Gantry high pier straining beam and capping beam construction supporting system for overcrossing existing highway bridge
Through the modularly assembled steel pipe columns and bracket systems, the problems of small space and difficulty in erection in bridge construction are solved, and rapid construction and efficient installation of beam and cover beam support are achieved, reducing construction risks and ensuring driving safety.
Patent Information
- Application Number
- CN202420581222.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-25
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2034-03-25
AI Technical Summary
In bridge construction, especially in the construction of gate-type high-pier beams and cover beams with upper spans of existing highways, the existing technology has problems such as small space, high installation difficulty, high cost and long construction period, resulting in relatively high construction risks It is large and difficult to complete the bracket construction quickly.
The steel pipe columns are made up of steel pipe section flanges of different lengths, combined with bracket unloading device, distribution beam, Beret beam, transverse industrial steel and formwork, and can be quickly erected and removed through modular assembly. The length of the steel pipe column can be adjusted Adapt to construction needs at different heights, and improve structural stability through coupling and stiffening plates.
It achieves low difficulty and fast construction and installation, shortens construction period, saves construction space, improves construction efficiency, and ensures driving safety of existing roads.
Smart Images

Figure CN222065207U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of bridge construction, and in particular relates to a construction support system for a portal high pier tie beam and a cap beam over an existing highway bridge. Background Art
[0002] With the continuous development of national transportation construction, two existing highway bridges often cross at a small angle. In order to avoid affecting the driving safety of existing highways, the highway bridge piers built later usually adopt portal high piers with strong span and saving lower space. In order to ensure the stability and force requirements of the pier columns, pier tie beams and cap beams must be set between the pier columns to enhance the overall stiffness of the pier columns. The commonly used support methods for the construction of reinforced concrete bridge cap beams include full-chamber bracket method, reserved hole through round steel method, embedded steel bracket method and hoop method. At present, in the construction of tie beams and cap beams, due to the crossing of existing highways, the support construction work has problems such as narrow space, difficulty in bracket erection, high cost, long construction period and high construction risk. How to quickly complete the construction of tie beams and cap beam brackets in a limited space is a difficult problem that technicians in this field need to solve urgently. The structure of the construction bracket and the difficulty of erection are the key to ensuring project quality and shortening construction period. Utility Model Content
[0003] The utility model aims to overcome the deficiencies of the prior art and provide a construction support system for a gantry high pier tie beam and a cap beam across an existing highway bridge, which has low erection difficulty and fast construction speed.
[0004] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0005] A construction support system for tie beams and cap beams of portal-type high piers over existing highway bridges, comprising a cap and a steel pipe column of the portal-type high pier, wherein a support foundation is arranged on the ground inside the cap; two steel pipe columns form a group, two groups of the steel pipe columns are respectively installed and fixed on the caps on both sides, and the other two groups of the steel pipe columns are respectively installed and fixed on the support foundations on both sides; the steel pipe column is formed by flange connection of steel pipe sections of different lengths so that the height of the steel pipe column can be suitable for cast-in-place construction of tie beams and cap beams; the steel pipe sections are divided into standard sections with the same length and adjustable sections with various lengths;
[0006] When used for cast-in-place construction of tie beams, the top of the steel pipe column is sequentially installed with a bracket unloading device, a distribution beam, a Bailey beam, a transverse steel and a formwork; when used for cast-in-place construction of cap beams, the top of the steel pipe column is sequentially installed with a bracket unloading device, a distribution beam, a Bailey beam, a transverse steel, a disc bracket and a formwork.
[0007] Furthermore, the length of the standard section is 4 meters, and the lengths of the adjustment sections are divided into 0.2 meters, 0.5 meters, 1 meter and 2 meters.
[0008] Furthermore, the support foundation is an enlarged foundation, the size of which is determined by calculation, and 10 column bottom stiffening plates are vertically provided at the bottom of the steel pipe column thereon, and the column bottom stiffening plates are evenly arranged along the outer periphery of the bottom of the steel pipe column.
[0009] Furthermore, embedded parts are arranged in the foundation and are welded and fixed to the steel pipe column.
