforcement 422, the transverse slow-bend reinforcement 431, and the longitudinal slow-bend straight reinforcement 432 are all made of φ12mm threaded steel bars. The transverse positioning reinforcement 411 and the longitudinal positioning reinforcement 412 are fixed by spot welding, the transverse sharp-bend reinforcement 421 and the longitudinal sharp-bend straight reinforcement 422 are fixed by spot welding, and the transverse slow-bend reinforcement 431 and the longitudinal slow-bend straight reinforcement 432 are fixed by spot welding.

[0033] Among them, combined Figure 2 and Figure 3 As shown, the second steel mesh 5 includes a second positioning steel mesh 51, a second slow-bend steel mesh 52 and a third slow-bend steel mesh 53 which are connected in sequence. The second positioning steel mesh 51 is horizontal and has the same structural size as the first positioning steel mesh 41, the second slow-bend steel mesh 52 is concave and has the same structural size as the first slow-bend steel mesh 43, and the third slow-bend steel mesh 53 is convex and has the same structural size as the first slow-bend steel mesh 43.

[0034] Combination Figure 2 and Figure 3 As shown, the third steel mesh 6 includes a third positioning steel mesh 61, a fourth slow-bend steel mesh 62 and a second sharp-bend steel mesh 63 connected in sequence. The third positioning steel mesh 61 is horizontal and has the same structural size as the first positioning steel mesh 41, the fourth slow-bend steel mesh 62 is concave and has the same structural size as the first slow-bend steel mesh 43, and the second sharp-bend steel mesh 63 is concave and has the same structural size as the first sharp-bend steel mesh 42.

[0035] The multiple sharp bend inclined portions on both sides of the first sharp bend steel mesh 42 are respectively arranged alternately with the multiple gentle bend inclined portions on both sides of the second gentle bend steel mesh 52 and the multiple gentle bend inclined portions on both sides of the fourth gentle bend steel mesh 62, the gentle bend inclined portion of the second gentle bend steel mesh 52 is parallel to the gentle bend inclined portion of the fourth gentle bend steel mesh 62 on the same side thereof, the multiple sharp bend inclined portions on both sides of the second sharp bend steel mesh 63 are respectively arranged alternately with the multiple gentle bend inclined portions of the first gentle bend steel mesh 43 and the multiple gentle bend inclined portions of the third gentle bend steel mesh 53, the gentle bend inclined portion of the first gentle bend steel mesh 43 is parallel to the gentle bend inclined portion of the third gentle bend steel mesh 53 on the same side thereof.

[0036] Combination Figure 2 and Figure 3 As shown, the support frame 2 includes two relatively arranged support members, and the support members include hooked frames 21 arranged at intervals along the length direction of the filling body 3, and the hooked frame 21 includes a base plate 211 and a column 212 vertically arranged on the base plate 211, and three hooks 213 are arranged at intervals along the vertical direction on the column 212, and the first steel mesh 4, the second steel mesh 5 and the third steel mesh 6 are all provided with rings 7 hooked with the hooks 213, the hook 213 at the bottom is 300 mm above the ground, the hook 213 at the middle is 900 mm above the ground, and the hook 213 at the top is 1500 mm above the ground, the hooked frame 21 is 1.6 m high, the base plate 211 is 20 mm thick, and the column 212 is 15 mm in diameter.

[0037] Specifically, the two ends of the longitudinal positioning rib 412 are respectively provided with rings 7, the two ends of the transverse sharp bend rib 421 are respectively provided with rings 7, the two ends of the transverse slow bend rib 431 are respectively provided with rings 7, the two opposite rings 7 on the first positioning steel mesh 41 and the first sharp bend steel mesh 42 along the length direction of the first steel mesh 4 are connected by a lock buckle 8, the two opposite rings 7 on the first sharp bend steel mesh 42 and the first slow bend steel mesh 43 along the length direction of the first steel mesh 4 are connected by a lock buckle 8, and the diameter of the ring 7 is 20 mm.

[0038] Furthermore, two opposite rings 7 along the length direction of the second steel mesh 5 on the second positioning steel mesh 51 and the second slow-bend steel mesh 52 are connected by a locking buckle 8, and two opposite rings 7 along the length direction of the first steel mesh 4 on the second slow-bend steel mesh 52 and the third slow-bend steel mesh 53 are connected by a locking buckle 8.

[0039] More specifically, the two opposite rings 7 on the third positioning steel mesh 61 and the fourth slow-bend steel mesh 62 along the length direction of the third steel mesh 6 are connected by a lock buckle 8, and the two opposite rings 7 on the fourth slow-bend steel mesh 62 and the second sharp-bend steel mesh 63 along the length direction of the third steel mesh 6 are connected by a lock buckle 8.

