Automatic deburring device

By designing an automatic deburring device, the automatic loading and deburring of workpieces is achieved using components such as proximity switches, material push cylinders, workpiece distribution robots, etc., which solves the problem of low manual operation efficiency in the existing technology and improves the production of deburring efficiency.

CN222059754UActive Publication Date: 2024-11-26JISHAN AUTOMATION TECH (SHANGHAI) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420769086.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-15
Publication Date
2024-11-26
Estimated Expiration
2034-04-15

AI Technical Summary

Technical Problem

The existing automatic deburring device requires manual loading and unloading of fixture components, resulting in low deburring efficiency of workpieces, inconvenience and insufficient production efficiency.

Method used

An automatic deburring device is designed, including workstation fence, material collection and conveying line, pre-positioning mechanism, and automatic loading and unloading structure, using proximity switch, material pushing cylinder, positioning cylinder, blowing block, workpiece distribution robot, chip blowing box, The temporary storage table, workpiece grabber, chip-coating truck and grinding robot realizes automatic loading and unloading and deburring operations of workpieces.

Benefits of technology

Through the automated loading and unloading and deburring processes, the deburring processing efficiency of the workpiece is significantly improved, manual intervention is reduced, and production efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222059754U_ABST
    Figure CN222059754U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of workpiece deburring, in particular to an automatic deburring device which comprises a work station fence, a workpiece distribution robot is arranged on the inner side of the work station fence, a scrap blowing box is fixedly installed on the inner front wall of the work station fence, and a workpiece grabbing robot is arranged on the inner side of the work station fence. And a grinding robot is arranged on the right side of the chip receiving trolley. According to the automatic deburring device, the material taking conveying line is used for automatic feeding and primary scrap blowing operation, the workpiece distribution robot clamps turbine workpieces and then places the turbine workpieces into the scrap blowing box for secondary scrap blowing cleaning, the cleaned turbine workpieces are placed into the temporary storage table through the workpiece distribution robot, and the turbine workpieces are clamped and fixed by the control pneumatic clamp to wait for clamping; and then the workpieces are cleaned again through a second blowing block, the workpieces are clamped one by one through a workpiece grabbing robot and are matched with a grinding robot to be ground and deburred, meanwhile, chippings are collected through a chipping collecting trolley, and then automatic discharging is conducted through a discharging conveying line.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of workpiece deburring, in particular to an automatic deburring device. Background Art

[0002] Deburring refers to the removal of thorns or burrs formed at the intersection of part surfaces. Especially in industrial production, various parts may produce different types of burrs on the workpiece due to problems in the production process. The presence of burrs will not only affect the surface accuracy of the workpiece, but also directly affect the inspection, assembly, performance and service life of the parts, bringing great potential harm to the normal use of the parts. Therefore, in the process of workpiece processing and production, it is necessary to use automatic deburring equipment to deburr the workpiece surface.

[0003] After searching, it was found that an automatic deburring device was disclosed in a utility model patent with Chinese patent publication number CN219666050U. The deburring device in the utility model patent can automatically deburr the workpiece by placing the workpiece on a fixture assembly. However, the fixture clamping operation of the automatic deburring device requires manual loading and unloading of the workpiece, which has certain inconveniences in actual production and use, and the production efficiency is low. Therefore, the deburring process of the automatic deburring device needs to be further improved, so an automatic deburring device is proposed. Utility Model Content

[0004] In view of the shortcomings of the prior art, the utility model provides an automatic deburring device, which has the advantage of being able to automatically load and unload materials during deburring, and solves the problem that the automatic deburring device in the above-mentioned background technology requires manual loading and unloading of the fixture assembly, resulting in the deburring efficiency of the workpiece needs to be further improved.

[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an automatic deburring device, comprising a workstation fence and a safety door arranged inside the workstation fence, a material taking conveyor line is arranged inside the workstation fence, a pre-positioning mechanism is arranged outside the material taking conveyor line, and an automatic feeding structure is arranged inside the workstation fence;

[0006] The pre-positioning mechanism includes a proximity switch, a material pushing cylinder, a positioning cylinder and a No. 1 air blowing block. The outer side of the material taking conveyor line is fixedly installed with a proximity switch, the outer side of the material taking conveyor line is fixedly installed with a material pushing cylinder, the outer side of the material taking conveyor line is fixedly installed with a positioning cylinder, and the outer side of the material taking conveyor line is fixedly connected with a No. 1 air blowing block;

[0007] The automatic loading and unloading structure includes a workpiece distribution robot, a chip blowing box, a temporary storage table, a workpiece grasping robot, a chip receiving trolley and a grinding robot. The workpiece distribution robot is arranged on the inner side of the workstation fence, a chip blowing box is fixedly installed on the inner front wall of the workstation fence, a temporary storage table is arranged on the right side of the workpiece distribution robot, a workpiece grasping robot is arranged on the inner side of the workstation fence, a chip receiving trolley is arranged on the right side of the workpiece grasping robot, and a grinding robot is arranged on the right side of the chip receiving trolley.

