Building construction fence

By designing shading structures and foldable parts on the construction fence, the problem of water sprinkling on pedestrians during the construction fence is solved, and the space utilization rate is improved.

CN222066356UActive Publication Date: 2024-11-26JIANGXI ZHONGHENG UNDERGROUND SPACE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323439943.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-18
Publication Date
2024-11-26
Estimated Expiration
2033-12-18

AI Technical Summary

Technical Problem

During construction, when the construction fence sprays water and dust, the water is easily sprinkled on pedestrians, affecting health.

Method used

A construction fence is designed, including fixed-installed positioning blocks, adjustment blocks, elastic sleeves, shading frames and latches. By adjusting and fixing the positions and angles of these components, a shading structure is formed to prevent water from spilling out, and Fold some parts when water is not sprayed to improve space utilization.

Benefits of technology

Effectively prevent water from sprinkling on pedestrians when the construction fence is sprayed, and at the same time, folding the components when the water is not sprayed, improving space utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222066356U_ABST
    Figure CN222066356U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction fences, in particular to a building construction fence which comprises a fence body, two positioning blocks are fixedly installed on the surface of the fence body, adjusting blocks are rotationally connected to the surfaces of the positioning blocks, elastic sleeves are connected between the adjusting blocks and the positioning blocks in a sliding mode, and the elastic sleeves are connected with the positioning blocks in a sliding mode. A square block is fixedly connected to the inner wall of the elastic sleeve, a supporting hole is formed in the surface of the adjusting block, rotating rods are rotatably connected to the inner wall of the supporting hole, a shielding frame is fixedly connected to the ends, close to each other, of the two rotating rods, plug pins are in threaded connection to the inner wall of the supporting hole, and anti-skid protrusions are arranged on the surfaces of the two plug pins. And the inner wall of the shielding frame is slidably connected with a shielding plate. According to the building construction fence, the defect that in the prior art, when a pedestrian passes by the building construction fence, water can be sprinkled on the pedestrian, and the health of the pedestrian is affected is overcome.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction enclosures, in particular to a building construction enclosure. Background Art

[0002] Construction fencing refers to temporary fences or baffles set up during the construction process to protect the safety of the construction site and the cleanliness of the surrounding environment. The materials of construction fencing are generally steel pipes, iron plates, plastic plates, etc. The specific choice should be determined according to the characteristics and needs of the construction site.

[0003] With respect to the above-mentioned and existing related technologies, the inventors believe that the following defects often exist: in order to keep the environment around the construction site clean and tidy, water pipes are usually installed on the construction fence to spray water to reduce dust. However, when pedestrians pass by the fence, the water will be sprinkled on the pedestrians, affecting their health.

[0004] Therefore, the utility model provides a building construction enclosure. Utility Model Content

[0005] The utility model aims to solve the shortcoming in the prior art that when pedestrians pass by the construction fence, water will be sprinkled on the pedestrians, thus affecting the health of the pedestrians, and a construction fence is proposed.

[0006] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme: a construction fence, including a fence body, two positioning blocks are fixedly installed on the surface of the fence body, the surface of the positioning block is rotatably connected with an adjustment block, an elastic sleeve is slidably connected between the adjustment block and the positioning block, a square block is fixedly connected to the inner wall of the elastic sleeve, a support hole is opened on the surface of the adjustment block, the inner wall of the support hole is rotatably connected with a rotating rod, the ends of the two rotating rods close to each other are fixedly connected with a shielding frame, and the inner wall of the support hole is threadedly connected with a pin.

[0007] The effect achieved by the cooperation of the above components is that when the construction fence is sprayed with water to reduce dust, the water sprayed on the construction fence can be shielded so that the water will not splash on passers-by. At the same time, when the construction fence is not sprayed with water to reduce dust, some components can be folded to improve space utilization.

[0008] Preferably, the surfaces of the two latches are provided with anti-slip protrusions, and the inner wall of the shielding frame is slidably connected with a shielding plate.

[0009] The effect achieved by the above components is that the shielding plate can assist the shielding frame in blocking water.

[0010] Preferably, positioning ropes are fixedly connected to the surfaces of the two square blocks, one end of the positioning rope away from the square block is fixedly connected to the enclosure body, and a clamping plate is fixedly connected to the surface of the square block.

[0011] The effect achieved by the above components is that the positioning rope can hang the square block and the elastic sleeve, so that the square block and the elastic sleeve are not easy to be lost.

[0012] Preferably, a positioning groove is provided on the surface of the enclosure body, and the size of the positioning groove is matched with the size of the elastic sleeve.

