Foundation settlement detection device

By designing the integrated connection between the protective box and the L-shaped observation column and the sliding groove and block structure, the problem of long installation time of the traditional foundation settlement monitoring device is solved, a fast and accurate installation process is achieved, and the overall installation efficiency and stability are improved. sex.

CN222069658UInactive Publication Date: 2024-11-26YANTAI MUPING SHUGUANG REAL ESTATE DEV CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420814761.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-19
Publication Date
2024-11-26
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The installation process of traditional foundation settlement monitoring devices requires the installation of concrete first, which leads to a long installation time. The protection box may affect the L-shaped settlement observation point during the installation process, increasing the overall installation time.

Method used

A foundation settlement detection device is designed, including a protective box, sliding groove, bracket block and L-shaped observation column. The protective box and L-shaped observation column are integrated with the connecting block, and the protection is installed simultaneously through cement embedded connecting blocks. Box and L-shaped observatory columns reduce installation time.

Benefits of technology

It realizes rapid installation, improves installation accuracy and stability, shortens overall installation time, and improves installation accuracy through sliding grooves and spherical offset warnings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222069658U_ABST
    Figure CN222069658U_ABST
Patent Text Reader

Abstract

The utility model provides a foundation settlement detection device which comprises a protection box, a sliding groove and a supporting block are arranged on the protection box, an L-shaped observation column is movably connected to the sliding groove, and a connecting block is arranged on the L-shaped observation column. The L-shaped observation column and the protection box are integrally connected through the connecting block and the supporting block, and by means of the connecting block, when a settlement monitoring point needs to be installed, the connecting block can be directly embedded into a preset installation hole, synchronous installation of the protection box and the L-shaped observation column is achieved, and the time needed by overall installation is shortened.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of foundation settlement measurement, in particular to a foundation settlement detection device. Background Art

[0002] The foundation settlement observation point refers to the specific location or point selected during the land foundation settlement monitoring process. These observation points are usually located around buildings or in the land foundation engineering area. The settlement observation point is equipped with settlement monitoring devices to facilitate the staff to monitor the settlement of the house.

[0003] When the foundation settlement point is used to detect the foundation of a house, the settlement monitoring device is installed at the lower part of the four corners of the building, and the house foundation is measured through the L-shaped settlement observation points installed with pre-punched holes. In order to ensure that the L-shaped settlement observation points are not affected or damaged by the external environment, the monitoring device needs to be equipped with a special protection box in addition to the L-shaped settlement observation points. The protection box is generally installed by gluing or punching holes again after the monitoring point is installed and dried. When the observation point needs to be measured, the cover on the protection box is lifted for measurement.

[0004] Traditional foundation settlement monitoring devices require drilling and installation of the measuring points before pre-embedding in concrete. To prevent the protection box from affecting the L-shaped settlement observation point during installation, the protection box must be re-drilled or glued and installed after the concrete has dried, which prolongs the overall installation time of the L-shaped settlement observation point. Utility Model Content

[0005] Aiming at the defect of the existing technology that the installation process is too long, the utility model provides a foundation settlement detection device, which can achieve the effect of quickly installing the measuring point and the protection box.

[0006] In order to solve the above technical problems, the utility model is solved by the following technical solutions:

[0007] A foundation settlement detection device comprises a protection box, a sliding groove and a supporting block are provided on the protection box, an L-shaped observation column is movably connected to the sliding groove, and a connecting block is provided on the L-shaped observation column; the connecting block integrally connects the L-shaped observation column and the protection box through the supporting block.

[0008] By means of the connecting block of the utility model, the protective box and the L-shaped observation column can be fixed to each other, eliminating the waiting time originally required for separate installation. When the settlement monitoring point needs to be installed, the device can directly embed the connecting block into the preset installation hole, fix the connecting block to the preset hole with cement, and realize the simultaneous installation of the protective box and the L-shaped observation column, thereby reducing the time required for the overall installation.

[0009] Preferably, the height of the sliding groove is the same as the length of the highest point of the L-shaped observation column, and the width of the sliding groove is consistent with the diameter of the cylindrical surface formed by the L-shaped observation column.

[0010] In the utility model, the L-shaped observation column can ensure that the L-shaped observation column is placed in the left and right center parts of the protection box through the sliding groove, thereby improving the installation accuracy of the L-shaped observation column in the protection box.

[0011] Preferably, the connection block is provided with a plurality of edges and corners on the outside, and the angles between the edges and corners are the same.

[0012] In the utility model, the outer edges and corners of the connection block are better fitted with cement than the traditional cylindrical installation surface, and the connection is more stable when measuring the building.

[0013] Preferably, a first cavity and a second cavity are provided inside the connection block, the first cavity is located in front of the second cavity, and the inner wall diameter of the first cavity is greater than the inner wall diameter of the second cavity.

[0014] In the utility model, since the inner wall of the first cavity is larger than that of the second cavity, the first cavity will not be blocked by the thread corresponding to the second cavity during the installation process, thereby improving the convenience of device installation.