[0008] Furthermore, the material-feeding conveyor line is a conveyor belt structure with three components, the number of the proximity switches is three, the three proximity switches are respectively located on one side of the three material-feeding conveyor lines, and the three proximity switches are respectively provided with photoelectric sensing probes on the side facing the three material-feeding conveyor lines, and each of the proximity switches is electrically controlled by an optical signal processor. The number of the pushing cylinders and the positioning cylinders is three, the three pushing cylinders are respectively located on one side close to the three proximity switches, and the three positioning cylinders are respectively located on the other side of the three material-feeding conveyor lines.

[0009] Furthermore, the three proximity switches are electrically connected to the three pushing cylinders and the three positioning cylinders through the control circuit respectively, and a No. 1 air pump is fixedly installed on the bottom of the three material feeding conveyor lines. The number of the No. 1 air blocks is six, and the three No. 1 air pumps are respectively connected to the bottom of the six No. 1 air blowing blocks through the No. 1 air supply pipeline, and the three pushing cylinders are movably connected to the first piston push rod on one side facing the three material feeding conveyor lines, and the three positioning cylinders are movably connected to the second piston push rod on one side facing the three material feeding conveyor lines.

[0010] Furthermore, the workpiece distribution robot includes a robot base No. 1 of a turntable structure, a robot arm No. 1 is movably mounted on the top of the robot base, a air claw No. 1 is movably mounted on the top of the robot arm, a No. 2 air pump is fixedly mounted on the bottom of the chip blowing box, and a number of air hole nozzles are fixedly mounted inside the chip blowing box, the No. 2 air pump is through-connected to the bottom of the several air hole nozzles through a No. 2 air supply pipeline, the bottom of the chip blowing box is through-connected to a dust collecting box, the top of the dust collecting box is fixedly connected to a filter plate, and the several air hole nozzles are all located directly above the filter plate.

[0011] Furthermore, an air circuit installation box is fixedly installed inside the temporary storage table, and three placement stations are opened on the top of the temporary storage table, a photoelectric switch is fixedly installed on the top of each placement station, and two pneumatic clamps are fixedly connected to the top of each placement station, and each pneumatic clamp is electrically connected to the air circuit installation box.

[0012] Furthermore, a number of No. 2 air blowing blocks are fixedly connected to the top of each placement station, a No. 3 air pump is fixedly installed inside the temporary storage table, the No. 3 air pump is connected to the bottom of each No. 2 air blowing block through a No. 3 air supply pipeline, and a protective cover shell is fixedly installed on the top of the temporary storage table.

[0013] Furthermore, the workpiece grasping robot comprises a No. 2 robot base with a turntable structure, a No. 2 robot arm is movably mounted on the top of the No. 2 robot base, a No. 2 air gripper is movably mounted on the top of the No. 2 robot arm, the chip trolley comprises a chip hopper, and a chip removal trolley is arranged at the bottom of the chip hopper.

[0014] Furthermore, a hydraulic cylinder is fixedly installed on the top of the chip hopper, and a hydraulic rod is movably connected to the bottom of the hydraulic cylinder. The grinding robot includes a No. 3 robot base with a turntable structure, a No. 3 robot arm is movably installed on the top of the No. 3 robot base, and a grinding head is movably installed on the top of the No. 3 robot arm.

[0015] Furthermore, a material unloading conveyor line is provided on the inner right wall of the workstation fence, and the material unloading conveyor line is a conveyor belt structure with three components. A circuit master control cabinet is fixedly installed on the front side of the workstation fence.