[0040] In addition, the filling body 3 is formed by mixing and stirring waste glass powder, whole tailings, cement and water to prepare a slurry, and then consolidating and hardening. The mass ratio of waste glass powder, cement, whole tailings and water in the slurry of the filling body 3 is: 0.8-1.0 parts of waste glass powder, 45-55 parts of whole tailings, 7-8 parts of cement, and 20-25 parts of water; the mass concentration of the filling body in the slurry state is 75-79%,

[0041] The base 1 is formed by paving the crushed ore to a thickness of 150-200 mm.

[0042] In addition, combined Figure 9-12 As shown, when the false roof structure of the present application is used, there are multiple false roof structures arranged side by side, and the false roof structure consists of two parts: a beam head 9 and a beam body 10. There are two beam heads 9 and they are located on both sides of the beam body 10. The horizontal pillars 12 are mined before the upper and lower mine rooms 13. The horizontal pillars 12 divide the panel area, and the panel area is mined by the approach method. The approach stope 16 is arranged perpendicular to the direction of the ore body, and the mining sequence is from the two wings of the panel area to the center one by one; the horizontal pillars 12 and the middle section of the roadway are connected by arranging the connecting roadway 14, and the mining conditions of the approach stope 16 are formed by arranging the vein roadway 15; the vein roadway 15 is arranged in the surrounding rock 11 close to the boundary of the ore body, and the end of the approach stope 16 is over-excavated into the surrounding rock 11. After the mining of the approach stope 16 is completed, a false roof is constructed. The approach stope 16 and the vein roadway 15 are closed and filled to form a false roof structure. The part of the false roof structure embedded in the surrounding rock 11 is the beam head 9, and the remaining part is the beam body 10.

[0043] Therefore, arranging multiple layers of positioning steel mesh at the beam head 9 can improve the ability of the large-span false roof to resist flexural damage and improve the tensile strength of the false roof; arranging the sharp-bend steel mesh and the slow-bend steel mesh structure at the beam body 10 can withstand the main tensile stress generated by the bending moment and shear force, and improve the shear resistance of the beam-shaped false roof at the junction of the mine and rock.

[0044] The thickness of the horizontal pillar 12 is 5~6m, and the width of the panel is 50~60m; the cross-sectional shape of the vein tunnel 15 is a straight-wall three-center arch with a cross-sectional dimension of 4.0~4.5m in width and 4.0~4.5m in height; the cross-sectional shape of the approach stope 16 is a straight-wall semicircular arch with a cross-sectional dimension of 3.0~3.5m in width and 4.0~4.5m in height, and the over-excavation depth at the end of the approach stope 16 is 4.5~5.0m.

[0045] It should be noted that the above embodiments are only used to illustrate the present utility model, but the present utility model is not limited to the above embodiments. Any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present utility model fall within the protection scope of the present utility model.

Claims

1. A false roof structure suitable for pillar-free mining of thick and steeply inclined ore bodies, characterized in that: The invention comprises a base (1) and a filling body (3) arranged on the base (1); a support frame (2) extending into the filling body (3) is arranged on the base (1); a first steel mesh (4), a second steel mesh (5) and a third steel mesh (6) are arranged at intervals in the vertical direction near the bottom of the filling body (3); the first steel mesh (4), the second steel mesh (5) and the third steel mesh (6) are all arranged on the support frame (2); and the first steel mesh (4), the second steel mesh (5) and the third steel mesh (6) are arranged in pairs.

2. A false roof structure suitable for pillar-free mining of thick and steeply inclined ore bodies according to claim 1, characterized in that: The first steel mesh (4) comprises a first positioning steel mesh (41), a first sharp-bend steel mesh (42) and a first slow-bend steel mesh (43) which are connected in sequence; the first positioning steel mesh (41) is horizontal, the first sharp-bend steel mesh (42) is upwardly convex, and the first slow-bend steel mesh (43) is upwardly convex; the first positioning steel mesh (41) is formed by a plurality of transverse positioning ribs (411) and a plurality of longitudinal positioning ribs (412) which are crisscrossed; the first sharp-bend steel mesh (41) is horizontal, the first sharp-bend steel mesh (42) is upwardly convex, and the first slow-bend steel mesh (43) is upwardly convex; 2) It is formed by a plurality of transverse sharp bend bars (421) and a plurality of longitudinal sharp bend straight bars (422) interlaced in a vertical and horizontal manner, the transverse sharp bend bars (421) are in an isosceles trapezoidal shape and include a sharp bend horizontal portion and sharp bend inclined portions located on both sides of the sharp bend horizontal portion, and the first slow bend steel mesh (43) is formed by a plurality of transverse slow bend bars (431) and a plurality of longitudinal slow bend straight bars (432) interlaced in a vertical and horizontal manner, the transverse slow bend bars (431) are in an isosceles trapezoidal shape and include a slow bend horizontal portion and slow bend inclined portions located on both sides of the slow bend horizontal portion.