[0015] Preferably, thread grooves are provided inside the first cavity and the second cavity, a first thread is provided at the lower part of the support block, a second thread is provided at the rear part of the L-shaped observation column, the diameter of the first thread is larger than the diameter of the second thread, the first cavity and the first thread fit together, and the second thread and the second cavity fit together.

[0016] In the utility model, the L-shaped observation column and the protection box can be synchronously connected through the first thread and the second thread and the first cavity and the second cavity matched therewith, thereby improving the convenience of device installation.

[0017] Preferably, a blocking cover is provided at the rear of the connecting block, and the length of the L-shaped observation column is the same as the length from the blocking cover to the center point of the protective box.

[0018] In the utility model, by setting the barrier cover, the rear position of the L-shaped observation column can be limited, thereby ensuring that the end of the L-shaped observation column is located in the center of the front and rear direction of the protective box, further improving the accuracy of the installation of the L-shaped observation column inside the protective box.

[0019] Preferably, a hollow block is provided at the cover of the protection box, a cavity is formed in the middle of the hollow block, and the surface of the hollow block is made of transparent material. A concave groove is provided in the middle of the hollow block, and a rolling ball is placed in the concave groove.

[0020] In the utility model, the arrangement of the sphere allows a deviation warning to be issued when the device is pre-installed, thereby improving the accuracy of the overall installation of the protection box.

[0021] Preferably, the bottom of the concave groove is higher than or equal to one quarter of the diameter of the sphere.

[0022] In the utility model, the ball can be fixed in the middle of the hollow block by the concave groove during installation, and the acceptable offset error during the installation process will not trigger the ball, so it is convenient to adjust it while ensuring the installation accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the overall protection box in Example 1;

[0024] Figure 2 This is a schematic diagram of an exploded view of the device in Example 1;

[0025] Figure 3 is a schematic diagram of a side cross-sectional view of the protection box in Example 1;

[0026] Figure 4 For Example 1 Figure 3 The enlarged schematic diagram at A in the middle;

[0027] Figure 5 This is a schematic diagram of the connecting block in Example 1.

[0028] The parts indicated by the numbers in the accompanying drawings are as follows:

[0029] 100, protective box; 110, hollow block; 210, L-shaped observation column; 220, connecting block; 230, supporting block; 240, first thread; 250, second thread; 260, sliding groove; 410, concave groove; 420, sphere; 510, first cavity; 520, second cavity; 530, barrier cover. DETAILED DESCRIPTION

[0030] In order to further understand the content of the utility model, the utility model is described in detail in conjunction with the accompanying drawings and embodiments. It should be understood that the embodiments are only used to explain the utility model but not to limit it.

[0031] Example 1

[0032] like Figure 1-2 As shown, this embodiment provides a foundation settlement detection device, which includes a protective box 100, on which a sliding groove 260 and a support block 230 are provided, an L-shaped observation column 210 is movably connected to the sliding groove 260, and the L-shaped observation column 210 is provided with a connecting block 220; the connecting block 220 integrates the L-shaped observation column 210 with the protective box 100 through the support block 230.

[0033] In this embodiment, the L-shaped observation column 210 is placed on the upper part of the support block 230, and slides into the cavity of the protective box 100 through the sliding groove 260, and the rear part of the L-shaped observation column 210 is aligned with the support block 230, and then the L-shaped observation column 210 is integrated through the connecting block 220. When the settlement monitoring point needs to be installed, the connecting block 220 is directly embedded in the preset installation hole, so that the protective box 100 and the L-shaped observation column 210 are installed simultaneously, thereby reducing the time required for the overall installation.

[0034] Combination Figure 1 , Figure 2 and Figure 5 As shown, in this embodiment, the height of the sliding groove 260 is the same as the length of the highest point of the L-shaped observation column 210, the width of the sliding groove 260 is consistent with the diameter of the cylindrical surface formed by the L-shaped observation column 210, and the length of the L-shaped observation column 210 is the same as the length from the blocking cover 530 to the center point of the protective box 100.

[0035] In this embodiment, the L-shaped observation column 210 is placed inside the protective box 100. The sliding groove 260 can ensure that the L-shaped observation column 210 is placed in the left and right center parts of the protective box 100. At the same time, the L-shaped observation column 210 is perpendicular to the top of the protective box 100. During installation, the rear part of the L-shaped observation column 210 is aligned with the support block 230. The protruding end point of the L-shaped observation column 210 will be located in the middle of the protective box 100 in the up and down direction. Through double positioning, the L-shaped observation column 210 is fixed in the center part of the overall space of the protective box 100.

