Construction waste recycled aggregate preparation device
By designing dust collecting chambers and fan systems in construction waste crushing equipment, dust is absorbed and collected, the problem of dust diffusion is solved, the practicality of the equipment is improved and the effective treatment of dust is realized.
Patent Information
- Application Number
- CN202420714102.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-04-09
AI Technical Summary
The existing construction waste crushing equipment will produce dust during the crushing process, and the dust will easily float into the air through the feed port, affecting the air quality and reducing the practicality of the device.
A construction waste recycled aggregate preparation device is designed, including a dust collecting chamber, a fan, a collection chamber and an auxiliary component. The dust collecting chamber is driven to move through an electric push rod. The fan generates wind power to absorb dust, and the connection hose and rotating end will be connected to the The dust is collected into the collection chamber, and the dust is effectively controlled and collected by using a partition net and an adsorption pad.
Effectively control the diffusion of dust, avoid the impact on air quality, and realize the collection and processing of dust, improve the practicality of the device, and prepare new building materials with certain strength and stability.
Smart Images

Figure CN222058351U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of preparation devices, and more specifically, to a construction waste recycled aggregate preparation device. Background Art
[0002] Recycled aggregate from construction waste refers to discarded construction materials such as concrete, bricks, sand and gravel, which are reprocessed and converted into new aggregates through specific process methods for reuse in construction projects. In the process of aggregate preparation, corresponding crushing equipment is usually used to process construction waste, but it still has some shortcomings in actual use, such as: the existing crushing equipment usually produces a certain amount of dust when crushing construction waste, and when the amount of dust is large or when raw materials are added to the equipment, the dust is easy to drift into the air through the feed port of the crushing equipment, thereby affecting the air quality and reducing the practicability of the preparation device to a certain extent. Utility Model Content
[0003] In order to overcome the above-mentioned defects of the prior art, an embodiment of the utility model provides a construction waste recycled aggregate preparation device to solve the problem that the dust generated when the construction waste is crushed in the prior art is easily dispersed into the air through the feed port of the preparation device.
[0004] In order to solve the above technical problems, the utility model provides the following technical solutions: a construction waste recycled aggregate preparation device, comprising a preparation device body, the construction waste recycled aggregate preparation device also includes
[0005] Dust collection chamber;
[0006] A fixing plate, one side of which in the length direction is fixedly connected to the back side of the preparation device body;
[0007] An electric push rod, the electric push rod is fixedly mounted on the top surface of the fixed plate, a connecting plate is fixedly mounted on the top of the electric push rod, and one side of the connecting plate in the length direction is fixedly connected to the back side of the dust collecting chamber;
[0008] A fan, wherein the fan is arranged at the bottom of the fixed plate, the air outlet of the fan is fixedly connected with a connecting pipe 1, and the top end of the connecting pipe 1 is rotatably connected with a rotating end 1;
[0009] A collecting chamber, wherein the bottom end of the collecting chamber is connected to the inner thread of the rotating end 1, the top end of the collecting chamber is threadedly mounted with the rotating end 2, and the top of the rotating end 2 is rotatably connected to the connecting pipe 2;
[0010] The transfer chamber is fixedly connected to the top of the connecting pipe 2, the top surface of the transfer chamber is fixedly connected to a connecting hose, and one end of the connecting hose away from the transfer chamber is fixedly connected to the top surface of the dust collecting chamber.
[0011] Among them, it includes auxiliary components, which are arranged on the top of the preparation device body.
[0012] Among them, the auxiliary component includes a mounting frame, a screw, an abutment column, a connecting seat, a rotating column, and a flip plate. The mounting frame is fixedly connected to the back side of the top of the preparation device body, the screw thread is installed inside the mounting frame, the side of the screw close to the back side of the preparation device body in the length direction is fixedly connected to the surface of the abutment column, the connecting seat is relatively arranged on the top of the preparation device body, the rotating column is rotatably connected inside the connecting seat, one side of the flip plate in the length direction is fixedly connected to the surface of the rotating column, and the surface of the abutment column is in contact with one end of the rotating column close to the back side of the preparation device body in the length direction.
[0013] Wherein, it also includes an adsorption pad, and the adsorption pad is arranged on the bottom surface of the flip plate.