3. The false roof structure suitable for pillar-free mining of thick and steeply inclined ore bodies according to claim 2 is characterized in that: The second steel mesh (5) comprises a second positioning steel mesh sheet (51), a second slow-bending steel mesh sheet (52) and a third slow-bending steel mesh sheet (53) which are connected in sequence; the second positioning steel mesh sheet (51) is horizontal and has the same structure and size as the first positioning steel mesh sheet (41); the second slow-bending steel mesh sheet (52) is concave and has the same structure and size as the first slow-bending steel mesh sheet (43); and the third slow-bending steel mesh sheet (53) is convex and has the same structure and size as the first slow-bending steel mesh sheet (43).

4. The false roof structure suitable for pillar-free mining of thick and steeply inclined ore bodies according to claim 3 is characterized by: The third steel mesh (6) comprises a third positioning steel mesh sheet (61), a fourth slow-bend steel mesh sheet (62) and a second sharp-bend steel mesh sheet (63) which are connected in sequence; the third positioning steel mesh sheet (61) is horizontal and has the same structure and size as the first positioning steel mesh sheet (41); the fourth slow-bend steel mesh sheet (62) is concave and has the same structure and size as the first slow-bend steel mesh sheet (43); and the second sharp-bend steel mesh sheet (63) is concave and has the same structure and size as the first sharp-bend steel mesh sheet (42).

5. The false roof structure suitable for pillar-free mining of thick and steeply inclined ore bodies according to claim 4, characterized in that: The support frame (2) comprises two support members arranged opposite to each other, the support members comprising hooked stands (21) arranged at intervals along the length direction of the filling body (3), the hooked stands (21) comprising a bottom plate (211) and a column (212) vertically arranged on the bottom plate (211), three hooks (213) being arranged at intervals along the vertical direction on the column (212), and the first steel mesh (4), the second steel mesh (5) and the third steel mesh (6) are all provided with rings (7) hooked with the hooks (213).

6. The false roof structure suitable for pillar-free mining of thick and steeply inclined ore bodies according to claim 5, characterized in that: The longitudinal positioning ribs (412) are provided with collars (7) at both ends, the transverse sharp bend ribs (421) are provided with collars (7) at both ends, and the transverse slow bend ribs (431) are provided with collars (7) at both ends. Two collars (7) on the first positioning steel mesh (41) and the first sharp bend steel mesh (42) that are opposite to each other along the length direction of the first steel mesh (4) are connected by means of lock buckles (8), and two collars (7) on the first sharp bend steel mesh (42) and the first slow bend steel mesh (43) that are opposite to each other along the length direction of the first steel mesh (4) are connected by means of lock buckles (8).

7. The false roof structure suitable for pillar-free mining of thick and steeply inclined ore bodies according to claim 6, characterized in that: Two collars (7) on the second positioning steel mesh (51) and the second slow-bending steel mesh (52) that are opposite to each other along the length direction of the second steel mesh (5) are connected by means of a lock buckle (8); and two collars (7) on the second slow-bending steel mesh (52) and the third slow-bending steel mesh (53) that are opposite to each other along the length direction of the first steel mesh (4) are connected by means of a lock buckle (8).

8. The false roof structure suitable for pillar-free mining of thick and steeply inclined ore bodies according to claim 7, characterized in that: Two collars (7) on the third positioning steel mesh (61) and the fourth slow-bending steel mesh (62) that are opposite to each other along the length direction of the third steel mesh (6) are connected by means of a lock buckle (8); and two collars (7) on the fourth slow-bending steel mesh (62) and the second sharp-bending steel mesh (63) that are opposite to each other along the length direction of the third steel mesh (6) are connected by means of a lock buckle (8).

9. The false roof structure suitable for pillar-free mining of thick and steeply inclined ore bodies according to claim 8, characterized in that: The filling body (3) is formed by mixing waste glass powder, whole tailings, cement and water to prepare a slurry, which is then consolidated and hardened. The base (1) is formed by paving crushed ore to a thickness of 150-200 mm.

10. The false roof structure suitable for pillar-free mining of thick and steeply inclined ore bodies according to claim 8, characterized in that: The false roof structure comprises a beam head (9) and a beam body (10); the filling body (3) comprises a beam body and a beam head; a first positioning steel mesh (41), a second positioning steel mesh (51) and a third positioning steel mesh (61) are located at the beam head; a first sharp bend steel mesh (42), a first slow bend steel mesh (43), a second slow bend steel mesh (52), a third slow bend steel mesh (53), a fourth slow bend steel mesh (62) and a second sharp bend steel mesh (63) are provided.