[0013] The effect achieved by the above components is that the positioning groove can accommodate the elastic sleeve and the square block.

[0014] Preferably, a plurality of elastic rings are evenly and fixedly connected inside the shielding plate, and a plurality of positioning pins are evenly and slidably connected inside the shielding frame, and the size of the positioning pins is matched with the size of the elastic rings.

[0015] The effect achieved by the above components is: after sliding the shielding plate, the positioning pin is inserted into the inner wall of the corresponding elastic ring, and the shielding plate and the shielding frame are fixed at this time, achieving the effect of fixing the shielding plate and the shielding frame.

[0016] Preferably, a limiting hole is provided on the surface of the shielding frame, a clamping plate is slidably connected to the inner wall of the limiting hole, and the surface of the clamping plate is fixedly connected to the shielding plate.

[0017] The effect achieved by the above components is that after the shielding plate is slid for a long distance, the clamping plate will shield the shielding plate, so that the shielding plate cannot slide out of the inner wall of the shielding frame.

[0018] In summary:

[0019] The utility model discloses that when the building construction fence sprays water to reduce dust, the shielding frame is rotated. After the shielding frame is rotated to the required angle, the shielding frame is stopped, and then the latch is rotated. The latch moves in the direction close to the adjusting block with the help of the thread. After the latch moves a certain distance, the surface of the latch presses the rotating rod. At this time, the rotating rod and the adjusting block are fixed, and the shielding frame and the adjusting block are also fixed. Then the shielding plate is slid. After the shielding plate slides a certain distance in the direction away from the shielding frame, the sliding shielding plate is stopped, and then the positioning pin is inserted into the corresponding elastic ring inner wall. At this time, the shielding plate and the shielding frame are fixed. The blocking frame and the shielding plate can block the sprayed water. When the construction fence is not spraying water to reduce dust, the square block and the elastic sleeve are pulled out from the gap between the positioning block and the adjusting block with the help of the clamping plate. At this time, the positioning block and the adjusting block lose their fixation. At this time, the adjusting block rotates under the action of gravity, thereby achieving the effect of folding the adjusting block. The effect achieved by the cooperation of the above components is: when the construction fence is spraying water to reduce dust, the water sprayed on the construction fence can be blocked so that the water will not splash on passers-by. At the same time, when the construction fence is not spraying water to reduce dust, some components can be folded to improve space utilization. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0021] Figure 2 For this utility model Figure 1 Schematic diagram of the local structure;

[0022] Figure 3 For this utility model Figure 2 A magnified image of point A;

[0023] Figure 4 For this utility model Figure 1 A side view structural schematic diagram of;

[0024] Figure 5 For this utility model Figure 4 Enlarged view of point B.

[0025] Legend: 1. Enclosure body; 2. Adjustment block; 3. Shield frame; 4. Shield plate; 5. Positioning block; 6. Positioning rope; 7. Positioning slot; 8. Square block; 9. Elastic sleeve; 10. Card plate; 11. Latch; 12. Rotating rod; 13. Support hole; 14. Positioning pin; 15. Elastic ring; 16. Limit hole; 17. Clamp. DETAILED DESCRIPTION

[0026] Reference Figure 1-5As shown, the utility model provides a technical solution: a construction enclosure, including an enclosure body 1, two positioning blocks 5 are fixedly installed on the surface of the enclosure body 1, and the surface of the positioning block 5 is rotatably connected with an adjustment block 2, and an elastic sleeve 9 is slidably connected between the adjustment block 2 and the positioning block 5, and a square block 8 is fixedly connected to the inner wall of the elastic sleeve 9, and a support hole 13 is opened on the surface of the adjustment block 2, and a rotating rod 12 is rotatably connected to the inner wall of the support hole 13, and the ends of the two rotating rods 12 close to each other are fixedly connected to the shielding frame 3, and the inner wall of the support hole 13 is threadedly connected with a plug 11. The surfaces of the two plugs 11 are provided with anti-slip protrusions, and the inner wall of the shielding frame 3 is slidably connected with a shielding plate 4, and the shielding plate 4 can assist the shielding frame 3 in blocking water. The surfaces of the two square blocks 8 are fixedly connected with positioning ropes 6, and the ends of the positioning ropes 6 away from the square blocks 8 are fixedly connected to the enclosure body 1, and the surfaces of the square blocks 8 are fixedly connected with a clamping plate 10, and the positioning ropes 6 can hang the square blocks 8 and the elastic sleeve 9, so that the square blocks 8 and the elastic sleeve 9 are not easily lost. The surface of the enclosure body 1 is provided with a positioning groove 7, the size of which matches the size of the elastic sleeve 9, and the positioning groove 7 can accommodate the elastic sleeve 9 and the square block 8. Several elastic rings 15 are evenly fixedly connected to the interior of the shielding plate 4, and several positioning pins 14 are evenly slidably connected to the interior of the shielding frame 3, and the size of the positioning pins 14 matches the size of the elastic ring 15. After sliding the shielding plate 4, the positioning pins 14 are inserted into the inner wall of the corresponding elastic ring 15, and the shielding plate 4 and the shielding frame 3 are fixed at this time, achieving the effect of fixing the shielding plate 4 and the shielding frame 3. A limiting hole 16 is provided on the surface of the shielding frame 3, and a clamping plate 17 is slidably connected to the inner wall of the limiting hole 16. The surface of the clamping plate 17 is fixedly connected to the shielding plate 4. After sliding the shielding plate 4 for a long distance, the clamping plate 17 will block the shielding plate 4, so that the shielding plate 4 cannot slide out of the inner wall of the shielding frame 3.