[0016] Beneficial Effects

[0017] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0018] 1. The automatic deburring device puts the turbine workpiece to be deburred into three material conveying lines. When the turbine workpiece reaches the detection end of the proximity switch, the push cylinder and the positioning cylinder are controlled to drive the piston push rod to position the turbine workpiece. Then, the No. 1 air pump and the No. 1 blowing block are used to remove the dust on the workpiece surface, which is convenient for the No. 1 air claw gripping operation of the workpiece distribution robot.

[0019] 2. In the automatic deburring device, the workpiece distribution robot clamps the turbine workpiece and puts it into the chip blowing box, and uses the No. 2 air pump and the air hole nozzle to clean the debris attached to the surface of the workpiece. After cleaning, the workpiece distribution robot puts it into the temporary storage table. After the photoelectric switch detects the workpiece, it controls the pneumatic clamp to clamp and fix it, and then uses the No. 3 air pump and the No. 2 air blowing block to clean it again. Then, the workpiece is clamped one by one by the workpiece grasping robot, and cooperates with the grinding head of the grinding robot to grind and deburr the workpiece. At the same time, the chip receiving car is used to collect the debris dropped by grinding, and the workpiece grasping robot is used to put it into three unloading conveyor lines one by one, thereby realizing automatic loading and unloading operations when grinding and deburring the turbine workpiece, further improving the deburring processing efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1It is a three-dimensional schematic diagram of the overall structure of the deburring workstation of the utility model;

[0021] Figure 2 for Figure 1 Schematic diagram of the material conveying line structure from a viewing angle;

[0022] Figure 3 for Figure 1 Schematic diagram of the structure of the workpiece distribution robot.

[0023] Figure 4 for Figure 1 View from above of the chip blower box structure;

[0024] Figure 5 for Figure 1 Schematic diagram of the structure of the perspective temporary storage station;

[0025] Figure 6 for Figure 1 Schematic diagram of the structure of the workpiece grasping robot.

[0026] Figure 7 for Figure 1 Schematic diagram of the chip receiving car structure from perspective;

[0027] Figure 8 for Figure 1 Schematic diagram of the perspective polishing robot structure.

[0028] In the figure: 1. Workstation fence; 2. Safety door; 3. Material conveyor line; 4. Pre-positioning mechanism; 401. Proximity switch; 402. Push cylinder; 403. Positioning cylinder; 404. No. 1 air blowing block; 5. Automatic feeding structure; 501. Workpiece distribution robot; 5011. No. 1 robot base; 5012. No. 1 robot arm; 5013. No. 1 air claw; 502. Chip blowing box; 503. Temporary storage table; 5031. Air circuit installation box; 5032. Photoelectric switch; 5033. Pneumatic clamp; 5034, No. 2 air blowing block; 5035, protective cover; 504, workpiece grasping robot; 5041, No. 2 robot base; 5042, No. 2 robotic arm; 5043, No. 2 air claw; 505, chip receiving car; 5051, chip receiving hopper; 5052, chip removal car; 5053, hydraulic cylinder; 506, grinding robot; 5061, No. 3 robot base; 5062, No. 3 robotic arm; 5063, grinding head; 6, unloading conveyor line; 7, circuit control cabinet. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] See also Figure 1-8 An automatic deburring device comprises a workstation fence 1 and a safety door 2 arranged on the inner side of the workstation fence 1. The workstation fence 1 and the safety door 2 can isolate the working area to protect the safety of the surrounding staff. A material taking conveyor line 3 is arranged on the inner side of the workstation fence 1. The material taking conveyor line 3 is an automatic feeding structure. A pre-positioning mechanism 4 is arranged on the outer side of the material taking conveyor line 3. An automatic feeding structure 5 is arranged on the inner side of the workstation fence 1. A material unloading conveyor line 6 is arranged on the inner right wall of the workstation fence 1. The material unloading conveyor line 6 is a conveyor belt structure with three numbers, and the material unloading conveyor line 6 is an automatic unloading structure. A circuit master control cabinet 7 is fixedly installed on the front side of the workstation fence 1. The circuit master control cabinet 7 is connected to the PLC circuit control system and can control the system operation of the entire workstation.