[0010] Furthermore, the steel pipe columns are made of φ609×16mm steel pipes, and the two steel pipe columns in each group are arranged along the longitudinal direction of the existing highway bridge. The longitudinal distance between the two steel pipe columns is 4m; the setting position of the steel pipe columns needs to avoid the existing highway bridge.
[0011] Furthermore, the four steel pipe columns on each side are provided with connection systems in the longitudinal and transverse directions of the bridge, the connection systems use 20a channel steel, and the connection heights of the longitudinal and transverse connections of the connection systems are both 2m.
[0012] Furthermore, a support arm extends from one side of the connection system, and one end of the support arm extends into the pier column on the base; the support arm is made of 20a channel steel.
[0013] Furthermore, the distribution beam and the Bailey beam are connected via a limiter to ensure the stability of the structure; the limiter is a steel plate buckle.
[0014] Furthermore, the transverse working steel and the Bailey beam are connected by a steel plate buckle, and the transverse working steel and the disc buckle bracket are firmly fixed by spot welding or other connection methods.
[0015] Furthermore, the distribution beam adopts double-jointed 56b I-beams; the Bailey beam adopts a single-layer standard "321" type Bailey plate, the Bailey beam has a longitudinal bridge spacing of 0.45m and is connected horizontally with lattice windows; the Bailey beam needs to be set away from existing highway bridges.
[0016] During actual construction, firstly, according to the specific conditions on site, the support foundation is constructed without affecting the existing highway; the steel pipe column is installed and fixed on the support foundation or the pedestal; the support unloading device is installed on the steel pipe column; the distribution beam, Bailey beam, transverse steel and template are installed and fixed on the unloading device in order from bottom to top; the cast-in-place work of the tie beam is completed; after the concrete of the tie beam is strong, the template, transverse steel, Bailey beam, distribution beam and support unloading device are removed;
[0017] Afterwards, the steel pipe column is directly connected to the cap beam; the distribution beam, Bailey beam, transverse steel, disc bracket and formwork are hoisted and fixed in sequence above the connected steel pipe column; the cast-in-place work of the cap beam is completed; and the bracket is removed after the cap beam concrete is strong.
[0018] The beneficial effects of the utility model are:
[0019] The steel pipe column, distribution beam, Bailey beam, unloading device and other components of the utility model are made of common materials, can be assembled in a modular manner, have simple processes, and are easy to install and disassemble; the length of the steel pipe column is adjustable, so that the steel pipe column can match the height of templates with different heights; compared with the traditional construction support system, the utility model can share the steel pipe column during the construction of the tie beam and the cap beam, and the steel pipe column can be directly raised during the construction of the cap beam, saving the time of the cap beam construction;
[0020] Furthermore, the steel pipe column of the utility model avoids the existing highway bridge, thereby improving the construction efficiency, shortening the construction period, saving the construction space and ensuring the driving safety of the existing highway. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] The drawings constituting part of the present application are used to provide a further understanding of the present invention. The exemplary embodiments and descriptions of the present invention are used to explain the present invention and do not constitute an improper limitation on the present invention. Among them:
[0022] Figure 1 It is a front view of the tie beam construction support in the specific embodiment provided by the utility model.
[0023] Figure 2 It is a side view of the tie beam construction support in the specific embodiment provided by the utility model.
[0024] Figure 3 This is a front view of a cap beam construction support in a specific embodiment provided by the utility model.
[0025] Figure 4 It is a side view of the cap beam construction support in the specific embodiment provided by the utility model.
[0026] Figure 5 It is a structural schematic diagram of a steel pipe column according to an embodiment of the utility model.
[0027] Figure 6 It is a schematic structural diagram of a steel plate buckle according to an embodiment of the utility model.
[0028] Figure 7 This is a schematic diagram of the use status of the steel plate buckle according to an embodiment of the utility model.
[0029] In the figure: 1. Support foundation; 2. Steel pipe column; 21. Steel pipe section; 3. Support unloading device; 4. Distribution beam; 5. Bailey beam; 6. Horizontal industrial steel; 7. Formwork; 8. Tie beam; 9. Connecting system; 10. Cap; 11. Disc bracket; 12. Cap beam; 13. Existing highway bridge; 14. Armrest, 15-Steel plate clip, 16-Upper flange of Bailey beam chord. DETAILED DESCRIPTION
[0030] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the protection scope of the present invention.