[0027] Working principle: when the construction enclosure sprays water to reduce dust, the shielding frame 3 is rotated. After the shielding frame 3 is rotated to the required angle, the shielding frame 3 is stopped, and then the latch 11 is rotated. The latch 11 moves in the direction close to the adjustment block 2 with the help of the thread. After the latch 11 moves a certain distance, the surface of the latch 11 squeezes the rotating rod 12. At this time, the rotating rod 12 and the adjustment block 2 are fixed, and the shielding frame 3 and the adjustment block 2 are also fixed. Then slide the shielding plate 4. After the shielding plate 4 slides a certain distance in the direction away from the shielding frame 3, stop sliding the shielding plate 4, and then insert the positioning pin 14 into the corresponding inner wall of the elastic ring 15. At this time, the shielding plate 4 and the shielding frame 3 are fixed. The shielding frame 3 and the shielding plate 4 can block the sprayed water. When the construction fence does not spray water to reduce dust, the square block 8 and the elastic sleeve 9 are pulled out from the gap between the positioning block 5 and the adjusting block 2 with the help of the clamping plate 10. At this time, the positioning block 5 and the adjusting block 2 lose their fixation. At this time, the adjusting block 2 rotates under the action of gravity, achieving the effect of folding the adjusting block 2. The effect achieved by the cooperation of the above components is: when the construction fence is sprayed with water to reduce dust, the water sprayed on the construction fence can be blocked, so that the water will not be sprinkled on passers-by. At the same time, when the construction fence is not sprayed with water to reduce dust, some components can be folded to improve space utilization.

[0028] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

Claims

1. A construction enclosure, comprising an enclosure body (1), characterized in that: Two positioning blocks (5) are fixedly mounted on the surface of the enclosure body (1); the surface of the positioning block (5) is rotatably connected to an adjustment block (2); an elastic sleeve (9) is slidably connected between the adjustment block (2) and the positioning block (5); a square block (8) is fixedly connected to the inner wall of the elastic sleeve (9); a support hole (13) is opened on the surface of the adjustment block (2); a rotating rod (12) is rotatably connected to the inner wall of the support hole (13); a shielding frame (3) is fixedly connected to one end of the two rotating rods (12) that are close to each other; and a latch (11) is threadedly connected to the inner wall of the support hole (13).

2. A construction enclosure according to claim 1, characterized in that: The surfaces of the two latches (11) are both provided with anti-slip protrusions, and the inner wall of the shielding frame (3) is slidably connected with a shielding plate (4).

3. A construction enclosure according to claim 1, characterized in that: The surfaces of the two square blocks (8) are fixedly connected with positioning ropes (6), one end of the positioning rope (6) away from the square block (8) is fixedly connected to the enclosure body (1), and the surface of the square block (8) is fixedly connected with a clamping plate (10).

4. A construction enclosure according to claim 1, characterized in that: A positioning groove (7) is provided on the surface of the enclosure body (1), and the size of the positioning groove (7) is matched with the size of the elastic sleeve (9).

5. A construction enclosure according to claim 2, characterized in that: A plurality of elastic rings (15) are evenly and fixedly connected inside the shielding plate (4), and a plurality of positioning pins (14) are evenly and slidably connected inside the shielding frame (3), and the size of the positioning pins (14) is matched with the size of the elastic rings (15).

6. A construction enclosure according to claim 2, characterized in that: A limiting hole (16) is provided on the surface of the shielding frame (3), a clamping plate (17) is slidably connected to the inner wall of the limiting hole (16), and the surface of the clamping plate (17) is fixedly connected to the shielding plate (4).