Novel blockage eliminating device

By using a combination of three-way structural parts and a bolt valve in the pneumatic conveying system, the blocked pipe is automatically blown through, which solves the problem of blocking pipes at the turn and high maintenance costs, and achieves the effect of reducing maintenance costs and wear.

CN222063432UActive Publication Date: 2024-11-26ZHEJIANG FEIDA ELECTRIC ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420726480.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-11-26
Estimated Expiration
2034-04-09

AI Technical Summary

Technical Problem

In the pneumatic conveying system, the material is prone to blocking the pipe at the downward turning point, and the existing elbow structure wears quickly and is difficult to maintain, resulting in high maintenance costs.

Method used

A three-way structural member is arranged at the lower turn of the lower pipe, and a bolt valve is arranged at its corresponding discharge end. When the dust blocking pressure increases, the bolt valve automatically opens and blows the pipe, replacing the traditional elbow structure.

Benefits of technology

It effectively reduces maintenance costs and elbow wear, saves on-site maintenance workload, and improves pipeline smoothness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222063432U_ABST
    Figure CN222063432U_ABST
Patent Text Reader

Abstract

The utility model discloses a novel blockage eliminating device which comprises a first pipeline, a three-way structural member, a second pipeline and a plug forming valve, the lower end of the first pipeline is communicated with the upper end of the three-way structural member, and the right end of the three-way structural member is communicated with the left end of the second pipeline. The left end of the three-way structural member is parallel to the left end of the second pipeline in a front-back corresponding manner, and the left end of the three-way structural member is communicated with a plug forming valve. The three-way structural part is arranged at the descending turning position of the lower pipeline to replace an elbow structure, and the plug forming valve is arranged at the discharging end of the three-way structural part, so that when the ash blocking pressure in the pipeline rises, the plug forming valve is automatically opened to blow air and blow through the pipeline, the on-site overhaul workload is saved, the elbow abrasion is reduced, and the production efficiency is improved. And the maintenance cost can be effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The utility model relates to the technical field of pipeline components, in particular to the technical field of a novel anti-blocking device. [Background technology]

[0002] In the pneumatic conveying system, when materials are transported from the ash hopper to the ash bin, especially under the economizer, the materials are large in size, there are many equipments in the boiler frame, the conveying pipeline is complex, and the inspection and maintenance are difficult. The pipes are often blocked at the turning points of the pipes. In the prior art, elbows are generally used directly at the turning points of the conveying pipelines. Since the gas is mixed at this elbow, the exhaust speed is very fast, and the materials are easily accumulated to cause pipe blockage. The back of the elbow wears quickly, which is easy to cause leakage. In addition, the pipes under the economizer are generally arranged overhead, which makes on-site inspection and maintenance difficult and the inspection and maintenance cost is very expensive. [Contents of the utility model]

[0003] The purpose of the utility model is to solve the problems in the prior art and propose a novel anti-blocking device, which can replace the elbow structure by arranging a three-way structure at the descending turning point of the lower pipeline, and at the same time, a plug valve is arranged at the end of the three-way structure corresponding to the discharge. When the pressure in the pipeline increases due to ash blockage, the plug valve automatically opens to blow air to blow the pipeline through, thereby saving on-site maintenance workload, reducing elbow wear, and effectively reducing maintenance costs.

[0004] To achieve the above-mentioned purpose, the utility model proposes a novel anti-blocking device, including a first pipeline, a three-way structure, a second pipeline and a plug-forming valve, the lower end of the first pipeline is connected with the upper end of the three-way structure, the right end of the three-way structure is connected with the left end of the second pipeline, the left end of the three-way structure and the left end of the second pipeline are parallel to each other in front and back correspondence, and the left end of the three-way structure is connected with a plug-forming valve.

[0005] Preferably, the connection modes of the first pipeline, the three-way structure, the second pipeline and the bolt valve are all detachable.

[0006] Preferably, the upper end of the three-way structural member is a bent pipe, and the left end and the right end of the three-way structural member are long straight pipes.

[0007] Preferably, the upper end of the three-way structural member is a thickened pipe.

[0008] Preferably, a sealing flange is provided at the connection portion between the upper end of the three-way structural member and the first pipeline.

[0009] Preferably, a reduced diameter pipe is provided at the connecting portion between the left end of the three-way structural member and the plug valve.

[0010] Preferably, the inner side surface of the three-way structural member is evenly provided with a wear-resistant ceramic coating.

[0011] Preferably, a pressure sensor connected to the bolt valve is provided at the upper end of the three-way structural member.

