Tool for measuring and sampling top surface of pile foundation construction concrete

By designing pile foundation construction tools made of galvanized steel, using scale lines, slurry unloading holes and cleaning rings, the problems of inaccurate measurement of the top elevation of concrete piles in foundation pit projects and inconvenient sampling are solved, achieving more accurate and convenient measurement and sampling process.

CN222070199UActive Publication Date: 2024-11-26SHANGHAI BAOYE GRP CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420317288.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-20
Publication Date
2024-11-26
Estimated Expiration
2034-02-20

AI Technical Summary

Technical Problem

During the construction of foundation pit projects, the existing measuring tools are inaccurate in measuring the elevation of the concrete pile top surface due to the small weight of the measuring rope and the large buoyancy of the mud, and are inconvenient to sample.

Method used

A tool including a sampling cylinder and a sampling rod is designed. The sampling cylinder is connected to the bottom of the sampling rod, equipped with a scale mark and a slurry relief hole, and is equipped with a check plate and a sealing ring. The sampling rod is equipped with a cleaning ring, and the material is Galvanized steel pipe.

Benefits of technology

It reduces the influence of external factors, ensures the accuracy of readings, is easy to operate, and can sample during measurement. It only needs to be cleaned after use, improving the accuracy and practicality of the measurement tool.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222070199U_ABST
    Figure CN222070199U_ABST
Patent Text Reader

Abstract

The utility model provides a tool for measuring and sampling a pile foundation construction concrete top surface, which comprises a sampling barrel and a sampling rod, the sampling barrel is connected to the bottom of the sampling rod, a plurality of scale marks are arranged along the length of the sampling rod, and a plurality of slurry discharge holes are arranged on the side wall of the sampling barrel. The device is less influenced by external factors, reduces the influence of mud buoyancy and unknown components at the bottom on reading, ensures the accuracy of reading, is an integrated finished product, is convenient to operate, only needs to clean mud after measuring, can sample during measurement, has two purposes, and has very high use value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of engineering measurement equipment, in particular to a tool for measuring and sampling the top surface of concrete in pile foundation construction. Background Art

[0002] At present, in the construction of foundation pit projects, in order to ensure the quality of the project, the pouring of pile foundations needs to be continuously poured and formed in one time, so it is necessary to keep track of the elevation of concrete pouring at all times. In the actual construction process, the elevation of the top surface of the poured concrete piles is usually measured by measuring ropes and other measurement methods. Often, due to the small weight of the measuring rope and the large buoyancy of the mud, the measuring rope will float up and make the measurement inaccurate, and it is also inconvenient to sample the concrete in the filling area. Utility Model Content

[0003] The utility model aims to solve the problem of measuring the elevation of concrete pouring in engineering projects and provides a tool for measuring and sampling the top surface of concrete in pile foundation construction. The tool is highly practical, can be reused, and is more convenient and safe.

[0004] A technical solution to achieve the above purpose is:

[0005] The utility model provides a tool for measuring and sampling the top surface of concrete in pile foundation construction, comprising a sampling tube and a sampling rod, wherein the sampling tube is connected to the bottom of the sampling rod, a plurality of scale lines are arranged along the length of the sampling rod, and a plurality of slurry discharge holes are arranged on the side wall of the sampling tube.

[0006] In an optional embodiment of the utility model, the sampling barrel also includes a check plate, an opening is provided at the bottom of the sampling barrel, a sealing ring is installed at the opening, the check plate can be flipped and installed at the opening, and the check plate has a first state in which it abuts against the top of the sealing ring and closes the opening, and a second state in which it flips upward to open the opening.

[0007] In an optional embodiment of the present utility model, the slurry discharge holes are arranged side by side in sequence from top to bottom on the side wall of the sampling tube.

[0008] In an optional embodiment of the present utility model, a cleaning ring is sleeved on the sampling rod, and the cleaning ring can slide along the length direction of the sampling rod.

[0009] In an optional embodiment of the present utility model, the sampling tube and the sampling rod are both made of galvanized steel pipe.

