Light funnel device for concrete pouring and discharging of bridge anti-collision guardrail
By designing a light funnel device and using the combination of brackets and curved plates, the problems of waste and high-altitude operation risks during concrete discharge during bridge collision guardrail construction are solved, and concrete utilization and safety are improved.
Patent Information
- Application Number
- CN202421073989.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-16
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2034-05-16
AI Technical Summary
In the construction of bridge anti-collision guardrails, waste and high-altitude operation risks are easily caused during concrete discharge, and the existing technology is difficult to effectively solve the problems of low concrete formwork rate and personnel safety.
A light funnel device is designed, including a bracket and a curved plate, forming a flow guide funnel, through the combination of a bracket and a curved plate, providing a discharge port, reducing the scattering of concrete and reducing the risk of high-level operations for personnel.
It improves concrete utilization, reduces losses, and reduces the risk of high-level operations for personnel, simplifies the concrete pouring process, and reduces labor input.
Smart Images

Figure CN222083352U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tobacco equipment, in particular to a light funnel device used for pouring and discharging materials for bridge anti-collision guardrail concrete. Background Art
[0002] With the rapid development of infrastructure projects, various highways and municipal bridges are being built on a large scale. Cast-in-place concrete anti-collision guardrails have been widely used for a long time because of their convenient construction, reliable structure, coordinated appearance and low cost.
[0003] The construction of bridge anti-collision guardrails generally adopts the method of driving concrete tank trucks onto the bridge deck and unloading them directly into the warehouse through the chute. Because the top size of the anti-collision guardrail is relatively small, generally 200 to 250 mm thick, it is difficult for the concrete unloaded directly from the tank truck chute into the warehouse to slide into the formwork. If the concrete is scattered outside the formwork, it will cause concrete waste, bridge deck pollution and the risk of falling objects from heights injuring people.
[0004] In the past, in order to ensure the concrete filling rate, workers usually stood opposite the chute holding the inclined formwork, and the concrete that was poured onto the formwork slid into the formwork along the wooden board. During the pouring process, a worker had to stand on the formwork and hold the wooden board throughout the process, and the risk of people working at heights was high. Due to the low reliability of manual work, concrete often leaked out of the formwork, resulting in concrete waste. Utility Model Content
[0005] The utility model aims to overcome the disadvantages of the prior art and provides a light funnel device for pouring and discharging concrete for bridge anti-collision guardrails.
[0006] The purpose of the utility model is achieved through the following technical solutions: a light funnel device for pouring and unloading concrete for bridge anti-collision guardrails, comprising:
[0007] The bracket is configured as a frame-shaped support frame, including: a horizontal rod, an arc-shaped rod, a vertical rod, a support rod; and a hopper, the hopper includes an arc-shaped plate; and a discharge port;
[0008] Among them, the hopper is set on the bracket, and the discharge port is set in the middle of the hopper; the cross bar is fixedly connected to the top of the arc rod, the two arc rods are fixedly connected by a vertical rod, and a support rod is fixedly connected at the lower part of each arc rod; the arc plate is set as a plate with the same curvature as the arc rod, and the middle opening of the arc plate forms the discharge port.
[0009] Optionally, at least four vertical rods are provided, which are symmetrically arranged at the top and the lower middle part of the arc plate.
[0010] Optionally, the bottom vertical rod is located at the support rod.
[0011] Optionally, a smooth guide plate is provided on the surface of the arc plate.
[0012] Optionally, the bracket is formed by welding and fixing a cross bar, an arc-shaped bar, a vertical bar and a support bar.
[0013] Optionally, the arc-shaped plate is a bellows.
[0014] The utility model has the following advantages: the utility model forms a diversion funnel through a simple bracket and an arc-shaped plate, which can reduce the manual input in the concrete pouring process, reduce the risk of personnel working at heights during the concrete pouring process, and improve the concrete utilization rate and reduce loss. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. It is obvious that the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.
[0016] Figure 1 It is a structural schematic diagram of the utility model.
[0017] Figure 2 It is a top view of the utility model.
[0018] In the figure, the support (1), the hopper (2), the discharge port (3), the curved plate (11), the guide plate (12), the cross bar (21), the curved bar (22), the vertical bar (23), and the support bar (24). DETAILED DESCRIPTION
[0019] In order to make the purpose, technical scheme and advantages of the embodiments of the present invention clearer, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. The components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0020] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present invention.
