Drilling device for air preheater tube plate machining
By designing an air preheater tube plate drilling device containing multiple mechanical devices, the problems of low drilling accuracy and low automation in the prior art are solved, and high-precision automated drilling is realized, saving manpower and improving stability.
Patent Information
- Application Number
- CN202323629883.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-28
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2033-12-28
AI Technical Summary
The existing air preheater pipe plate drilling methods have low accuracy, low degree of automation and poor stability, resulting in large labor consumption.
A drilling device including a bracket, a base plate, a limiting rod, an electric push rod, a fixing ring, a telescopic rod, an adjustment device, a mounting mechanism, an angle device, a set mechanism and a hole punching device are designed, and the electric push rod and Motor drives, automatic control of the drilling process, improving accuracy and stability.
It realizes high-precision automated drilling of air preheaters, saves manpower, and improves the stability and automation of the drilling device.
Smart Images

Figure CN222058903U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of processing air preheater tube plates, in particular to a drilling device for processing air preheater tube plates. Background Art
[0002] The air preheater is a heating surface that preheats the air before it enters the boiler to a certain temperature through the internal heat sink. It is a device used to improve the heat exchange performance of the boiler and reduce energy consumption. The air preheater tube sheet is an important part of the air preheater of the boiler equipment. Its main function is to provide a flue gas channel and facilitate heat exchange. Usually, the tube sheet is installed on the pre-opened holes in the air preheater, and the tube sheet needs to be drilled around the air preheater holes before installation to facilitate the installation of the tube sheet.
[0003] The existing method for drilling holes in the air preheater is to use a manual handheld drilling machine to drill holes, which not only has low accuracy and low automation, but also has low stability of the drilling machine. Utility Model Content
[0004] In order to solve the above technical problems, the utility model provides a drilling device for processing air preheater tube sheets, which can not only ensure that the drilling machine can drill holes in the air preheater smoothly and improve its drilling accuracy, but also can automatically drill holes, saving manpower and improving the degree of automation.
[0005] The utility model discloses a drilling device for processing an air preheater tube plate, comprising a bracket, a base plate, two groups of limiting rods, two groups of first electric push rods, two groups of fixing rings, two groups of telescopic rods, an adjusting device, a clamping mechanism, an angle device, a suiting mechanism and a punching device. The base plate is mounted on the bottom of the bracket, the two groups of fixing rings are respectively mounted on the left and right parts of the base plate, the two groups of limiting rods are respectively mounted on the bottom ends of the two groups of fixing rings, the two groups of limiting rods are respectively slidably connected to the two groups of telescopic rods, the two groups of first electric push rods are respectively mounted on the top ends of the two groups of telescopic rods, the output ends of the two groups of first electric push rods are respectively connected to the top ends of the two groups of fixing rings, the two groups of telescopic rods are respectively slidably connected to the left and right ends of the base plate, the adjusting device is mounted on the two groups of telescopic rods, the clamping mechanism is mounted on the bracket, the angle device is mounted on the clamping mechanism, and the suiting mechanism and the punching device are both mounted on the angle device.
[0006] Preferably, the adjusting device includes six groups of rollers, two groups of sleeves, two groups of first springs and two groups of limiting rings. The two groups of sleeves are respectively slidably connected to the outer ends of the two groups of telescopic rods, the two groups of limiting rings are respectively installed on the two groups of telescopic rods, the two groups of first springs are respectively sleeved on the two groups of telescopic rods, the inner ends of the two groups of first springs are connected to the two groups of limiting rings, the outer ends of the two groups of first springs are connected to the inner ends of the two groups of sleeves, and the six groups of rollers are respectively rotatably installed on the outer ends of the two groups of sleeves.
[0007] Preferably, the clamping mechanism includes a slip ring, two groups of first screws, four groups of connecting rods, two groups of support plates, two groups of motors and a fixed rod, the two groups of motors are respectively installed at the front end and the rear end of the bracket, the two groups of first screws are respectively installed at the output ends of the two groups of motors, the top ends of the two groups of first screws are respectively rotatably connected to the fixed rods, the fixed rods are installed at the top end of the bracket, the slip ring is slidingly sleeved on the fixed rod, the front and rear parts of the slip ring are both connected and provided with threaded holes, the slip ring is threadedly connected to the two groups of first screws, the four groups of connecting rods are respectively rotatably installed at the left and right ends of the slip ring and the left and right ends of the bracket, the two groups of support plates are respectively rotatably connected to the two groups of connecting rods on the left and the two groups of connecting rods on the right, and the angle device is installed at the top end of the fixed rod.