[0031] The pre-positioning mechanism 4 includes a proximity switch 401, a pushing cylinder 402, a positioning cylinder 403 and a No. 1 blowing block 404. The proximity switch 401 is fixedly installed on the outer side of the material conveying line 3. After the photoelectric sensing probe of the proximity switch 401 detects the arrival of the workpiece, a pushing cylinder 402 is fixedly installed on the outer side of the material conveying line 3, and a positioning cylinder 403 is fixedly installed on the outer side of the material conveying line 3. The pushing cylinder 402 and the positioning cylinder 403 are controlled by the control circuit to drive the piston push rod to clamp and position the workpiece, which is convenient for the workpiece distribution robot 501 to clamp. The outer side of the material conveying line 3 is fixedly connected with a No. 1 blowing block 404, and the No. 1 air pump is connected to each No. 1 blowing block 404 through a No. 1 air pipeline, which is used for preliminary cleaning of dust on the surface of the workpiece.

[0032] The automatic feeding structure 5 includes a workpiece distribution robot 501, a chip blowing box 502, a temporary storage table 503, a workpiece grasping robot 504, a chip receiving car 505 and a grinding robot 506. The workpiece distribution robot 501 is arranged on the inner side of the workstation fence 1. The workpiece distribution robot 501 realizes the clamping of workpieces from the material collection conveyor line 3 and the chip blowing box 502. The chip blowing box 502 is fixedly installed on the inner front wall of the workstation fence 1. The second air pump and the air hole nozzle are used for the second cleaning step. A temporary storage table 503 is arranged on the right side of the workpiece distribution robot 501. The temporary storage table 503 is mainly used for temporary storage of workpieces to facilitate the workpiece grasping robot 504 to clamp and grind them one by one. The workpiece grasping robot 504 is arranged on the inner side of the workstation fence 1. The chip receiving car 505 is arranged on the right side of the workpiece grasping robot 504. The chip receiving car 505 is used to collect grinding debris falling from above. The grinding robot 506 is arranged on the right side of the chip receiving car 505.

[0033] according to Figure 1 and Figure 2 As shown, the material taking conveyor line 3 is a structure of three conveyor belts, which is used to automatically load the placed turbine workpieces to the inner side of the workstation fence 1. The side of the proximity switch 401 facing the material taking conveyor line 3 is a photoelectric sensing probe structure. When the workpiece is detected to have arrived at the adjacent position, an electrical signal is generated by the optical signal processor and transmitted to the circuit control system of the circuit master control cabinet 7, so that the pushing cylinder 402 and the positioning cylinder 403 respectively drive the No. 1 piston push rod and the No. 2 piston push rod to clamp and position the workpiece.

[0034] according to Figure 1 and Figure 2 As shown, a No. 1 air pump is fixedly installed at the bottom of each material conveying line 3, and the air outlet port of the No. 1 air pump is connected to the bottom of six No. 1 blowing blocks 404 via a forked No. 1 air supply pipeline, and the air jet port of each No. 1 blowing block 404 faces one side of the workpiece, so as to perform preliminary cleaning of dust on the surface of the workpiece.

[0035] according to Figure 1 and Figure 3 as well as Figure 4 As shown, the No. 1 piston push rod and the No. 2 piston push rod are used to clamp and position the workpiece, so that the No. 1 mechanical arm 5012 and the No. 1 air gripper 5013 of the workpiece distribution robot 501 can clamp the workpiece, and the workpiece is placed on the filter plate inside the chip blowing box 502 using the programmed program control, wherein the No. 1 mechanical arm 5012 is a 70kg FANUC robot, the No. 1 air gripper 5013 is a SCHUNK air gripper structure, and the air outlet port of the No. 2 air pump is connected to a number of air hole nozzles by a forked No. 2 air supply pipeline, and the side of the air hole nozzle facing the workpiece is an air jet, so that the dust on the surface of the workpiece is cleaned for the second time, and the dust collecting box is used to collect the dust that falls from the top.

[0036] according to Figure 1 and Figure 5 As shown, three placement stations are provided on the top of the temporary storage table 503, which can temporarily store three turbine workpieces to facilitate orderly grasping by the workpiece grasping robot 504. When the workpiece distribution robot 501 puts the workpiece into the placement station, the photoelectric switch 5032 detects the workpiece, and the control circuit controls the air circuit installation box 5031 to make the pneumatic clamp 5033 clamp and fix the turbine workpiece, waiting for the clamping operation.

[0037] according to Figure 1 and Figure 6 As shown, the outlet port of the No. 3 air pump is connected to the forked No. 1 air pipeline, and the air is sprayed toward the workpiece through the No. 2 air blowing block 5034 to clean the attached debris for the third time, and then the No. 2 mechanical arm 5042 and the No. 2 air claw 5043 of the workpiece grasping robot 504 clamp the workpieces one by one.