[0031] In the description of the present invention, the terms "longitudinal", "lateral", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings. They are only for the convenience of describing the present invention and do not require that the present invention must be constructed and operated in a specific direction. Therefore, they cannot be understood as limitations on the present invention. The terms "connected" and "connection" used in the present invention should be understood in a broad sense. For example, they can be fixed connections or detachable connections; they can be directly connected or indirectly connected through intermediate components. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0032] The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments. It should be noted that the embodiments and features in the embodiments of the present invention can be combined with each other without conflict.
[0033] like Figures 1 to 4 As shown, a construction support system for a tie beam and a cap beam of a portal high pier over an existing highway bridge comprises a cap 10 and a steel pipe column 2 of a portal high pier, a support foundation 1 being arranged on the ground inside the cap 10; the steel pipe columns 2 are grouped in two, the two groups of the steel pipe columns 2 are respectively mounted and fixed on the caps 10 on both sides, the two groups of the steel pipe columns 2 are respectively mounted and fixed on the support foundations 1 on both sides, the two groups of the steel pipe columns 2 on one side are respectively supported by the cap 10 and the support foundation 1, so as to meet the overall force requirements of the cap 10 structure and avoid damage to the cap 10; a total of 8 steel pipe columns 2 support the Bailey beam 5, the formwork 7, and the buckle bracket 11, and together form a construction platform, which meets the requirements of the construction space and is sufficiently stable and will not affect the driving safety of the existing highway bridge 13;
[0034] The steel pipe column 2 is formed by flange connection of steel pipe sections 21 of different lengths so that the height of the steel pipe column 2 can be suitable for cast-in-place construction of tie beams and cap beams; the steel pipe sections 21 are divided into standard sections with the same length and adjustable sections with various lengths;
[0035] When used for cast-in-place construction of tie beams, the tie beam 8 in this embodiment is rectangular; the top of the steel pipe column 2 is sequentially installed with a bracket unloading device 3, a distribution beam 4, a Bailey beam 5, a transverse steel 6 and a template 7, and the two steel pipe columns 2 of each group are correspondingly arranged on both sides of the tie beam 8 position and the cap beam position, the top of the steel pipe column 2 is connected to the bracket unloading device 3, the distribution beam 4 is horizontally mounted on the top of the bracket unloading device 3 of the same group, and the Bailey beam 5 is horizontally mounted on the distribution beams 4 on both sides; the transverse steel 6 spans the Bailey beam 5, and the length of the transverse steel 6 is set according to the size of the tie beam 8 operating platform;
[0036] When used for cast-in-place cap beam construction, the steel pipe column 2 is directly raised by standard sections and adjustment sections. The cap beam 12 in this embodiment is trapezoidal. Therefore, in addition to installing the bracket unloading device 3, distribution beam 4, Bailey beam 5, and transverse steel 6 when constructing the tie beam 8, it is also necessary to set up a buckle bracket 11 on the transverse tooling to support the template 7;
[0037] Since the present invention uses a new type of method, the steel pipe column 2 can be directly raised after the construction of the tie beam 8 to construct the cap beam 12, thereby avoiding the need to rebuild the steel pipe column 2 for the construction of the cap beam 12 as in the traditional method, thereby improving the construction efficiency and saving the construction period.
[0038] In one embodiment, the length of the standard section is 4 meters, and the length of the adjustment section is divided into 0.2 meters, 0.5 meters, 1 meter and 2 meters; each standard section and adjustment section has flanges at both ends, and the flanges are connected by bolts; for example, in this embodiment, the construction platform height of the tie beam 8 is 21 meters, and the height of the construction platform of the cap beam 12 is 45 meters. After the construction of the tie beam 8 is completed, 6 standard sections can be used to raise the steel pipe column 2.
[0039] Furthermore, the support foundation 1 is an expanded foundation, and its size is determined according to calculation. Ten column bottom stiffening plates are vertically provided at the bottom of the steel pipe column 2 thereon, and the column bottom stiffening plates are evenly arranged along the outer periphery of the bottom of the steel pipe column 2; in one embodiment, further, the steel pipe column 2 adopts φ609×16mm steel pipe, and the two steel pipe columns 2 in each group are arranged along the longitudinal direction of the existing highway bridge 13, and the longitudinal distance between the two steel pipe columns 2 is 4m; the setting position of the steel pipe column 2 needs to avoid the existing highway bridge 13; at this time, the minimum size of the support foundation 1 is 6m×1.5m×1m.