[0008] Preferably, the angle device includes a first rotating frame, a second rotating frame and a first bolt, the first rotating frame and the second rotating frame are both connected to the top end bearing of the fixed rod, the front ends of the first rotating frame and the second rotating frame are connected and provided with threaded holes, the first bolt is threadedly connected to the threaded holes of the first rotating frame and the second rotating frame, the set device is installed on the first rotating frame, and the punching device is installed on the second rotating frame.
[0009] Preferably, the set device includes a second bolt, a moving rod, a second spring and a rubber rod. A slide groove is provided at the bottom end of the first rotating frame. The moving rod slides in the slide groove of the first rotating frame. A threaded hole is provided at the top end of the moving rod. The second bolt is threadedly connected to the threaded hole of the moving rod. The second bolt tightens the first rotating frame. The second spring is sleeved on the moving rod. The top end of the second spring is installed on the moving rod. The bottom end of the second spring is connected to the top end of the rubber rod, and the rubber rod is slidably installed at the bottom end of the moving rod.
[0010] Preferably, the punching device includes a third bolt, a second electric push rod, a slide, a second screw, an I-frame, a splint and a support plate. A slide groove is provided at the bottom end of the second rotating frame. The slide slides in the slide groove of the second rotating frame. A threaded hole is provided on the slide. The third bolt is threadedly connected to the threaded hole of the slide. The second electric push rod is installed at the top of the slide. The output end of the second electric push rod passes through the slide and is connected to the top of the I-frame. A threaded hole is provided at the top of the I-frame. The second screw is threadedly connected to the threaded hole of the I-frame. The splint is rotatably installed at the bottom of the second screw rod, and the support plate is installed at the right end of the I-frame.
[0011] Compared with the prior art, the utility model has the following beneficial effects: the base plate is placed in the hole opened in the air preheater, and then the two groups of first electric push rods are opened, and the two groups of first electric push rods drive the two groups of telescopic rods to slide on the base plate, and the two groups of limit rods slide on the two groups of telescopic rods, and the two groups of telescopic rods drive the adjusting device to open, thereby pre-supporting the bracket, and then the hole opened in the air preheater is opened by the clamping mechanism, so as to fix the bracket as a whole, and then the punching device is opened, and the punching device drills holes in the air preheater, and then the angle of the angle device is adjusted and fixed, and then the set mechanism is clamped in the drilled hole, and then the punching device is opened, and the punching device drills holes in the air preheater, and the above operations are repeated to drill holes in the air preheater. By setting this equipment, not only can the drilling machine be guaranteed to drill holes in the air preheater stably, and its drilling accuracy is improved, but also the drilling can be performed automatically, which saves manpower and improves the degree of automation. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a structural schematic diagram of the utility model;
[0013] Figure 2 yes Figure 1 A is a schematic diagram of the enlarged structure of the middle part;
[0014] Figure 3 yes Figure 1 A schematic diagram of the enlarged structure of B;
[0015] Markings in the attached drawings: 1. support rod; 2. base plate; 3. limit rod; 4. first electric push rod; 5. fixed ring; 6. telescopic rod; 7. roller; 8. sliding sleeve; 9. first spring; 10. limit ring; 11. sliding ring; 12. first screw rod; 13. connecting rod; 14. support plate; 15. motor; 16. fixed rod; 17. first rotating frame; 18. second rotating frame; 19. first bolt; 20. second bolt; 21. moving rod; 22. second spring; 23. rubber rod; 24. third bolt; 25. second electric push rod; 26. slide seat; 27. second screw rod; 28. I-beam; 29. clamping plate; 30. support plate. DETAILED DESCRIPTION
[0016] The following is a further detailed description of the specific implementation of the present invention in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0017] like Figures 1 to 3As shown, a drilling device for processing an air preheater tube sheet of the utility model comprises a bracket 1, a base plate 2, two groups of limiting rods 3, two groups of first electric push rods 4, two groups of fixing rings 5, two groups of telescopic rods 6, an adjusting device, a clamping mechanism, an angle device, a set mechanism and a punching device, the base plate 2 is mounted on the bottom of the bracket 1, the two groups of fixing rings 5 are respectively mounted on the left and right parts of the base plate 2, the two groups of limiting rods 3 are respectively mounted on the bottom ends of