[0012] The beneficial effects of the utility model are as follows: the utility model combines a pipeline, a three-way structure, a second pipeline and a plug-forming valve together, and after experimental optimization, can provide a three-way structure at the descending turning point of the lower pipeline to replace the elbow structure, and at the same time provide a plug-forming valve at the end of the three-way structure corresponding to the discharge of the material. When the pressure in the pipeline increases due to dust blockage, the plug-forming valve automatically opens to blow air to blow the pipeline through, thereby saving on-site maintenance workload, reducing elbow wear, and effectively reducing maintenance costs.

[0013] The features and advantages of the present invention will be described in detail through embodiments in conjunction with the accompanying drawings.

Brief Description of the Drawings

[0014] Figure 1 It is a structural schematic diagram of a novel anti-blocking device of the utility model.

[0015] In the figure: 1-first pipeline, 2-three-way structural member, 3-second pipeline, 4-bolt valve, 5-sealing flange, 6-reducing pipeline. [Specific implementation method]

[0016] See also Figure 1 The utility model discloses a novel anti-blocking device, comprising a first pipeline 1, a three-way structure 2, a second pipeline 3 and a plug-forming valve 4. The lower end of the first pipeline 1 is connected to the upper end of the three-way structure 2, the right end of the three-way structure 2 is connected to the left end of the second pipeline 3, the left end of the three-way structure 2 and the left end of the second pipeline 3 are parallel to each other, and the left end of the three-way structure 2 is connected to the plug-forming valve 4. The connection modes of the first pipeline 1, the three-way structure 2, the second pipeline 3 and the plug-forming valve 4 are all adjustable. It is a detachable type, the upper end of the three-way structural member 2 is a bent pipe, the left end and the right end of the three-way structural member 2 are both long straight pipes, the upper end of the three-way structural member 2 is a thickened pipe, and the connecting portion between the upper end of the three-way structural member 2 and the first pipe 1 is provided with a sealing flange 5, and the connecting portion between the left end of the three-way structural member 2 and the bolt-forming valve 4 is provided with a reduced-diameter pipe 6, the inner side surface of the three-way structural member 2 is evenly provided with a wear-resistant ceramic coating, and the upper end of the three-way structural member 2 is provided with a pressure sensor connected to the bolt-forming valve 4.

[0017] The utility model combines a pipeline, a three-way structure 2, a second pipeline 3 and a plug-forming valve 4 together, and after experimental optimization, can arrange a three-way structure 2 at the descending turning point of the lower pipeline to replace the elbow structure, and at the same time arrange a plug-forming valve 4 at the end of the three-way structure 2 corresponding to the discharge of the material. When the pressure in the pipeline increases due to ash blockage, the plug-forming valve 4 automatically opens to blow air to blow the pipeline through, thereby saving on-site maintenance workload, reducing elbow wear, and effectively reducing maintenance costs.

[0018] The above embodiments are intended to illustrate the present invention, not to limit the present invention. Any solution that is a simple transformation of the present invention falls within the protection scope of the present invention.

Claims

1. A new type of blocking device, characterized by: The invention comprises a first pipeline (1), a three-way structure (2), a second pipeline (3) and a closure valve (4); the lower end of the first pipeline (1) is connected to the upper end of the three-way structure (2); the right end of the three-way structure (2) is connected to the left end of the second pipeline (3); the left end of the three-way structure (2) and the left end of the second pipeline (3) are parallel to each other in front and back correspondence; the left end of the three-way structure (2) is connected to the closure valve (4).

2. A novel anti-blocking device as claimed in claim 1, characterized in that: The connection modes of the first pipeline (1), the three-way structural member (2), the second pipeline (3) and the plug-forming valve (4) are all detachable.

3. A novel anti-blocking device as claimed in claim 1, characterized in that: The upper end of the three-way structural component (2) is a bent pipe, and the left end and the right end of the three-way structural component (2) are both long straight pipes.

4. A novel anti-blocking device as claimed in claim 1, characterized in that: The upper end of the three-way structural member (2) is a thickened pipe.

5. A novel anti-blocking device as claimed in claim 1, characterized in that: A sealing flange (5) is provided at the connection portion between the upper end of the three-way structural member (2) and the first pipeline (1).

6. A novel anti-blocking device as claimed in claim 1, characterized in that: A reduced diameter pipe (6) is provided at the communicating portion between the left end of the three-way structural member (2) and the plug-forming valve (4).

7. A novel anti-blocking device as claimed in claim 1, characterized in that: The inner side surface of the three-way structural component (2) is evenly provided with a wear-resistant ceramic coating.

8. A novel anti-blocking device as claimed in claim 1, characterized in that: The upper end of the three-way structural member (2) is provided with a pressure sensor connected to the bolt-forming valve (4).