[0038] according to Figure 1 and Figure 7 As shown, the No. 2 robot arm 5042 is a 12kg FANUC robot, and the No. 2 air gripper 5043 is a single-handed gripper, whose structure is a SCHUNK air gripper. The chip hopper 5051 receives the chips falling from above and discharges the chips into the chip discharge trolley 5052 below for collection.

[0039] according to Figure 1 and Figure 8 As shown, a hydraulic cylinder 5053 is fixedly installed on the top of the chip hopper 5051. The hydraulic cylinder 5053 drives the hydraulic rod to vibrate and knock the chip hopper 5051, which can speed up the chip removal efficiency of the hopper. At the same time, the No. 3 robot arm 5062 is a 7kg FANUC robot, and the grinding head 5063 is a SCHUNK 150 pneumatic floating grinding head, which cooperates with the workpiece grasping robot 504 to grind and deburr the workpiece.

[0040] according to Figure 1 As shown, the unloading conveyor line 6 is also a three-conveyor belt structure. The deburred turbine workpieces are placed one by one into the three unloading conveyor lines 6 by the workpiece grabbing robot 504 for automatic unloading and conveying processing.

[0041] In summary, the automatic deburring device puts the turbine workpiece to be deburred into three material taking conveyor lines 3. When the turbine workpiece reaches the detection end of the proximity switch 401, the push cylinder 402 and the positioning cylinder 403 are respectively controlled to drive the piston push rod to position the turbine workpiece. Then, the No. 1 air pump and the No. 1 blowing block 404 are used to remove dust on the surface of the workpiece, so as to facilitate the clamping operation of the No. 1 air claw 5013 of the workpiece distribution robot 501. After the workpiece distribution robot 501 clamps the turbine workpiece, it is placed in the chip blowing box 502. The No. 2 air pump and the air hole nozzle are used to clean the debris attached to the surface of the workpiece. After cleaning, the workpiece distribution robot 501 puts it into the temporary storage table 503, and the photoelectric switch 5032 detects the workpiece. After the workpiece is finished, the pneumatic clamp 5033 is controlled to clamp and fix it, and then the No. 3 air pump and the No. 2 blowing block 5034 are used to clean it again, and then the workpiece is clamped one by one by the workpiece grasping robot 504, and the workpiece is polished and deburred by cooperating with the polishing head 5063 of the polishing robot 506. At the same time, the chip receiving car 505 is used to collect the debris dropped by grinding, and the workpiece grasping robot 504 is used to put them into three unloading conveyor lines 6 one by one, so as to realize automatic loading and unloading operations when grinding and deburring the turbine workpiece, further improving the deburring processing efficiency, and solving the problem that the automatic deburring device in the above-mentioned background technology needs to manually load and unload the fixture assembly, resulting in the deburring efficiency of the workpiece needs to be further improved.

[0042] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0043] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An automatic deburring device, comprising a workstation fence (1) and a safety door (2) arranged inside the workstation fence (1), characterized in that: A material taking conveyor line (3) is arranged on the inner side of the workstation fence (1), a pre-positioning mechanism (4) is arranged on the outer side of the material taking conveyor line (3), and an automatic material feeding structure (5) is arranged on the inner side of the workstation fence (1); The pre-positioning mechanism (4) comprises a proximity switch (401), a material pushing cylinder (402), a positioning cylinder (403) and a first blowing block (404); the proximity switch (401) is fixedly installed on the outer side of the material taking conveyor line (3); the material pushing cylinder (402) is fixedly installed on the outer side of the material taking conveyor line (3); the positioning cylinder (403) is fixedly installed on the outer side of the material taking conveyor line (3); and the first blowing block (404) is fixedly connected to the outer side of the material taking conveyor line (3); The automatic feeding structure (5) comprises a workpiece distribution robot (501), a chip blowing box (502), a temporary storage table (503), a workpiece grasping robot (504), a chip receiving trolley (505) and a grinding robot (506); the workpiece distribution robot (501) is arranged on the inner side of the workstation fence (1); the chip blowing box (502) is fixedly installed on the inner front wall of the workstation fence (1); the temporary storage table (503) is arranged on the right side of the workpiece distribution robot (501); the workpiece grasping robot (504) is arranged on the inner side of the workstation fence (1); the chip receiving trolley (505) is arranged on the right side of the workpiece grasping robot (504); and the grinding robot (506) is arranged on the right side of the chip receiving trolley (505).