the two groups of fixing rings 5, the two groups of limiting rods 3 are respectively slidably connected with the two groups of telescopic rods 6, the two groups of first electric push rods 4 are respectively mounted on the top ends of the two groups of telescopic rods 6, the output ends of the two groups of first electric push rods 4 are respectively connected with the top ends of the two groups of fixing rings 5, the two groups of telescopic rods 6 are respectively slidably connected with the left and right ends of the base plate 2, the adjusting device is mounted on the two groups of telescopic rods 6, the clamping mechanism is mounted on the bracket 1, the angle device is mounted on the clamping mechanism, and the set mechanism and the punching device are both mounted on the angle device;
[0018] The bottom plate 2 is placed in the hole opened in the air preheater, and then the two groups of first electric push rods 4 are opened, and the two groups of first electric push rods 4 drive the two groups of telescopic rods 6 to slide on the bottom plate 2, and the two groups of limit rods 3 slide on the two groups of telescopic rods 6, and the two groups of telescopic rods 6 drive the adjusting device to open, thereby pre-supporting the bracket 1, and then the hole opened in the air preheater is opened by the clamping mechanism, so as to fix the bracket 1 as a whole, and then the punching device is opened, and the punching device drills holes in the air preheater, and then the angle of the angle device is adjusted and fixed, and then the set mechanism is clamped in the drilled hole, and then the punching device is opened, and the punching device drills holes in the air preheater, and the above operations are repeated to drill holes in the air preheater. By setting this equipment, not only can the drilling machine be ensured to drill holes in the air preheater stably, and its drilling accuracy is improved, but also the drilling can be performed automatically, saving manpower and improving the degree of automation.
[0019] As a preferred embodiment of the above, the adjusting device includes six groups of rollers 7, two groups of sliding sleeves 8, two groups of first springs 9 and two groups of limiting rings 10. The two groups of sliding sleeves 8 are respectively slidably connected to the outer ends of the two groups of telescopic rods 6, the two groups of limiting rings 10 are respectively installed on the two groups of telescopic rods 6, the two groups of first springs 9 are respectively sleeved on the two groups of telescopic rods 6, the inner ends of the two groups of first springs 9 are connected to the two groups of limiting rings 10, the outer ends of the two groups of first springs 9 are connected to the inner ends of the two groups of sliding sleeves 8, and the six groups of rollers 7 are respectively rotatably installed on the outer ends of the two groups of sliding sleeves 8;
[0020] By setting the roller 7, the sliding sleeve 8, the first spring 9 and the limit ring 10, the two groups of telescopic rods 6 drive the two groups of sliding sleeves 8 to move outward, and the two groups of sliding sleeves 8 pre-support the bracket 1 under the action of the two groups of first springs 9, thereby pre-supporting the base plate 2.
[0021] As a preferred embodiment of the above, the clamping mechanism includes a slip ring 11, two groups of first screws 12, four groups of connecting rods 13, two groups of support plates 14, two groups of motors 15 and a fixed rod 16, the two groups of motors 15 are respectively installed at the front end and the rear end of the bracket 1, the two groups of first screws 12 are respectively installed at the output ends of the two groups of motors 15, the top ends of the two groups of first screws 12 are respectively rotatably connected with the fixed rod 16, the fixed rod 16 is installed at the top end of the bracket 1, the slip ring 11 is slidably sleeved on the fixed rod 16, the front and rear parts of the slip ring 11 are both connected and provided with threaded holes, the slip ring 11 is threadedly connected with the two groups of first screws 12, the four groups of connecting rods 13 are respectively rotatably installed at the left and right ends of the slip ring 11 and the left and right ends of the bracket 1, the two groups of support plates 14 are respectively rotatably connected with the two groups of connecting rods 13 on the left and the two groups of connecting rods 13 on the right, and the angle device is installed at the top of the fixed rod 16;
[0022] By setting the slip ring 11, the first screw rod 12, the connecting rod 13, the support plate 14, the motor 15 and the fixed rod 16, by turning on the two sets of motors 15, the two sets of motors 15 drive the two sets of first screw rods 12 to rotate, the two sets of first screw rods 12 are threadedly connected with the slip ring 11, the slip ring 11 slides downward on the fixed rod 16, and the slip ring 11 supports the two sets of support plates 14 under the action of the four sets of connecting rods 13, so that the bracket 1 is fixed in the hole opened in the air preheater, thereby fixing the bracket 1.