[0040] Furthermore, the foundation 10 is provided with embedded parts and is welded and fixed to the steel pipe column 2 .
[0041] Further, such as Figure 1 , Figure 3As shown, the four steel pipe columns 2 on each side are provided with connection systems 9 in the longitudinal and transverse directions of the bridge, and the connection systems 9 are made of 20a channel steel. The connection heights of the longitudinal and transverse connection systems 9 are both 2m, and the connection systems 9 ensure the stability and rigidity of the steel pipe columns 2. Preferably, an armrest 14 extends from one side of the connection system 9, and one end of the armrest 14 extends into the pier on the pedestal 10 in order to stabilize the steel pipe column 2. The armrest 14 is also made of 20a channel steel.
[0042] Furthermore, the transverse steel 6 is connected to the Bailey beam 5 via a steel plate buckle 15, such as Figure 6 As shown, the steel plate buckle 15 is a small square steel plate with a notch-shaped buckle on one side of the long plate, and the thickness is about 4mm; Figure 7 As shown, when in use, the steel plate clip 15 is obliquely inserted at an angle of about 45° at the intersection of the upper chord of the Bailey beam 5 and the transverse steel 6, so that the upper flange 16 of the Bailey beam chord and the lower flange of the transverse steel can be clamped in the notch-shaped clip of the steel plate clip 15, thereby firmly connecting the distribution beam 4 to the Bailey beam 5; the transverse steel 6 and the disc buckle bracket 11 are firmly fixed by spot welding or other connection methods to ensure the stability of the structure.
[0043] Furthermore, the distribution beam 4 and the Bailey beam 5 are connected by a limiter to ensure the stability of the structure; the limiter is a steel plate clip 15; the connection method of the steel plate clip 15 between the distribution beam 4 and the Bailey beam 5 is consistent with the connection method of the transverse industrial steel 6 and the Bailey beam 5, which will not be repeated here.
[0044] Furthermore, the distribution beam 4 adopts double-jointed 56b I-beams; the Bailey beam 5 adopts a single-layer standard "321" type Bailey plate, the Bailey beam 5 has a longitudinal bridge spacing of 0.45m and is connected horizontally with lattice windows; the Bailey beam 5 needs to be set away from the existing highway bridge 13.
[0045] The construction method of the support for the gantry high pier tie beam 8 and cap beam 12 of the utility model over the existing highway bridge comprises the following steps:
[0046] S1: Construction of support foundation 1;
[0047] S2: Install the steel pipe column 2 to the lower part of the tie beam 8;
[0048] S3: Install a support unloading device 3 above the steel pipe column 2;
[0049] S4: hoisting the distribution beam 4, Bailey beam 5, transverse steel 6 and template 7 in sequence above the support unloading device 3;
[0050] S5: Cast-in-place construction of tie beams;
[0051] S6: After the concrete of the tie beam 8 is strong, the formwork 7, the transverse steel 6, the Bailey beam 5, the distribution beam 4 and the bracket unloading device 3 are removed; the bracket removal principle is "first erection and then dismantling, and the last erection and then dismantling", and the stability of the structure is ensured during dismantling;
[0052] S7: Raise the steel pipe column 2 to below the cap beam 12;
[0053] S8: Sequentially hoisting the distribution beam 4, the Bailey beam 5, the transverse steel 6, the buckle bracket 11 and the formwork 7 above the connected steel pipe column 2;
[0054] S9: Cast-in-place construction of cap beam;
[0055] S10: After the concrete of the cap beam 12 is strong, the bracket is removed.
[0056] The steel pipe column 2, distribution beam 4, Bailey beam 5, unloading device and other components of the utility model are made of common materials, can be assembled in a modular manner, have a simple process, and are easy to install and disassemble; the length of the steel pipe column 2 is adjustable, so that the steel pipe column 2 can match the height of templates 7 with different heights; compared with the traditional construction support system, the utility model can share the steel pipe column 2 during the construction of the tie beam 8 and the cap beam 12, and the steel pipe column 2 can be directly raised during the construction of the cap beam 12, saving the time for the construction of the cap beam 12; and the steel pipe column 2 of the utility model avoids the existing highway bridge 13, while improving the construction efficiency and shortening the construction period, it saves construction space and ensures the driving safety of the existing highway.