2. The automatic deburring device according to claim 1, characterized in that: The material-collecting conveyor line (3) is a conveyor belt structure with three members, and the number of the proximity switches (401) is three. The three proximity switches (401) are respectively located on one side of the three material-collecting conveyor lines (3), and the three proximity switches (401) are each provided with a photoelectric sensing probe on one side facing the three material-collecting conveyor lines (3). Each of the proximity switches (401) is electrically controlled by an optical signal processor. The number of the pushing cylinders (402) and the positioning cylinders (403) are both three. The three pushing cylinders (402) are respectively located on one side close to the three proximity switches (401), and the three positioning cylinders (403) are respectively located on the other side of the three material-collecting conveyor lines (3).

3. The automatic deburring device according to claim 1, characterized in that: The three proximity switches (401) are electrically connected to the three pushing cylinders (402) and the three positioning cylinders (403) through the control circuit respectively; a No. 1 air pump is fixedly installed at the bottom of the three material taking conveying lines (3); the number of the No. 1 air blowing blocks (404) is six; the three No. 1 air pumps are respectively connected to the bottoms of the six No. 1 air blowing blocks (404) through a No. 1 air transmission pipeline; the three pushing cylinders (402) are movably connected to the first piston push rod on one side facing the three material taking conveying lines (3); the three positioning cylinders (403) are movably connected to the second piston push rod on one side facing the three material taking conveying lines (3).

4. The automatic deburring device according to claim 1, characterized in that: The workpiece distribution robot (501) includes a robot base No. 1 (5011) of a turntable structure, a robot arm No. 1 (5012) is movably mounted on the top of the robot base No. 1 (5011), a pneumatic gripper No. 1 (5013) is movably mounted on the top of the pneumatic arm No. 1 (5012), a second air pump is fixedly mounted on the bottom of the chip blowing box (502), and a number of air hole nozzles are fixedly mounted inside the chip blowing box (502), the second air pump is through-connected to the bottom of the plurality of air hole nozzles via a second air supply pipeline, a dust collecting box is through-connected to the bottom of the chip blowing box (502), a filter plate is fixedly connected to the top of the dust collecting box, and the plurality of air hole nozzles are located directly above the filter plate.

5. The automatic deburring device according to claim 1, characterized in that: An air circuit installation box (5031) is fixedly installed inside the temporary storage table (503), and three placement stations are opened on the top of the temporary storage table (503), and a photoelectric switch (5032) is fixedly installed on the top of each placement station, and two pneumatic clamps (5033) are fixedly connected to the top of each placement station, and each pneumatic clamp (5033) is electrically connected to the air circuit installation box (5031).

6. The automatic deburring device according to claim 5, characterized in that: A number of No. 2 air blowing blocks (5034) are fixedly connected to the top of each placement station, and a No. 3 air pump is fixedly installed inside the temporary storage table (503). The No. 3 air pump is connected to the bottom of each No. 2 air blowing block (5034) through a No. 3 air supply pipeline, and a protective cover shell (5035) is fixedly installed on the top of the temporary storage table (503).

7. The automatic deburring device according to claim 1, characterized in that: The workpiece grasping robot (504) comprises a No. 2 robot base (5041) of a turntable structure, a No. 2 robot arm (5042) is movably mounted on the top of the No. 2 robot base (5041), a No. 2 air gripper (5043) is movably mounted on the top of the No. 2 robot arm (5042), and the chip receiving trolley (505) comprises a chip receiving hopper (5051), and a chip removal trolley (5052) is arranged at the bottom of the chip receiving hopper (5051).

8. The automatic deburring device according to claim 7, characterized in that: A hydraulic cylinder (5053) is fixedly installed on the top of the chip hopper (5051), and a hydraulic rod is movably connected to the bottom of the hydraulic cylinder (5053). The grinding robot (506) includes a No. 3 robot base (5061) with a turntable structure, and a No. 3 robot arm (5062) is movably installed on the top of the No. 3 robot base (5061), and a grinding head (5063) is movably installed on the top of the No. 3 robot arm (5062).

9. The automatic deburring device according to claim 1, characterized in that: The inner right wall of the workstation fence (1) is provided with a material unloading conveyor line (6), and the material unloading conveyor line (6) is a conveyor belt structure with three in number. A circuit master control cabinet (7) is fixedly installed on the front side of the workstation fence (1).