[0023] As a preferred embodiment of the above, the angle device includes a first rotating frame 17, a second rotating frame 18 and a first bolt 19. The first rotating frame 17 and the second rotating frame 18 are both connected to the top bearing of the fixing rod 16. The front ends of the first rotating frame 17 and the second rotating frame 18 are both connected and provided with threaded holes. The first bolt 19 is threadedly connected to the threaded holes of the first rotating frame 17 and the second rotating frame 18. The set device is installed on the first rotating frame 17, and the punching device is installed on the second rotating frame 18.
[0024] By setting the first rotating frame 17, the second rotating frame 18 and the first bolt 19, after the punching device drills a group of holes in the air preheater, the angle of the first rotating frame 17 and the second rotating frame 18 is adjusted, and then the first bolt 19 is rotated, and the first bolt 19 is threadedly connected and tightened with the first rotating frame 17 and the second rotating frame 18, so that the angle between the first rotating frame 17 and the second rotating frame 18 can be adjusted according to the spacing of the holes required to be drilled in the air preheater.
[0025] As a preferred embodiment of the above, the set device includes a second bolt 20, a moving rod 21, a second spring 22 and a rubber rod 23. A slide groove is provided at the bottom end of the first rotating frame 17. The moving rod 21 slides in the slide groove of the first rotating frame 17. A threaded hole is provided at the top end of the moving rod 21. The second bolt 20 is threadedly connected to the threaded hole of the moving rod 21. The second bolt 20 tightens the first rotating frame 17. The second spring 22 is sleeved on the moving rod 21. The top end of the second spring 22 is installed on the moving rod 21. The bottom end of the second spring 22 is connected to the top end of the rubber rod 23. The rubber rod 23 is slidably installed at the bottom end of the moving rod 21.
[0026] By setting the second bolt 20, the moving rod 21, the second spring 22 and the rubber rod 23, the position of the moving rod 21 on the first rotating frame 17 is adjusted according to the diameter of the tube sheet to make the moving rod 21 slide on the slide groove of the first rotating frame 17. When the moving rod 21 slides to the specified position, the second bolt 20 is rotated, and the second bolt 20 is threadedly connected with the moving rod 21. The second bolt 20 presses the first rotating frame 17 to fix the moving rod 21. The rubber rod 23 is inserted into the hole drilled on the air preheater under the action of the second spring 22, thereby limiting the first rotating frame 17 and the second rotating frame 18, thereby positioning the punching device.
[0027] As a preferred embodiment of the above embodiment, the punching device includes a third bolt 24, a second electric push rod 25, a slide 26, a second screw 27, an I-shaped frame 28, a clamping plate 29 and a support plate 30. A slide groove is provided at the bottom end of the second rotating frame 18. The slide 26 slides in the slide groove of the second rotating frame 18. A threaded hole is provided on the slide 26. The third bolt 24 is threadedly connected with the threaded hole of the slide 26. The second electric push rod 25 is installed at the top of the slide 26. The output end of the second electric push rod 25 passes through the slide 26 and is connected to the top of the I-shaped frame 28. The top of the I-shaped frame 28 is provided with a threaded hole. The second screw 27 is threadedly connected with the threaded hole of the I-shaped frame 28. The clamping plate 29 is rotatably installed at the bottom end of the second screw 27. The support plate 30 is installed at the right end of the I-shaped frame 28.
[0028] By setting the third bolt 24, the second electric push rod 25, the slide 26, the second screw rod 27, the I-frame 28, the clamping plate 29 and the support plate 30, the slide 26 is slid to the specified position on the second rotating frame 18, and the third bolt 24 is rotated, the third bolt 24 is threadedly connected to the slide 26, and the third bolt 24 presses the second rotating frame 18 to fix the slide 26, and then the drilling machine is placed on the I-frame 28 and the support plate 30, and then the second screw rod 27 is rotated, the second screw 27 is threadedly connected to the I-frame 28, and the second screw 27 drives the clamping plate 29 to move downward, thereby fixing the drilling machine, and then the second electric push rod 25 is opened, and the second electric push rod 25 drives the I-frame 28 to move downward, and at the same time the drilling machine is opened, and the drilling machine drills holes in the air preheater, thereby playing the role of drilling holes in the air preheater.