[0014] The beneficial effects of the above technical solution of the utility model are as follows:
[0015] In the above scheme, when the construction waste enters the preparation device body for crushing, the electric push rod located on the back of the preparation device body is extended or retracted to drive the dust collecting chamber to move vertically to a suitable height. At this time, the fan arranged at the bottom of the fixed plate is started, and the wind force generated by the fan absorbs the dust diffused from the feed port and enters the transfer chamber through the connecting hose. After passing the rotating end 2 connected to the bottom of the transfer chamber, the dust finally enters the collecting chamber. A partition net is arranged in the collecting chamber, so that the dust can be stored in the collecting chamber. When a certain amount of dust is collected in the collecting chamber, the collecting chamber can be disassembled by rotating the rotating end 2 and the rotating end 1, so that the dust diffused from the feed port can be effectively controlled, avoiding the dust from affecting the air quality, and realizing the collection of dust, so that the dust can be processed uniformly to prepare a new type of building material with certain strength and stability, thereby achieving the effect of improving the practicality of the device;
[0016] By rotating the rotating column inside the connecting seat, the flip plate connected to the surface of the rotating column can be flipped at a certain angle to cooperate with the dust collecting chamber to cover the top of the preparation device body, and by rotating the screw, the abutment column is moved horizontally so that the abutment column can contact and abut with the inside of one end of the rotating column, and the position of the flip plate is fixed by friction, and the dust is adsorbed by the adsorption pad, thereby expanding the coverage of the top of the preparation device body on the basis of the dust collecting chamber covering the top of the preparation device body, thereby improving the effect of suppressing dust diffusion. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0018] Figure 2 It is a three-dimensional assembly diagram of the overall device of the utility model;
[0019] Figure 3 This is a schematic diagram of the related structures of the electric push rod, connecting plate, and dust collecting chamber of the utility model;
[0020] Figure 4 This is a schematic diagram of the auxiliary component structure of the utility model.
[0021] [reference numerals]
[0022] 1. Preparation device body; 2. Dust collecting chamber; 3. Fixed plate; 4. Electric push rod; 5. Connecting plate; 6. Fan; 7. Connecting pipe one; 8. Rotating end one; 9. Collection chamber; 10. Rotating end two; 11. Connecting pipe two; 12. Transfer chamber; 13. Connecting hose; 14. Auxiliary components; 141. Mounting frame; 142. Screw; 143. Abutment column; 144. Connecting seat; 145. Rotating column; 146. Flip plate; 147. Adsorption pad. DETAILED DESCRIPTION
[0023] In order to make the technical problems to be solved, technical solutions and advantages of the present invention more clear, a detailed description will be given below in conjunction with the accompanying drawings and specific embodiments.
[0024] As attached Figure 1 To Attachment Figure 4 The embodiment of the utility model provides a construction waste recycled aggregate preparation device, comprising a preparation device body 1, the construction waste recycled aggregate preparation device also includes
[0025] Dust collecting chamber 2;
[0026] A fixing plate 3, one side of the fixing plate 3 in the length direction is fixedly connected to the back side of the preparation device body 1;
[0027] The electric push rod 4 is fixedly mounted on the top surface of the fixed plate 3, and a connecting plate 5 is fixedly mounted on the top of the electric push rod 4. One side of the connecting plate 5 in the length direction is fixedly connected to the back of the dust collecting chamber 2. Through the structure of the electric push rod 4, the dust collecting chamber 2 can be driven to move vertically for a certain distance, so that the dust collecting chamber 2 can be adjusted in height according to the actual situation of feeding, so as to avoid the placement position of the dust collecting chamber 2 affecting the normal feeding;
[0028] The fan 6 is arranged at the bottom of the fixed plate 3, the air outlet of the fan 6 is fixedly connected with a connecting pipe 7, and the top end of the connecting pipe 7 is rotatably connected with a rotating end 8;
[0029] The collecting chamber 9, the bottom end of the collecting chamber 9 is connected with the internal thread of the rotating end 8, the top end of the collecting chamber 9 is threadedly installed with the rotating end 10, and the top of the rotating end 10 is rotatably connected with the connecting pipe 11;
[0030] The transfer chamber 12 is fixedly connected to the top of the connecting pipe 11 , and the top surface of the transfer chamber 12 is fixedly connected to a connecting hose 13 , and one end of the connecting hose 13 away from the transfer chamber 12 is fixedly connected to the top surface of the dust collecting chamber 2 .
[0031] Among them, an auxiliary component 14 is included, and the auxiliary component 14 is arranged on the top of the preparation device body 1.
[0032] Among them, the auxiliary component 14 includes a mounting frame 141, a screw 142, an abutment column 143, a connecting seat 144, a rotating column 145, and a flip plate 146. The mounting frame 141 is fixedly connected to the back of the top of the preparation device body 1, the screw 142 is threadedly installed inside the mounting frame 141, and the side of the screw 142 close to the back of the preparation device body 1 in the length direction is fixedly connected to the surface of the abutment column 143, the connecting seat 144 is relatively arranged at the top of the preparation device body 1, the rotating column 145 is rotatably connected inside the connecting seat 144, one side of the flip plate 146 in the length direction is fixedly connected to the surface of the rotating column 145, the surface of the abutment column 143 is in contact with one end of the rotating column 145 close to the back of the preparation device body 1 in the length direction, and through the set flip plate 146 structure, the two sides in the width direction are inclined surfaces, so that it can be extended on the basis of the plate structure of the flip plate 146 itself, thereby expanding the coverage of the flip plate 146 on the top feed port of the preparation device body 1, and further improving the degree of dust suppression.