[0021] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0022] like Figure 1 and Figure 2 A light hopper device for pouring and discharging concrete for bridge anti-collision guardrails shown in the figure comprises: a bracket 1, which is set as a frame-shaped support frame, including: a cross bar 21, an arc-shaped bar 22, a vertical bar 23, and a support bar 24; and a hopper 2, which comprises an arc-shaped plate 11; and a discharge port 3;
[0023] Among them, the hopper 2 is set on the bracket 1, and the discharge port 3 is set in the middle of the hopper 2; the cross bar 21 is fixedly connected to the top of the arc rod 22, the two arc rods 22 are fixedly connected by the vertical rod 23, and a support rod 24 is fixedly connected to the lower part of each arc rod 22; the arc plate 11 is set as a plate with the same curvature as the arc rod 22, and the middle opening of the arc plate 11 forms the discharge port 3.
[0024] In this device, the bracket 1 is fixedly connected at the top by a cross bar 21 and an arc-shaped rod 22 to form a semicircular frame. The two semicircular frames are fixedly connected by a vertical rod 23 to form a trough-shaped frame. A support bracket 1 is formed by setting a support rod 24 at the bottom. The top of the bracket 1 forms a quadrilateral and the bottom is arc-shaped. After the arc-shaped plate 11 is placed on the bracket 1, a supported trough is formed. After a through hole is opened at the bottom as a discharge port 3, a funnel is formed. When in use, the device is clamped on the anti-collision guardrail template at the position to be poured, and the funnel is moved to the next discharge point as the pouring proceeds. During the pouring process, the upper opening size is relatively large. When the concrete tank truck is directly unloaded into the warehouse, the concrete can be concentrated into the guardrail template to prevent the concrete from being scattered outside the template during the pouring process, causing waste, thereby improving the utilization rate of concrete and reducing losses; at the same time, it can be firmly placed on the guardrail template through the external steel skeleton, without the need for personnel to assist in fixing, reducing the risk of personnel working at high altitudes during the pouring process and reducing labor input.
[0025] In one embodiment, at least four vertical rods 23 are provided, which are symmetrically arranged at the top and the lower middle part of the arc-shaped plate 11, so that the arc-shaped plate 11 can be better supported to provide support.
[0026] In one embodiment, the bottom vertical rod 23 is located at the support rod 24, which has better mechanical properties.
[0027] In one embodiment, a smooth guide plate 12 is provided on the surface of the arc plate 11 to facilitate guiding the cement to the point to be poured. The guide plate 12 can be made of a smooth metal plate or a plastic plate.
[0028] In one embodiment, the bracket 1 is welded and fixed by a horizontal rod 21, an arc rod 22, a vertical rod 23, and a support rod 24. These rods can be welded with lightweight materials such as small-diameter steel bars to ensure that the hopper device is light and easy to move on site after assembly.
[0029] In one embodiment, the arc plate 11 is a corrugated tube, specifically a Φ400mm plastic tube of about 60cm in length, which is cut into two halves, and a long strip notch is opened in the middle of the half, the width of the notch is slightly smaller than the width of the top of the anti-collision guardrail to form a discharge port 3.
[0030] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A light funnel device for pouring concrete for bridge anti-collision guardrail, characterized by: include: A support (1), the support (1) being configured as a frame-shaped support frame, comprising: a horizontal rod (21), an arc-shaped rod (22), a vertical rod (23), a support rod (24); and a hopper (2), the hopper (2) comprising an arc-shaped plate (11); and a discharge port (3); The hopper (2) is arranged on the bracket (1), and the discharge port (3) is arranged in the middle of the hopper (2); the cross bar (21) is fixedly connected to the top of the arc-shaped rod (22), the two arc-shaped rods (22) are fixedly connected by the vertical rod (23), and the support rod (24) is fixedly connected to the lower part of each arc-shaped rod (22); the arc-shaped plate (11) is arranged to be a plate with the same curvature as the arc-shaped rod (22), and the middle opening of the arc-shaped plate (11) forms the discharge port (3).
2. A light funnel device for pouring and unloading concrete for bridge anti-collision guardrail according to claim 1, characterized in that: At least four vertical rods (23) are provided, and are symmetrically arranged at the top and the lower middle part of the arc-shaped plate (11).
3. A light funnel device for pouring and unloading concrete for bridge anti-collision guardrail according to claim 2, characterized in that: The vertical rod (23) at the bottom is located at the supporting rod (24).
4. A light funnel device for pouring and unloading concrete for bridge anti-collision guardrail according to claim 1, characterized in that: A smooth guide plate (12) is arranged on the surface of the arc-shaped plate (11).
5. A light funnel device for pouring and unloading concrete for bridge anti-collision guardrail according to claim 1, characterized in that: The bracket (1) is formed by welding and fixing a cross bar (21), an arc-shaped bar (22), a vertical bar (23) and a supporting bar (24).
6. A light funnel device for pouring and unloading concrete for bridge anti-collision guardrail according to claim 1, characterized in that: The arc-shaped plate (11) is a corrugated tube.