[0029] The utility model discloses a drilling device for processing a tube sheet of an air preheater. When the utility model is in operation, the bottom plate 2 is first placed in a hole opened in the air preheater, and then two groups of first electric push rods 4 are opened. The two groups of first electric push rods 4 drive two groups of telescopic rods 6 to slide on the bottom plate 2. Two groups of limit rods 3 slide on the two groups of telescopic rods 6. The two groups of telescopic rods 6 drive two groups of sliding sleeves 8 to move outward. The two groups of sliding sleeves 8 pre-support the bracket 1 under the action of two groups of first springs 9. Then, by opening two groups of motors 15, the two groups of motors 15 drive two groups of first screws 12 to rotate. The two groups of first screws 12 are threadedly connected with the slip ring 11. The slip ring 11 Then, the slide 26 slides downward on the fixing rod 16, and the slip ring 11 opens the two sets of support plates 14 under the action of the four sets of connecting rods 13, thereby fixing the bracket 1 in the hole opened in the air preheater. Then, after the slide 26 slides to the specified position on the second rotating frame 18, the third bolt 24 is rotated, and the third bolt 24 is threadedly connected with the slide 26. The third bolt 24 presses against the second rotating frame 18 to fix the slide 26. Then, the drilling machine is placed on the I-shaped frame 28 and the support plate 30, and then the second screw 27 is rotated, and the second screw 27 is threadedly connected with the I-shaped frame 28. The second screw 27 drives the clamping plate 29 to move downward, thereby The drilling machine is fixed, and then the second electric push rod 25 is opened, and the second electric push rod 25 drives the I-shaped frame 28 to move downward, and the drilling machine is opened at the same time, and the drilling machine drills holes in the air preheater, and then the angle between the first rotating frame 17 and the second rotating frame 18 is adjusted. After the angle between the first rotating frame 17 and the second rotating frame 18 is adjusted, the first bolt 19 is turned, and the first bolt 19 is threadedly connected with the first rotating frame 17 and the second rotating frame 18 to fix, and then the position of the moving rod 21 on the first rotating frame 17 is adjusted according to the diameter of the tube sheet to be installed, so that the moving rod 21 slides on the slide groove of the first rotating frame 17, and when the moving rod 21 slides to the specified After the second rotating frame 17 and the second rotating frame 18 are in the fixed position, the second electric push rod 25 is turned, and the second electric push rod 25 drives the I-beam 28 to move downward. At the same time, the drilling machine is turned on and the drilling machine drills holes in the air preheater. Then, the first rotating frame 17 and the second rotating frame 18 are rotated on the fixing rod 16 to realize the drilling of holes in the air preheater.
[0030] The installation method, connection method or setting method of the drilling device for processing the tube sheet of an air preheater of the utility model are all common mechanical methods, and any method can be implemented as long as it can achieve its beneficial effects; the first electric push rod 4, the motor 15 and the second electric push rod 25 of the drilling device for processing the tube sheet of an air preheater of the utility model are purchased on the market, and technicians in this industry only need to install and operate it according to the accompanying instruction manual.
[0031] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A drilling device for processing air preheater tube sheet, characterized in that: The invention comprises a bracket (1), a base plate (2), two groups of limiting rods (3), two groups of first electric push rods (4), two groups of fixing rings (5), two groups of telescopic rods (6), an adjusting device, a clamping mechanism, an angle device, a sleeve mechanism and a punching device. The base plate (2) is mounted on the bottom of the bracket (1), the two groups of fixing rings (5) are mounted on the left and right parts of the base plate (2), the two groups of limiting rods (3) are mounted on the bottom ends of the two groups of fixing rings (5), the two groups of limiting rods (3) are slidably connected to the two groups of telescopic rods (6), the two groups of first electric push rods (4) are mounted on the top ends of the two groups of telescopic rods (6), the output ends of the two groups of first electric push rods (4) are connected to the top ends of the two groups of fixing rings (5), the two groups of telescopic rods (6) are slidably connected to the left and right ends of the base plate (2), the adjusting device is mounted on the two groups of telescopic rods (6), the clamping mechanism is mounted on the bracket (1), the angle device is mounted on the clamping mechanism, and the sleeve mechanism and the punching device are both mounted on the angle device.