[0033] The flip plate 146 further includes an adsorption pad 147 , which is disposed on the bottom surface of the flip plate 146 .
[0034] The working process of the utility model is as follows: when the construction waste enters the preparation device body 1 for crushing, the electric push rod 4 located at the back of the preparation device body 1 is extended or contracted to drive the dust collection chamber 2 to move vertically to a suitable height, and then the fan 6 arranged at the bottom of the fixed plate 3 is started, and the wind force generated by the fan absorbs the dust diffused from the feed port, and enters the transfer chamber 12 through the connecting hose 13, and finally enters the collection chamber 9 through the rotating end 10 connected to the bottom of the transfer chamber 12. The collection chamber 9 is provided with a partition net so that the dust can be stored in the collection chamber 9. When a certain amount of dust is collected in the collection chamber 9, the collection chamber 9 can be disassembled by rotating the rotating end 10 and the rotating end 8;
[0035] By rotating the rotating column 145 inside the connecting seat 144, the flip plate 146 connected to the surface of the rotating column 145 can be flipped at a certain angle to cooperate with the dust collecting chamber 2 to cover the top of the preparation device body 1, and by rotating the screw 142, the abutment column 143 is moved horizontally, so that the abutment column 143 can contact and abut with the inside of one end of the rotating column 145, and the position of the flip plate 146 is fixed by friction, and the dust is adsorbed by the adsorption pad 147.
[0036] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;
[0037] Secondly: In the drawings of the embodiments disclosed in the present utility model, only the structures related to the embodiments disclosed in the present utility model are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;
[0038] Finally: The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present utility model should be included in the protection scope of the present utility model.
Claims
1. A construction waste recycled aggregate preparation device, comprising a preparation device body (1), characterized in that: The construction waste recycled aggregate preparation device also includes Dust collecting chamber (2); A fixing plate (3), one side of the fixing plate (3) in the length direction is fixedly connected to the back side of the preparation device body (1); An electric push rod (4), the electric push rod (4) being fixedly mounted on the top surface of the fixing plate (3), a connecting plate (5) being fixedly mounted on the top of the electric push rod (4), and one side of the connecting plate (5) in the length direction being fixedly connected to the back surface of the dust collecting chamber (2); A fan (6), wherein the fan (6) is arranged at the bottom of the fixed plate (3), the air outlet of the fan (6) is fixedly connected to a connecting pipe (7), and the top end of the connecting pipe (7) is rotatably connected to a rotating end (8); A collecting chamber (9), wherein the bottom end of the collecting chamber (9) is connected to the internal thread of the rotating end 1 (8), the top end of the collecting chamber (9) is threadedly mounted with the rotating end 2 (10), and the top of the rotating end 2 (10) is rotatably connected to the connecting pipe 2 (11); A transfer chamber (12), the transfer chamber (12) is fixedly connected to the top end of the connecting pipe (11), the top surface of the transfer chamber (12) is fixedly connected to a connecting hose (13), and one end of the connecting hose (13) away from the transfer chamber (12) is fixedly connected to the top surface of the dust collecting chamber (2).
2. The construction waste recycled aggregate preparation device according to claim 1, characterized in that: It also includes an auxiliary component (14), which is arranged on the top of the preparation device body (1).
3. The construction waste recycled aggregate preparation device according to claim 2, characterized in that: The auxiliary component (14) comprises a mounting frame (141), a screw (142), an abutment column (143), a connecting seat (144), a rotating column (145), and a flip plate (146); the mounting frame (141) is fixedly connected to the back of the top of the preparation device body (1); the screw (142) is threadedly mounted inside the mounting frame (141); one side of the screw (142) close to the back of the preparation device body (1) in the length direction is fixedly connected to the surface of the abutment column (143); the connecting seat (144) is relatively arranged at the top of the preparation device body (1); the rotating column (145) is rotatably connected to the inside of the connecting seat (144); one side of the flip plate (146) in the length direction is fixedly connected to the surface of the rotating column (145); the surface of the abutment column (143) is in contact with one end of the rotating column (145) close to the back of the preparation device body (1) in the length direction.
4. The construction waste recycled aggregate preparation device according to claim 2, characterized in that: It also includes an adsorption pad (147), which is arranged on the bottom surface of the flip plate (146).