[0010] The beneficial effects of the utility model are as follows: the device is less affected by external factors, reduces the impact of mud buoyancy and unknown components at the bottom on readings, and ensures the accuracy of readings. The device is an integrated finished product, easy to operate, and only requires cleaning the mud after measuring. Sampling can also be performed during measurement, killing two birds with one stone, and has high use value. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] In order to more clearly illustrate the technical solution of the implementation mode of the present utility model, the drawings required for use in the implementation mode will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0012] Figure 1 It is a schematic diagram of the structure of a tool for measuring and sampling the top surface of concrete in pile foundation construction.

[0013] In the figure: 1-sampling tube; 10-slurry discharge hole; 11-opening; 12-check plate; 13-sealing ring; 2-sampling rod; 20-cleaning ring; 21-scale line. DETAILED DESCRIPTION

[0014] In order to make the purpose, technical solution and advantages of the implementation mode of the present invention clearer, the technical solution in the implementation mode of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the implementation mode of the present invention.

[0015] It should be understood that the terms indicating orientation or positional relationships are based on the orientation or positional relationships shown in the drawings and are only for the convenience of describing the present invention and simplifying the description. They do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, they should not be understood as limitations on the present invention.

[0016] In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0017] like Figure 1As shown, the utility model provides a tool for measuring and sampling the top surface of concrete in pile foundation construction, including a sampling tube 1 and a sampling rod 2. The sampling tube 1 is connected to the bottom of the sampling rod 2. A plurality of scale lines 21 are arranged along the length of the sampling rod 2. The scale lines 21 are usually set to 0.5 meters per grid, and the density of the scale lines 21 can also be increased according to the use needs. The side wall of the sampling tube 1 is provided with a plurality of slurry discharge holes 10. The slurry discharge holes 10 are circular and arranged side by side from top to bottom on the side wall of the sampling tube 1. When measuring and sampling, excess slurry will flow out through the side slurry discharge holes 10, which is convenient for sampling and observing whether it is concrete.

[0018] Furthermore, the sampling barrel 1 further comprises a check plate 12, an opening 11 is provided at the bottom of the sampling barrel 1, a sealing ring 13 is installed at the opening 11, the check plate 12 is reversibly installed at the opening 11, and the check plate 12 has a first state in which the check plate 12 abuts against the top of the sealing ring 13 and closes the opening 11, and a second state in which the check plate 12 is flipped upward to open the opening 11. When the check plate 12 is in the second state, the opening 11 is open, and concrete can enter the sampling barrel 1 through the opening 11, and at the same time, the mud will be squeezed out of the sampling barrel 1 by the concrete. When the sampling barrel 1 is extracted upward, the check plate 12 will return to the first state, the opening 11 will be closed, and the concrete will be taken out.

[0019] A cleaning ring 20 is sleeved on the sampling rod 2, and the cleaning ring 20 can slide along the length direction of the sampling rod 2. In order to avoid data errors, measurements will be performed at different positions of the pile foundation construction concrete. Before each measurement, the cleaning ring 20 can be slid downward to clean off the mud, which is very convenient to use.

[0020] The sampling tube 1 and the sampling rod 2 are both made of galvanized steel pipes, which are low in price, not easy to rust, and can be used repeatedly.

[0021] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may be modified and varied in various ways. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A tool for measuring and sampling the top surface of concrete in pile foundation construction, characterized in that: It comprises a sampling tube and a sampling rod, wherein the sampling tube is connected to the bottom of the sampling rod, a plurality of scale lines are arranged along the length of the sampling rod, and a plurality of slurry discharge holes are arranged on the side wall of the sampling tube; The sampling tube also includes a check plate, an opening is provided at the bottom of the sampling tube, a sealing ring is installed at the opening, the check plate can be flipped and installed at the opening, and the check plate has a first state in which it abuts against the top of the sealing ring and closes the opening, and a second state in which it flips upward to open the opening.

2. A tool for measuring and sampling the top surface of concrete for pile foundation construction according to claim 1, characterized in that: The slurry discharge holes are arranged in parallel from top to bottom on the side wall of the sampling tube.

3. A tool for measuring and sampling the top surface of concrete for pile foundation construction according to claim 2, characterized in that: A cleaning ring is sleeved on the sampling rod, and the cleaning ring can slide along the length direction of the sampling rod.

4. A tool for measuring and sampling the top surface of concrete for pile foundation construction according to claim 1, characterized in that: The sampling tube and the sampling rod are both made of galvanized steel pipe.