[0036] Combination Figure 2 , Figure 3 and Figure 5 As shown, in this embodiment, a first cavity 510 and a second cavity 520 are provided inside the connecting block 220, the first cavity 510 is located in front of the second cavity 520, the inner wall diameter of the first cavity 510 is larger than the inner wall diameter of the second cavity 520, thread grooves are provided inside the first cavity 510 and the second cavity 520, a first thread 240 is provided at the lower part of the support block 230, a second thread 250 is provided at the rear part of the L-shaped observation column 210, the diameter of the first thread 240 is larger than the diameter of the second thread 250, the first cavity 510 and the first thread 240 fit together, the second thread 250 and the second cavity 520 fit together, a blocking cover 530 is provided at the rear part of the connecting block 220, and a plurality of edges and corners are provided on the outside of the connecting block 220, and the angles between the edges and corners are the same.

[0037] After the L-shaped observation column 210 in this embodiment is placed in the protective box 100, the bottom of the L-shaped observation column 210 and the support block 230 are on the same plane, and the connecting block 220 is inserted into the rear part of the support block 230. Since the inner wall of the first cavity 510 is larger than the second thread 250, the first cavity 510 does not contact the second cavity 520. The first cavity 510 will be connected to the first thread 240 on the support block 230, and the thread groove on the second cavity 520 is connected to the second thread 250, so that the protective box 100 and the L-shaped observation column 210 are fixed to each other. After the second thread 250 on the L-shaped observation column 210 completely enters the second cavity 520, the blocking cover 530 will limit the second thread 250 to ensure that it is in the connecting block 220. The connecting block 220 is placed in the preset hole. Compared with the traditional cylindrical mounting surface, the external edges and corners of the connecting block 220 fit better with the cement, and the connection is more stable when measuring the building.

[0038] Combination Figure 2-4 As shown, a hollow block 110 is provided at the cover of the protective box 100, a cavity is formed in the middle of the hollow block 110, and the surface of the hollow block 110 is made of transparent material. A concave groove 410 is provided in the middle of the hollow block 110, and a rolling ball 420 is placed in the concave groove 410, and the bottom of the concave groove 410 is higher than or equal to one-quarter of the diameter of the ball 420.

[0039] In the present embodiment, when aligning the protective box 100 and the preset hole for installation, the installer can judge the deviation of the installation direction of the protective box 100 by observing the movement of the sphere 420 on the surface of the hollow block 110, so as to improve the accuracy of the installation angle of the protective box 100. At the same time, the L-shaped observation column 210 fixed inside it improves the installation accuracy. The concave groove 410 can fix the sphere 420 in the middle of the hollow block 110 during installation. The acceptable deviation error during the installation process will not trigger the sphere 420, so it is convenient to adjust it while ensuring the installation accuracy.

[0040] In short, the above is only a preferred embodiment of the present utility model, and all equivalent changes and modifications made according to the scope of the patent application of the present utility model should fall within the scope of the present utility model patent.

Claims

1. A foundation settlement detection device, characterized in that: The protective box (100) comprises a sliding groove (260) and a supporting block (230) provided on the protective box (100); an L-shaped observation column (210) is movably connected to the sliding groove (260); and a connecting block (220) is provided on the L-shaped observation column (210); The connection block (220) integrally connects the L-shaped observation column (210) and the protection box (100) via the support block (230).

2. A foundation settlement detection device according to claim 1, characterized in that: The height of the sliding groove (260) is the same as the length of the highest point of the L-shaped observation column (210), and the width of the sliding groove (260) is consistent with the diameter of the cylindrical surface formed by the L-shaped observation column (210).

3. A foundation settlement detection device according to claim 1, characterized in that: The connection block (220) is provided with a plurality of edges and corners on the outside, and the angles between the edges and corners are the same.

4. A foundation settlement detection device according to claim 1, characterized in that: A first cavity (510) and a second cavity (520) are provided inside the connection block (220); the first cavity (510) is located in front of the second cavity (520); and the inner wall diameter of the first cavity (510) is greater than the inner wall diameter of the second cavity (520).

5. A foundation settlement detection device according to claim 1 or 4, characterized in that: The first cavity (510) and the second cavity (520) are both provided with thread grooves, the lower part of the support block (230) is provided with a first thread (240), the rear part of the L-shaped observation column (210) is provided with a second thread (250), the diameter of the first thread (240) is greater than the diameter of the second thread (250), the first cavity (510) and the first thread (240) are mutually matched, and the second thread (250) and the second cavity (520) are mutually matched.

6. A foundation settlement detection device according to claim 1, characterized in that: A blocking cover (530) is disposed at the rear of the connection block (220), and the length of the L-shaped observation column (210) is the same as the length from the blocking cover (530) to the center point of the protection box (100).

7. A foundation settlement detection device according to claim 1, characterized in that: A hollow block (110) is arranged at the cover of the protection box (100), a cavity is formed in the middle of the hollow block (110), and the surface of the hollow block (110) is made of a transparent material. A concave groove (410) is arranged in the middle of the hollow block (110), and a rolling ball (420) is placed in the concave groove (410).

8. A foundation settlement detection device according to claim 7, characterized in that: The bottom of the concave groove (410) is higher than or equal to one quarter of the diameter of the sphere (420).