2. A drilling device for processing an air preheater tube sheet as claimed in claim 1, characterized in that: The adjusting device comprises six groups of rollers (7), two groups of sliding sleeves (8), two groups of first springs (9) and two groups of limiting rings (10). The two groups of sliding sleeves (8) are respectively slidably connected to the outer ends of the two groups of telescopic rods (6). The two groups of limiting rings (10) are respectively mounted on the two groups of telescopic rods (6). The two groups of first springs (9) are respectively sleeved on the two groups of telescopic rods (6). The inner ends of the two groups of first springs (9) are connected to the two groups of limiting rings (10). The outer ends of the two groups of first springs (9) are connected to the inner ends of the two groups of sliding sleeves (8). The six groups of rollers (7) are respectively rotatably mounted on the outer ends of the two groups of sliding sleeves (8).
3. A drilling device for processing an air preheater tube sheet as claimed in claim 2, characterized in that: The clamping mechanism comprises a slip ring (11), two groups of first screw rods (12), four groups of connecting rods (13), two groups of support plates (14), two groups of motors (15) and a fixing rod (16). The two groups of motors (15) are respectively mounted on the front end and the rear end of the bracket (1). The two groups of first screw rods (12) are respectively mounted on the output ends of the two groups of motors (15). The top ends of the two groups of first screw rods (12) are respectively rotatably connected to the fixing rod (16). The fixing rod (16) is mounted on the top end of the bracket (1). The slip ring (11) is slidably sleeved on the fixed rod (16); the front and rear parts of the slip ring (11) are both connected with threaded holes; the slip ring (11) is threadedly connected with two groups of first screw rods (12); four groups of connecting rods (13) are rotatably mounted on the left and right ends of the slip ring (11) and the left and right ends of the bracket (1); two groups of support plates (14) are rotatably connected with the two groups of connecting rods (13) on the left and the two groups of connecting rods (13) on the right; and an angle device is mounted on the top of the fixed rod (16).
4. A drilling device for processing an air preheater tube sheet as claimed in claim 3, characterized in that: The angle device comprises a first rotating frame (17), a second rotating frame (18) and a first bolt (19); the first rotating frame (17) and the second rotating frame (18) are both connected to the top bearing of the fixing rod (16); the front ends of the first rotating frame (17) and the second rotating frame (18) are both connected and provided with threaded holes; the first bolt (19) is threadedly connected to the threaded holes of the first rotating frame (17) and the second rotating frame (18); the set device is installed on the first rotating frame (17); and the punching device is installed on the second rotating frame (18).
5. The drilling device for processing the air preheater tube sheet according to claim 4, characterized in that: The set device comprises a second bolt (20), a moving rod (21), a second spring (22) and a rubber rod (23). A sliding groove is arranged at the bottom end of the first rotating frame (17). The moving rod (21) slides in the sliding groove of the first rotating frame (17). A threaded hole is arranged at the top end of the moving rod (21). The second bolt (20) is threadedly connected with the threaded hole of the moving rod (21). The second bolt (20) is pressed against the first rotating frame (17). The second spring (22) is sleeved on the moving rod (21). The top end of the second spring (22) is installed on the moving rod (21). The bottom end of the second spring (22) is connected with the top end of the rubber rod (23). The rubber rod (23) is slidably installed on the bottom end of the moving rod (21).
6. A drilling device for processing an air preheater tube sheet as claimed in claim 5, characterized in that: The punching device comprises a third bolt (24), a second electric push rod (25), a slide seat (26), a second screw rod (27), an I-shaped frame (28), a clamping plate (29) and a supporting plate (30). A sliding groove is arranged at the bottom end of the second rotating frame (18). The slide seat (26) slides in the sliding groove of the second rotating frame (18). A threaded hole is arranged on the slide seat (26). The third bolt (24) is threadedly connected with the threaded hole of the slide seat (26). The second electric push rod (25) is installed at the top end of the slide seat (26). The output end of the second electric push rod (25) passes through the slide seat (26) and is connected with the top end of the I-shaped frame (28). A threaded hole is arranged at the top end of the I-shaped frame (28). The second screw rod (27) is threadedly connected with the threaded hole of the I-shaped frame (28). The clamping plate (29) is rotatably installed at the bottom end of the second screw rod (27). The supporting plate (30) is installed at the right end of the I-shaped frame (28).