[0057] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are within the scope of protection of the pending claims of the present invention.
Claims
1. A construction support system for a tie beam and a cap beam of a portal high pier over an existing highway bridge, comprising a cap (10) of a portal high pier, a steel pipe column (2), a bracket unloading device (3), a distribution beam (4), a Bailey beam (5), a transverse steel (6), a buckle bracket (11) and a template (7), characterized in that: A support foundation (1) is arranged on the ground inside the pedestal (10); the steel pipe columns (2) are grouped into two, two groups of the steel pipe columns (2) are respectively installed and fixed on the pedestals (10) on both sides, and the other two groups of the steel pipe columns (2) are respectively installed and fixed on the support foundations (1) on both sides; the steel pipe columns (2) are formed by flange connection of steel pipe sections (21) of different lengths so that the height of the steel pipe columns (2) can be suitable for cast-in-place construction of tie beams and cast-in-place construction of cap beams; the steel pipe sections (21) are divided into standard sections of the same length and adjustable sections of various lengths.
2. The construction support system for the portal high pier tie beam and cap beam of the existing highway bridge according to claim 1 is characterized in that: The length of the standard section is 4 meters, and the lengths of the adjustment sections are divided into 0.2 meters, 0.5 meters, 1 meter and 2 meters.
3. The construction support system for the portal high pier tie beam and cap beam of the existing highway bridge according to claim 1 is characterized in that: The support foundation (1) is an expanded foundation, on which 10 column bottom stiffening plates are vertically arranged at the bottom of the steel pipe column (2), and the column bottom stiffening plates are evenly arranged along the outer periphery of the bottom of the steel pipe column (2).
4. The construction support system for the portal high pier tie beam and cap beam of the existing highway bridge according to claim 1 is characterized in that: The cap (10) is provided with embedded parts and is welded and fixed to the steel pipe column (2).
5. The construction support system for the portal high pier tie beam and cap beam of the existing highway bridge according to claim 1 is characterized in that: The steel pipe columns (2) are made of φ609×16 mm steel pipes. The two steel pipe columns (2) in each group are arranged along the longitudinal direction of the existing highway bridge (13). The longitudinal distance between the two steel pipe columns (2) is 4 m. The arrangement position of the steel pipe columns (2) needs to avoid the existing highway bridge (13).
6. The construction support system for the portal high pier tie beam and cap beam of the existing highway bridge according to claim 1 is characterized in that: The four steel pipe columns (2) on each side are provided with connection systems (9) in the longitudinal and transverse directions of the bridge, the connection systems (9) are made of 20a channel steel, and the connection heights of the longitudinal and transverse connections of the connection systems (9) are both 2m.
7. The construction support system for the portal high pier tie beam and cap beam of the existing highway bridge according to claim 6 is characterized in that: A support arm (14) extends from one side of the connection system (9), and one end of the support arm (14) extends into a pier column on the base (10); the support arm (14) is made of 20a channel steel.
8. The construction support system for the portal high pier tie beam and cap beam of the existing highway bridge according to claim 1 is characterized in that: The distribution beam (4) and the Bailey beam (5) are connected via a limiting piece to ensure the stability of the structure; the limiting piece is a steel plate buckle (15).
9. The construction support system for the portal high pier tie beam and cap beam of the existing highway bridge according to claim 1 is characterized in that: The transverse steel (6) is connected to the Bailey beam (5) via a steel plate buckle (15), and the transverse steel (6) is firmly fixed to the buckle bracket (11) by spot welding or other connection methods.
10. The construction support system for the portal high pier tie beam and cap beam of the existing highway bridge according to claim 1 is characterized in that: The distribution beam (4) is made of double-jointed 56b I-beams; the Bailey beam (5) is made of a single-layer standard "321" type Bailey sheet; the Bailey beams (5) are spaced 0.45m in the longitudinal direction of the bridge and are connected in the transverse direction by lattice windows; the Bailey beams (5) are arranged to avoid existing highway bridges (13).